Experience with high intensity operation of the GANIL facility
|
|
|
- Austin Peregrine Peters
- 10 years ago
- Views:
Transcription
1 Experience with high intensity operation of the GANIL facility E. Baron, J.-L. Baelde, C. Berthe, D. Bibet, A. Chabert, C. Jamet, P. Gudewicz, F. Loyer, M.-H. Moscatello, E. Petit, et al. To cite this version: E. Baron, J.-L. Baelde, C. Berthe, D. Bibet, A. Chabert, et al.. Experience with high intensity operation of the GANIL facility. Baron E. Lieuvin M. 15th International Conference on Cyclotrons and their Applications, Jun 1998, Caen, France. IOP Publishing, pp , <in2p > HAL Id: in2p Submitted on 29 Nov 2013 HAL is a multi-disciplinary open access archive for the deposit and dissemination of scientific research documents, whether they are published or not. The documents may come from teaching and research institutions in France or abroad, or from public or private research centers. L archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des établissements d enseignement et de recherche français ou étrangers, des laboratoires publics ou privés.
2 EXPERIENCE WITH HIGH INTENSITY OPERATION OF THE GANIL FACILITY E. Baron, J.L. Baelde, C. Berthe, D. Bibet, A. Chabert, C. lamet, P. Gudewicz, F. Loyer, M-H. Moscatello, E. Petit, C. Ricaud, A. Savalle and G. Senecal. GANIL - B.P F Caen Cedex 5 France The GANIL three stage accelerator facility is being upgraded to higher beam intensities for light projectiles (C to Ar). In view of the production and acceleration of radioactive ion beams by the SPIRAL complex. intensities of the order of I to 2x10 l3 pps are anticipated at the maximum energy of95 MeV/u. The status of the upgrading program is summarised and details on the hardware and software additions and modifications are given. At the SSCI ejection energy. the design goal could be reached. As for SSC2, several factors are presently limiting the output current to 5x10 12 pps. Operational experience and solutions to reach the design goal are reported. 1 INTRODUCTION Since the beginning of the GANIL operation in 1983, experiments have been performed to produce exotic nuclei by projectile fragmentation in order to study their properties. In 1994, SISSI [1], a dedicated device associating a rotating target with two superconducting solenoids was put in operation: its main characteristic is to increase the collection solid angle of the fragments exiting from the production target, thus forming an exotic beam A drawback of this method is that it is impossible to reach energies below 25 MeV/u by degrading the high energy beam through the required thickness of matter without destroying the optical beam qualities. Today, the needs of the experimental program are extending, and the trend is to produce variable energy exotic beams with higher intensities. Two tools are being developed to match this programme: the SPIRAL project, built at GANIL and described elsewhere [2,3], is designed to produce radioactive species through the ISOL method and to accelerate them in the 1.7 to 25 Me V lu range. It implies however that the primary beam intensity issued from the last stage of acceleration (SSC2, figure 1) has to be raised in order to increase the production rate. This upgrade is called the THI project which will benefit also to SISSI. this THI project, described in details at the Cape Town Conference [4], consists of a series of actions undertaken on the GANIL accelerators components in view of increasing the present intensities of light ion beams (up to Ar) by a factor of about 15. Examples of goal figures are 2xlO pps for C and l.lxlo l3 pps for Ar. The series of adaptations required by this upgrading in terms of protection and control of the components is described below. Then are reported the results of the beam tests and the proposed strategy to overcome the present limitations. 2. THE THI PROJECT IMPLEMENTATION 2.1 Protection against beam losses Medium or high energy heavy ions deposit their energy in solid matter over a very short range, i.e. from a fraction of a millimetre to a few millimetres. Therefore, uncooled or unshielded elements can melt very rapidly if hit by high intensity beams. The localisation of losses and the reduction 13 SSC2 SPIRAL C02 セイャァゥf@ I. G/\1\;I1.. ァ ャセイ ャ vhiャエ@ 385
3 of their level, whenever possible, is of paramount importance to reduce both this hazard and the activation problems. The vacuum chambers of all the dipoles of the beam lines L2 and L3 (fig 1) have been thermally shielded either by carbon or tungsten sheets, or water-cooled copper sheets. In addition, each entrance and output of these dipoles is equipped with an electrically insulated collimator made of carbon: when operating at high intensity, any change in the beam direction or transverse dimensions leading to an amount of loss larger than a pre-determined level triggers a reduction of the intensity through a fast response electronic module. Identically, the electrostatic and magnetic injection and extraction elements of the two SSCs have frontal insulated and water-cooled electrodes that are used in the same manner. Note that below the "safety" level, the intensity lost on any of these sensors can be measured on a