A Deeper Look into Switchgear and Switchboards



Similar documents
Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS

Secondary Unit Substations

Engineering Series Ratings: Is It Practical?

Primary and Secondary Electrical Distribution Systems

Fusible Disconnect Switch

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

Section 9: Power Distribution Equipment Bill Brown, P.E., Square D Engineering Services

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

Alternate Methods to Short Circuit Breaker Coordination

How To Choose A Transformer

Eaton Electrical Inc Cherrington Parkway Moon Township, PA United States tel:

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application

Type-Tested Power Distribution Board 8PT with Rear Busbars. sivacon

STANDARDS AND RATINGS FOR THE APPLICATION OF MOLDED CASE, INSULATED CASE, AND POWER CIRCUIT BREAKERS

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

A Comparison of Contemporary Electrical Distribution Equipment Standards. San Francisco IEEE Industry Applications Society May 26, 2009

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

Mission Critical Data Center Systems

Electronic Trip Circuit Breaker Basics Circuit Breaker Application Guide Class 0600

HVL 5 38 kv Load Interrupter Switchgear. The Standard for Performance, Protection and Dependability

Reliability requires consulting engineers and end users to grasp design, maintenance basics. By Reza Tajali, P.E. Square D Power Systems Engineering

New SACE Emax 2 for UL 1066 From Circuit Breaker to Power Manager

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV

Unit substation solutions with type SIMOSEC primary switches quick reference guide E50001-F710-A389-X-4A00. Answers for energy.

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS

misconceptions about arc-flash hazard assessments

Arc Flash Hazards. Electrical Hazards. Dan Neeser Field Application Engineer Electrical Hazards 2/18/2015. Shock.

Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves

Spectra Series Switchboards

Eaton Automatic Transfer Switches

Franco Vecchiato, SAM LPBS Regional Manager New SACE Emax 2 From Circuit-breaker to Power Manager

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED

Extend the Life of Existing Switchgear

Learning Module 13: Panelboards and Switchboards. 101 Basic Series

Sentron Series Circuit Breakers

How To Test A Power Switch On A Power Supply

Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems

Bypass transfer switch mechanisms

Modis 25/32. Modular Switchboard Solution

Switchgear and Metal-Enclosed Bus

Guidelines on the Short Circuit Current Rating for Industrial Control Panels

Choosing the Best Solution for Reducing Arc Energy

101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer

Atlanta Chapter IEEE Industry Applications Society

How to reduce exposure to arc flash hazards

Short Circuit Current Calculations

Engineers Edge, LLC PDH & Professional Training

The Application of Circuit Breakers to Reduce Downtime in Datacentres

SIVACON The Versatile Low-Voltage Switchboard

Part 1 System Modeling & Studies for Existing Systems

Low Voltage Switchboards The Best Technical Solution for Your Ship

SWITCHGEAR. EGP Switchgear

Circuit Breakers. Next Generation of Protection Capabilities

INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002

Overcurrent Protection

Low Voltage Switchgear

Data Bulletin. Circuit Breaker Characteristic Trip Curves and Coordination Class 0600 TRIP CURVES AND COORDINATION CIRCUIT BREAKER TRIP CURVES

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

Switchgear Capabilities. NexGear is a Division of PowerSecure NASDAQ: POWR

Introduction. Upon completion of Basics of Switchboards you should be able to: Explain the role of switchboards in a distribution system

Arc Flash Mitigation & Selective Co-ordination

Power Management Module 2. Installation

METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast.

Tmax MCCBs. Molded case circuit breakers. Tmax

P System Cubicles. Certified for more safety

QUESTIONS and ANSWERS RFB , Metal Clad Switchgear and Power Control Room

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

SIVACON Low Voltage Switchboard

Bolted contact switches. Pringle switches

Medium Voltage Products. ZN1 12 kv arc-proof air-insulated switchgear for primary distribution

Switchboards. Section BuyLog Catalog 12-1

UL 508A Industrial Control Panels Power Distribution and Control. Lunch & Learn Training Eaton Corporation. All rights reserved.

Understanding Arc Flash

Safety By Design. Strategies for Electrical Contractors

Modular Systems, PPMV, 2014 UniPack-G Glass Fiber Reinforced Polyester Compact Secondary Substation

Fault Characteristics in Electrical Equipment

CAT ATC POWER BREAKER & POWER CASE SWITCH AUTOMATIC TRANSFER SWITCH

UniGear ZS1. Medium voltage, arc proof, air insulated switchgear for primary distribution

Dimensions, Inches (mm) No. of Poles Width Height Depth 2, (210) 16 (407) 5.5 (140) (283) 16 (407) 5.5 (140)

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

The power distribution board that sets new standards

Medium Voltage Motor Control Assemblies

Commercial/Industrial Electricity

Spending too much to maintain aging switchgear? Circuit breaker solutions from Square D Services.

