DABO ADDS INTELLIGENCE AND MEMORY TO A BUILDING S OPERATING SYSTEM

Similar documents
Building Analytics Improve the efficiency, occupant comfort, and financial well-being of your building.

The Building Commissioning Association

Building Energy Management: Using Data as a Tool

Impact of Control System Technologies on Industrial Energy Savings

Find what matters. Information Alchemy Turning Your Building Data Into Money

Using Time-of-Day Scheduling To Save Energy

CATALYST Frequently Asked Questions

Central Plant Air Systems: Keeping the Heart and. Title Style. Better Buildings Summit May 2016

Enterprise Energy Management Technical Session

ULTIMATE GUIDE TO BUILDING AUTOMATION SYSTEM (BAS)

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Seven Steps to Maximizing Central Plant Efficiency

Realizing the full potential of high performance buildings

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

Optimising building HVAC services through control

Halton - Achieving Energy Efficiency in School Design

Energy Audits. Who needs one? Why it is needed? So many choices. Which one is right for my home? My business? My community?

Building Technologies. The APOGEE Compliance Solution for FDA-Regulated Facilities

ENERGY AUDITS FOR EXISTING BUILDINGS: It s like (nearly) free money! FSi consulting engineers

Criteria for Building Automation Dashboards

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

Building Information Technology and Management

Commercial Building Energy Initiative Tenant Business Case

BEST PRACTICE GUIDE TO MAXIMIZE ROI OF ENERGY MANAGEMENT SYSTEMS. Bob Zak SVP, Facility Solutions Ecova

Integrating Landscape Irrigation Control With Building Automation Issues and Opportunities

Building Analytics. Managed Services. Better Building Alliance Department of Energy April 17, 2015

Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings

HOW INTELLIGENT BUILDING TECHNOLOGY CAN IMPACT YOUR BUSINESS BY REDUCING OPERATING COSTS

Energy Design Resources Commissioning Plan Outline Template

Business Process Services. White Paper. Leveraging the Internet of Things and Analytics for Smart Energy Management

Model-Based Performance Monitoring: Review of Diagnostic Methods and Chiller Case Study

Bells and Whistles, or Just Plain Effective? The New Generation of Wireless Controls in Existing Commercial Buildings.

C-Bus Application Messages & Behaviour Chapter 25 Air Conditioning

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview

Existing Building Commissioning (EB Cx) Top 10 Lessons For Commercial Properties

Meet the New Standard. in Building Management Solutions for Commercial Buildings

Commercial/Office Space

Fundamentals of HVAC Control Systems

FAQ' s. Frequently Asked Questions. A1 Control Units. Pge 1 of 7 PUMPKIN HOOK ROAD PO BOX OGD VAN HORNESVILLE NY USA

Chap 1. Software Quality Management

The Key to Energy Efficiency in Buildings

SUCCESS STORY ENERGY TO CARE UF HEALTH SHANDS VISTA REHAB & UF HEALTH SHANDS CANCER HOSPITAL (SOUTH TOWER)

HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J.

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

HEATING, VENTILATION & AIR CONDITIONING

How Energy Efficiency Ensures Financial Health for Hospitals

Instructions for Participating in ASHRAE s. Operations & Performance Management Professional (OPMP) Certification Program

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Data and Interfaces for Advanced Building Operations and Maintenance - RP 1633 Final Report

Case Study. Vermont Hospital: Advanced Analytics as a Preventative Maintenance Tool

Bring the fresh in. Dedicated Outside Air Systems

Power Monitoring for Modern Data Centers

Highly challenged environment

EnerSmart Programs. enercase. Performance Contracting. contracting. Tired of. chasing capital for infrastructure upgrades?

Green proof of performance pays

Commissioning and Maintenance: Two Sides of the Same Coin? Kristin Heinemeier, PE, PhD Principal Engineer UC Davis WCEC

Pilot Program Description: Building EMIS

Building Diagnostic Market Deployment Final Report

Building Optimization: Recommissioning Your Building to Deliver Peak Performance

Section 7. Evaporator thermistor. Under-and-over pressure safety switches. Connections to the ECU

EarthCents (DSM) Program Summary

BUILDING AUTOMATION AND CONTROL TECHNOLOGIES

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling

for K-12 School Buildings

Energy Efficiency: Integrated Design and HVAC Systems HEALTHCARE - TOP 5 GREEN BUILDING STRATEGIES

Energy Benchmarking for Commercial Buildings. by Michael F. Keohane BE MEngSc

Texas School District Energy Management: The Status of Energy Management in Texas Schools

Case Study. Redmond Middle School: Advanced Analytics to Detect Energy Waste in HVAC System

Ventilation Retrofit Opportunities for Packaged HVAC

your comfort. our world. DNSS EcoSave A/C remote monitoring and malfunction prediction

Absolute and relative humidity Precise and comfort air-conditioning

New Approaches in Automating and Optimizing Demand Response to Solve Peak Load Management Problems

Chapter-5 Introduction to Building Automation System (BAS)

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Wireless Pneumatic Thermostat Technology Demonstration Test. Los Angeles Unified School District 333 S. Beaudry Ave.

