Guidelines for Preparing for a Temporary Steam Plant

Similar documents
Energy Efficiency in Steam Systems

REQUEST FOR QUOTATIONS

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

FLASH TANK ECONOMIZER PRODUCT GUIDE

Boiler NOx Emissions and Energy Efficiency

SIOUX HYBRID WATER HEATER

Some Criteria for Choosing a Steam Boiler for a Microbrewery

IVISIONS STEAM PLANT DIVISIONS TOTAL TURNKEY SOLUTIONS. INDUSTRIAL BOILER & MECHANICAL

Energy Efficient Operations and Maintenance Strategies for Boilers

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

ECO-STAR II. ECO-nomical ECO-logical the ECO-STAR II. Packaged Low NOx Multi-Fuel Burner. Features. Benefits. Combustion Excellence Since 1888 ESII-1

Steam System Efficiency. Bill Lumsden Leidos Engineering

Factory owners must ensure the boiler is:

I. STEAM GENERATION, BOILER TYPES

OROT RABIN POWER STATION UNITS x 350 MW

Boiler Preparation, Start-Up and Shutdown

University of Iowa Power Plant

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Routine and Emergency Boiler Operation

Boiler Tune-up Guide

MOSS WOOD BOILER SYSTEMS

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

Saving Boiler Fuel. Figure 1: Boiler System Operation Costs

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

Forgotten savings: Heat recovery from surface blowdown

Energy Saving Ideas for Your Box Plant

Boiler Efficiency. Charles Stark Department of Poultry Science.

Energy Saving Solutions. Bob Montgomery Technical Solutions Specialist Waterloo Manufacturing

Natural Gas Energy Efficiency Opportunities for Commercial & Industrial Customers. Michael Pace Lead Engineer C & I Efficiency Programs

BOILER FEED AND CONDENSATE RECOVERY SYSTEMS Extend the life and efficiency of your boiler system

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012

steam centre of excellence Steam Boiler System Optimization

INTEC Engineering GmbH Heating Solutions for the Marine Industry

Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities

Rules for construction of heating boilers, Boiler and Pressure Vessel Code, Section IV-2007

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

Backup Fuel Oil System Decommissioning & Restoration Plan

Federal Wage System Job Grading Standard for Heating and Boiler Plant Equipment Mechanic, Table of Contents

How To Clean Up A Reactor Water Cleanup

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

BorsodChem MCHZ, Czech Republic. 6,000 Nm 3 /h HTCR Topsøe Hydrogen Plant A Case Story: 18 Months from Engineering to Operation

RECON WATER HEATER INSTALLATION FORM

Commercial Gas Water Heaters

BOILER ROOM GUIDE. Reference Guide

Boiler and Steam Efficiency What does it mean?

Indirect fired heaters

Heavy Fuel Oil supply units. The world s best selling HFO supply unit. The right choice for any conditions

Energy Efficient Operations and Maintenance Strategies for Industrial Gas Boilers

POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER:

Originators of the Flexible Water Tube design

SWIMMING POOL HEAT PUMP

TABLE OF CONTENTS THE WATERTUBE BOILER REGULATORY CODES ECONOMIZERS BLOWDOWN SEPARATOR...1-8

EMERGENCY VAPOR SCRUBBER SYSTEMS

CABINET. A Clean Burn Heat Exchanger provides approximately 200% more surface area for capturing combustion heat. You get more heat from less oil.

Energy Saving Fact Sheet Boilers

Series GM. Peerless Boilers. Residential/Commercial Gas Boilers

PREPIPED LIQUID FUEL MANIFOLDS PLPM

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

IGEMA BOILER LEVEL & TDS CONTROLS

G234X-55 Conventional Gas Boiler

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Medical Air Systems: Scroll

INSTALLATION & MAINTENANCE MANUAL TURBOPOWER GAS, OIL & GAS/OIL WATER HEATER

Technical Specification. Generating Set with Waukesha engine burning natural gas

PRODUCT PRODUCT CODE TECHNICAL INSTRUCTIONS PAGE

Condensate water pump with neutralisation system

Features and Benefits

Steam Generation Efficiency Module Blowdown Losses Section

Steam Generation Solutions

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Boiler Efficiency Workshop

POWERING THE WAY Rental Power Planner

Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

Water-Tube Package Boilers Reliable and Economical Steam Production

Job Grading Appeal Decision Under Section 5346 of Title 5, United States Code

Electric Process Heaters & Engineered Systems

INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK

ABSTRACT. aspects of potential waste heat recovery systems and the economics of installing them at selected survey factories.