logarithmic scale and therefore be accurately minimised. A complementary and more global system protects portions of the accelerator as a whole : the difference between input and output currents of each SSC is measured by a differential current transformer so that below a given transmission efficiency, the intensity reduction is triggered [5]. Beam line L2 is protected in the same way. There are three places in the accelerator where losses are inevitable : a) the charge state separator located after the stripper where all undesired charge states are lost in the vacuum chambers and on slits (figure 1) ; these chambers are shielded with carbon plates and the activation level stays at reasonable values due to the low energy of SSCI (maximum: 13.6 MeV/u) b) when SISSI is in operation, the downstream focusing and bending elements are tuned for the magnetic rigidity of the secondary beam, while the primary one, although slowed down by the target, is defocused and lost in the first two bending magnets which have water-cooled shields. c) defining slits, especially in the a. spectrometer, can become highly activated and difficult to disconnect under safe conditions. They have been redesigned to simplify the disconnection procedure and to be recessed in a lead envelope by an actuator when not in use. 2.2 Reducing the losses in the cyclotrons As indicated above, the loss sensors located in the SSCs are equipped with a logarithmic converter. At each step of the intensity increase, several readjustments are made, for example correction of the beam direction, change of the RF voltage of bunchers and rebunchers, etc. The most important loss takes place at the entrance of the electrostatic deflector of SSC2, of which both the septum and the high voltage electrode are protected by a detector/shield sensor. In order to reduce the width of the last turn at extraction of SSC2, a new rebuncher (R2 on figure 1) was designed [6] and put in operation. The result of its action on a low peak-intensity beam is illustrated on figure 2. <ll/dr (na/m01) Figure 2. Pattern of the last two turns at SSC2 extraction with and without rebuncher R2 2.3 The stripper In order to increase the stripper lifetime without defocusing the beam, the whole foil-holder was made to rotate at 0.01 rpm in a plane perpendicular to the beam so as to use a larger area of the carbon foil. In the rotation, the phase of the bunch at SSC2 injection is only slightly affected by foil inhomogeneities (± 0.16 RF degrees) and this excursion can easily be compensated by a feedback action on the bias voltage applied to the stripper. 2.4 The tuning method Several methods are possible to step-by-step tune the accelerator for high intensity, starting from a low level: a) act on the source tuning, or on a collimator at its output, b) act on emittance defining slits, either in the axial injection beam line, or in Ll (see fig 1) where the 1 MeV/n beam is still almost harmless and c) use a chopper of which the dutycycle is increased by steps up to a DC mode. Methods a) and b) modify the beam density distribution in phase space as well of course as the peak intensity. Method c) would have been the best and the most straightforward, had we succeeded in replacing all the existing secondary emission beam profile monitors (SEBPM) by noninterceptive ones based on ionisation of the residual gas and collection on micro-channel plates (MCPBPM). Although this second type of BPM works perfectly to control steady beams [7], they appeared to be too fragile when tuning a beam with occurrences of large variations in direction, focusing and intensity. On the other hand, protection of the SEBPM requires such a low duty-factor for the chopper that profiles become hardly measurable. It was therefore decided to: 1) tune the beam at low intensity with a combination of pepper-pot and chopper and 2) once the BPMs are removed, remove also the pepper-pot and increase the intensity step by step with the chopper. dr (0101) 386
4 3. RESULTS OF BEAM TESTS AND PERPECTIVES The test beam is 36 Ar IO + 1l8 + accelerated at 95 MeV/u. The intensity extracted from the ion source at 80 kv and in a 60 x 60 1t rum mrad emittance is of the order of 5xlO 13 pps, which should be sufficient to reach 1.lxlO 13 pps at SSC2 output, corresponding to a power of 6 kw. Efforts still have to be made in order to get a better stability of the source. Transmission efficiencies of the injector cyclotron, of SSC 1 and of beam lines L 1 and L2 are acceptable [4]. However, when testing the method described above, it appeared immediately that the machine tuning is depending on the peak value of the intensity : the transmission efficiencies of SSCI and SSC2 drop by an important factor when the pepper-pot is removed, even for an intensity maintained to a low average value by the chopper. As the chopper duty-cycle is increased, parameters essentially related to the buncher, rebunchers and RF systems have to be readjusted and the transmission through SSCI can be recovered above a 95 % level, but the losses at extraction of SSC2 are increasing up to an unbearable level (200 watts) when the beam intensity exceeds 5xlO 12 pps. Method b), consisting in tuning SSCI and SSC2 