MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB



Similar documents
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT

Transportation Management Plan Template

Draft Transportation Management Plan for Via Verdi Repair Project

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN

Lane Shutdowns and Mobile Operations

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL

Transportation Management Plan Overview. Module 3

REQUEST FOR PROPOSALS

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

Idaho Transportation Department. Work Zone Safety and Mobility Program

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments

Guidelines. Work Zone Access and Egress

Table of Contents. Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7

Traffic Incident Management Enhancement (TIME) Blueprint Version 2.0 Executive Summary

Traffic controllers and speed zones

DESCRIPTION OF WORK:

Activity Report for FY 2010 Real-time Traffic Signal Adjustments

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)

Massachusetts Department of Transportation, Highway Division Ten Park Plaza, Boston, MA A Guide on Traffic Analysis Tools

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts

Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

Guide to the Preparation of a Traffic Management Plan

Montana Department Transportation

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

Chapter Thirteen WORK ZONE TRANSPORTATION MANAGEMENT PLANS BUREAU OF DESIGN AND ENVIRONMENT MANUAL

3 Tappan Zee Bridge Rehabilitation Options

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Appendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation

TOURIST ATTRACTION SIGNS GENERAL INFORMATION & APPLICATION

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

AIR QUALITY TECHNICAL MEMORANDUM

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Belmont Street Bridge Rehabilitation Project

CITY OF SUN PRAIRIE NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM

Design-Build Process for Project Managers

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

STATEWIDE ITS ASSETS 1

MOVING FORWARD: TRAFFIC OPERATIONS AND SAFETY RESEARCH

Construction Traffic Management Plan

Boston University Bridge Rehabilitation Project. June 30, :30-8 p.m. Boston University Photonics Center

Sign Combo Permit Application For a Development and Building Permit for Permanent Signs

Traffic Management Guidelines

SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT

FHWA Emergency Relief (FHWA-ER) Training

Work Breakdown Structure Element Dictionary Construction

Montana Department Transportation

Contra Costa Community College District Business Procedure PARKING AND TRAFFIC REGULATIONS

Alternatives Presentation Meeting Middlebury WCRS(23)

May 29, Ongoing Flood Damages to County Federal-aid Routes

Traffic Management During Construction

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

Goals & Objectives. Chapter 9. Transportation

Scope. General. General. Accident Investigation. Public Hazard Control 10/15/2012

Policies & Procedures

Central Regional Traffic Management Center

All Electronic Tolling System (AETS) Implementation Project

OM-13: Transportation Management and Operations

Appendix J Transportation Management Plan Report. Traffic Operational Analysis Report

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES & OPERATIONS IN SCHOOL AREAS

Route Development Plan

LOCATION AND DESIGN DIVISION

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

Temporary Traffic Management

Congestion Management Systems: A Federal Perspective. 7 Key CMS Components

Special Specification 6033 Computerized Transportation Management System

PREFACE. Any interpretation or clarification regarding the City of Dallas Traffic Barricade Manual shall be made by the City s Traffic Engineer.

RESOLUTION NO

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

7.2 Warrants and Planning Considerations

TRANSPORTATION MANAGEMENT PLAN NOTES

CHAPTER 2 GENERAL SAFETY REQUIREMENTS

PRIVATELY OPERATED TOURIST INFORMATION CENTER SIGNS GENERAL INFORMATION & APPLICATION

Developing and Implementing Mobility Management in Oregon. W.D. Baldwin OBDP/HDR TCM 2008 Orlando, Florida

CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

Massachusetts Department of Transportation Highway Division A 2014 Synthesis; the Status of Intelligent Transportation Systems Deployment April 2014

RIGHT OF WAY ACTIVITY APPLICATION FOR OUTDOOR PATIOS ON MUNICIPAL PROPERTY IN THE CITY CENTRE

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

City of Columbus, Ohio Department of Public Safety Division of Police February 2006

TMC Pooled Fund Study Quarterly Progress Report

5 ALTERNATIVE SOLUTIONS AND EVALUATION

UNIVERSITY AND COLLEGE SIGN GENERAL INFORMATION AND APPLICATION

Topic 2 11/28/2012 Blocks & Street Network

Guidelines for Developing Traffic Incident Management Plans for Work Zones

CONSTRUCTION COST ESTIMATES

Office of Outdoor Advertising Public Meeting

COLUMBIA COUNTY HIGHWAY INCIDENT MANAGEMENT PLAN Adopted April 2008

The Corporation of the TOWN OF MILTON

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

Policy for the Design and Operation of Closed-Circuit Television (CCTV) in Advanced Traffic Management Systems September 4, 2001

Transcription:

MassDOT s Work Zone Transportation Management Procedures By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB

What is the Work Zone Safety and Mobility Rule? 23 CFR 630 Subpart J, effective October 2007 Requires Clear and Comprehensive Process for evaluating and mitigating the impacts of construction work zones Provide safe work zones for all workers and road users while also providing for the highest level of mobility Define the evaluation techniques to be used during the planning, design, and construction phases of a project

