Trapeze Rail System Simulation and Planning

Similar documents
English. Trapeze Rail System.

Appendix A. About RailSys 3.0. A.1 Introduction

IVU PUBLIC TRANSPORT Overview of IVU and the IVU.suite. Han Hendriks

Trains crossing at Toronto s Old Mill Station 2009 TTC. Train Control

Train Planning System TPS Network Capacity Management

Smart Transport ITS Norway

Railway Simulation & Timetable Planning

Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques

the only system with Unified Management & Optimization of: crew SchedulAir decisal

OPTIMIZING YOUR WORLD REVENUE TECHNOLOGY SERVICES. Revenue Management. for. Cruise Ferries

Shareholder Presentation

Lesson 2: Technology Applications Major Transit Technologies Grouped by Function

OPTIMISING THE RESOURCES OF THE WORLD. Resource Planning & Management Systems.

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

Application of Systems Engineering to Enhance Safety and Risk Management in Railway Projects. R N Dumolo Mott MacDonald Limited

Asset Management Systems Information

Full-time MSc in Logistics and Supply Chain Management

Application of Artificial Intelligence for a Computerized Maintenance Scheduling System

End-to-end Field Service Management

IN ENERGY. Essentials Guide. Common Problems.

Data Center Infrastructure Management. optimize. your data center with our. DCIM weather station. Your business technologists.

Exhibit F. VA CAI - Staff Aug Job Titles and Descriptions Effective 2015

Integrate Optimise Sustain

Germany s largest fleet management system

BUSINESS OCR LEVEL 3 CAMBRIDGE TECHNICAL. Cambridge TECHNICALS BUSINESS PROJECT MANAGEMENT CERTIFICATE/DIPLOMA IN K/502/5459 LEVEL 3 UNIT 18

Model, Analyze and Optimize the Supply Chain

Generate optimal production schedules to maximize profitability and meet service levels

Asset Management Policy March 2014

Software for Supply Chain Design and Analysis

Trackunit Telematics Solution. for OEM

SKYport Reporting SKYport BI for SAP. port. Business Intelligence for Airports.

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

IAM Certificate in Asset Management Ver1.2 January 2013

NOVUS. for Demand Response. Thinking in 360 Degrees. Making it Happen.

ALWAYS ON THE RIGHT PATH. Optimized planning and dispatch with SyncroTESS

WHITE PAPER December TMS Transportation Management Systems & Supply Chain Sustainability

WHITE PAPER. iet ITSM Enables Enhanced Service Management

Principal risks and uncertainties

Please contact a member of our sales team on

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations

A comprehensive information system for railway networks

Channels of Delivery of Travel Information (Static and Dynamic On-Trip Information)

INTELLIGENT AND INNOVATIVE TRANSPORT SYSTEMS

Load Building and Route Scheduling

Microsoft SharePoint: A Powerful Solution for Environmental Health and Safety Programs

MSD Supply Chain Programme Strategy Workshop

Add a new perspective to your supply chain management.

RouteMatch Fixed Route

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy

Simulation of Railway Networks

Focus on Customer Information. Stationary, highly automated customer information systems. Innovative and reliable Information Technologies

AMT - Asset Management Software: Solutions for Mining Companies

Advantage HCM for Oil and Gas An affordable workforce management solution for improved corporate performance

Fleet Logistics Optimiser

ViryaNet Service Scheduler

Railway Business Strategy and R&D in Europe

Changing locations every day. Can service be as mobile as a locomotive?

Certification in Humanitarian Supply Chain Management (CHSCM) Competence Model. Final Version 2007

The future of public transport is here and now

ERTMS for a competitive railway

Risks and uncertainties

CorHousing. CorHousing provides performance indicator, risk and project management templates for the UK Social Housing sector including:

GIS DESIGN AND IMPLEMENTATION SERVICES

Industrial IT Process Data Management. Advanced IT Tools for Building Information Systems in the Process Industry

Microsoft Dynamics NAV for Government Contractors

analysis needs be met at the push of a button?