using the admittance slits in Lias a monitor for the beam intensity, lead to the same limitation (figure 3). Intensity extracted from CSS2 ( Ar 36, 95 MeVln) O,E+OO l Io @セMNLNLNM o Admittance of beam line Ll (Pi x mm mrad) Figure 3, Intensity extracted from SSC2 as a function of the admittance of beam line Lt. It was then decided to develop a two-fold strategy : a) consolidate a steady 2 kw beam power operation (this will require an adaptation of the production target geometry to this value). This was performed during a beam in June 1998 : the best result was a 4xlO 12 pps (about 2.2 kw) beam for about 8 hours, with a 96 % transmission efficiency of SSC2. However, sparks issuing from upstream electrostatic or RF devices were triggering the safety interlock system too often : since then, an electronic circuit that automatically sets the system back after a looms delay has been satisfactorily tested and a smooth operation was obtained, b) get a better understanding of the «peak intensity effect». Although beam optics computations had shown [8] that space charge was playing a minor role except in the injector 14 cyclotron CO 1 below 100 ella, a series of tests is going to be undertaken, with the collaboration of Th. Stammbach from PSI, in order to evaluate and counteract a possible longitudinal effect. Three possible cures can then be tested : - generate strongly bunched beams [9] into the injector cyclotron - correct for this effect in SSC2 by changing the RF phase and, - cut phase tails with slits. An additional puzzling phenomenon has to be taken care of: the beam transverse emittance out of the injector CO 1 is much larger than could be predicted and is almost independent of the input emittance. We plan to recalculate the optics in COl with the modem tools developed for SPIRAL [10] in order to determine the proper injection conditions (correlations). From this study, we expect the following benefits for the high intensity operation: - better transmission efficiency in Ll (presently 70 %) - lower requirements on source intensity, which would then lead to a reduction of space charge forces - more leeway for the beam in the SSCs admittance. 4. SUMMARY The accelerator complex is now almost fully protected against possible accidents caused by beams of several kw, The transmission efficiency is not a problem up to the extraction region of SSC2, where unexpected losses are observed, A steady 2 kw beam is expected to be used for production of exotic nuclei when SPIRAL is put in operation in Meanwhile, beam tests are underway for a better understanding of the cause of the losses and for finding methods to ensure the proper transmission efficiency, ACKNOWLEDGEMENTS The author would like to express his thanks to all the accelerator physicists, engineers, technicians and operators of the Technical Group, the Operation Group and the SPIRAL team for their deep involvement and persisting efforts in pursuing this project. REFERENCES [I] ll. Baelde, E.Baron, C. Grunberg & A.Joubert - SISSI : a new tool for radioactive beams. Nouvelles du GANIL n 44, February 1993, pp59. [2] M. Lieuvin and the SPIRAL group. - Status of SPIRAL, the radioactive beam project at GANIL. Proceedings of the 14th Int. Conf. on Cyclotrons and their Applications. Cape Town (1995), pp Ed : lc. Cornell. Publisher: W orid Scientific. [3] M.P, Bourgarel and the SPIRALIGANIL groups. - SPIRAL facility : first results of the CIME cyclotron obtained with stable ion beams. These proceedings 387
5 [4] E. Baron and the GANIL Staff - Upgrading the GANIL facilities for high-intensity heavy ion beams (T.H.I. Project). Ref [2], pp [5] C. Jamet et E. Petit - Recent developments for beam intensity operation. These proceedings [6] M. Di Giacomo. - Design and manufacturing tools for RF resonators at GANIL. These proceedings [7] R. Anne, J-L. Vignet, Y. Georget, R. Hue, C. Tribouillard. - Beam profile and beam time structure monitors for the extracted beams from the GANIL cyclotrons. These proceedings [8] E. Baron, R. Beck, M.P. Bourgarel, B. Bru, A. Chabert, Ch. Ricaud. - High intensity and space charge problems at GANIL.Ilth Int. Conf. on Cyclotrons and their Applications, Tokyo (1986) pp Ed: M. Sekiguchi, Y. Yano and K. Hatanaka. Publisher: lonics. [9] Th. Stammbach - Experience with the high current operation of the PSI cyclotron facility. 13th lnt. Conf. on Cyclotrons and their Applications, Vancouver (1992). pp Ed: G. Dutto, MK Craddock. Publisher: World Scientific. [10] P. Bertrand, D. Bibet, M.P. Bourgarel, B. Bru, A. Chabert, F. Daudin, M. Duval, M. Ozille, Ch. Ricaud, F. Varenne - Ion beam simulation and optimisation method used for the CIME cyclotron injection. These proceedings. 388
How To Improve The Ganil Control System
FR9800224 Extending the GANIL Control System for the SPIRAL Project L corche Eric Control Group GANIL BP5027 14076 Caen Cedex 5 France e-mail: [email protected] GANIL A 97 02 Extending the GANIL Control
THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES
THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES R. Beunard, GANIL, BP 55027, 14076 CAEN, CEDEX 5, France Abstract The SPIRAL2* project, located at the GANIL** facility in Caen,