Chapter 1. Network Structures

Securing your electrical installations Prisma,

CONDUCTOR SHORT-CIRCUIT PROTECTION

SWITCHGEAR Section 16. SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less.

Engineering innovation

Power System Selectivity: The Basics of Protective Coordination

Safe and secure distribution of medium voltage with AX1

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

Increasing safety, reliability and efficiency for today s data centers

IEC >>> IEC GUIDE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

ZONE SELECTIVE INTERLOCKING (ZSI) APPLICATION AND TESTING GUIDE SIEMENS WL UL489 AND UL1066 AIR CIRCUIT BREAKERS

Low voltage Direct Current Network. Compact NSX DC PV. Circuit breakers and switch disconnectors for solar application.

3.0 CHARACTERISTICS. AR Auxiliary Relay High Speed, High Threshold C

Transcription:

by Morris Kornblit and Dennis Balickie, GE Systems Engineers Assistance by Vicent Incorvati, Sales Engineer Everything is relative and depends on perspective. Like the half empty, half full parable, the same application could be seen by one as providing a need for switchgear, and by another for a switchboard. This article will delve into that world of uncertainty and attempt to straighten it out just a little. I. Switchgear Vs Switchboards Our first target will be the common anxiety of whether to apply switchgear or switchboards. It seems intuitive that switchgear is larger and more expensive but more reliable than switchboards. In order to transition from the intuitive to the real world we established five application case conditions to be compared for analysis. The results are outlined in Table 1. Though this relatively small basis of analysis does not claim to be statistically precise, it was structured towards maintaining a fair comparison. The system configurations are detailed in the table and its notes. To maintain a common field of reference between the two types of equipment we kept the main the same in each (WavePro, drawout) and all the feeders sized at 800A (WP individually-mounted in the switchgear; Molded-case group-mounted in the switchboards). We investigated V as well as V systems and main bus capacity sizes varying from to 4000 amperes. Though actual costs are not shown, net results are represented on a per-unit basis, at a multiple of the lowest item of reference within its grouping. The results are in line with expectations and indicate that, for the cases surveyed, switchgear costs anywhere from to 100% more than its counterpart in group-mounted switchboards. This naturally begs the question of value returned for the added cost of switchgear. The best source of reference to investigate this matter is IEEE-493-1990 (The Gold Book, Ref 1). Based on extensive failure data evaluations, Table 10, Chapter 3 of that standard, summarizes the statistical failure rate per unit-year of a variety of power system equipment. Though switchgear is not directly compared to switchboards, fixed low-voltage breakers (600V and below, including molded case), as used in group-mounted applications like switchboards, can be compared to low voltage metalclad drawout type breakers, as used in switchgear. The failure rate of switchboards is approximately 156% of switchgear, with an average downtime of four hours per occurrence. Though the basis of the data is historic, the writers believe it is a valid reflection on the production and design philosophies of each product. Molded case protective devices are intended to meet a market need as economically as possible. Steel framed switchgear was developed for those applications that require reliability and continuity of service. When the above statistics are combined with the anticipated per-event power outage costs for various industries (commercial = $2,299; industrial = $61,710; institutional = $53,455; Ref 2), it is clear why applications concerned with reliability and safety would design around switchgear. Elimination of one failure event within the lifetime of the gear more than provides payback for the increased initial investment. Page 1 of 5