Advanced Technologies

Asset Register Asset Care Plan Developer On Key Analytics Maintenance Manager Planning and Scheduling On Key Interface Tool

How To Manage A Plane With A-Cdm

COST EFFICIENCIES/PRODUCTIVITY

Global M2M Platform vodacom.co.za/business

Front PLATO. Planning, Logistics & Transport Optimisation

Deployable Logistics Solutions

QlikView for Supply Chain. Automotive, Industrial and Aerospace

DATA LEAP Production Data Management. SOFTWARE FOR PROCESS-ORIENTED PRODUCTION MANAGEMENT IN THE FACTORY OF TOMORROW.

WORKFORCE MANAGEMENT HAS NEVER BEEN SO EASY

ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators. 19 September 2005

The Definitive Guide to Shift Scheduling. From best practices to inside tips, explore how to become a shift scheduling expert

Tracking & Fleet Management System. Itzik Baron, Mobile Satellite Sales Manager

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)

DC Traction Power Supply. Powerful, efficient and safe. siemens.com/mobility

Railway Crossing Information System

White Paper On Pilot Method Of ERP Implementation

Global Machine to Machine Smart Services

2015 Trends & Insights

Life-cycle automation and services

FRE FRE IFT IFT S.A.

Tactical Routing. The leading solution for optimizing your transport on a tactical level

Smarter operations. Discover how intelligent data can help you implement and reap the rewards of smarter, streamlined operations. bmtsmart.

Air Dispatch and Finnair

Cloud computing for maintenance of railway signalling systems

OR Applications in the Airline Industry

SALES AND OPERATIONS PLANNING BLUEPRINT BUSINESS VALUE GUIDE

Transcription:

trapeze Rail System English Software for Rail Modelling and Planning Trapeze Rail System Simulation and Planning www.trapezegroup.com

Enabling future railway plans Cost reductions through integrated planning and simulation The worldwide growth in demand for travel and increasing competition between all modes of transport places ever greater demands on railways. To meet this challenge, railway businesses must increasingly strive to make better of their existing and planned resources. Trapeze Group rail s tools assist in achieving these objectives. By drawing on experience, tried and trusted solutions are combined with new innovation to meet specific requirements. Product Overview planning SIMULATION & MODELLING Train Operations Power Supply Network Timetables Simulate operations (rolling stock, signalling systems, energy) Running time calculation Identification of conflicts Validation of timetables Data for cost-benefit calculations Simulate power supply demands, electrical outages and emergency scenarios Assessment of substation locations Assessmant of supply robustess Simulate AC, DC networks & return circuits Robustness Analyser Networks capacity optimisation Timetable stability What-if-senarios NETWORK & TIMETABLE PLANNING Network Planning Negotiate track access Identify available tracks Path request Management Possession request Management Timetable Planning Stations, stops and connections Unlimited what-if -timetables Running times Conflict detection & Validation Route planning Possession planning RESOURCE PLANNING Vehicle Planning Iterative feedback between vehicle planning and crew planning Auto validation Capacity and blocking Fuel and maintenance Vehicle optimisation Crew Planning Iterative feedback between vehicle planning and crew planning What-if scenarios and cost caculations Employee qualifications Crew optimisation Employee Roster Rostering Manually and automatic Employee assignment Roll-out Optimisation OPERATIONS Vehicle Allocation Dispatch, incident and change Administration of vehicle Planning of ad hoc and Trapeze Group your Dispatch, long-term incident and change partner management maintanance fixed route transport management Staff availability Fuel Management Customer and contact As a well established developer Rolling stock register and provider of leading Validation planning, and operational simulation, warnings and Asset modelling configurationin the railway industry administration worldwide, Validation & Statistics Operations optimisation Materials management rebuild Vehicle Roster we have extensive experience On-board system of implementing systems Employee communication for clients with widely and different procurement operating procedures, and widely different requirements. A careful analysis of requirements is always carried out before a solution is implemented at the client s Vehicle Monitoring Driver Monitoring Fleet & Asset Tracking On-Board REAL TIME site. Open communication with customers and partners ensures that the solutions are effective and can be implemented Vehicle Monitoring Driver monitoring OPERATIONS/MONITORING without interrupting operations. Driver training Eco Driving Voice and Message control Automatic vehicle location Schedule adherence Incident reporting Key Advantages at a Glance Vehicle Management Crew Management Asset Management Cargo Management Holistic planning supports the requirements of both infrastructure operators and train operating companies In-Vehicle & Wayside Journey Planning Ticketing & Fares PASSENGER Timetable INFO development with consideration of the entire life cycle of strategic long-term planning right up to Arrival / departure / delays Front and back-end solution Mobile ticketing JOURNEY PLANNING real-time operation Next stop and connections Web, app, call centres Smart cards / Comfoaccess TICKETING Voice Announcements Data integrity for networks, timetables, staff and rolling stock Stationary and mobile vending machines Automatic passenger counts Ticket printers Configuration of all organisational variables, numerous user types and various Fare sites collection High-performance analysis tools with decision-making support functions. Wage Calculation Contracts Business Intelligence ADMINISTRATION STATISTICS 2 Trapeze Rail & Planning ANALYSIS System Automatic calculation of payroll Union agreement Rules and in-house agreements Contract management Booking and order management Real time tracking of fleet, inventory, equipment, Maintenance log and scheduling Consist building and Marshalling Auto logging of Consist make up Production calculation Operational statistics Cost and revenue statistics Dashboards Software and computers Voice & data communication High-speed internet connection Integration to peripheral devices Data logging and data management