Mobility management and vertical handover decision making in heterogeneous wireless networks
Mobility management and vertical handover decision making in heterogeneous wireless networks Mariem Zekri To cite this version: Mariem Zekri. Mobility management and vertical handover decision making in
A new extraction system for the upgraded AIC-144 cyclotron
NUKLEONIKA 2001;46(2):51 57 ORIGINAL PAPER A new extraction system for the upgraded AIC-144 cyclotron Edmund Bakewicz, Krzysztof Daniel, Henryk Doruch, Jacek Sulikowski, Ryszard Taraszkiewicz, Nikolaj
ibalance-abf: a Smartphone-Based Audio-Biofeedback Balance System
ibalance-abf: a Smartphone-Based Audio-Biofeedback Balance System Céline Franco, Anthony Fleury, Pierre-Yves Guméry, Bruno Diot, Jacques Demongeot, Nicolas Vuillerme To cite this version: Céline Franco,
HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON
HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON 18 th International Conference on Cyclotrons and their Applications, Sicily, 2007 Vasile Sabaiduc, Project Manager, RF Senior Engineer Advanced Cyclotron
Territorial Intelligence and Innovation for the Socio-Ecological Transition
Territorial Intelligence and Innovation for the Socio-Ecological Transition Jean-Jacques Girardot, Evelyne Brunau To cite this version: Jean-Jacques Girardot, Evelyne Brunau. Territorial Intelligence and
Status of High Current Ion Sources. Daniela Leitner Lawrence Berkeley National Laboratory
http://ecrgroup.lbl.gov Status of High Current Ion Sources Daniela Leitner Lawrence Berkeley National Laboratory October, 27th, 2003 1 Content Overview of available high current sources Requirements for
Undulators and wigglers for the new generation of synchrotron sources
Undulators and wigglers for the new generation of synchrotron sources P. Elleaume To cite this version: P. Elleaume. Undulators and wigglers for the new generation of synchrotron sources. Journal de Physique
ANIMATED PHASE PORTRAITS OF NONLINEAR AND CHAOTIC DYNAMICAL SYSTEMS
ANIMATED PHASE PORTRAITS OF NONLINEAR AND CHAOTIC DYNAMICAL SYSTEMS Jean-Marc Ginoux To cite this version: Jean-Marc Ginoux. ANIMATED PHASE PORTRAITS OF NONLINEAR AND CHAOTIC DYNAMICAL SYSTEMS. A.H. Siddiqi,
Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator
Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator R. Gupta and M.Harrison, Brookhaven National Laboratory A. Zeller, Michigan State University
Reliability and Availability Aspects of. the IPHI Project
Reliability and Availability Aspects of the IPHI Project Pierre-Yves Beauvais CEA/DSM/DAPNIA for the IPHI Team 18/02/2002 Pierre-Yves Beauvais, CEA Saclay 1 Table of contents Brief description of IPHI
A usage coverage based approach for assessing product family design
A usage coverage based approach for assessing product family design Jiliang Wang To cite this version: Jiliang Wang. A usage coverage based approach for assessing product family design. Other. Ecole Centrale
Cracks detection by a moving photothermal probe
Cracks detection by a moving photothermal probe J. Bodnar, M. Egée, C. Menu, R. Besnard, A. Le Blanc, M. Pigeon, J. Sellier To cite this version: J. Bodnar, M. Egée, C. Menu, R. Besnard, A. Le Blanc, et
The ithemba LABS Radioactive Beam Project. R A Bark
The ithemba LABS Radioactive Beam Project R A Bark Scientific Committee Local Committee Rob Bark Krish Bharuth-Ram Pete Jones Steve Karataglidis Kobus Lawrie Rudzani Nemutudi Rudolf Nchodu Paul Papka Carlos
Zero Degree Extraction using an Electrostatic Separator
Zero Degree Extraction using an Electrostatic Separator L. Keller Aug. 2005 Take another look at using an electrostatic separator and a weak dipole to allow a zero degree crossing angle a la the TESLA
A graph based framework for the definition of tools dealing with sparse and irregular distributed data-structures
A graph based framework for the definition of tools dealing with sparse and irregular distributed data-structures Serge Chaumette, Jean-Michel Lepine, Franck Rubi To cite this version: Serge Chaumette,
STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON
Proceedings of IBIC15, Melbourne, Australia - Pre-Release Snapshot 17-Sep-15 1:3 MOPB41 STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON K. P. Nesteruka,, M. Augera, S. Braccinia, T.
Expanding Renewable Energy by Implementing Demand Response
Expanding Renewable Energy by Implementing Demand Response Stéphanie Bouckaert, Vincent Mazauric, Nadia Maïzi To cite this version: Stéphanie Bouckaert, Vincent Mazauric, Nadia Maïzi. Expanding Renewable
Study on Cloud Service Mode of Agricultural Information Institutions
Study on Cloud Service Mode of Agricultural Information Institutions Xiaorong Yang, Nengfu Xie, Dan Wang, Lihua Jiang To cite this version: Xiaorong Yang, Nengfu Xie, Dan Wang, Lihua Jiang. Study on Cloud
An example: helium isotopes. An example: helium isotopes. Limits to Detection/Measurement. Lecture 14 Measurements II: Mass spectrometry
Limits to Detection/Measurement Ionization is fundamentally a Probabilistic Process Just like radioactive decay So is transmission through the analyzer There is an intrinsic statistical uncertainty Proportional
Faut-il des cyberarchivistes, et quel doit être leur profil professionnel?