MassDOT Philosophy Keep what is already working in place Evaluate project impacts and define requirements accordingly Encourage consultant MassDOT collaboration early on in design process MassDOT (former MassHighway) submitted letter to FHWA that documented existing procedures, directives and specifications that meet the intent of the Work Zone Safety and Mobility Rule (September 2007)

What is a TMP? The Traffic Management Plan (TMP) may consist of many different components depending on the level of impact: Construction Management Outline (CMO) Temporary Traffic Control Plan (TTCP) Public Informational Plan (PIP) ITS Monitoring Plan (IMP)

Construction Management Outline The CMO is a text narrative developed at the 25% design stage detailing the proposed traffic management plan The CMO covers all lane closures, pedestrian route impacts, detours, etc. needed to complete each component of a construction project The narrative may include plan sketches and/or references to the required temporary traffic control plans as necessary to convey the design engineer s intent A CMO is required for Roadway, Bridge and Intersection projects, as well as Private Development/Permit projects

Temporary Traffic Control Plans The TTCP is all of the temporary traffic control plans or details that describe how traffic will be maintained during construction The TTCP depicts the number and width of travel lanes to be maintained and any proposed detour routes TTCPs detail all the required signs, pavement markings, temporary traffic control devices and changeable message signs to be used as part of the work

Temporary Traffic Control Plans Site specific TTCP designs or special details must be stamped by a Massachusetts PE Specific TTCPs shall be developed for areas of special concern including: Areas where intersections are spaced less than 1000 feet apart Areas of insufficient horizontal sight distance Areas of insufficient vertical sight distance Abutter access points spaced less than 50 feet apart Vehicular, Pedestrian and Bicycle route closure and detour Work within intersections Traffic impacts to remain for 24 hours or more Traffic impacts to remain through a peak traffic period

Public Informational Plan The PIP shall consist of a text description or plan with notations describing what mechanisms shall be employed to notify the general public of upcoming construction work and the associated impact the work is expected to have on the public way The plan may incorporate the following notification methods: MassDOT Roadway Work Notification Form posting Changeable Message Signs (CMS) notifications (permanent or portable) MassDOT Website(s) Posting Press Release(s) (newspapers, radio, television) Special Projects Website HOC posting on existing DMS or other electronic media

ITS Monitoring Plan The Intelligent Transportation Systems (ITS) Monitoring Plan (IMP) may consist of the following based on the expected project duration, complexity, and traffic volume information : Microwave Monitoring Systems Closed Circuit Television (CCTV) Monitoring Systems Highway Advisory Radio (HAR) Systems Changeable Message Signs (CMS) notifications (permanent or portable) Queue Detection Systems

Project Impact Categorization Criteria Each project will be categorized into one of four impact levels using the following evaluation criteria: Posted speed Impacts to the public way based on the proposed construction staging Anticipated duration of construction Anticipated impacts to high traffic volume generators and adjacent abutting property access

Impact Level 1 Impact Designation Minimal or no traffic delays due to the Temporary Traffic Control Plan (TTCP) (i.e. off road work, shoulder work, no impact to public way) No bicycle or pedestrian impacts Potential Action/Submittal MassDOT Roadway Work Notification Form (RWF) for each specific activity/traffic setup Construction Management Outline (CMO) Typical Detail Figures per MassDOT TTCP Manual or TTCP from Contract Documents Public Informational Plan (PIP)

Impact Level 2 Impact Designation Possible traffic delays and impacts but impact greatly reduced or eliminated by restrictive work schedule (off peak hours) Posted speed 40 mph or less No roadway closures Maintain a minimum of 1 lane of traffic in each direction of travel at all times Changes in pedestrian or bicycle routes or widths Mobile/moving operations Potential Action/Submittal MassDOT Roadway Work Notification Form (RWF) for each specific activity/traffic setup Construction Management Outline (CMO) Typical Detail Figure (s) per MassDOT TTCP Manual TTCP from Contract Documents Contractor Designed TTCP Public Informational Plan (PIP)

Impact Level 3 Impact Designation Inevitable/unavoidable traffic delays and impacts categorized as low to medium Posted speed greater than 40 mph Peak Hour Roadway Impacts Partial road closure (alternating traffic). Roadway closures with detours Work in areas where signalized intersections are spaced less than 1000 apart Contra flow or traffic diversions to Temp Roadways Multiple Lane Closures Work on Freeways; Interstate Highways or Turnpikes Bridge Maintenance Impact Designation (continued) Temporary Traffic Signals Blasting Potential Action/Submittal MassDOT Roadway Work Notification Form (RWF) for each specific activity/traffic setup Construction Management Outline (CMO) Typical Detail Figure (s) per MassDOT TTCP Manual Contractor Designed TTCP TTCP from Contract Documents ITS Monitoring Plan (IMP) Public Informational Plan (PIP)