Yet IEEE-493 also demonstrates that failures occur on a much more frequent basis than that, dependent on environment, maintenance and duration of use. The added features built into the equipment, such as 30 cycle short time withstand rating on the bus, high short time ratings on circuit breakers, drawout construction, and full maintainability, simply become added benefits to the owner. They facilitate up-stream and down-stream coordination, the ability to extend the life and service the breakers without need for a bus outage, as well as increased life expectancy of the gear. A surprising result in Table 1 is the floor space requirements for each type of equipment. Conventional wisdom would anticipate switchboards to always be significantly smaller than switchgear. These results indicate otherwise. They are effectively comparable for the cases modeled. This is due to the main protective device selected, which plays a significant factor in the footprint of the gear and whether it requires rear access. As a rule-of thumb, any gear depth greater than 45 typically requires rear access and rear working clearances in accordance with NEC 110.26. Had an insulated case main breaker been specified, the 4000A main section dimension could have been reduced to 45 from. Even so, it is noteworthy that the group-mounted switchboard lineups remain wider in most cases, and significantly so (62% longer) for some. The lesson to be learned is the importance of properly selecting frame sizes in order to optimize footprint. For example, an 800A rated breaker utilizes the same frame size as a 1200A breaker. Both therefore require the same height spacing and must be single-mounted in a 40 wide enclosure. A 600A breaker, however, can reduce that height spacing by 33% and may be double-width mounted in the same size enclosure. Therefore, in restricted switchboard locations, there is a definite advantage in applying more 600A rather than 800A breakers, or fewer 1200A rather than 800A feeders to downstream sub-distribution panels. More such details can be investigated in the switchboard application publication GET-8032, and DET-196 for switchgear. II. Switchboard Functionality Switchboards certainly represent the most widely used low-voltage sub-distribution equipment yet there appears to be significant confusion about many of its capabilities and when to most effectively use them. Table 2 has been prepared as a tool to help shed some clarity on a number of the most commonly raised questions. Table 2 incorporates the results of twenty-six application case conditions, with variations in switchboard design, which were modeled for analysis. These cases are grouped into five substation sizes ranging from to kva (three at V, two at V), each with its resulting short-circuit and continuous current levels defined. Each grouping consists of five case conditions, except the first group, which has six. All cases have been selected to be fairly typical so that the results may be most widely applicable. Each case condition was evaluated as a switchboard design based on slight variations in its make-up specification, then priced and sized. The resulting costs and sizes were per-unitized (PU) on the basis of its substation grouping, as done in Table 1, so the data could be quickly evaluated. It must be understood that these case conditions are only representative for this evaluation. Each application should be evaluated with its unique design requirements taken into account. Fuses Vs Breakers Page 2 of 5

A common question raised is whether to apply fuses or breakers. For the cases evaluated, breakers have the clear cost and size advantage. The size advantage is significantly in favor of switchboards using breakers. Fused switchboards are shown to be anywhere from 143% to 213% larger. A sub-category is evaluated for fused switchboards that include the Bolted Pressure Switch (BPS) versus the High Pressure Contact (HPC) switch. Though both are essentially the same price, the HPC switch is about 16% smaller for these cases. Each is classified as a Fused Power Circuit Device and listed under UL977, but only the HPC incorporates an over-center toggle mechanism with high-energy springs and silver-tungsten carbide alloy butt-type contacts. This construction provides it with higher short-time ratings and faster operating speeds (under 3 cycles!), placing it in a breaker-class of reliability. More information can be found in application publication GET-6205. Bolt-on Vs Plug-in Construction The flexibility of switchboards has been improved to a level where they are now available in either bolt-on or plug-in construction. In the bolt-on design the protective devices are solidly bolted onto the main electrical distribution bus work. The plug-in construction incorporates a removable module to which the protective device is mounted and permits it to clamp onto the main distribution bus. That connection is made with spring reinforced high tension jaw clamps designed to hug the bus even tighter under high fault conditions (ref. DE-168). The major advantage to plug-in construction is a rapid removal of that protective device from the board without a need to unbolt the breaker (or switch) from the main bus. Though a bus outage is required for safety purposes, this feature minimizes that outage time. Table 2 shows this function only adds about 2% to the cost of the board and has no impact on overall gear footprint size. Fully- Or Series-Rated Gear Series-rated gear can provide economy in high short-circuit applications. Such economy was not evident for the short-circuit levels included in the case conditions modeled here. If, however, series-rated equipment had been specified for the project and provided, the equipment and application would be subject to certain restrictions and special labeling and handling requirements as specified in NEC 110.22 and 240.86. The clear lesson to be learned is, if series-rated equipment provides no cost or size advantage, do not request it since added expense in labeling, installation and limitation of application could result. Further insights are available on series ratings in application publication DET-008. Individually- Vs Group-Mounted Mains For applications of 1200A or lower, the main protective device can be individually-mounted or group-mounted with the feeders. One special case condition was included in the first substation grouping, Case 3A, to illustrate the possible ramifications of this option. Group mounting the main, in this case, only saves about 4% in cost but results in elimination of one entire enclosure stack thereby decreasing the footprint by 43%! Caution, however, should be exercised here. There are advantages in retaining a separate cable-entry section. These include ease of installation, cooler long term operation of the feeder section (which translates to extended equipment life), and complete isolation of power from the feeder section when the main is opened. These are significant benefits for a mere 4% cost adder, but only if floor space permits. Page 3 of 5