Faut-il des cyberarchivistes, et quel doit être leur profil professionnel? Jean-Daniel Zeller To cite this version: Jean-Daniel Zeller. Faut-il des cyberarchivistes, et quel doit être leur profil professionnel?.
SELECTIVELY ABSORBING COATINGS
SELECTIVELY ABSORBING COATINGS J. Vuletin, P. Kuli ik, M. Bosanac To cite this version: J. Vuletin, P. Kuli ik, M. Bosanac. SELECTIVELY ABSORBING COATINGS. Journal de Physique Colloques, 1981, 42 (C1),
Donatella Corti, Alberto Portioli-Staudacher. To cite this version: HAL Id: hal-01055802 https://hal.inria.fr/hal-01055802
A Structured Comparison of the Service Offer and the Service Supply Chain of Manufacturers Competing in the Capital Goods and Durable Consumer Goods Industries Donatella Corti, Alberto Portioli-Staudacher
The truck scheduling problem at cross-docking terminals
The truck scheduling problem at cross-docking terminals Lotte Berghman,, Roel Leus, Pierre Lopez To cite this version: Lotte Berghman,, Roel Leus, Pierre Lopez. The truck scheduling problem at cross-docking
QASM: a Q&A Social Media System Based on Social Semantics
QASM: a Q&A Social Media System Based on Social Semantics Zide Meng, Fabien Gandon, Catherine Faron-Zucker To cite this version: Zide Meng, Fabien Gandon, Catherine Faron-Zucker. QASM: a Q&A Social Media
A model driven approach for bridging ILOG Rule Language and RIF
A model driven approach for bridging ILOG Rule Language and RIF Valerio Cosentino, Marcos Didonet del Fabro, Adil El Ghali To cite this version: Valerio Cosentino, Marcos Didonet del Fabro, Adil El Ghali.
Performance Evaluation of Encryption Algorithms Key Length Size on Web Browsers
Performance Evaluation of Encryption Algorithms Key Length Size on Web Browsers Syed Zulkarnain Syed Idrus, Syed Alwee Aljunid, Salina Mohd Asi, Suhizaz Sudin To cite this version: Syed Zulkarnain Syed
An update on acoustics designs for HVAC (Engineering)
An update on acoustics designs for HVAC (Engineering) Ken MARRIOTT To cite this version: Ken MARRIOTT. An update on acoustics designs for HVAC (Engineering). Société Française d Acoustique. Acoustics 2012,
VR4D: An Immersive and Collaborative Experience to Improve the Interior Design Process
VR4D: An Immersive and Collaborative Experience to Improve the Interior Design Process Amine Chellali, Frederic Jourdan, Cédric Dumas To cite this version: Amine Chellali, Frederic Jourdan, Cédric Dumas.
Cathode Ray Tube. Introduction. Functional principle
Introduction The Cathode Ray Tube or Braun s Tube was invented by the German physicist Karl Ferdinand Braun in 897 and is today used in computer monitors, TV sets and oscilloscope tubes. The path of the
Flauncher and DVMS Deploying and Scheduling Thousands of Virtual Machines on Hundreds of Nodes Distributed Geographically
Flauncher and Deploying and Scheduling Thousands of Virtual Machines on Hundreds of Nodes Distributed Geographically Daniel Balouek, Adrien Lèbre, Flavien Quesnel To cite this version: Daniel Balouek,
DEM modeling of penetration test in static and dynamic conditions
DEM modeling of penetration test in static and dynamic conditions Quoc Anh Tran, Bastien Chevalier, Pierre Breul To cite this version: Quoc Anh Tran, Bastien Chevalier, Pierre Breul. DEM modeling of penetration
obems - open source Building energy Management System T4 Sustainability Ltd
obems - open source Building energy Management System T4 Sustainability Ltd AMR and BMS What are the problems? Cost - hardware, rental or purchase, and software licenses, upgrades etc. Lack of open standards.
TOF FUNDAMENTALS TUTORIAL
TOF FUNDAMENTALS TUTORIAL Presented By: JORDAN TOF PRODUCTS, INC. 990 Golden Gate Terrace Grass Valley, CA 95945 530-272-4580 / 530-272-2955 [fax] www.rmjordan.com [web] [email protected] [e-mail] This
Use of tabletop exercise in industrial training disaster.
