CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

Similar documents
CITY OF WHITEHORSE Construction Management Plan G U I D E L I N E S

Approval Services Unit

Construction Management Plan Template

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

Household waste & recycling storage requirements

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

Construction Management Plan (CMP) Application

Construction Traffic Management Plan

Version Decision Number Adoption Date History 1 20\ /02/10 Adopted 2 3 4

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

CONTACTS: Mitchell Shire Council M.S.C. Building Department M.S.C. Health Department

Construction Site Set Up Requirements

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

WITHOUT PREJUDICE. City of Port Phillip Planning Permit Application No. P0039/2015

THIS PAGE INTENTIONALLY LEFT BLANK

Federation of Piling Specialists

VEHICLE CROSSOVER INFORMATION PACK

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

Waste & Recycling. Planning Guidance on Waste & Recycling Storage and Collection. Development & Enterprise FOR INTERNAL USE ONLY.

University Arms Hotel, Cambridge

Guide Document for Development of WHS Management Plans

Undercover storage requirements for waste/recycling depots

Department of Public Works. Recycling policy for buildings and civil infrastructure

APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.

Best Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins

TEMPLATE -PRINCIPAL CONTRACTOR CONSTRUCTION SAFETY & ENVIRONMENT MANAGEMENT PLAN

2. Permit to Establish or Alter a Memorial or Place of Interment

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

Traffic Management Plan - Depot Procedure

STANDARD SITE LICENCE CONDITIONS FOR RESIDENTIAL PARK HOME SITES IN GUILDFORD CARAVAN SITES AND CONTROL OF DEVELOPMENT ACT 1960 (AS AMENDED)

Construction Management Statement. Introduction. Contents

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Waste management guidance notes for residential developments

Standard terms and conditions

Provision of Household Waste & Recycling Service

Caravan Sites and Control of Development Act Permanent Residential Mobile Home Sites Licence Conditions

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

PLANNING POLICY 3.3.5

Definition of Tower from the Bradley County Zoning Resolution

Traffic Management Issue 1.0 Revision: v2 October 2014

Policy document on the provision of waste & recycling collection and storage facilities. Includes both domestic and commercial premises

BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

WAVERLEY BOROUGH COUNCIL ENVIRONMENTAL SERVICES DEPARTMENT WASTE AND RECYCLING

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

Basements and Deep Building Construction Policy 2014

Demolition & Construction Management Plan

CSC-DIVISION 1-MASTER SECTIONS Description

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

Appendix 6 Storage and Collection of Waste and Recycling

SITE CONTRACTOR PROCEDURES

CONTRACTOR INDUCTION HANDBOOK

Construction and Demolition Waste

City of Beaumont, Texas Grading Permit Information

For ease of reference the clauses are arranged in 12 sections as follows:-

Waste and Recycling Storage and Collection Guidance for Houses, Flats, Houses of Multiple Occupancy, New Builds, and Conversions.

Developer Guidance Note: Provision of Waste and Recycling Collection and Storage Facilities

Pollution & Noise from Demolition & Construction Sites

IALN / FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF

Restaurant & café guide

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

SECTION SITE PREPARATION

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

TRAFFIC MANAGEMENT PLAN

Engineering Standard

Introduction Management Tenancy terms Applying Licence agreement Payment of fees Insurance Moving in...

Leakage Code of Practice. Domestic Customers

Home Office, Home Occupation and Home Business

Florida Department of Environmental Protection

Construction Traffic Management Plan

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993

Managing the risk of falls while working on roofs in housing construction

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

Preparing a maintenance plan

Tree Management Policy

GUIDELINES FOR OUTDOOR EATING FACILITY

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

Tree Pits Operation & Maintenance Guide

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

Construction Traffic Management Plan

HOME INSURANCE ASSESSMENT

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

Contractors and Suppliers Code of Conduct. June 2013

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Storm Drain Inlet Protection

Transcription:

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention of land, demolition and building work within its municipal boundaries. To achieve this, the City requires many builders and developers to prepare a Construction Management Plan (CMP) that takes into account all relevant aspects of demolition or building work. The need for a Construction Management Plan depends on the nature of work, likelihood of disruptions, impact on local amenity, dangers or risks involved, traffic management or any other relevant issue required to be addressed under the Planning and Building Approvals. A CMP must be submitted to fully address each new stage of construction. The CMP must address in detail a range of health, safety, traffic management and amenity issues relating to the construction site and adjoining community. Purpose of a Construction Management Plan The Construction Management Plan outlines the minimum requirements to be addressed by builders and developers when formulating their individual CMP for demolition or building work in and around the City. The requirement to prepare a CMP may be specifically stated in the planning approval for a site, or otherwise required by the City depending on the nature of proposed building works. How should the Construction Management Plan be used? Approved CMPs are a contract between the developer and Council addressing the site and development management issues that are relevant during building activity. All contractors working on the site are to abide by and adhere to the provisions of the approved CMP. How to prepare a Construction Management Plan? Check the planning approval to determine whether it has a condition requiring a CMP to be prepared. Make a note of whether specific requirements need to be addressed. Prepare the CMP in accordance with the Construction Management Plan Application for Approval and Guidelines. All CMPs are required at a minimum to address: Item 1: Public Safety, Amenity and Site Security Submit CMP to Building Surveyor at the City of Vincent. Respond to queries from the City of Vincent and amend and/or provide additional information if requested. CMP approval issued. A Building Licence will not be approved/issued until such time as the CMP has been approved by the City. Ensure all personnel and contractors on site are aware of the Construction M a n a g e m e n t P l a n a n d i t s requirements which are to be adhered to. If circumstances change, a request to amend the CMP is to be submitted to the City of Vincent. Should the City receive an enquiry/complaint regarding the excavation, demolition or building works the City will contact the builder/developer to ensure strict adherence to the CMP.

Item 1: Public Safety, Amenity and Site Security. This section of the Construction Management Plan has been included to ensure the general public and the City s Infrastructure is adequately protected from activities occurring on building sites. Security Measures Signage Security measures must be in place at all times when the site is not in operation. This may include: perimeter barriers, locks, surveillance systems, security lighting and motion detectors. Signage specifying any security measures and key contact details shall be erected on the perimeter of the building site (i.e. attached to the building, fence or hoarding). A 24 hour contact name and phone number must be provided. Essential safety signs to protect workers and the public around building sites are to be installed for the duration of works (e.g. Danger Construction Site No Unauthorised Access and All Visitors Report to Site Office). Public Domain Any damage to the footpath, road, kerb stormwater drains and street furniture that results from excavation, demolition and building work is the responsibility of the builder or developer. Any hazard which may impact on pedestrians, cyclists and motorists safety should be repaired immediately. Bicycle paths must be maintained where existing bicycle access is provided adjacent to a construction site. Developers and builders must ensure there are no tripping hazards from the hoarding or perimeter fencing on nearby footpaths. Electrical, plumbing and other services extending over footpaths must be covered over and secured, and pedestrian and disability access facilitated by a ramp. Ramps must have a non-slip surface, a handrail, and a maximum gradient of 1:14 unless the existing topography of the street or road requires some variation to this ratio. The general public must be protected from construction activities including vehicle loading and off-loading within the public domain. Precautions must be fully specified and include the following measures: The use of spotters and traffic controllers Restriction on the hours of operation of these activities (non peak hours). Security mesh or barriers to separate the public from the work area. Unless otherwise permitted, an obstruction must not protrude from premises causing it to interfere with pedestrians or traffic in a public place. Unless otherwise permitted, all construction materials must be stored onsite and not in the street or public space. When a crossover is required for vehicular access to the site, consider: Power Lines The type and size of trucks entering the site The loading and potential for damage to the existing crossover and footpath The nature of protection of crossover and pavements The need for a dilapidation survey of the footpath before and after works have taken place. When working in proximity to Western Power Distribution Lines, all work must comply with Worksafe Regulation 3.64 - Guidelines for Work in the Vicinity of Overhead Power Lines. If any work is to breach the minimum safe working distances a Request to Work Near Underground and Overhead Power Lines form must be submitted to and approved by Western Power. Contact Western Power for more information in this regard.

Item 2: Storm Water and Sediment Control This section of the Construction Management Plan has been included to ensure to prevent contamination of, or damage to, stormwater drains and waterways; and to ensure sediment from the building site is retained onsite during construction work. Water discharge is not permitted to flow to adjacent private or public property and is to be adequately contained within the lot. Drainage of the site is to be directed to the legal point of discharge through construction. Stormwater in sediment control points is to be filtered before entering the legal point of discharge. Waste materials, including liquid wastes such as paint, concrete slurries and chemicals, must not be discharged into a stormwater drain. Wash Down Facilities Wash down areas must be located near the site entrance and be designed to capture and treat water prior to discharge into the stormwater system. Sediment Control The storage of loose materials such as soil, sand and gravel must be carefully considered and measures put in place to prevent their displacement. Water Conservation Activities on construction sites need to consider permanent water saving measures. All hoses must be in good condition and fitted with a trigger nozzle etc. Item 3: Traffic and Access Management This section of the Construction Management Plan has been included to ensure disruption to traffic caused by construction activities is minimised and to ensure the safety of all road users. A suitably endorsed Traffic Management Plan is to be prepared that addresses site and traffic issues arising from the development works and to identify the traffic management procedures to be implemented by contractors and subcontractors during the project. Primary issues to be addressed in the Traffic Management Plan are identified below: Traffic Assessment: Analysis of existing traffic volumes (vehicles, pedestrians and cyclists). Existing and proposed speeds - are there temporary speed reductions proposed? Existing on and off site car parking facilities. Public transport routes will the works impact on public transport routes? If so have arrangements been made with the Public Transport Authority for a route deviation? NOTE: Traffic Management Plans will only be required by larger developments and those in difficult locations as determined by the Director Technical Services. Pedestrian Movement The path of pedestrian and cyclists is to be free of obstruction and clearly legible. In some instance it is acknowledged that pedestrian diversions/detours are required. If the footpath and verge is proposed to be obstructed by the installation of the work shed, the City may require the shed to be placed on gantries above the footpath or may require the installation of kerbing, at the applicant's expense, to provide safe pedestrian access on the road.