Impact Level 4 Impact Designation Significant Project Classification Inevitable/unavoidable traffic delays and impacts categorized as medium to high Reduction in roadway capacity for 24 hours or more during peak traffic periods Projects meeting Significant Project Status Criteria Potential Action/Submittal MassDOT Roadway Work Notification Form (RWF) for each specific activity/traffic setup Construction Management Outline (CMO) Contract Temporary Traffic Control Plan (TTCP) detailing travel ways, work areas, abutter access etc for each stage of construction stamped by P.E. registered in MA and qualified in specific field of responsibility (Civil, Traffic, Structural) ITS Monitoring Plan (IMP) Public Informational Plan (PIP)

Types of Projects Roadway, Bridge and Intersection Construction Metropolitan Highway System (MHS) Roadways Roadway Maintenance Utility Repair and Construction Private Development/Permit Project Construction

Roadway, Bridge and Intersection Construction TMP development for traditional MassDOT construction projects will begin during the preliminary engineering stage (25% design) The CMO will be developed at that level and carry through each subsequent design stage When necessary, the consultant shall develop conceptual staging plans for review by MassDOT prior to advancing to the Construction Staging Plan at 25% design MassDOT project flow chart has been updated to reflect the new TMP development process

Metropolitan Highway System The MHS consists of the following roadways: Boston Metropolitan Tunnels, Ramps and Frontage Roads, including the Tobin Bridge I-93 Northern Section - from the Tip O Neill Tunnel to Exit 30 in Somerville I-93 Southern Section - Southeast Expressway from the Tip O Neill Tunnel to I-95 in Canton Specific MHS Requirements: TMPs for any work on the MHS must be reviewed and approved by the MassDOT District 6 Office Access Work Requests (AWR), permits to access the MHS, must be obtained through the MassDOT District 6 Permits Office for any work on the MHS Work will be scheduled at weekly Work Access Meetings at Dist. 6

Roadway Maintenance Requirements: Completed MassDOT Roadway Work Notification (RWF) Form Copies of the appropriate Temporary Traffic Control figure(s) or contract documents in accordance with MassDOT RWF procedures Work hours will be as approved by the MassDOT District Office

Utility Repair / Construction Requirements: Utility work on State Highway requires an Access Permit through the District Office TTC Plans approved through permit process TMP for utility construction or repair projects will be reviewed by the MassDOT District Office and MassDOT Boston dependent on roadway classification and impact level designation Utility/Contractor will need to provide a RWF for approval by District Office NOTE: Utility work that is required as part of MassDOT construction project will be exempt from the access permit approval process

Private Development/Permit Requirements: Project Construction The Proponent s Representative (construction manager, engineer of record, etc.) shall be responsible for submitting the completed MassDOT Roadway Work Notification Form to the District Permit Engineer in accordance with MassDOT RWF procedures The Proponent s Representative shall verify that the setup has been erected in accordance with the approved plans MassDOT District Personnel shall conduct field inspections to ensure compliance with approved TTC plans

Available Lane Capacity Analysis Roadway capacity, delay and potential length of queue shall be evaluated based on the speed, character of the roadway and number of impacted lanes The Measured Average Work Zone Capacities table from the MassDOT TTCP Manual shall be used to evaluate the potential impact due to proposed construction conditions on the MHS, a limited access roadway or high speed roadways with multiple lanes Using ATR data the designer must demonstrate that there is sufficient capacity available on the roadway to support the volumes during planned working hours based on the # of lanes to be maintained Should a case arise where planned construction and work hours will impact traffic and backups are expected, the designer shall quantify the backups using the MassDOT Queue Analysis Spreadsheet SYNCHRO shall be used to evaluate operations for any project where the proposed work would impact operations at an intersection

Process Review FHWA recommends periodic evaluation of work zone policies, processes, and procedures to continually address and manage the safety and mobility impacts of work zones There are four key measures of work zone performance that MassDOT will focus on: Safety Mobility Construction efficiency and effectiveness Public perception and satisfaction

Temporary Traffic Control Devices To further emphasize the focus of 23 CFR 630 Subpart J, FHWA released the Final Rule on Temporary Traffic Control Devices in December 2007 This Rule supplements FHWA's regulation that governs work zone safety and mobility in highway and street work zones to include conditions for the following: Appropriate use of, and expenditure of funds for, uniformed law enforcement officers Positive protective measures between workers and motorized traffic Installation and maintenance of temporary traffic control devices during construction, utility, and maintenance operations

MassDOT Compliance with Subpart K MassDOT is developing guidelines for the use of barrier/channelization devices within the work zone Separate pay items are provided for major categories of traffic control devices, safety features, and work zone safety activities MassDOT has adopted the American Traffic Safety Services Association (ATSSA) Quality Standards for Temporary Traffic Control Devices for reviewing and determining acceptable, marginal, and unacceptable TTC devices

Thank You! Michael R. Sutton, P.E. Project Engineer Office: 617.924.1770 x1147 Email: msutton@vhb.com Neil E. Boudreau State Traffic Engineer Office: 617-973-8211 Email: neil.boudreau@state.ma.us