IBM Maximo Adapter for Primavera



Similar documents
Configuring the Optimization Server

IBM Tivoli Software. Maximo Business Intelligence Work Packs. Workorder, Asset Failure, Asset and Inventory Management

The 3 Must Dos for Maintenance Planning and Scheduling

MAXIMO Project Manager User s Guide

EXHIBIT 2-2-C PROGRESS SCHEDULES

IBM Certified Deployment Professional-Maximo V6 ITSM. Version: Demo. Page <<1/9>>

IBM Tivoli and Maximo Asset Management Development Update & Maximo 7.1 Preview

Asset Management Systems Information

MAXIMO SCHEDULER Bouke Spoelstra

School of Management and Languages Capacity Planning

IBM Maximo. Doug Wood, Architect Tivoli CTO s Office Esther Burwell, Tech Lead Tivoli CTO s Office. 07-Dec-2011 COBie CMMS/CAFM Challenge 1

A S S E T I N T E G R I T Y I N T E L L I G E N C E

The Art of the Possible Scheduling Options in SAP. Mark W. Scott Vesta Partners, LLC

3 SYSTEMS DESIGN AND CAPACITY

B2B Sales Benchmarks. Compare Yourself to your Peers & Discover the Best Tactics and Channels that Drive Revenue

Project Management the smart way. Engineering & Construction. Timesheet Management QTIME. System. Improve Efficiency with QTIME

SALES PLANNING AND FORECASTING A WEB-BASED PLANNING PROCESS BY CUSTOMER AND PRODUCT PERFORMANCE BLUEPRINT VERSION 2.0

Work Execution Management Training and Coaching Services

Metrics-Based Performance Monitoring

Spec. Standard: 11/27/ Revision: 11/27/06

IBM Maximo for Transportation. Don Beahm IBM Transportation and Government Product Manager

IBM Maximo Asset Management V7.1 Solution Design Exam.

Oracle Primavera P6 Enterprise Project Portfolio management Overview Programme Reference # 201A

Mastering Microsoft Project 2010

Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University.

Maximo Scheduler Update

Best Practices for the Planning and Execution of Turnaround Projects in the Oil and Gas Industry

Predictive Maintenance

Maintenance Assessment Questionnaire. Please Print and Complete this Document.

Infor Planning Tools. From Demand to Execution. Hans Smet Senior Account Executive

QAD Enterprise Asset Management BI Metrics Demonstration Guide. May 2015 BI 3.11

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

How To Increase Employee Productivity And Increase Wrench Time At An Oil Refinery

FaciliWorks 8i. Product Features. Features in blue are specific to FaciliWorks 8i Enterprise. Flexible Installation Options

NE-50413B Mastering Microsoft Project 2010

Maximo Business Intelligence Reporting Roadmap Washington DC Users Group

Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry

2012 National BDPA Technology Conference. Defining Project and PMO Metrics

MODEL SCHEDULING SPECIFICATION

Asset Management for Green Manufacturing

PMO Metrics Recommendations

An integrated approach to managing today s energy and utility assets

IBM Maximo Asset Management V7.6 Overview. January 8, 2015

FRA s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011

TEC-Maximo integration. Involved Software: IBM Tivoli Enterprise Console (TEC) Maximo MS SQL server Project scope:

4. Maintenance and Materials Management

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

What is Costrac? Approval of Budget against WBS. Feasibility Study Completed. Define & Map WBS. Approval of WBS. Estimate

Unified management supports the convergence of healthcare assets

Frank Cervone Vice Chancellor for Information Services and Chief Information Officer Purdue University Calumet January 17, 2012 CARLI Anatomy of a

Sun Bear Marketing Automation Software

Mastering Microsoft Project B; 3 days, Instructor-led

Agile Project Management Controls

Engineering and Construction

Oracle Sales and Marketing

DCMA 14-Point Assessment Metrics

Five Strategies for Increasing the ROI of Marketing Events

Asset and Plant Lifecycle Management

Application for 2015 University of California Larry L. Sautter Award for Innovation in Information Technology

Building Contractor Management Excellence

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Los Angeles Unified School District Maximo 7.5 / Work Order Module Labor Reporting Application Guide

The expression better, faster, cheaper THE BUSINESS CASE FOR PROJECT PORTFOLIO MANAGEMENT

Chapter 2 Maintenance Strategic and Capacity Planning

Accounting and financial services are among the first type of services to be outsourced by business owners.

HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM

SCHEDULE AND BUDGETING

ORACLE RAPID PLANNING

Deltek Maconomy Project Management

Optimizing Inventory in Today s Challenging Environment Maximo Monday August 11, 2008

SALES COMPENSATION PLANNING A WEB-BASED PROCESS FOR MANAG- ING SALES COMPENSATION PLAN-TO-PERFORM BLUEPRINT

CSSE 372 Software Project Management: Software Project Scheduling

Ready-to-Use RFP Outline Time & Attendance (TA) Software

AC 234 ก 3(3-0-9) (Management Accounting)

project management product sheet

Private healthcare market in Bulgaria Development forecasts for

Document Management Roadmap. April 2016

Increase your Performance with the PSA Suite for Microsoft Dynamics CRM

MICROSOFT OFFICE PROJECT - SYLLABUS

The Combination of Last Planner System and Location-Based Management System

SLIM Estimate and Microsoft Project Best Practices

SALES AND OPERATIONS PLANNING BLUEPRINT BUSINESS VALUE GUIDE

50 Questions before computerization

Business strategies: Business strategies to minimize the risk of business failure, plan implementation/control strategies, Case Study

1 Aggregate Production Planning

THE ROLE OF PROJECT MANAGEMENT IN KNOWLEDGE MANAGEMENT

Transcription:

IBM Maximo Tivoli Lab Services IBM Maximo Adapter for Primavera April 2008

Primavera partnership history Tactical partnership with custom integrations as early as 2000 Formalized integrations supporting Maximo 4 Maximo 5 Maximo 6 Initiatives Partnership Agreements Joint business plans / collaboration on sales pipeline activity Co-presenters at various tradeshows and industry events Sales channel expansion

Maximo Adapter for Primavera Primavera Maximo Primavera Project Planner Primavera API Maximo Adapter for Primavera Maximo Asset

Typical Planning As Is State. Goal % Wrench Time * (Productivity) 55-50 - 45-35 - Obstacles: - Asset breakdowns - Waiting for other crafts - Travel lag between jobs - No plan for next job - Waiting for tools - Waiting for materials - Unscheduled meetings As Is Asset & Project Planning Systems Source: Maintenance Planning, Doc Palmer

Addition of Enterprise Asset System Goal % Wrench Time * (Productivity) 55-50 - 45-35 - As Is Benefits: - Centralized work order collection - Collection of labor and cost data - Cost control/tracking - Materials management Enterprise Asset Obstacles: - No What-if analysis - Limited Reporting - No resource leveling - Limited planning capability - No work order resource relationships - No activity relationships Asset & Project Planning Systems

Integrated Project Solution Goal % Wrench Time * (Productivity) 55-50 - 45-35 - As Is Enterprise Asset Benefits: - Resource scheduling and leveling - Extended reporting capabilities - Extended plan for how the work will be completed Project Solution Obstacle: - Silos of work order and and project information Asset & Project Planning Systems

Integrated Solution Benefits: - Increased wrench time - Ability to forecast cost, schedule and resources to completion - Reduced workorder/scheduling backlog - Easy What if analysis - Improved data integrity Goal % Wrench Time * (Productivity) 55-50 - 45-35 - As Is Enterprise Asset Project Solution Project Solution Integration Enterprise Asset Asset & Project Planning Systems

Extending Value through Project Integration Increased wrench time from 35% - 60% Reduced unplanned man-hours (overtime) Creation of large-equipment interdependencies Easy What If analysis Reduced work order / scheduling backlog Published 2 week look-ahead Improved data integrity Improved employee morale

Maximo - Primavera Integration Points Maximo Asset Project Create Work Orders in Maximo Export Work Orders and Planned Maintenance routines to Primavera Identify resource requirements in Primavera Level, schedule and add logic in Primavera based on priority Load Work Orders back into Maximo Publish a two week look ahead report by role/resource within Primavera

Two-Way Integration Maximo Primavera Work Preventive Maintenance WOs Activities Resource Levelling Scheduling Assets Resources Purchasing Maximo PMs Logic Schedule Activitie s Logic Schedule Primavera Logic Projects Constraints Reporting Actuals Expenses Expenses Custom map Custom map

Version availability matrix Currently available Maximo 6.2.1 and Primavera 5 Significant performance enhancements Future Plans Maximo 6.2.1 and Primavera 6.1 Maximo 6.2.2 and Primavera 6.1 Note: no plans to retrofit Maximo 5 with Primavera 6.1

For more information IBM Your Business Solutions Mgr (BSM) or Business Dev Mgr (BDM) Katie Doyle kdoyle1@us.ibm.com Primavera Dean Edmundson DEdmundson@primavera.com

DEMO

More information IBM Maximo Adapter for Primavera data sheet Who to call for more information Existing customers Contact your Business Solutions Manager (BSM) Not sure who your BSM is? Email kdoyle1@us.ibm.com for contact information. Prospects MROI Sales Representative

Maximo Export to Primavera List of projects to be Exported Selected records are sent from Maximo to Primavera via pushbutton

Maximo Scheduling with Primavera List of work to be assigned Technician availability

Maximo Import from Primavera List of work to be assigned After setting dates, work orders are brought into Maximo from Primavera via pushbutton

Maximo interface to Primavera writes both ways List of work to be assigned