Parking Parking and traffic controls around building sites must be complied with and accommodated in a manner that minimises disruption to the precinct. Careful consideration must be made for the provision of contractor/worker vehicles. Enforcement patrols will be increased if there is a noticeable increase in damage to nearby parking meters and signs. Vehicle Access The general public must be protected from construction activities including vehicle loading and off-loading within the public domain. Precautions must be fully specified and include the following measures: The use of spotters and traffic controllers. Restriction on the hours of operation of these activities (non peak hours). Security mesh or barriers to separate the public from the work area. Item 4: Waste Management and Material Re-Use This section of the Construction Management Plan has been included to ensure consideration is given to maximising the reuse and/or recycling of construction materials. Applicants should consider resource recovery and waste management actions to reduce the amount of waste ending up in landfill. Consideration should be given to : Efforts to minimise waste on site by avoiding over -estimation of purchasing requirements, minimising packaging materials, and buying environmentally approved and recycled content products. Procedures for the collection and sorting of recyclable construction materials. Provision of containers for recyclable materials including cardboard, glass, metal, and plastic and green waste. The re-use of timber, glass and other materials. The recycling of asphalt, metal, bricks, tiles, masonry, concrete, plasterboard, plastic, batteries, cardboard, carpet and other materials. Provisions for collection of daily rubbish from workers. Procedures for removal of waste (materials that cannot be reused or recycled) from the site. Procedures for removal of hazardous or dangerous materials from the site.

Item 5: Earth Works and Associated Matters This section of the Construction Management Plan has been included to minimise the likelihood of damage to adjacent buildings and structures or other property under the care control and management of the City. The City does not encourage Sheet Piling and encourages less intrusive methods of retaining. Sheet piling is a retaining system comprising overlapping sections of sheet piles formed from varying gauges and strengths of uniform steel sheeting. Sheet piling is commonly used to retain boundary walls during construction in situations where the adjacent buildings are deemed tolerant to the vibration that will occur during the installation process. Installation of the sheet piles are undertaken using a method of high frequency vibration conveyed through the drive head configuration of either an excavator mast or crane. Sheet piling can be incorporated into the design of a project to be a sacrificial or permanent element of construction and the sheets are able to penetrate depths of up to approx 16 metres depending on the geotechnical conditions of the site. Sheet piling will not generally be approved unless an appropriately qualified consultant certifies that it will not damage nearby properties. Dilapidation Reports The purpose of a dilapidation report is to record the current condition of a property prior to any building work being undertaken. Dilapidation reports are typically undertaken on properties adjacent to the proposed building site and should comprise: a) the relevant property owner s signature; b) annotated photographs; c) site and floor plan; and d) details of any pre existing damage (including measurements). The report can be used to resolve any disputes that may arise during or after the building works. The City does not undertake dilapidation reports. A dilapidation report should be commissioned by the builder/applicant. All costs associated with the preparation of a dilapidation report shall be borne by the applicant/builder(s). NOTE: A copy of the dilapidation report for any property/site listed on the State Register of Heritage Places will be forwarded to the Heritage Council for its records Due to the range of rigs available for the installation of sheet piling, sheet piling is used across a broad spectrum of construction from small residential to large commercial and civil projects. It is noted that No two walls are the same. Careful analysis of each structure and the affect it may have on the structure should be undertaken. This analysis should be carried out by the architect, professional contractor or structural engineer. The developer s engineer should make specific design recommendations due

DISCLAIMER This guideline has been developed to provide general guidance in relation to the general requirements for Construction Management Plans. It is not extensive and the City of Vincent hereby expressly disclaims all liability for errors and omissions of any kind whatsoever whether negligent or otherwise for any loss, damage, injury or other consequences that may arise from any reliance on this publication. The use or representation of any product or system is not to be taken to imply approval or endorsement of the same.