Use of tabletop exercise in industrial training disaster. Alexis Descatha, Thomas Loeb, François Dolveck, Nathalie-Sybille Goddet, Valerie Poirier, Michel Baer To cite this version: Alexis Descatha, Thomas
RF-thermal-structural-RF coupled analysis on the travelling wave disk-loaded accelerating structure
RF-thermal-structural-RF coupled analysis on the travelling wave disk-loaded accelerating structure PEI Shi-Lun( 裴 士 伦 ) 1) CHI Yun-Long( 池 云 龙 ) ZHANG Jing-Ru( 张 敬 如 ) HOU Mi( 侯 汨 ) LI Xiao-Ping( 李 小
Comparative optical study and 2 m laser performance of the Tm3+ doped oxyde crystals : Y3Al5O12, YAlO3, Gd3Ga5O12, Y2SiO5, SrY4(SiO4)3O
Comparative optical study and 2 m laser performance of the Tm3+ doped oxyde crystals : Y3Al5O12, YAlO3, Gd3Ga5O12, Y2SiO5, SrY4(SiO4)3O R. Moncorge, H. Manaa, M. Koselja, G. Boulon, C. Madej, J. Souriau,
Cobi: Communitysourcing Large-Scale Conference Scheduling
Cobi: Communitysourcing Large-Scale Conference Scheduling Haoqi Zhang, Paul André, Lydia Chilton, Juho Kim, Steven Dow, Robert Miller, Wendy E. Mackay, Michel Beaudouin-Lafon To cite this version: Haoqi
What Development for Bioenergy in Asia: A Long-term Analysis of the Effects of Policy Instruments using TIAM-FR model
What Development for Bioenergy in Asia: A Long-term Analysis of the Effects of Policy Instruments using TIAM-FR model Seungwoo Kang, Sandrine Selosse, Nadia Maïzi To cite this version: Seungwoo Kang, Sandrine
Activities at the University of Frankfurt (IAP)
Activities at the University of Frankfurt (IAP) Holger Podlech Ulrich Ratzinger Oliver Kester Institut für Angewandte Physik (IAP) Goethe-Universität Frankfurt am Main H. Podlech 1 Development of 325 MHz
FP-Hadoop: Efficient Execution of Parallel Jobs Over Skewed Data
FP-Hadoop: Efficient Execution of Parallel Jobs Over Skewed Data Miguel Liroz-Gistau, Reza Akbarinia, Patrick Valduriez To cite this version: Miguel Liroz-Gistau, Reza Akbarinia, Patrick Valduriez. FP-Hadoop:
Novel Client Booking System in KLCC Twin Tower Bridge
Novel Client Booking System in KLCC Twin Tower Bridge Hossein Ameri Mahabadi, Reza Ameri To cite this version: Hossein Ameri Mahabadi, Reza Ameri. Novel Client Booking System in KLCC Twin Tower Bridge.
Numerical simulations of heat transfer in plane channel
Numerical simulations of heat transfer in plane channel flow Najla El Gharbi, Rafik Absi, Ahmed Benzaoui To cite this version: Najla El Gharbi, Rafik Absi, Ahmed Benzaoui. Numerical simulations of heat
Advantages and disadvantages of e-learning at the technical university
Advantages and disadvantages of e-learning at the technical university Olga Sheypak, Galina Artyushina, Anna Artyushina To cite this version: Olga Sheypak, Galina Artyushina, Anna Artyushina. Advantages
Online vehicle routing and scheduling with continuous vehicle tracking
Online vehicle routing and scheduling with continuous vehicle tracking Jean Respen, Nicolas Zufferey, Jean-Yves Potvin To cite this version: Jean Respen, Nicolas Zufferey, Jean-Yves Potvin. Online vehicle
ANALYSIS OF SNOEK-KOSTER (H) RELAXATION IN IRON
ANALYSIS OF SNOEK-KOSTER (H) RELAXATION IN IRON J. San Juan, G. Fantozzi, M. No, C. Esnouf, F. Vanoni To cite this version: J. San Juan, G. Fantozzi, M. No, C. Esnouf, F. Vanoni. ANALYSIS OF SNOEK-KOSTER
Running in 2011 - Luminosity. Mike Lamont Verena Kain
Running in 2011 - Luminosity Mike Lamont Verena Kain Presentations Many thanks to all the speakers! Experiments expectations Massi Ferro-Luzzi Pushing the limits: beam Elias Métral Pushing the limits:
Information about the T9 beam line and experimental facilities
Information about the T9 beam line and experimental facilities The incoming proton beam from the PS accelerator impinges on the North target and thus produces the particles for the T9 beam line. The collisions
Electromagnetism and Circular Motion in a Cyclotron
Electromagnetism and Circular Motion in a Cyclotron Contents p. 3 About Physics in Action Funding Availability Videos in the Physics in Action Series p. 5 Physics in Action: Electromagnetism and Circular
World-first Proton Pencil Beam Scanning System with FDA Clearance
Hitachi Review Vol. 58 (29), No.5 225 World-first Proton Pencil Beam Scanning System with FDA Clearance Completion of Proton Therapy System for MDACC Koji Matsuda Hiroyuki Itami Daishun Chiba Kazuyoshi
