HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON



Similar documents
Status of High Current Ion Sources. Daniela Leitner Lawrence Berkeley National Laboratory

Proceedings of the 14th International Conference on Cyclotrons and their Applications, Cape Town, South Africa

Activities at the University of Frankfurt (IAP)

A new extraction system for the upgraded AIC-144 cyclotron

MYRRHA Injector Design

CONCEPT OF DETERMINISTIC ION IMPLANTATION AT THE NANOSCALE

Reliability and Availability Aspects of. the IPHI Project

Large Systems Commissioning

RF SYSTEM FOR VEPP-5 DAMPING RING

14.5GHZ 2.2KW CW GENERATOR. GKP 22KP 14.5GHz WR62 3x400V

Development of on line monitor detectors used for clinical routine in proton and ion therapy

X-ray Imaging Systems

INTEGRATED CIRCUITS DATA SHEET. TDA7000 FM radio circuit. Product specification File under Integrated Circuits, IC01

COST / BENEFIT COMPARISON 45 MEV AND 70 MEV CYCLOTRONS MAY 26, 2005 FOR

Results: Low current ( ) Worst case: 800 MHz, GeV, 4 turns Energy oscillation amplitude 154 MeV, where

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

K O M A C. Beam Commissioning of 100-MeV KOMAC Linac. Korea Multi-purpose Accelerator Complex 양 성 자 가 속 기 연 구 센 터

High Power Neutral Beam Injection in LHD

Digital vs. Analogue Control Systems

DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I

The BESSY HOM Damped Cavity with Ferrite Absorbers. Review of prototype cavity test results, taperedwaveguidesvshomogenouswaveguides

E. K. A. ADVANCED PHYSICS LABORATORY PHYSICS 3081, 4051 NUCLEAR MAGNETIC RESONANCE

The ithemba LABS Radioactive Beam Project. R A Bark

AMI MASCHINENBAU-KOLLOQUIUM

Status of the HOM Damped Cavity for the Willy Wien Ring

Principles of Ion Implant

Status of Radiation Safety System at

Zero Degree Extraction using an Electrostatic Separator

Development of High Stability Supports for NSLS-II RF BPMS

AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM

Electromagnetism and Circular Motion in a Cyclotron

P2O LED. High Power LED PRODUCT DATASHEET. Introduction. RoHS Compliant

If there is any doubt about the results, measurement shall be made within the following limits : Ambient temperature 25±3 Relative humidity 40%~70%

BB-18 Black Body High Vacuum System Technical Description

Coating Technology: Evaporation Vs Sputtering

P2N LED. High Power LED PRODUCT DATASHEET. Introduction. RoHS Compliant

Data Sheet, V1.1, May 2008 SMM310. Silicon MEMS Microphone. Small Signal Discretes

The commissioning of the LHC: first the technical systems, then the commissioning with beam

Mission: Cure, Research and Teaching. Marco Pullia Cnao design and commissioning

Overview of Proton Beam Cancer Therapy with Basic Economic Considerations

THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES

Tom Wilson Product Marketing Manager Delivery Systems Varian Medical Systems International AG. CERN Accelerator School, May 2015

Cleaning Methods of SRF Power Couplers. Mircea Stirbet

Cyclotron Centre in Poland and 2D thermoluminescence dosimetry

FIVE PROJECTS OF HIGH RF POWER INPUT COUPLERS & WINDOWS FOR SRF ACCELERATORS*

Digital panoramic X-ray for practical diagnostics

Bert Windhorst Radiopharmaceutical scientist VU University Medical Center Amsterdam

World-first Proton Pencil Beam Scanning System with FDA Clearance

How To Improve The Ganil Control System

NUCLEAR MAGNETIC RESONANCE. Advanced Laboratory, Physics 407, University of Wisconsin Madison, Wisconsin 53706

STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON

Cryogenic Current Comparator Status at GSI/FAIR -

Damping Wigglers in PETRA III

IR Edixeon Emitter. 1W Edixeon

How To Control A Power Supply On A Powerline With A.F.F Amplifier

An example: helium isotopes. An example: helium isotopes. Limits to Detection/Measurement. Lecture 14 Measurements II: Mass spectrometry

Comb beam for particle-driven plasma-based accelerators

Neuere Entwicklungen zur Herstellung optischer Schichten durch reaktive. Wolfgang Hentsch, Dr. Reinhard Fendler. FHR Anlagenbau GmbH

OPTIMAL DESIGN AND OPERATION OF HELIUM REFRIGERATION SYSTEMS *

Voltage Current volume. 24 V DC 4.5 A 330 m 3 /hr 3000 W W

Nanometer-scale imaging and metrology, nano-fabrication with the Orion Helium Ion Microscope