Complex requirements: Comprehensive planning tools Delivers better balance between infrastructure, rolling stock, staff, service, and cost Delivery of an operational railway timetable involves the coordination of three key components: infrastructure, rolling stock and staff. These all have very different requirements and constraints. Trapeze Rail addresses these by developing, delivering, and supporting planning and simulation tools that help railway planners and engineers understand the issues identified during the planning stage, and to develop effective operational plans that satisfy key business requirements. Close Co-operation: Train Operating Companies and Infrastructure Operators The planning of daily train schedules involves sharing and exchanging data between various stakeholders. To match this, Trapeze has expertise in providing electronic support for the business processes involved in e.g. line capacity and train path bidding and allocation. Successful Management: Efficient Planning The systems Trapeze Rail delivers make companywide planning and management tools available. These tools enable the planning and integration of the various operational functions over the entire life-cycle from long-term strategic plans right up to their implementation in daily operation. Each part of the organisation can then clearly identify the effects that future schedules will have and so forecast operational performance and financial effects. Well-Founded Decisions: Market-Orientated Action Ensuring a flexible response to the needs of the market or to operational problems demands a quick and effective decision making process. Modern graphic interfaces in combination with optimised tools provide user support in developing and delivering robust and cost-effective timetables. These easy-to-use tools both reduce staff training times and can be put to highly flexible use. 3

Systematic Solutions: Integrated, Individual and Innovative Trapeze Rail delivers planning and simulation modules that can be customised to suit individual needs and integrated to form a larger overall system. Our Simulation, modelling and simulation tools form the basis of long term and short term operational planning. Combined with our solution for the-day-to-day operational management Trapeze delivers a 360 degree solution for a variety of railway clients worldwide. The flexibility of the Trapeze Rail soltuion means that customers can be confident that the system will meet their respective requirements. Simulation of Train Operations Trapeze Rail s simulation tool RailPlan enables rail experts and engineers to predict the behaviour of rolling stock, signalling systems, and power supply networks, and to combine these to show complete train movements. The full benefits of RailPlan become evident when simulating the operation of a complete railway system conflicts are identified, and the effect of failures and incidents predicted and presented. RailPlan has been developed to simulate all types of signalling and train control systems. It can be used to assess various options for infrastructure development and provides accurate data for cost-benefit calculations. RailPlan offers a broad range of applications, e.g. determining signal headways, assessing the locations of points and crossings, and validating the viability of timetables. Simulation of the Power Supply Network An integral part of the modelling of train movements in RailPlan, the PowerPlan module simulates the demands that will be made on the power supply network. Its dynamic feedback function allows the power supply behaviour to modify the power available to the trains in the RailPlan simulation. It allows the assessment of substation locations, robustness of supply, and susceptibility of the network to degraded performance. PowerPlan not only simulates AC and DC networks, but also return circuits. 4