University Health Network. Energy Management Plan 2014 to Energy & Environment. University Health Network

smart leaders in efficiency Save Money Modernize Assets Reduce Your Footprint Access electric utility programs

Heating / Ventilation / Air Conditioning Room Climate Control with ABB i-bus KNX


PENNSYLVANIA GREEN ENERGY LOAN FUND

Designer. of control solutions NA O7.124A

Building Relationships. Building Solutions.

Comprehensive Solutions for Data Centers. Rely on Siemens for maximum uptime, reliability, and efficiency.

May 26, 2011, Strategic Planner Circle Innovation Management at Siemens Building Technologies Division Lucas Schmid, Head of Strategy

The software beyond the climatic. Environment simulation

Case Study. Crown Melbourne & BUENO Systems: Energy and Operational Savings Across a Multi-Use Entertainment Complex.

Results Based Maintenance: Next Generation Preventive and Predictive Maintenance By Gordon Sharp, MSEE

Power Proportional Distribution (PPD)

ASTCEA04 Identify effective measures to reduce energy consumption and achieve carbon reduction

Sample Building Owners & Property Managers Survey

Scope of Work. See for resources available

Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned

Alan Matzka, P.E., Senior Mechanical Engineer Bradford Consulting Engineers

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

Transcription:

DABO ADDS INTELLIGENCE AND MEMORY TO A BUILDING S OPERATING SYSTEM We were already very efficient in the technical management of our building... DABO helped us go that much further! Mario Poirier Director of Building Management Palais des congrès de Montréal

A HIGH-PERFORMANCE OPERATIONAL MANAGEMENT TOOL FOR BUILDINGS DABO USERS INCLUDE: facility operation managers operators of heating ventilation and air conditioning (HVAC) systems heads of corrective maintenance teams ongoing commissioning professionals DABO IS: a database designed to collect all of the information received by the central building automation system. In addition to climate conditions and energy consumption, it retrieves data collected by sensors and other components of the electromechanical system such as the temperature, air flow rate, static pressure, position of dampers, and the performance of service equipment. 800 expert rules for consistency analysis, efficiency assessment and good operating practices 275 performance indices to help identify non-optimal operation and under- or overdesigned components HOW DABO WORKS: every 10 minutes, DABO interfaces with the central building automation system to record the values for all the electromechanical system s components and stores the data in its database every hour, DABO analyzes the information in the database, applies its expert rules, detects abnormal component behaviour and identifies operational anomalies at the user s request (in general, every two to four weeks), DABO applies performance indices to conduct a more detailed analysis at the user s request (generally once a day when the operator arrives at work), DABO produces fault detection and performance analysis reports. In addition to these diagnoses, DABO suggests corrective measures that could be taken by the maintenance team before the faults affect the system performance ADVANTAGES OF USING DABO INCLUDE: increased user comfort and reduction in the number of complaints and service calls real-time identification of corrective actions to take and efficient scheduling of corrective maintenance team tasks all traceability elements required to implement a quality assurance policy (ISO) optimal design of a component or system to be replaced, thanks to the operational and performance history lasting energy savings, with initial savings of more than 15% ongoing commissioning ease in obtaining LEED certification!

THANKS TO THE DABO DATABASE, BUILDING MANAGERS NOW HAVE A COMPLETE HISTORY OF THE BUILDING S OPERATION Centralized Building Automation System Acquisition and storage of data in an SQL database Monitors BAS parameters DABO intelligence 800 rules used to continuously analyse the performance of individual components 275 performance indices used to analyse system performance on different time scales Analyses and diagnoses faults on mechanical and electrical systems - Incorrect sensor readings - Leakage through dampers and valves - Unstable controllers - Incorrect sequence of operation - Sub-optimal set-points - Poor system design Fault detection reports Work order management Performance indices reports Proposes strategies for optimizing sequences of operation Global Analysis Energy performance, global or zone-by-zone optimization of load and consumption Generates performance reports History Storage of historical data, system performance analyses, and measures implemented Retraces the history of system operations and past corrections made DABO structure

