Laboratory Facility Cleaning and Maintenance Guidelines

Similar documents
RMM 501 Hazardous Materials Management Systems Including WHMIS Program Page 2 November 2014

Laboratory Safety and Environmental Health Assessment Program

COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL

Checklist for a Physical Containment Level 2 (PC2) Laboratory Facility

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

OH&S Management Systems Audit Checklist (NAT, E3)

Contractor Safety Management

BOSTON COLLEGE ENVIRONMENTAL HEALTH AND SAFETY LABORATORY GUIDE FOR RENOVATIONS, REMODELS, MOVES AND TERMINATIONS

Environment of Care Hazardous Materials and Waste Management Plan

Asbestos Abatement Management Program. Facilities Operations and Development Environmental Health & Safety

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Laboratory Safety Inspection Checklist (Biology and Biochemistry)

NQTMVS GENERAL INFORMATION. heading text INSTALLATION SERVICE PAGE 1» SECTION MARKER SUB-HEADING. Body Text

Level I Inspection Guidance Document 2014

University of Colorado at Boulder

UCCS Biosafety Management Policy

Building Service & Maintenance

Executive Director Human Resources Approved by

Archived. Gloves should be changed frequently during the analysis.

Safety and Health Office WORKPLACE SAFETY CHECKLIST

Construction Crafts: Plumbing of Sanitary Appliances (Intermediate 2)

Contractor Safety Program Office of Environmental Health and Safety University of Toronto

Supplier Environmental Health and Safety Certification

PICAC TRAINING SCHEDULE

Lead Management. Presented by: Gary Chinn (815) President, Best Technology Systems

Required Biosafety Level Three (BSL-3) Practices, Procedures, Facilities, and Safety Equipment For BSL-3 and BSL3/2 Laboratories

Waste Management Log Book

Food Safety and Quality Management System

ASBESTOS MANAGEMENT POLICY

STUDENT INFORMATION GUIDE

Laboratory Audit Sheet Auditor s Name: Date of Inspection: / / Building Name: Room# Principal Investigator:

Safety Inspection Checklist

Inspection, Measuring and Test Equipment (IMTE) Calibration

Title: Plant and Equipment Management Procedure

Policies. Prep Room Policies

Health and Safety Management Standards

DOCUMENT AND RECORDS CONTROL PROCEDURE

School or service safety advisor (SSA) role

Particularly Hazardous Substances (PHS) Standard Operating Procedure (SOP)

School Science Lab Safety Guidelines

Appendix J IBC Biohazard Spill Management Plan

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

LABORATORY SAFETY INSPECTION CHECKLIST

PPG SUPPLIER DEVELOPMENT ASSESSMENT

STRATEGIC CLEANING PLAN POLICY (In conjunction with Operational Cleaning Manual)

STANDARD OPERATING PROCEDURES Safe Autoclave Operations

LABORATORY SAFETY GUIDELINES

Central Glasshouse Services Induction Training. Glasshouse Client Induction 2015

Cambridge Biosafety Committee POLICIES AND PROCEDURES

CONTRACTOR INDUCTION HANDBOOK

The terms hazard and risk are often used, which we define as the following:

OSHA Compliance Checklist ASC

Construction and Civil Work Management

RADIOACTIVE WASTE MANAGEMENT PLAN

SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)

PRINCIPAL INVESTIGATOR REGISTRATION FOR SELECT AGENTS

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

Approved by: UBC ACT Committee

AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014)

Domestic Shipping. Safety Management System. Company:

Policy for the Management of Asbestos in Buildings

SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.

OHS Training Guidelines

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Laboratory Biosafty In Molecular Biology and its levels

Department of Environmental Health and Safety & Emergency Management

WHS CONTRACTOR MANAGEMENT PROCEDURE

Fire Risk Assessment Safety Checklist

ASBESTOS in state and local government

STANDARD OPERATING PROCEDURE LABORATORY LOGBOOKS

Asbestos Management Plan EC 45 Page 1

Communication of Health and Safety Policy and Information

Facility Safety Plan State University of New York Upstate Medical University

BRC/IoP Global Standard

Biosafety Level 2 (BSL-2) Safety Guidelines

THE UNIVERSITY OF NEWCASTLE- SCHOOL of BIOMEDICAL SCIENCES

WHS Contractor Management Procedure

Asbestos Policy & Procedure

APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS

LabcliQ User Guide. Santa Clara University

Risk Assessment: Biosafety Cabinet

Generic risk assessment form. This document forms part of Loughborough University s health and safety policy Version 3 February 2014