Conflict-free Timetables With more than 500 installations globally, Trapeze Rail s Timetabel Planning Tool, TrainPlan, is amongst the world s most-used timetable development tools. Thanks to its highly developed conflict detection and solution routines, TrainPlan is setting industry standards. Creating Conflict-Free Timetables TrainPlan offers a fully scalable timetabling tool that meets the requirements of a wide range of users: from a single planner in an engineering consultancy, through to national rail organisations with multiple locations networked to a single national database. TrainPlan provides an extremely robust timetable database capable of storing all the development versions of a timetable, from the strategic plan to the short-term engineering plan. To satisfy the broad spectrum of operational users, data handling is customised to support the relevant business rules and deliver the required local outputs. The system is fully language configurable. TrainPlan offers a modern graphic interface that allows several information windows to be displayed across multiple screens. The displays include familiar tabular and graphical images like time-distance line diagrams, platform occupation diagrams, corridor graphs and timetable books. Where appropriate, these displays can be manipulated using drag & drop functionality. Due to TrainPlan the process of creating conflict free timetables is accelerated significantly. At the same time safety mechanisms within the system allow planning data to be managed securely. 5

Ensuring Timetable Stability Predict timetable performance, and identify avoidable weak spots in any timetable Simulation of Timetable Stability The Timetable Robustness Analyser (TTRA) is a highspeed simulation tool that assesses the stability of timetables over very large areas. TTRA simulates possible train delays, caused for example by excessive station dwell times, traction performance problems, or temporary speed restrictions, and models the knock on effects for the system being investigated. One timetable can have the characteristic that delayed trains will lead to considerable knock-on effects, whereas another version of the timetable may, by contrast be able to absorb such effects more readily. The use of TTRA at the planning stage helps identify which of the timetables are most robust, and substantially reduces the risk of train delays in operation. This not only makes travelling more reliable for customers, but also means that train operators can avoid the sometimes substantial financial and reputational penalties that poor service delivery can incur. 6

Integration of Timetables and Resources Planning the effective use of resources is a crucial part for all train operations Not only does the process ensure resources are planned to achieve delivery of the advertised timetable, it also sets the fundamental cost base for the business as a whole. The significance of efficient resource planning should not therefore be under-estimated. Today much greater emphasis is being placed on the process, the efficiency of the results, and the importance of resource planning. ResourcePlan x-y graph assisting visual creation of resource schedules Interactive Gantt chart Creation of crew and vehicle schedules using timetable data generated in the planning process For a train operating company, existing operating options are limited by two factors: mobile resources (rolling stock, staff), and track capacity. Solutions for train operating companies that cover the integrated planning of trains and resources are therefore valuable, as they ensure shorter planning periods, create the conditions for plans to be developed in parallel, and ensure that all relevant factors are considered. Optimisation procedures further speed up resource planning and enable disruptions or problems to be managed effectively, whilst taking account of operational conditions. Restrictions created by staff knowledge and certification, staff working hours, any technical limitations due to the section compatibility of the vehicles, and any legal or contractual restrictions can all be considered. These are built into the tool to ensure the feasibility of the vehicle and crew plans generated. These plans can be continually compared with the current version or with a daily version to ensure that changes have not been overlooked. 7

Trapeze Group: www@trapezegroup.eu www.trapezegroup.com Canada +1 905 627 8400 info.trapezegroup.com Denmark +45 8744 1600 info@trapezegroup.eu Germany, Berlin (ITS) +49 30 3862 07-72 info.ch@trapezegroup.com Germany, Hamburg +49 40 5300 31-0 info@trapezegroup.de Sweden +46 (0) 8 122 016 30 info@trapezegroup.se Switzerland (ITS) +41 58 911 11 11 info.ch@trapezegroup.com UK +44 (0) 1225 784200 info.trapezegroup.com UK, York (Rail) +44 (0) 1904 639091 railuk@trapezegroup.eu @trapezegroup twitter.com/trapezegroup facebook.com/trapezegroup linkedin.com/company/trapeze-group