SF 6 Gas Insulated Switchgear Type SDF for 170 kv

The half cell of the storage ring SESAME looks like: Magnetic length =

N35L-U High Power LED

Nuclear Medicine & PET Research. F Production. Radiochemie.nl Cursus 18 F chemie

Proton beam. Medical Technical Complex Joint Institute for Nuclear Research, Dubna, Russia

DISCRETE SEMICONDUCTORS DATA SHEET

ASACUSA: Measuring the Antiproton Mass and Magnetic Moment

For Touch Panel and LCD Sputtering/PECVD/ Wet Processing

Vertical Cavity Surface Emitting Laser OPV300, OPV310, OPV310Y, OPV314, OPV314Y

Cathode Ray Tube. Introduction. Functional principle

C W COB Series

10 Project Costs and Schedule

Programmable Single-/Dual-/Triple- Tone Gong SAE 800

Projects and R&D activities

HITACHI Proton Beam Therapy System

Methods of plasma generation and plasma sources

Frequency Map Experiments at the Advanced Light Source. David Robin Advanced Light Source

Status of the Free Electron Laser

The design and performance of Static Var Compensators for particle accelerators

C W COB Series

Status And Future Plans. Mitsuyoshi Tanaka. AGS Department.Brookhaven National Laboratory* Upton NY 11973, USA INTRODUCTION

Charged Particle in a Magnetic Field

SpectraTec II. Polarized Multi-Laser Source BLUE SKY RESEARCH WAVELENGTHS. The SpectraTec II

Experience with high intensity operation of the GANIL facility

Study of electron cloud at MI and slip stacking process simulation

November terminal Filters. For signal line. MEM series. * Dimensions Code JIS[EIA]

PXIE Control System Status. Jim Patrick 07 April 2015

View of ΣIGMA TM (Ref. 1)

Study the Quality Assurance of Conventional X-ray Machines Using Non Invasive KV meter

The TSL 6.4 GHz ECR ion source status, improvements and measurements

Transcription:

HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON 18 th International Conference on Cyclotrons and their Applications, Sicily, 2007 Vasile Sabaiduc, Project Manager, RF Senior Engineer Advanced Cyclotron System Inc. (ACSI) 7851 Alderbridge Way, Richmond, B.C. CANADA

Introduction ACSI manufactures high current commercial cyclotrons based on two magnet platforms designed for maximum extraction energy of 30MeV and 19MeV. The TR30 and TR19 cyclotrons design first originated in TRIUMF and has been further developed at ACSI. We are presenting the progress that has been made in increasing the intensity of the beam current extracted from the TR30 Cyclotron: 30MeV, 1200 A of proton beam through complex acceptance and uptime testing. 30MeV, 1600 A of stable proton beam.

TR30 Cyclotron Projects 1. TR30 MDS/Nordion commissioned at 500 A in 1990, upgraded by TRIUMF to 1mA in 1996. 2. TR30/15 Institute of Nuclear Energy Research (INER) Taiwan, upgraded to 1mA at 1MeV (T. Kuo) and tested at 800 A, 24MeV (T. Kuo, ACSI). 3. TR30 Nordion 2 commissioned at 750 A in 2003, operates at 1mA. 4. TR30/1 COVIDIEN/Mallinckrodt commissioned at 1mA in 2005, tested for uptime performance in 2005. 5. TR30 GE Healthcare/Amersham commissioned at 1mA in 2005. 6. TR30/2 COVIDIEN/Mallinckrodt commissioned at 1.2mA in 2007, tested for uptime performance at 1.0mA and 1.2mA in 2007.

Cyclotron Upgrades Main concepts implemented in TR30 manufacturing: All cyclotron subsystems must be upgradeable to 2mA of proton beam. Part of the cyclotron subsystems have been fully upgraded and ready to sustain 2mA of proton beam operation. Maximum reliability achieved through experienced design and GMP Each cyclotron is commissioned and tested through a complex and detailed set of performance testing on customer site.

Ion Source and Injection Line (ISIS) The ISIS performance of today has been ensured by: The original ISIS design from TRIUMF ISIS development by T. Kuo et. al. [2] [3]. ACSI ongoing improvement and fine tuning of the ion source. Improvements implemented: Four half ring filaments The cusp confinement and virtual filter arrangement Extraction electrodes Addition of an Einzel lens

ISIS Characteristics 10mA of beam extracted at 28kV, ion source operating at an arc of 20A &100Volts Normalized 4rms emittance of 0.43 -mm-mr Emittance-normalized brightness of 5 ma/mm 2 -mr 2 Beam transmission to 1MeV of 18% at 1.2mA operation Cyclotron operation: Routine operation at 1.2mA with an ion source arc current of 12 to 13A at 100V. Performance operation at 1.6mA tuned at 35A of arc current. Excess capacity makes the 1.2mA operation very reliable and easy to maintain

RF System and Extraction Probe Upgrade 100kW, 74MHz RF amplifier suitable for 2mA beam operation 6 1/8 transmission line Coupler improved design with the addition of cooling water Extraction probe improved driving mechanism (existing five foil carrousel) Water cooled design added to extraction probe.