Summary The case conditions and comparisons evaluated here demonstrate how seemingly minor variations in design and specification can have significant impact on a project s economics and space efficiency. They have further served to illustrate how general perceptions may be out of line with the reality of any given application since each is unique and merits its own evaluation. Comments All evaluations presented in this article are based on the use of GE type AKD Switchgear and GE type Spectra Switchboards, configured as detailed within the referenced tables and within the notes provided for those tables. Results may vary with other types of equipment and/or varying configurations and options. References 1. IEEE Std 493-1990, Design Of Reliable Industrial And Commercial Power Systems, Chapter 3, pp 54, Table 10. 2. Chowdhury, A. A., Koval, D. O., Balancing Society s Cost Of Electric Grid Blackouts And The Worth Of Improved Electric Grid Reliability, Keynote Presentation and Paper at the 16 th International Conference on Systems Research, Informatics and Cybernetics, pp 4, Upcoming July 29, 2004, Baden- Baden, Germany. Table 1 Switchgear Vs Switchboard - Comparison Of Sizes And Cost Main CB Feeder Per Unit Line-up Dim'ns (in.) Per Unit Case # Voltage Sub KVA Gear Type Amp Rating Types Net Cost W D Footprint 1 1 Switchgear 00 WP 1.7 74 60 1.1 2 1 Switchboard 00 MCCB 1.0 80 1.0 3 Switchgear 3200 WP 1.5 74 60 0.7 4 Switchboard 3200 MCCB 1.0 120 1.0 5 00 Switchgear 4000 WP 2.0 96 60 1.0 6 00 Switchboard 4000 MCCB 1.0 120 1.0 7 Switchgear WP 1.6 66 60 1.0 8 Switchboard MCCB 1.0 80 1.0 9 Switchgear 3200 WP 1.8 74 60 0.7 10 Switchboard 3200 MCCB 1.0 120 1.0 Notes: 1. In all cases mains are elect operated Wave-Pro CB's, drawout, LSI (with GF at V only); feeders are manually operated, rated 800A, LSI ( with GF at V only). 2. The switchgear includes all drawout units; Switchboard construction includes group mounted feeders. All boards are rated 65kAIC. 3. Capacity of feeder circuits equals approximately 200% of substation capacity, ie: 4000A gear includes qty 10 800A feeders. 4. Each line-up incorporates main bus CPT, CT's, PT's, power quality main meter, 200kA TVSS. 5. Footprint comparison assumes main depth x lineup width. Though group-mounted stacks are shallower than mains, that space remains unsalvageable. Page 4 of 5 6. Cost comparison is based on budgetary net project values. 7. WP = Wave-Pro steel frame breakers; MCCB = Molded-Case Circuit Breaker.

Table 22 Switchboard Analysis - Comparison of Sizes Case # Voltage Sub kva Sh Ckt ka Main Breaker Feeder Per Unit Line-up Dim'ns (in.) Per Unit Type Amp Rating Type Plug-In/Bolt-On Net Cost W D Footprint 1 2 3 3A 4 5 BPS 1200 FU HPC 1200 FU -Series Rtd 1.60 120 30 2.06 1.57 120 1.71 1.00 70 1.00 0.96 40 0.57 1.01 70 1.00 1.00 70 1.00 6 7 8 9 10 1 1 1 1 1 BPS FU 1.38 120 30 1.71 HPC FU 1.36 120 1.43 CB CB CB CB 1.02 70 30 1.00 CB CB-Series Rtd 0.90 70 30 1.00 11 12 13 14 15 BPS 00 FU HPC 00 FU CB 00 CB CB 00 CB CB 00 CB-Series Rtd 1.34 170 2.13 1.32 170 30 1.82 1.00 80 1.00 1.02 80 1.00 1.00 80 1.00 16 17 18 19 20 BPS 1600 FU HPC 1600 FU CB 1600 CB CB 1600 CB CB 1600 CB-Series Rtd 1.55 120 30 1.71 1.53 120 1.43 1.01 70 30 1.00 21 22 23 24 BPS 00 FU HPC 00 FU CB 00 CB CB 00 CB CB 00 CB-Series Rtd 1. 170 2.13 1.40 170 30 1.82 1.00 80 1.00 1.08 80 1.00 1.00 80 1.00 Notes: 1. All BPS (Bolted Pressure Switches) and HPC (High Pressure Contact Switches) include Blown Fuse and Phase Failure protection. 2. All mains are 100% rated, stationary, manually operated, include GF at V only. Main CB trip units also include LSI functions. 3. All mains are individually mounted, all feeders are group mounted; except case # 3a which is totally group mounted. 4. Each lineup includes a power quality meter, 200kA/mode TVSS, heat rated CU bus, CPT, service entrance label. 5. Each linup is fully rated except where feeders are noted 'CB-Series Rtd.' 6. Amount of feeders based on 1% of bus rating with mix as follows:1200 bus = 6-100A, 2-200A, 2-400A; 1600A bus = 4, 2, 4; A bus = 00 bus = 6, 4, 6. 7. Price evaluation based on budgetary user net market values as of June 2004. 8. Footprint evaluation based on switchboard length, and depth of deepest section.