Our team has a firm grasp of the notion of continuous optimization, but DABO gives us the means to achieve our objectives far more efficiently. SUSTAINING OUR FUTURE BY REBUILDING OUR PAST Gordon V.R. Holness, P.E. 2009-2010 ASHRAE President (...) A key element to remember is that in the life cycle of a building, initial construction cost is only 2%, and operational and energy costs are only 6%. The major cost is that of the building occupants, and they represent over 92% of life-cycle cost. If you can improve the health, wellbeing and productivity of the building occupants by providing an efficient and sustainable environment, you can more than pay for the initial building costs. While we can build the seemingly most efficient buildings, that means nothing if we cannot keep them operating efficiently. We need to learn why building performances typically deterio rate as much as 30% in the first three to four years of operation and the role that commissioning and retrocommissioning can play to reduce that performance decay. We do know that com missioning is a quality focused process that if implemented early in the design can save time and money and improve the quality of the end product: a healthy and productive building. According to studies, retrocommissioning of existing buildings can save 10% to 40% simply by improving operational strategies. Certainly, we know that the 20 to 50 cent per square foot cost can be returned in less than one year through energy savings of at least 15%, according to the Building Commissioning Association (www.bcxa.org). In Sustaining Our Future By Rebuilding Our Past by Gordon V.R. Holness, P.E., Fellow/Life Member ASHRAE in August 2009 issue of the ASHRAE Journal. Copyright 2009 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. We had taken steps to improve our energy efficiency before installing DABO. We were very proud of achieving energy savings of nearly 20% thanks to our efforts. Amazingly enough, since we have been using DABO, we have further decreased our annual energy costs by $150,000! Mario Poirier, Director of Building Management Palais des congrès de Montréal CONTINUOUS BUILDING OPTIMIZATION: A CLEAR, INNOVATIVE OPERATING APPROACH Installing new generation, high-efficiency equipment has significant advantages. But experts, as ASHRAE, agree that the largest energy losses are the result of non-optimal operation of electromechanical systems. To avoid or correct this problem, you need a policy based on two steps: recommissioning and ongoing commissioning. Recommissioning (updating each component of an electromechanical system and revising operating procedures) is something you can do immediately. When the installer sets up the database and reviews all of the electromechanical system s components, proceeding with recommissioning is a wise course of action. DABO has all of the specialized functions required to recommission your building. Once your systems have been updated and are operating in a logical, productive manner, you want to maintain this optimal performance. Ongoing commissioning is carried out by DABO s fault detection, diagnosis and performance monitoring functions.

DABO S ADVANTAGE OVER OTHER SOFTWARE AND WEB SOLUTIONS IS ITS CUTTING-EDGE TECHNOLOGY DABO is a continuous optimization tool based on the principles of fault detection, performance analysis and compilation of a documented history. This work method enables DABO to identify problems in real-time and suggest solutions that can be implemented immediately. Other tools: Energy consumption monitoring software flags abnormal consumption but provides no indication as to the source of the problem (was it a change in building activities? an operational anomaly? inefficiency of a piece of equipment? an issue with the calibration of a sensor?... ). Energy cost monitoring software has the same shortcomings as consumption analysis software, in addition to taking several weeks to produce the information. As for ongoing commissioning web services, they all have the same problem, which is that they have exclusive ownership of the information collected in the building. The client has no leeway and must pay for additional analyses. If the subscription to the service is not renewed, the compiled history is permanently lost. DABO therefore has the edge over other technological tools that provide building operation assistance. It is based on 10 years of research and development in Canada and on collaboration with a team of international experts. DABO is ahead of the technology curve of other solutions on the market by several years. It therefore gives users a significant competitive advantage. WHAT STAGE ARE YOU AT? REACTING PREVENTING ANTICIPATING Control system alarms Occupant complaints Abnormal energy consumption Preventive maintenance Recommissioning Monthly monitoring of energy costs Continuous monitoring 24/7 Automatic diagnoses and rapid corrective action Ongoing commissioning DABO helps you anticipate problems before they affect the system so you can avoid alarms and complaints. TYPES OF ANALYSIS TOOLS Benchmarking and labelling Energy cost analysis Trend analysis Meter reading Energy consumption monitoring Fault detection and performance analysis FUNCTIONS Global analysis of the building s performance by comparing it with a similar building (only after 6 to 12 months). Proposes optimal cost and identifies discrepancies compared to previous years. Produces only partial analyses. Does not identify specific causes or corrective measures. Detects anomalies in real time. Provides a global analysis. Does not identify causes. Detects anomalies, conflicting operating strategies, abnormal component behaviour. Performs in-depth analysis of performance Provides diagnoses and suggests corrective measures. Compiles a documented history Conducts ongoing commissioning (continuous real-time monitoring) Helps users obtain LEED points.