3.0 Project Description



Similar documents
List of Participating Dentists Southern California Counties

Southern California Avoid DUI Task Force Enforcement Operations Schedule

Fuel surcharge may apply. Check for current rates or for updates and/or changes to rates and cites serviced.

Transportation. Alzheimer's Orange County 2515 McCabe Way, Suite 200 Irvine, CA Transportation Services Referral List

2006 Kosmont Rose Institute Cost of Doing Business Survey. Executive Summary

2004 Kosmont-Rose Cost of Doing Business Survey Executive Summary

KOCE-TV CABLE / SATELLITE LIST

The Finalists will be receiving notification from the District in order to continue with the RFQP selection process.

153 HOSPITALS FOR CHILDREN S HOSPITAL OF ORANGE COUNTY Sorted by City and Name

Available for Lease or Sale

Orange County Office Market Report

Insurance Requirements

BOARD MEETING DATE: October 2, 2015 AGENDA NO. 9

Orange. County. Reclamation Plant No. 1 Treatment Plant No. 2. La Habra Brea. Fullerton Placentia Anaheim Villa Park Alamitos.

BEFORE THE PHOENIX PLANNING COMMISSION CITY OF PHOENIX, STATE OF OREGON

CSU Local Admission and Service Areas

A Guide to All Locations

ORANGE COUNTY, CALIFORNIA

California Hospital Association California Hospital Engagement Network Participants - August 2012

Spring 2006: Need Assessment Crime Scene Investigation

CAMINO NUEVO K-8 CHARTER SCHOOL BID RESULTS Bid Date September 5, 2013 at 2pm PDT Bid Package Number 1 - Grading and Earthwork

Capital Action Plan Status Thru Dec 2015

New Patient Handbook

Newspapers of General Circulation ~ Superior Court of San Bernardino County

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

I would like to introduce our company

Background City Code Requirements Business License Tax Rates and Revenue

FDIC ENVIRONMENTAL CHECKLIST OF. FDIC Asset Number Multi-Family Residence 2120 South Fairfield Avenue Chicago, Illinois

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

Would These Keywords Help Your Business? divorce lawyer divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca

Local Recycling Centers-Los Angeles County

BLOCK 400 PLANNED COMMUNITY DISTRICT

Easily compare our California HMO networks

PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA Telephone (805)

Easily compare our California HMO networks

Trade Subcontractor Location License#

Application for Certificate of Appropriateness Villa Drive, Atlanta, GA Owner: Mary T Farms LLC ( ) 3/25/16

REQUEST FOR PROPOSALS (RFP) to complete a

D3 April 8, 2015 Public Hearing

RELOCATION OF BUILDINGS

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

SECTION 3 ONM & J STRUCTURAL ANALYSIS

California - Los Angeles & Orange Counties HUD Photo List

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

FOR SALE. The Friedman Building th Avenue South, Seattle Nicholas T. Gill Allan Friedman

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Moving a House in Pasadena

CITY OF BELOIT REPORT TO THE BELOIT LANDMARKS COMMISSION

MID-TOWN RE-DEVELOPMENT

Minor Accommodation Planning Review Application

OWOW Proposition 84, Round 2 Master Project List

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

Saint Cloud Business Center

CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST

Creating jobs Saving energy Improving properties Lowering utility bills

FILE NO.: Z LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street

Combustible Soil Gas Hazard Mitigation

CSU Local Admission and Service Areas

City of Los Angeles CALIFORNIA ERIC GARCETTI MAYOR. November 6, 2014

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

makingspecialplaceshappen

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

STANFORD WHOLESALE MART

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

Residential Adjustments. Overview 4.1

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Incentives for Historic Preservation

St. Joseph Hospice Bereavement Resources. For: Orange County

ROYAL TERMITE CONTROL, INC 2874 W. VALLEY BLVD. ALHAMBRA CA 91803

CITY COUNCIL PACKET MEMORANDUM

17 East Main Street Cuba,NewYork Code Enforcement

Antelope Valley College Health Science Division 3041 West Avenue K Lancaster (661)

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION

B. Improve the appearance and character of areas surrounding new development.

New Patient Handbook

Los Angeles. BOX , Los Angeles, CA Sol ar Atlas FAX

Application for Tax Abatement for Rehabilitation of Property in a Local Historic District

Your Pest Company inc.