Jobson THE RIGHT CONTACT

OTF Oil Fired Pool Heater

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

Vision Engravers and Routers PRE-Installation Guide Vision Engraving & Routing Systems

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation

Department of Veterans Affairs VHA DIRECTIVE Veterans Health Administration Washington, DC October 15, 2008 BOILER PLANT OPERATIONS

GLYCOL CHILLER SYSTEM TROUBLESHOOTING 101

Annual Service Agreement

1 DESCRIPTION OF THE APPLIANCE

PACKAGED FIRE TUBE BOILER

US Heavy Duty Fleets - Fuel Economy

NAVIEN AMERICA INC FITCH AVENUE

Printing and Publishing Energy Savings Guide

Magnum Mobile Generator MMG55 Specifications

Developed by The American Society of Power Engineers (ASOPE )

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Costs Associated With Propane Vehicle Fueling Infrastructure

Investigating the Impact of Boiler Aging In Replacement Decisions

Transcription:

Guidelines for Preparing for a Temporary Steam Plant Trailer-Mounted Boilers Skid Mounted Boilers Mobile Boiler Rooms Mobile Feedwater Vans Mobile Steam Plants Emergency Preparedness Plan

Table of Contents 1.0 Introduction 3 2.0 Boiler Requirements 4 3.0 Boiler Size & Weight 4 4.0 Basic Equipment to be Supplied with the Rental Boiler 5 5.0 Fuels 5 6.0 Power Requirements 5 7.0 Piping Sizes 6 8.0 Instrument Air 6 9.0 Weather Protection 6 10.0 Local Codes 7 11.0 Piping Diagram 7 2 12.0 Rental Boiler Specifications 8

Guidelines For Preparing For A Temporary Steam Plant (Emergency Preparedness Plan) 1.0 Introduction When operating a steam plant, there are many factors which determine the reliability and availability of a steam supply. Whether the steam is used to power a system or as a part of a process, mechanical engineers and power plant operators know that, in the majority of installations, management expects the system to run 24 hours per day throughout the year. Real-world conditions often make this impossible. Frequently, there is a need for a temporary steam plant to replace or augment the permanent system for one of the following reasons: Unplanned outages for emergency repair Planned outages for repair, maintenance or upgrades Increased capacity requirements to handle peak loads Testing of a new process or production run Research and development projects Delays in bringing new systems on line Although management expects steam plants to operate without interruption, as well as to meet new and changing requirements, the likelihood that one of the above listed factors will affect any steam plant operation in one year s time is 100 percent! Furthermore, the probability that some part of a steam plant will cause an interruption in service at least once during any year is about 20 percent. One way to greatly improve the chances that your system will be able to supply steam reliably and without interruption is by planning for installation of a temporary steam plant. Typically, this means making adequate provisions for quickly installing a rental boiler and auxiliary equipment. Steam plant equipment that can be rented for both short- and long-term periods include: Boilers Deaerators Demineralizers, water softeners, chemical feed systems EconoStak economizers CataStak SCR systems Feedwater pumps Fuel oil heater sets Blowdown tanks Diesel generators Air compressors Valves Controls The best time to plan for installing a temporary steam plant is before the need actually arises. Including provisions for a temporary steam plant can be very cost effective if accomplished when building a new facility, or when making changes to upgrade your current power boiler or steam plant. Such provisions can be as simple as installing additional connections for steam, water, fuel and power. 3

