Network Manager Annual Report 2012



Similar documents
Overview of NM and CDM

Network Manager nominated by the European Commission EUROCONTROL. Network Manager Annual Report 2014

Directorate Network Management Monthly Network Operations Report Analysis December 2012

CS5 EAIMS Call For Interest Technical annexe

EUROCONTROL Training Activities 2013

PRR Performance Review Report. An Assessment of Air Traffic Management in Europe during the Calendar Year 2014

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

The Virtual Centre Model

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

airsight Company Profile

Creating the Functional Airspace Block Europe Central

EUROCONTROL Training 2016 EUROCONTROL

EUROCONTROL Training 2015 EUROCONTROL

ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots

European Route Network Improvement Plan

EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone

SUMMARY. This information paper summarises the status of Airport CDM Trial s and Implementation. RECOMMENDATION

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

AGREEMENT BETWEEN THE PORTUGUESE REPUBLIC AND THE KINGDOM OF SPAIN ON THE ESTABLISHMENT OF THE SOUTH WEST FUNCTIONAL AIRSPACE BLOCK (SW FAB)

The Mayor of London s Submission:

Official Journal of the European Union L 13/3

The SESAR programme: Making air travel safer, cheaper and more efficient

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

SES Safety and ATM/ANS Regulations - EASA activities related to MET services

PCP Active ECAC FCM05 REG ASP MIL APO USE INT IND NM

NEFAB ANSP Programme Business Plan ANSCB meeting 12 October 2015

Air Traffic Management Services Plan

How To Improve The Performance Of Anatm

How To Design An Airspace Structure

SESAR Studies & Demonstration Projects on RPAS & Cyber-Security

ATFCM OPERATING PROCEDURES FOR FLOW MANAGEMENT POSITION

SESAR. Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006

Space Applications and Technologies Expo Rome, Italy February 4 6, 2010

Traffic Flow Management. December 2010

Advanced Data Link Infrastructure Solution for Next Generation of Air Traffic Management

From patchwork to network:

Comparison of Air Traffic Management-Related Operational Performance: U.S./Europe

Monthly Network Operations Report

European ADS-B Regulation

EUROCONTROL WORKSHOP. Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin

Trends in Aeronautical Information Management

Key Points from CMAC/FUA Related Seminar/Workshop

Performance management Identification of metrics

User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG

ESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM

EUROPEAN COMMISSION. Impact assessment of revisions to Regulation 95/93. Final report (sections 1-12) March 2011

POLISH NATIONAL SUPERVISORY AUTHORITY POLISH PERFORMANCE PLAN Warsaw, June

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

Airspace User Forum Jan 2012 Voice your needs and discover the Network Manager

A-CDM from an airport perspective Oslo Airport

GATWICK AIRPORT LIMITED RESULTS FOR THE YEAR ENDED 31 MARCH 2015

A day in the life of an aircraft operator

Position Paper on Single European Sky (SES)

Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)

DGAC & Aviation crisis management

Optimisation and Prioritisation of Flows of Air Traffic through an ATM Network

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

ICAO Crisis Management Framework Document (EUR Doc 031)

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

ANNEXE III. Risk Management Report 15 December of 23

PENS. Centralised Service on Pan European Network Services (PENS) Concept of Operations (CONOPS) EUROCONTROL

Adapting to air traffic growth in Europe

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Preliminary Cost Benefit Analysis CS#7 Network Infrastructure Performance Monitoring and Analysis

European AIS Database Developments of the EAD. Peter Matern Head of European AIM Unit

Block 0: Capabilities within our Grasp

Federal Aviation Administration. Air Traffic. Flow Management. Presented to: MIT By: Date: FAA Command Center October 5, 2006

Carolyn McCall speech to the European Aviation Club. 26 th February 2015

Safety scanning. The development of the Safety Scanning Tool is a cooperation of

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

How To Manage A Plane With A-Cdm

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project CHANGE MANAGEMENT MANUAL

EUROCONTROL AT THE WORLD ATM CONGRESS

ATFM STATUS REPORT: SOUTH AFRICA

Imagine a world class Heathrow London First policy conclusions

CCAMS CONTINGENCY PLAN. Network Operations

Economic benefits of European airspace modernization

How To Know What Is Happening In European Air Transport

Common SES-Certification 4-States/Eurocontrol ANSPs Common Requirements AMCs and analyses working sheet Status: 2 February 2006

THE MASTER PLAN CAMPAIGN. Workshop RPAS (WS 03) 22 January 2015

AGENDA. Need for PENS Business Case PENS Governance Current PENS Users

Air Navigation Service Charges in Europe

Safety Management Systems (SMS) guidance for organisations

The need for Safety Intelligence based on European safety data analysis

Maturity Model. March Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Opening the European Sky to UAS From military to civilian

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

NEFAB Project Initiative 9 Commonality of CNS/ATM Systems

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

ATM Security. Emergent challenges and opportunities focusing on increasing automation and cyber-security. Antonio Nogueras