The Management of Asbestos containing Materials

Name of Business. Record 1- Approved Food Suppliers List

CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS

Policy on the Management of Asbestos

Replacement of Heat System Components

1. Organization and Management of UNR Safety Programs

STANDARD OPERATING PROCEDURES DIVISION OF COMPARATIVE MEDICINE UNIVERSITY OF SOUTH FLORIDA

COMPREHESIVE LAB SAFETY CHECKLIST

CPC40912 Certificate IV in Plumbing and Services

Title: OHS Risk Management Procedure

Biosafety Program University of Colorado. BSL-1 Audit Checklist

Emergency Eyewash and Drench Shower Program

Release: 1. PRSTS303A Test installed security equipment/system

Transcription:

Laboratory Facility Cleaning and Maintenance Guidelines Version 1.0 TRIM file number D11/55006 F Sc Document No Short description Relevant to Approved by Responsible officer Responsible office Date introduced Date(s) modified Guidelines for establishing a cleaning and maintenance routine and schedule for the Faculty of Science Technical areas. All employees Manager, University Laboratories Faculty of Science 01/09/2011 when approved Next scheduled review date 09, 2013 Related University documents CSU OHS policy Related legislation OHS Act 2000 & Regulation 2001 Key words cleaning, maintenance, asset, equipment 1. PURPOSE These guidelines describe how to draft a cleaning and maintenance program for a Faculty of Science Technical Area. 2. SCOPE The guidelines apply to all staff in all Science Technical Areas; including Laboratories, clinics yards, glasshouses etc. Division of Facilities Management (DFM) cleaning staff or contractors are not to enter gene technology facilities at PC2 or greater, quarantine facilities (AQIS) or Security Sensitive Biological facilities (SSBA). 3.0 RESPONSIBILITIES Laboratory Manager: Laboratory Cleaning and Maintenance Guidelines Page 1

implementing a cleaning roster and ensuring that the tasks are completed ensuring that the assets are serviced and calibrated according to accreditation, standards and regulatory guidelines implementing a system that identifies and documents any asset that is hazardous, needs accreditation, or is required to meet standards and regulations implementing a system to repair any damaged asset organising regular servicing in collaboration with members of their technical area committee managing assets in the BEIMS system ensuring annual stocktaking is conducted and recorded logging BEIMS requests to the Department of Facilities Management for maintenance requirements that are structural, for fixed equipment or trade related Logging BEIMS requests when safety hazards are identified Implementing appropriate induction to cleaning or contractor staff where required Technical Staff: maintaining the workplace in a clean and tidy manner on a daily basis completing the rostered tasks the maintenance and cleaning of the assets and equipment and the work area informing the laboratory manager of any safety hazards related to equipment or work areas NOTE: The Faculty The faculty of Science from time to time may implement at its discretion university wide service and maintenance contracts. These do not relieve the lab manager of the responsibility of ensuring the service and maintenance of equipment in their charge. 4.0 GUIDELINES The Faculty requires supervisors to use a documented system for cleaning and maintenance of their work area and the equipment within their area of responsibility. The supervisor is responsible for the routine maintenance of assets and equipment, so they are regularly cleaned and safely maintained. Cleaning and maintenance and its documentation are in addition to the workplace inspections that are conducted twice annually as a requirement under the OHS Act 2000. 4.1 Cleaning in Physical Containment Facilities General PC2 facilities can be cleaned (ie floors, windows, sinks) by general cleaning staff following an appropriate induction. Laboratory Cleaning and Maintenance Guidelines Page 2