2.0 Boiler Requirements There are three different types of boilers that are available for rent: Type 1. Mobile boiler rooms consisting of a complete system with firetube boiler and auxiliaries mounted in a semi-trailer van. Units are pre-piped and pre-wired. Type 2. Trailer-mounted watertube boilers Type 3. Skid-mounted package watertube or firetube boilers The capacity and design pressures of these boilers are as follows: CAPACITY DESIGN PRESSURE TYPE 100 hp (3,000 lb/hr) 150 psig, saturated 1 200 hp (6,000 lb/hr) 150 psig, saturated 1 350 hp (10,000 lb/hr) 200 psig, saturated 1 650 hp 250 psig, saturated 1 800 hp 200 psig, saturated 3 30,000 lb/hr 300 psig, saturated 2 40,000 lb/hr 600 psig, saturated 2 60,000 lb/hr 300 psig, saturated 2 75,000 lb/hr 350 psig, saturated or 750 psig/750 F 2 82,500 lb/hr 500 psig, saturated 3 82,500 lb/hr 350 psig, saturated 2 120,000 lb/hr 350 psig, saturated or 750 psig/750 F 2 180,000 lb/hr 400 psig, saturated 3 200,000 lb/hr 750 psig/750 F 3 Note: Multiple boilers can be used in parallel to meet a steam demand that is higher than the capacity of a single boiler. 4 3.0 Boiler Size & Weight Temporary boilers require a firm foundation or footing. A concrete pad is the best support and asphalt is an acceptable alternative. At a minimum, a stable, well drained, compacted area is required with wood timbers sufficient to support the boiler s weight. The boiler must be blocked-up prior to operation. All weight must be removed from the running gear on trailer-mounted boilers. CAPACITY SHIPPING DIMENSIONS (W,H,L) SHIPPING WEIGHT OPERATING WEIGHT 100 hp 8'0" x 14'0" x 30'0" 30,000 lbs 45,000 lbs 200-300 hp 8'0" x 14'0" x 30'0" 45,000 lbs 60,000 lbs 350-600 hp 8'0" x 14'0" x 30'0" 50,000 lbs 65,000 lbs 20-40,000 lb/hr 10'0" x 14'0" x 50'0" 60,000 lbs 80,000 lbs 40-60,000 lb/hr 10'0" x 14'0" x 50'0" 80,000 lbs 100,000 lbs 75-100,000 lb/hr 12'0" x 14'0" x 30'0" 100,000 lbs 125,000 lbs 150,000 lb/hr 10'0" x 16'0" x 40'0" 130,000 lbs 160,000 lbs

4.0 Basic Equipment Supplied with a Rental Boiler The following items are normally provided as a part of the complete rental boiler: Boiler Combustion controls Trailer Safety valves F.D. fan, motor and starter Blowdown valves Burner Feedwater stop and check valves Feedwater controls Steam gauge and other trim Flame safeguard system Non-return valve All other equipment is normally furnished by the customer or installer. 5.0 Fuels TYPE OF FUEL Natural gas No. 2 fuel oil No. 6 fuel oil SUPPLY PRESSURE 15 psig regulated 150 psig regulated 150 psig regulated and heated to 220 F (approx.) To determine the amount of fuel required: Natural gas: Boiler size: lb/hr X 1.28 = SCFH No. 2 fuel oil: No. 6 fuel oil: Boiler size: lb/hr X 0.0095 = GPH Boiler size: lb/hr X 0.009 = GPH NOTE: Hp X 34.5 = lb/hr 6.0 Power Requirements CAPACITY POWER (480VAC, 3-phase, 60Hz) 5-10,000 lb/hr 50 Amps 10-20,000 lb/hr 75 Amps 20-40,000 lb/hr 100 Amps 40-65,000 lb/hr 150 Amps 65-100,000 lb/hr 200 Amps 100-200,000 lb/hr Consult Nationwide Boiler Inc. 5 A disconnect switch must be provided between the power source and the rental boiler. Install temporary conduit and wiring after the rental boiler arrives at the site.

