STATEMENT OF ACKNOWLEDGMENT



Similar documents
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

Activity Yes No N/A Notes


COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

C. Storm Water Pollution Prevention Plan (SWPPP) Yes No Response / Comment. D. Good Site Management Housekeeping Yes No Response / Comment

City of Shelbyville Site Inspection Checklist

Beseck Switching Station Inspection

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information

Construction Site Inspection. Inspecting to Keep You in Compliance

TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Storm Water Management Requirements for Construction Projects Less than One Acre

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

NPDES Industrial Stormwater Inspection Worksheet

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Storm Drain System Operation and Maintenance

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Construction Site Monitoring Program Guidance Manual

Waste Handling & Disposal

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

Module 6: Pollution Prevention Plans and SWPPP Overview

Block and Gravel Inlet Protection (BIP)

Vehicle Tracking Pad

Storm Drain Inlet Protection

Outlet stabilization structure

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides

State of Florida. Department of Environmental Protection. Generic Permit. For. Stormwater Discharge from Large and Small Construction Activities

Temporary Batch Plants

E&SC Training & Certification

TABLE OF CONTENTS. Page 2 of 37 Ohio EPA Permit No.: OHC000004

Good? Bad? Why? Training Module 4

Storm Drain Inlet Protection

Concrete Waste Management

MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities

SeCTion TemPoRARy Soil erosion and WaTer pollution ConTrol sewpcp requirements

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

BUSINESS INSPECTION PROGRAM

CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION

Spill Prevention, Control & Cleanup SC-11

Erosion Control and Stormwater Quality Field Guide

Developing Your Stormwater Pollution Prevention Plan A Guide for Construction Sites

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

Definition of Tower from the Bradley County Zoning Resolution

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Storm Drain Inlet Protection - IP

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Preventing Storm Water Pollution: What We Can Do

City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses

4.3 Cisterns and Rain Barrels

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

TRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

Annual Standards and Specifications. Erosion and Sediment Control

Warren County MS4 Stormwater Management Program Plan

Appendix C3: Response Plan for Investigations of Illegal Discharges, 2016

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

City of Beverly Hills Construction Stormwater Requirement Checklist

SECTION 5. Sediment Control Measures

Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Water & Sewer Utility Maintenance SC-76

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

Table 4.9 Storm Drain Inlet Protetion Applicable for

Scheduling Maintenance for Infiltration Basins and Trenches

III. Relying on another Governmental Entity

Operation & Maintenance Document Templates

GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS

Prevent Blockages in the Sanitary Sewer System

CHAPTER 10 POLLUTION PREVENTION PLAN

12/3/2015 MUNICIPAL STORMWATER RESPONSIBILITIES YOU NEED TO KNOW WHAT IS STORMWATER? WHY?

State of California Department of Transportation Construction Site Best Management Practice (BMP) Field Manual and Troubleshooting Guide

PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington. Water Operations Stormwater Best Management Practices

STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES

Stormwater Ponds. c ıty of a bı le ne st or m wat e r utı lıty dıv ısı on

Transcription:

General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, issued 8/21/13, effective 10/1/13 Stormwater Monitoring Report SITE INFORMATION Permittee: BNE Energy Mailing Address: 29 South Main Street, Town Center, Suite 200, West Hartford, CT 06107 Business Phone: (800) 450-0503 ext.: Fax: Contact Person: Title: Site Name: Wind Colebrook South Site Address: 17 & 29 Flagg Hill Rd, Colebrook, CT Receiving Water (name, basin): Farmington 4302 Stormwater Permit No. GSN 002270 SAMPLING INFORMATION (Submit a separate form for each outfall) Outfall Designation: Date/Time Collected: Outfall Location(s) (lat/lon or map link): Person Collecting Sample: No sample collected No runoff during working hours from any storm events in DJanuary 2016 No indications of sediment in brooks or water courses after runoff periods Storm Magnitude (inches): Storm Duration (hours): Size of Disturbed Area at any time: Work areas have been stabilized MONITORING RESULTS Sample # Parameter Method Results (units) 1 Turbidity 2 Turbidity 3 Turbidity 4 Turbidity (provide an attachment if more than 4 samples were taken for this outfall) Avg = Laboratory (if applicable) STATEMENT OF ACKNOWLEDGMENT I certify that the data reported on this document were prepared under my direction or supervision in accordance with the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities. The information submitted is, to the best of my knowledge and belief, true, accurate and complete. Authorized Official: Signature: Please send completed form to: Date: DEPARTMENT OF ENERGY & ENVIRONMENTAL PROTECTION BUREAU OF MATERIALS MANAGEMENT AND COMPLIANCE ASSURANCE 79 ELM STREET HARTFORD, CT 06106-5127 DEEP-WPED-SMR-015 1 of 1 Rev. 9/3/13