Firearm-Related Injury and Death in Orange County ( )

CITY OF SANTA ROSA DEPARTMENT OF COMMUNITY DEVELOPMENT STAFF REPORT FOR PLANNING COMMISSION SEPTEMBER 13, 2012 APPLICANT FILE NUMBER CUP12-042

Transcription:

3.0 Project Description

City of Long Beach 2810 East 1st Street Project Environmental Impact Report 3.0 PROJECT DESCRIPTION 3.1 PROJECT LOCATION AND SETTING The City of Long Beach (City) is located in the southern portion of Los Angeles County, overlooking the Pacific Ocean and San Pedro Bay (approximately 22 miles south of downtown Los Angeles); refer to Exhibit 3-1, Regional Vicinity. The proposed 2810 East 1st Street Project (herein referenced as the Project ) is located north of Ocean Boulevard, between Temple Avenue and Orizaba Avenue, within Long Beach s Bluff Park Historic District; refer to Exhibit 3-2, Local Vicinity. Regional access to the site is provided via Interstate 405 (I-405) and State Route 22 (SR-22), located approximately 3.0 and 2.5 miles to the north and northeast, respectively, and I-710 located approximately 2.75 miles to the west. Pacific Coast Highway (PCH) is located approximately 2.0 miles to the north/northeast of the Project site. The primary local roadways providing access to the site are Ocean Boulevard, East Broadway, and Temple Avenue. 3.2 EXISTING ONSITE AND SURROUNDING CONDITIONS The Project site consists of one approximately 0.16-acre parcel, Assessor Parcel Number (APN) 7264-017-003. 1 The residence on the property is recorded by the County Assessor as 1,920 square feet of building living area. The structure currently lacks roof, walls, doors, and interior, as illustrated on Exhibit 3-3, North Elevation of Project Site Existing Condition. It consists of mostly intact wood framing on a concrete foundation, with several windows still in their frames. Land uses surrounding the Project site include various single- and multi-family residential uses to the north, a multi-family residential use to the east, and single-family residential uses to the south and west. 3.3 BACKGROUND AND HISTORY The residence located at 2810 East 1st Street was originally constructed in 1921. In 1982, the Bluff Park Historic District was designated with the 2810 East 1st Street residence identified as a contributing structure. On October 15, 2005, a Certificate of Appropriateness was approved allowing a 523-square foot addition and removal of the rough-textured stucco on the existing residential structure. In December 2005, permitted construction work was initiated. Upon removal of the rough-textured stucco, most of the lath detached from the framing, leaving the framing bare. Termite damage and dry rot in the framing were also discovered during the stucco removal. The former property owner notified the City and requested a Certificate of Appropriateness for demolition and new construction. Since 2005, the residence has remained in its current state. 1 Los Angeles County Office of the Assessor, http://maps.assessor.lacounty.gov/mapping/viewer.asp, Accessed January 22, 2013. Public Review Draft May 2013 3-1 Project Description

395 14 Palmdale Adelanto 15 Apple Valley 18 Victorville 18 Hesperia 138 SAN BERNARDINO COUNTY LOS ANGELES COUNTY 1 405 73 133 ORANGE COUNTY 5 241 74 138 173 Lake Arrowhead 18 San Fernando 210 18 Running 330 Springs 5 San Burbank Bernardino 15 Azusa Glendora Pasadena 210 Fontana 2 Rancho Rialto 38 Cucamonga 101 Redlands 10 Montclair Loma West Pomona Ontario 215 Linda Covina 10 10 Chino Los 605 60 Riverside Angeles Whittier 57 71 710 60 La Yorba Moreno Beaumont 105 Mirada Fullerton 91 Linda 90 Norco Valley La 110 Palma Cerritos Buena 91 Anaheim Park 91 Corona RIVERSIDE Torrance Cypress COUNTY 5 241 405 Garden 1 55 Perris Grove 22 74 261 Hemet LONG BEACH Huntington Beach Costa Mesa Newport Beach Santa Ana Irvine Lake Elsinore 15 Murrieta Sun City 215 Laguna Beach San Juan Capistrano Temecula PACIFIC OCEAN Dana Point San Clemente USMC Camp Pendleton Fallbrook 15 1 - Project Site Oceanside SAN DIEGO COUNTY NOT TO SCALE 05/13 JN 133143 CITY OF LONG BEACH ENVIRONMENTAL IMPACT REPORT 2810 EAST FIRST STREET PROJECT Regional Vicinity Exhibit 3-1

- Project Boundary Source: Google Maps, 2012. NOT TO SCALE 05/13 JN 133143 CITY OF LONG BEACH ENVIRONMENTAL IMPACT REPORT 2810 EAST FIRST STREET PROJECT Local Vicinity Exhibit 3-2

Source: Historical Resources Report prepared by Galvin Preservation Associates, February 2013. 05/13 JN 133143 CITY OF LONG BEACH ENVIRONMENTAL IMPACT REPORT 2810 EAST FIRST STREET PROJECT North Elevation of Project Site Existing Condition Exhibit 3-3