Technical Report FP-2010-06. Simple injector for high-current sheet electron beams
Technical Report FP-2010-06 Simple injector for high-current sheet electron beams Stanley Humphries, Ph.D. Field Precision LLC Albuquerque, New Mexico U.S.A. December 2010 1 Figure 1: Model electron trajectories
Additional mechanisms for rewriting on-the-fly SPARQL queries proxy
Additional mechanisms for rewriting on-the-fly SPARQL queries proxy Arthur Vaisse-Lesteven, Bruno Grilhères To cite this version: Arthur Vaisse-Lesteven, Bruno Grilhères. Additional mechanisms for rewriting
An Automatic Reversible Transformation from Composite to Visitor in Java
An Automatic Reversible Transformation from Composite to Visitor in Java Akram To cite this version: Akram. An Automatic Reversible Transformation from Composite to Visitor in Java. CIEL 2012, P. Collet,
Projects and R&D activities
Projects and R&D activities J.M. Jimenez On behalf of the Vacuum, Surface and Coatings Group (VSC) Vacuum, Surface and Coatings group* Mandate Design, construction, operation, maintenance and upgrade of
Mission: Cure, Research and Teaching. Marco Pullia Cnao design and commissioning
CNAO design and commissioning Marco Pullia, CNAO Foundation What is the CNAO Foundation No profit organisation (Foundation) created with the financial law 2001 to build the national center for hadrontherapy
The half cell of the storage ring SESAME looks like: Magnetic length =
6. Magnets 6.1 Introduction SESAME will be perhaps erected in steps. The number of steps depends upon the available money. The cheapest way is to use the quadrupole and sextupoles from BESSY I. In this
PIEZOELECTRIC FILMS TECHNICAL INFORMATION
PIEZOELECTRIC FILMS TECHNICAL INFORMATION 1 Table of Contents 1. PIEZOELECTRIC AND PYROELECTRIC EFFECTS 3 2. PIEZOELECTRIC FILMS 3 3. CHARACTERISTICS PROPERTIES OF PIEZOELECTRIC FILMS 3 4. PROPERTIES OF
High Power Neutral Beam Injection in LHD
JP0655016 High Power Neutral Beam Injection in LHD K. Tsumori, Y. Takeiri, K. Nagaoka, K. Ikeda, M. Osakabe, Y. Oka, O. Kaneko, M. Shibuya, T. Kondo, M. Sato and E. Asano. National Institute for Fusion
View of ΣIGMA TM (Ref. 1)
Overview of the FESEM system 1. Electron optical column 2. Specimen chamber 3. EDS detector [Electron Dispersive Spectroscopy] 4. Monitors 5. BSD (Back scatter detector) 6. Personal Computer 7. ON/STANDBY/OFF
Managing Risks at Runtime in VoIP Networks and Services
Managing Risks at Runtime in VoIP Networks and Services Oussema Dabbebi, Remi Badonnel, Olivier Festor To cite this version: Oussema Dabbebi, Remi Badonnel, Olivier Festor. Managing Risks at Runtime in
Beam Dynamics Studies and Design Optimisation of New Low Energy Antiproton Facilities arxiv:1606.06697v1 [physics.acc-ph] 21 Jun 2016
Beam Dynamics Studies and Design Optimisation of New Low Energy Antiproton Facilities arxiv:606.06697v [physics.acc-ph] 2 Jun 206 Javier Resta-Lopez, James R. Hunt, Carsten P. Welsch Department of Physics,
Aligning subjective tests using a low cost common set
Aligning subjective tests using a low cost common set Yohann Pitrey, Ulrich Engelke, Marcus Barkowsky, Romuald Pépion, Patrick Le Callet To cite this version: Yohann Pitrey, Ulrich Engelke, Marcus Barkowsky,
On the beam deflection method applied to ultrasound absorption measurements
On the beam deflection method applied to ultrasound absorption measurements K. Giese To cite this version: K. Giese. On the beam deflection method applied to ultrasound absorption measurements. Journal
Information Technology Education in the Sri Lankan School System: Challenges and Perspectives
Information Technology Education in the Sri Lankan School System: Challenges and Perspectives Chandima H. De Silva To cite this version: Chandima H. De Silva. Information Technology Education in the Sri
Shielding and Radiation Measurements at ESRF
Shielding and Radiation Measurements at ESRF Radiation Safety Meeting SOLEIL Synchrotron, 18 October 26 P. Berkvens European Synchrotron Radiation Facility Radiation protection policy at the ESRF Storage
LHC MACHINE PROTECTION
LHC MACHINE PROTECTION Rossano Giachino, CERN, Geneva, Switzerland Abstract The energy stored in LHC magnets presents a considerable challenge for commissioning even before any beam is injected. Furthermore,
Overview of model-building strategies in population PK/PD analyses: 2002-2004 literature survey.