ATTN: NEAL WILLIAMS DEEP-WPED-SMR-015 1 of 1 Rev. 9/3/13

General Information Project Name: Location: CT DEP Tracking No. Wind Colebrook South Winsted- Norfolk Road Colebrook, Connecticut CSC Petition 983 CT GSN 002270 Report No. 241 Date of Inspection: Jan 29, 2016 Start / End Time: 12:30 PM to 1:15PM Inspector s Name(s): Inspector s Title(s): Inspector s Contact Information: Roger Hurlbut Project Engineer LENARD ENGINEERING INC 860 379-6669 office Describe present phase of construction: No work on site No change in vegetation due to winter conditions Some minor internal erosion & riling, no discharges past perimeter silt fencing Type of Inspection: Regular Pre-storm event During storm event Post-storm event Weather Information Has it rained since the last inspection? If yes, provide: Storm Start Date & Time Storm Duration Approximate Rainfall 1/10/16 1.3in Weather at time of this inspection? 32 F Snow Flurries Discharge Information Do you suspect that discharges may have occurred since the last inspection? Are there any discharges at the time of inspection? Describe location of any discharges from the site: -. Page - 1

INSPECTOR CERTIFICATION Project: Project Location: Contractor: Address: Wind Colebrook South Winsted- Norfolk Road Colebrook CT None all work completed Phone: Fax: CONSTRUCTION INSPECTION & MAINTENANCE LOG Date Activity Description (1) Report No. Siting Council 1-29-2016 By R Hurlbut LEI #241 Page - 2

SITE-SPECIFIC BMPs (B) 1 2 3 4 BMP Description Anti Tracking Pad Sediment & Erosion Control Barriers around perimeter of site Temp Sediment Basins Sediment & Erosion Control Barriers BMP Installed and Operating Properly? Corrective Action Needed None - 5 Temp ground cover Stable and functioning New Fencing has been installed around active areas Non active surfaces are stable Date for corrective action / responsible party Not necessary Drive is paved Not necessary Site has been seeded & mulched 6 7 8 9 10 11 12 13 14 15 17 18 OVERALL SITE ISSUES Page - 3

(C) BMP/activity Implemented? Maintained? Corrective Action 1 2 3 Are all slopes and disturbed areas not actively being worked properly stabilized? Are natural resource areas (e.g., streams, wetlands, mature trees, etc.) protected with barriers or similar BMPs? Are perimeter controls and sediment barriers adequately installed (keyed into substrate) and maintained? Date for corrective action/responsible person 4 5 7 Are discharge points and receiving waters free of sediment deposits? Are storm drain inlets properly protected? Is trash/litter from work areas collected and placed in covered dumpsters? None necessary road is paved No work on site Page - 4

(C) BMP/activity Implemented? Maintained? Corrective Action 8 Are washout facilities (e.g., paint, stucco, concrete) available, clearly marked, and maintained? Date for corrective action/responsible person N/A 9 Are vehicle and equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? Not necessary all work completed 10 Are materials that are potential stormwater contaminants stored inside or under cover? N/A 11 Are nonstormwater discharges (e.g., wash water, dewatering) properly controlled? 12 (Other) 13 (Other) Page - 5

GENERAL INSPECTION COMMENTS AND EXPLANATION General Inspection Comments (D) All work on site has been complete Is other descriptive information attached to this inspection report? Plan Information (E) Were all current plan BMP s in place at the time of inspection? Are additional BMP s required? Does the plan need to be updated? Plans for as constructed site will be necessary Explanation of additional BMP and Plan update requirements: Name: Roger Hurlbut (Please print) Signature: Title: Independent(3 rd party) Inspector Date: 1/29/2016 Page - 6