City of Long Beach 2810 East 1st Street Project Environmental Impact Report 3.4 PROJECT CHARACTERISTICS The Applicant proposes to restore the existing structure, using over 90 percent of the remaining onsite materials, as illustrated on Exhibit 3-4, Illustration of Proposed Project. The proposal involves the use of 100 percent of the existing foundation and over 80 percent of the existing framing. Missing doors and windows would be replaced with circa 1920s. The following summarizes the proposed restoration/reconstruction: Structural Foundation: Retain and reuse 100 percent of the existing foundation, and sister a new engineered foundation for structural support. Roof Framing: Frame roof as per original design and structural upgrades. Roofing: Reuse 90 percent of the existing onsite adobe circa 1920 s roofing materials and replace the missing 10 percent adobe with imported circa 1920 s roofing materials. Garage: Retain and maintain the existing garage. Garage Roof: Repair and terrain grade the existing garage roof to prevent water intrusion. Front Porch: Retain, restore, maintain, and reuse the front porch. Framing: Chemically treat all framing for wood destroying organisms using Vikane Gas Fumigant (Sulfuryl Fluoride). 2 Timbers and Wood: Remove the existing dry rotted wood, replace with new structural wood, and sister the existing timbers, per engineering standards. Interior Coved Ceiling: Retain interior coved ceiling in living room and dining area. Flooring: Install period correct oak flooring. Simple Living Home: The roof is designed to accommodate a rain water receptacle. The interior is designed to create heating, cooling zones, and low energy lighting throughout. The goal is to minimize costly off site energy and materials, use all available onsite materials, and take full advantage of economical passive energy systems. Exterior Exterior Doors: Exterior doors circa 1920 s. Exterior Doors: Repair, restore, and reuse the existing exterior doors, and replace the missing doors with circa 1920s. Windows: Repair, restore, and reuse the existing windows, and replace the missing windows with circa 1920s. Garage Doors: Provide new garage doors circa 1920s. Front Metal Gates and Door Screen: Retain, repair and restore matching metal gates at front of property and front door screen. 2 Fluoride Action Network Website, http://www.fluoridealert.org/pesticides/sulfuryl.f.vikane.epa.htm, Accessed January 22, 2013. Public Review Draft May 2013 3-5 Project Description

Source: Begovich + Haug Architects, September 26, 2012. 05/13 JN 133143 CITY OF LONG BEACH ENVIRONMENTAL IMPACT REPORT 2810 EAST FIRST STREET PROJECT Illustration of Proposed Condition Exhibit 3-4

City of Long Beach 2810 East 1st Street Project Environmental Impact Report Architectural Detail: Restore architectural detail as per historical photos and onsite framing details. Exterior Colors: Use approved exterior colors and stucco. Hardscape/Landscape/Fencing Driveway and Walkways: Retain, maintain, and reuse the existing driveways and walkways; retain and grade the west side walkway. Fencing: Retain, maintain, repair, and reuse the existing fencing. Concrete Steps: Retain and repurpose for restoration the concrete steps located at south side of the house. Landscaping: Retain and maintain the orange tree and bougainvillea bushes. Utilities Water and Sewer Lines: Retain, maintain, repair, and reuse the existing water and sewer lines. Gas Lines: Test, repair, and retain the existing gas lines. Exhibit 3-5, Proposed Site Plan, illustrates the proposed site and floor plans, which include a 1,870-square foot house and a 338-square foot detached garage. 3.5 PROJECT GOALS/OBJECTIVES Pursuant to CEQA Guidelines Section 15124(b), the EIR project description must include [a] statement of objectives sought by the proposed project.the statement of objectives should include the underlying purpose of the project. The proposed Project objectives are: Eliminate a damaged, partially disabled and blighting structure from the Bluff Park Historic District. Restore/reconstruct the single family residence on a previously occupied site, using the maximum amount of on-site original materials that is feasible. Develop a new single-family residence with modern amenities while maintaining the District s historical significance, character, and quality by using architectural styles, materials, and features from the 1920s, the District s period of significance. 3.6 PHASING Construction of the Project is anticipated to occur in one phase, over a 12-month period. Construction would begin upon issuance of the Building Permit, which is anticipated to occur Summer 2013 and continue through issuance of the Occupancy Permit, which is anticipated to occur Summer 2014. Public Review Draft May 2013 3-7 Project Description

Source: Begovich + Haug Architects, September 26, 2012. NOT TO SCALE 05/13 JN 133143 CITY OF LONG BEACH ENVIRONMENTAL IMPACT REPORT 2810 EAST FIRST STREET PROJECT Proposed Site Plan Exhibit 3-5

City of Long Beach 2810 East 1st Street Project Environmental Impact Report 3.7 APPROVALS The agency approvals required for Project implementation include the following: City of Long Beach Certification of EIR by Planning Commission; Approval of Certificate of Appropriateness by Cultural Heritage Commission (or Planning Commission, upon appeal); and Building Permit. Public Review Draft May 2013 3-9 Project Description

City of Long Beach 2810 East 1st Street Project Environmental Impact Report This page intentionally left blank. Public Review Draft May 2013 3-10 Project Description