Beam Line Custom designed high current low losses beam lines using 4 lines and modular components. Extensive diagnosis throughout the beam line. Typical tuning characteristics and beam line losses: 1.2mA beam current distribution of 90% on target faces (uniform distributed on a 11mm x 35mm vertical window), 8 to 9% on target collimators and 1 to 2 % beam line losses 1.6mA beam current distribution of 80% on target faces, 18.4% on target collimators and 1.6% beam line losses Beam spot tuning for gas target applications

Solid Target Station Fully automated and built using radiation resistant materials. Significantly upgraded to increase current capability and reliability. Trouble free operation at 600 A per target station. Typical measurements at 600 A routine operation: 500 A beam current on target face, uniformly distributed on a 90mm x 35 mm surface area. 70 A to 90 A on four target collimators and 20 A to 30 A on target station entrance mask tests performed on blank copper targets for a typical 12 hour run between target changes. Target changes take an average of 15 to 20 minutes.

Solid Target Stations (cont d) Beam performance at 1600 A of extracted proton current equally split down two beam lines: 675 A beam current on target face, uniformly distributed on a 90mm x 35 mm surface area. 120 A to 150 A beam current on target station collimators and entrance mask. The test has been performed on blank copper targets for over four hours. There were no significant limitations that precluded continuing. For safety and radiation exposure reasons we elected to limit the beam current and testing time.

Cyclotron Systems Stability Performance The beam current stability measured on injection line beam stop and 1MeV probe is in the 10-4 range. Main magnet stability of 10-5 (18 bits digitally controlled power supply). Dee Voltage stability of 10-4. Beam Line power supplies stability of 10-4. Cooling water temperature stability of ±0.25 C.

Total Extracted Beam Stability Total Extracted Beam Current (ua) 1208 1206 1204 1202 1200 1198 1196 20:50 20:58 21:06 21:15 21:23 Time (min) Total extracted beam current stability of 0.5% Beam split ratio stability of 1% of the extracted current.

Target Current Stability Target current (ua) 505 500 495 490 485 480 475 470 TG1B\SCCUR TG2B\SCCUR 465 20:50 20:58 21:06 21:15 21:23 Time (min) Target current stability of 1.1 to 1.3%

Target station current TG1B

Extraction current EPR41

Uptime Performance The uptime performance of the TR30 cyclotron systems was thoroughly tested at a total extracted beam current of 1mA and 1.2mA. A total of three tests have been performed over two TR30 cyclotrons (TR30/1 and TR30/2), each test for a consecutive period of 13 weeks. During the testing time the machines have been continuously operated at maximum beam current as specified. The uptime has been defined as the ratio between the time the beam current was at an average value of 1mA or 1.2mA and the time scheduled, 24 hours per day, seven days a week, excluding the target transfer time and scheduled maintenance time.

TR30/1, 1.0mA Uptime Test 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Weekly Uptime Weekly Combined Average Uptime 0 2 4 6 8 10 12 14 Week Average uptime of 90%.

TR30/2, 1.0mA Uptime Test 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Weekly Uptime Weekly Combined Average Uptime 0 2 4 6 8 10 12 14 Week Average uptime of 89.3%.

TR30/2, 1.2mA Uptime Test 100% 99% 98% 97% 96% 95% 94% 93% 92% 91% 90% Weekly Uptime Weekly Combined Average Uptime 0 2 4 6 8 10 12 Week Average uptime of 98.3% for 10 weeks (test to be completed October 5).

RF Resonators

Cyclotron Layout

Target Station 1. Vacuum Chamber 2. Landing Terminal 3. Manipulator

12 x 24 mm ~5µA ~300µA ~60µA 7 o tilt

Target Thermal Simulation 30 MeV 500 ma 750 ma upgrade

Beam Radiograph Beam on Target for 200 ua Beam on Target for 400 ua

References [1] B.F. Milton et. al., Commissioning and First Operation of a 500 A, 30 MeV, Cyclotron, Proc. IEEE PAC 1991, p65. [2] T. Kuo et. al., On the development of 2mA RF H- Beam for Compact Cyclotrons, Proceedings of 14th ICC, Cape Town, S. A. 1995. [3] T. Kuo et. al., Development of a 15mA DC H- Multicusp Source for Cyclotron, Proceedings of 14th ICC, Cape Town, S. A. 1995. [4] T.S. Duh et al., The Current Status and Future Prospects of the TR30/15 H-/D- Cyclotron Facility at INER Taiwan, Proceedings of 17th ICC, Tokyo 2004. [5] R.R. Johnson et. al., Advances in intense beams, beam delivery, targetry and radiochemistry at Advanced Cyclotron Systems, NIM B 261 (2007), 803.