PC2 Gene technology labs (OGTR), AQIS and SSBA facilities are NOT to be cleaned by general cleaning staff. All cleaning in these areas must be rostered to staff working in the area. 4.2 Roster The Laboratory Manager shall produce the roster appropriate to their equipment, workspace and working hours. They are responsible for ensuring the occupants of the laboratory perform the task and complete the checklists. All persons working in the area (including researchers and academics where appropriate) shall be expected to participate in the roster. It is advisable that at a nominated time of the week all workers are to attend to their allocated task from the weekly cleaning schedule. The checklist for each week should be signed on the completion of the tasks. 4.3 Equipment Maintenance Each item of equipment that requires regular maintenance and/ or cleaning should have a separate Maintenance Log Equipment. This should be kept in a plastic sleeve or folder located on or adjacent to the item of equipment. Procedures for the frequency of maintenance and cleaning should be written as part of the Standard Operating Procedure (equipment) or as a separate SOP for maintenance procedures, depending on the complexity of the equipment. The Standard Operating Procedures Documentation is a useful reference when writing SOP s. Smaller items of equipment not requiring additional maintenance can be listed on a separate cleaning checklist based on their frequency of cleaning (ie the monthly or semester schedule). Safety showers and eye or face washes have specific checklists as documented in the Eyewash and safety shower compliance Procedure. There is a Maintenance Checklist Safety Shower weekly and also a Maintenance Checklist Safety Shower Flowrate for which the regularity of testing shall be dependant on the usage of the laboratory. 4.4 Documentation 4.4.1 Tasks It is expected that the workplace be maintained in a clean and tidy state and that mess or rubbish not be allowed to accumulate. The tasks for good housekeeping should be listed. These can be daily if required, but must be at least weekly. Tasks should be documented as an SOP (ie SOP for daily cleaning of room A) where required. It is not intended that tasks for daily cleaning be signed off. All areas should be left in a tidy and clean manner at the completion of work or at the end of the day. 4.4.2 Weekly Checklists Produce a proforma checklist with the tasks listed and a column to sign at the completion of the task that can be printed off each week. It may also be necessary for the laboratory manager to roster staff to perform particular tasks or it may be on a rotation. A Maintenance Checklists- Weekly and Maintenance Log Cleaning Laboratory Cleaning and Maintenance Guidelines Page 3

Checklist is available for download from the webpage. A Maintenance Checklist Safety Shower weekly is available on the website. Table 2 List of weekly tasks Item Face/Eye wash and Shower All Waste Biological Waste Requirement Weekly safety shower/facewash check Check waste segregation prior to disposal Remove and autoclave all biological waste Procedure or list the SOP no. Eye wash and shower procedure Hazardous Waste Procedure SOP Comments Action Required (Request in BEIMS if needed) Fill in checklist log Complete waste record /autoclave logbook. Document in biologicals register signature Date 4.4.3 Accreditation or compliance testing A list of assets and equipment requiring annual certification and servicing is required. You can use Maintenance logs - annual servicing and certification. Assets that require testing for compliance or accreditation should be documented and also noted on the Faculty s Asset Management data base (BEIMS). This allows notification to be given to the Laboratory Manager of upcoming compliance testing. Records of certification for assets and equipment are required to be kept in the laboratory records for a nominated period of time, as listed in table 3. Table 3 Accreditation records Item Validated required Service required Autoclave Annually Certified & accredited service ** must include calibration of the thermocouple and safety valves Autoclave Pressure Vessel inspection CSU Biosafety Committee Every 2 years Certified & accredited service Keep records for Annually CSU Biosafety Committee Fume Hood Annually Certified & accredited service (Natalie Allison at CSU is certified) Biosafety Cabinet Annually NATA **must include containment efficiency Drainage Backflow Risk assessment Electrical Equipment (tag & test) Annually Licensed & accredited plumber Annually Licensed and accredited tester The life of the asset Laboratory Cleaning and Maintenance Guidelines Page 4

4.4.4 Laboratory Clearance Form Prior to maintenance or cleaning by an external contractor, tradesperson or non technical staff, being performed on any major asset or part of a facility the Maintenance and Building Works Clearance Procedure should be implemented. The workers should be inducted into the facility and the associated Maintenance and Works Clearance Form issued by the facility or laboratory manager to allow the required work to commence. Biological Facilities also require an additional Biological Clearance Form to be completed, as do Radiation Laboratories with a Clearance for Maintenance Work Within/To a Radiation Facility Form. 5.0 RELATED DOCUMENTS AND FORMS Procedures Eyewash and safety shower compliance Procedure Maintenance and Building Works Clearance Procedure Standard Operating Procedures Documentation Forms Clearance for work Within/to a Biological Facility - Biological Clearance Form Clearance for Maintenance Work Within/To a Radiation Facility - RSC 12 (doc) - RSC 12 (pdf) Maintenance and Works Clearance Form Maintenance Log Equipment Maintenance Checklist Safety shower Flowrate Maintenance Checklists- Weekly Maintenance Checklist Safety Shower weekly Maintenance Log Cleaning Checklist Standard Operating Procedure (equipment) Table of amendments Version Date Approval and Position Short description of amendment number 0.1 6/2009 Draft 0.2 9/2009 1.0 9/2011 Charles Svenson Manager University Laboratories Initial version Laboratory Cleaning and Maintenance Guidelines Page 5