Overview of model-building strategies in population PK/PD analyses: 2002-2004 literature survey. Céline Dartois, Karl Brendel, Emmanuelle Comets, Céline Laffont, Christian Laveille, Brigitte Tranchand,
New implementions of predictive alternate analog/rf test with augmented model redundancy
New implementions of predictive alternate analog/rf test with augmented model redundancy Haithem Ayari, Florence Azais, Serge Bernard, Mariane Comte, Vincent Kerzerho, Michel Renovell To cite this version:
Proceedings of the 14th International Conference on Cyclotrons and their Applications, Cape Town, South Africa
Intensity Limitations in Compact H- Cyclotrons Rick A. Baartman TRIUMF, 4004 Wesbrook Mall, Vancouver, B. C. Canada V6T 2A3 At TRIUMF, we have demonstrated 2.5mA in a compact H- cyclotron. It is worthwhile
SIMULATIONS OF ELECTRON CLOUD BUILD-UP AND SATURATION IN THE APS *
SIMULATIONS OF ELECTRON CLOUD BUILD-UP AND SATURATION IN THE APS * K. C. Harkay and R. A. Rosenberg, ANL, Argonne, IL 60439, USA M. A. Furman and M. Pivi, LBNL, Berkeley, CA 94720, USA Abstract In studies
BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN
BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN Abstract BEPC Group, presented by Yingzhi Wu Institute of High Energy Physics, Beijing 100039, P.R. China The luminosity upgrades of the BEPC are briefly reviewed.
Study of electron cloud at MI and slip stacking process simulation
Study of electron cloud at MI and slip stacking process simulation Alexandr S. Valkovich Purpose 1.Understand the slip stacking process which happens in the Main Injector. 2. Calculation of bunch distortion
Discussion on the paper Hypotheses testing by convex optimization by A. Goldenschluger, A. Juditsky and A. Nemirovski.
Discussion on the paper Hypotheses testing by convex optimization by A. Goldenschluger, A. Juditsky and A. Nemirovski. Fabienne Comte, Celine Duval, Valentine Genon-Catalot To cite this version: Fabienne
Spherical Aberration Corrections for an Electrostatic Gridded Lens
BNL-8 1593-2008-IR C-AlAPl#3 12 May 2008 Spherical Aberration Corrections for an lectrostatic Gridded Lens Alexander Pikin Collider-Accelerator Department Brookhaven National Laboratory Upton, NY 11973
DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I
DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I A.S. Gerasimov, G.V. Kiselev, L.A. Myrtsymova State Scientific Centre of the Russian Federation Institute of Theoretical
AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM
10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO1.072-7 (2005) AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM A. Bogomyagkov, S. Karnaev,
Tom Wilson Product Marketing Manager Delivery Systems Varian Medical Systems International AG. CERN Accelerator School, May 2015
INDUSTRIAL DESIGN Tom Wilson Product Marketing Manager Delivery Systems Varian Medical Systems International AG VARIAN ONCOLOGY SYSTEMS 1 VARIAN ONCOLOGY SYSTEMS CERN Accelerator, May 2015 Industrial Design
Damping Wigglers in PETRA III
Damping Wigglers in PETRA III WIGGLE2005, Frascati 21-22.2.2005 Winni Decking, DESY-MPY Introduction Damping Wiggler Parameters Nonlinear Dynamics with DW Operational Aspects Summary DESY and its Accelerators
INTERFACES FOR RENEWABLE ENERGY SOURCES WITH ELECTRIC POWER SYSTEMS
INTERFACES FOR RENEWABLE ENERGY SOURCES WITH ELECTRIC POWER SYSTEMS Paulo Ferreira, Manuel Trindade, Júlio S. Martins and João L. Afonso University of Minho, Braga, Portugal [email protected],
The TSL 6.4 GHz ECR ion source status, improvements and measurements
NUKLEONIKA 2003;48(Supplement 2):S99 S104 PROCEEDINGS The TSL 6.4 GHz ECR ion source status, improvements and measurements Daniel van Rooyen, Dan Wessman Abstract The TSL 6.4 GHz ECR ion source performs
Experiment 7: Familiarization with the Network Analyzer
Experiment 7: Familiarization with the Network Analyzer Measurements to characterize networks at high frequencies (RF and microwave frequencies) are usually done in terms of scattering parameters (S parameters).
DIRECT CURRENT GENERATORS
DIRECT CURRENT GENERATORS Revision 12:50 14 Nov 05 INTRODUCTION A generator is a machine that converts mechanical energy into electrical energy by using the principle of magnetic induction. This principle
Calorimetry in particle physics experiments
Calorimetry in particle physics experiments Unit n. 8 Calibration techniques Roberta Arcidiacono Lecture overview Introduction Hardware Calibration Test Beam Calibration In-situ Calibration (EM calorimeters)
Electron Beam and Sputter Deposition Choosing Process Parameters
Electron Beam and Sputter Deposition Choosing Process Parameters General Introduction The choice of process parameters for any process is determined not only by the physics and/or chemistry of the process,
POSSIBL-E EXPERIMENTS ON THE 200-GeV ACCELERATOR. A. D. Krisch University of Michigan. R. Serber Columbia University.
FN-68 POSSIBL-E EXPERIMENTS ON THE 200-GeV ACCELERATOR A. D. Krisch University of Michigan R. Serber Columbia University August 23, 1967 We will describe a number of experiments that might be dcne on.,he