7.0 Piping Size 150 PSI STEAM CAPACITY STEAM LINE FEED WATER NATURAL GAS FUEL OIL BLOWDOWN/ DRAIN 10,000 lb/hr 4" 1" 2" 3/4" 2" 20,000 lb/hr 6" 2" 2-1/2" 3/4" 2" 30,000 lb/hr 6" 2" 3" 3/4" 2" 40,000 lb/hr 8" 2" 3" 1" 2" 50,000 lb/hr 8" 3" 3" 1" 2" 60,000 lb/hr 8" 3" 3" 1-1/2" 2" 75,000 lb/hr 8" 3" 4" 1-1/2" 2" 100,000 lb/hr 10" 4" 6" 2" 2" 150,000 lb/hr 12" 4" 6" 2" 2" 200,000 lb/hr 14" 4" 6" 2" 2" 650 PSI STEAM CAPACITY STEAM LINE FEED WATER NATURAL GAS FUEL OIL BLOWDOWN/ DRAIN 30,000 lb/hr 4" 2" 3" 3/4" 2" 40,000 lb/hr 6" 2" 3" 1" 2" 50,000 lb/hr 6" 3" 3" 1" 2" 60,000 lb/hr 6" 3" 3" 1-1/2" 2" 75,000 lb/hr 8" 3" 4" 1-1/2" 2" 100,000 lb/hr 8" 4" 6" 2" 2" 150,000 lb/hr 10" 4" 6" 2" 2" 200,000 lb/hr 10" 4" 6" 2" 2" 6 All connections 1-1/2 and larger should be flanged. All piping should be ASTM A-106 GrB or A53 GrB, SCH 80 or equivalent. 8.0 Instrument Air On larger boilers, instrument air is required to drive the dampers, combustion controls, valves and regulators. Generally this requires a supply of 1-2.5 SCFM of dry, clean instrument air, supplied at 80-100 psig and regulated to 20-25 psig. 9.0 Weather Protection Generally, all rental boilers are equipped with weather protection. However, if low temperatures are expected, provisions should be made to protect the boiler from freezing. A shelter in front of and around the boiler should be considered for the comfort of the operating personnel during inclement weather.

10.0 Local Codes Check local codes for stack height restrictions, emission limits, and other boiler installation requirements. 11.0 Piping Diagram Temporary Steam Plant Typical Installation EXISTING STEAM PLANT FEEDWATER STEAM HEADER CONNECTION BLOWDOWN CONNECTION FUEL (NATURAL GAS OR #2 OIL) CITY WATER INSTRUMENT AIR 5'-0" 480VAC SUPPLY 10'-0" RENTAL BOILER AUXILIARY EQUIPMENT (OPTIONAL) 50'-0" 5'-0" 50'-0" STANDARD NON-RETURN VALVE SHIPPED LOOSE TEMPORARY PIPING TO BE INSTALLED WITH BOILER 7 EXISTING HEADER CONNECTION POINT FOR RENTAL BOILER

12.0 Rental Boiler Specifications When inquiring about a rental boiler, the following information is required by Nationwide Boiler. Rental inquires can be made online by visiting www.nationwideboiler.com and completing the Nationwide Boiler Rental Inquiry Form or by calling the Nationwide Boiler toll free phone number: 1-800-227-1966. In most instances, Nationwide Boiler can provide a quotation within 1 hour. Contact Information Name / Title: Company: Address: City / State / Zip: Phone: E-Mail: Boiler Requirements Steam pressure design psig Steam temperature F Steam pressure operating psig Steam capacity Ib/hr Fuel: Natural gas No. 2 fuel oil No. 6 fuel oil Emission data (if available): NOx ppm CO ppm Electrical power available: Amps @ 480VAC, 3-phase, 60Hz Auxiliary Equipment EconoStak economizer CataStak SCR system Deaerator Feedwater pump Demineralizer or water softener Chemical feeder Blowdown tank Other (please describe): Required Delivery Date: Required Rental Period: Reason for Need: Nationwide Boiler Incorporated...Integrity, Dependability, Real Customer Service. Corporate Headquarters 42400 Christy Street, Fremont, CA 94538 Phone: 1-800-227-1966, 1-510-490-7100 Fax: 1-510-490-0571 Web: www.nationwideboiler.com Email: info@nationwideboiler.com Sales Offices Major cities throughout the world 2012 Nationwide Boiler Inc. (ICD028) 1000 11/12