AIXM Change Management Charter

FAA International Strategies 2010 to 2014 Western Hemisphere Region

GATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015

ATFCM USERS MANUAL. Network Operations

six mitigation measures SESAR Improvements alternative airport exogenus challenge Mitigating the Challenges for Air Transport 2030

AIR TRAFFIC MANAGEMENT VOLCANIC ASH CONTINGENCY PLAN TEMPLATE

Transcription:

Network Manager Annual Report 2012 June 2013 Approved by the Network Management Board on 6 June 2013

I. Building the Network Manager The European Union established under the Single European Sky (SES) II package the Network Manager 1. The aim was to address the difficulties of the past and respond to the request of users to have a seamless European airspace - better managed at network level. NM s priority is to create the operational partnerships needed to achieve the Single European Sky performance targets to the benefit of all states included in the pan European network 2. This was the driver of the NM activities throughout 2012. The NM also provides daily support to the air traffic operations across the network. To achieve its network performance objectives NM has built a strong foundation: good cooperation with its stakeholders, appropriate governance, and a network focus aimed at continuous improvement of the network operations through proactive NM activity. Stakeholder cooperation NM is at the centre of the ATM network and collaboration with its partners is a basic principle of the NM. This is not left to chance: NM and our stakeholders need good Cooperative Decision Making (CDM) in order to achieve decision consistency among the involved organisations in a fully transparent manner with all required information and inputs from parties who will have to implement these decisions. CDM CDM processes covering the main network functions were approved in 2012. The CDM processes include how knowledge-based decisions are made, who develops the preparatory details and describe the supporting working and consultation arrangements as well as the final approval of decision making phase. Governance Good governance is key for the NM. Network Director Operations (NDOP) played a key role in supporting NM to achieve its performance targets. It is NM s main operational forum for preparation, review and implementation of mandated operational actions. The NDOP structure includes mechanisms for direct involvement of ANSPs, military partners, airspace users and airports. NDOP has tackled various issues such as the preparation of the summer and winter seasons, addressing problem areas identified in the Network 1 Commission Regulation (EU) 677/2011 of 07 July 2011 laying down detailed rules for the implementation of air traffic management (ATM) network functions 2 States include: EU Member States, non-member States that are members of EUROCONTROL or have concluded an agreement with the Union on the implementation of the Single European Sky or are participating in a functional airspace block.

Operations Plan (NOP) or from the monitoring of the network performance, management of special events, repository of measures for industrial actions and contingency plans, as well as endorsement of key NM deliverables. The Network Management Board (NMB) is the industry led decision making body that works with NM to achieve the SES performance objectives. The NMB was very active and successful in 2012. It approved the major deliverables of NM, establishing the strategic and operational objectives both for the Network and for Network Manager 3. NMB also helped in tackling network performance issues that NM escalated through the Network Directors of Operations forum. Throughout 2012, EUROCONTROL Teams and their substructures provided expert input and coordination (namely the: NETOPS Airports - AIS/SWIM Safety - CNS Infrastructure). These teams are open to experts of all NM stakeholders and are tasked to develop and review specific technical and operational NM proposals at expert level. The external oversight of the Network Manager is performed by European Aviation Safety Agency (EASA). During 2012 EASA started the oversight activities through an initial audit, which was conducted in two phases (March and July 2012). NM activity NM s duty is to provide a consolidated and coordinated approach to the activities of the network to continuously improve its performance. This obliges the NM to safeguard the general interest of the network. NM is applying this network focus in the analysis of the real operational issues across the network. Throughout 2012 NM launched and contributed to a number of activities to address the bottlenecks in the network and prepare for the challenges of 2012. NM s performance analysis identified a number of critical areas in the Network Operation Plan (NOP). The underlying causes for the critical areas were investigated, which triggered an Action Plan developed to address the needs to further enhance the operational network performance. NM brought together ANSPs, Aircraft Operators and Slot coordinators to tackle airports with limited capacity. NM ensured detailed planning of special events to ensure that network delay remained low. NM implemented a number of action plans and mitigations to support stakeholders in improving capacity and allowing NM to contribute to delay reduction. 3 Major deliverables: Network Strategy Plan, including the NM Performance Plan and the Network Operations Plan are outlined in later sections.

II. NM achievements in 2012 NM activities in 2012 focused on achieving the performance targets of the first Reference Period (RP1) of the SES Performance Scheme. When NM was formally established in July 2011 the memory of the poor performance of 2010 (the worst for 10 years) was fresh in the mind of everybody. NM needed to tackle the systemic issues that led to the poor performance in 2010 to achieve the ambitious 2012 target of en-route delay of 0.7 min/flight. Its focus was on enhancing network operations management, synchronising major ATM changes, mitigating the impact of strikes on the network performance, improving flexibility of capacity management in some ACC constrained due to social tension or rigidity in the management of opening control sectors. NM had to show its added value. In 2012 NM gave a high priority across its organisation to the actions needed to achieve the performance targets on capacity and flight efficiency and the objectives on safety while ensuring that the NM financial costs remained within the limits of 2.9% of total en-route costs. All these targets and objectives are captured in the NM Performance Plan (NMPP). NM achieved its performance targets for 2012. Network Capacity The main performance indicator is the enroute ATFM delay measured in minutes per flight, for which the network performance target for 2012 was 0.7 min/flight. This target was met, at the end of 2012 the achieved en-route ATFM delay was 0.63 min/flight, the best performance for some years. Without industrial action it would have been 0.57 min/flight. 0.8 0.6 0.4 0.2 0.70 0.63 En-route delay (minutes/flight) 0.60 0.50 2012 2013 2014 En-route delay (min/flight) NM contribution to delay savings 0.80 In addition to the targets defined for the network, the 0.08 0.60 NMPP defines a range of other indicators which presents performance so that stakeholders understand 0.40 the NM added value with respect to ATM network 0.63 performance. In the capacity area, the main target for 0.20 NM is to reduce en-route ATFM delays by 10% below 0.00 the declared plans for 2012-2014. 2012 Achieved en-route delay NM savings NM contribution to delay savings in 2012 were calculated from accepted Re- routings Proposals (RRPs) and NM initiated CDM actions (e.g. rate negotiation with FMP, reconfiguration of the regulations, proposal to go to another sector configuration to increase capacity, level capping). The overall en-route delay reduction in 2012 was 730,000 minutes equivalent to 1900 min/day or 0.08 min/flt without this, the delay in 2012 would have been

0.71 min/flt. This equates to 10.7% of the annual network delay (when measured against the total potential network delay, achieved 0.63min/flt plus the saving 0.08min/flt = 0.71 min/flt). Around 190,000 minutes of this reduction achieved via direct re-routings. Flight Efficiency NMPP defines two targets measuring the route extension from an optimum defined by the great circle, one due to the design of the routes and the other due to the last filed flight plan. Both key performance indicators have to achieve a reduction of 0.75 percentage points from 2009 to the end of RP1. The design indicator achieved in 2012 was 2.96%, meeting the target and is on a good trend to achieve the RP1 target. The flight plan indicator value in 2012 was 4.64%, above the target by 0.04 percentage points. It 3.00% 4.60% 2.96% 4.64% was impacted negatively by industrial actions and social issues that led to reduced capacities and re-routings to avoid capacity constrained areas. The focus going forward is to provide sufficient capacity and to improve airspace utilisation to improve flight efficiency. 6% 5% 4% 3% 2% 1% 0% Route extension due to airspace design Route extension due to last filed flight plan Achieved Value 2012 Reference Value 2012

III. NM areas of actions NM is addressing the real issues of the network while ensuring that the performance targets are met. Its planning, operations and continuous monitoring activities are closely interconnected to ensure that network performance is achieved. Network Planning Network Operations While some NM activities have been part of the EUROCONTROL portfolio for some Monitoring Results time, NM refocused them to the new network centric approach. Network operations planning and Network current operations (tactical and pre-tactical) are prime examples in this category. NM has also started to address the network functions related to scarce resources as well as safety and the airports domains from a network performance perspective. Monitoring and reporting NM presented regular, timely and accurate reports on the overall performance of the network to NDOP and NMB throughout 2012. The monitoring results were considered in the Planning (e.g. additional actions or critical areas) and operational phases (e.g. Playbook helped identify the 'high risk' delay areas). The results highlighted where NM should use its pro-active stance and act when a problem occurred. Throughout 2012 post operations and performance monitoring analysed the efficiency of ATFM measures and continually improved the process to ensure NM could deliver over 10% delay savings for the network. Operations Planning The Network Operations Plan (NOP) for the period 2012-2014 is a detailed plan that implements, at operational level, the Network Strategy Plan. NOP was adopted in March 2012 by the NMB. Based on the traffic forecasts NOP identified the capacity of the network or individual ACCs needs as well as operational performance forecasts for delivering the ATFM function. This was done in close cooperation with the ANSPs involved, NOP which provided further inputs (an updated NOP was approved in June 2012). Critical areas for the network were identified and an Action Plan was developed to address the needs to further enhance the operational network performance. Additional such measures were proposed for Spain (Barcelona, Canarias and Madrid ACCs), Germany (Langen and Munich ACCs), Cyprus, Greece and Poland. The annual forecast of NOP for 2012 indicated an average en-route delay of 0.45 min/flight. The achieved value at the end of 2012 was 0.63min/flight. Within this value the overall NOP values for the staff and capacity were as forecasted. The

difference was due to the ATC strikes, higher weather delay than the value included in the forecast, other disruptions (including technical) and social issues at Lisbon ACC and Oslo ACC. Higher delays than the forecast were recorded at both the latter ACCs and at Nicosia, Langen, Munich, and Barcelona ACCs and better delays than the forecast in Greece, Warsaw and Canarias ACCs. 2012 Delays, Achieved vs Forecast Capacity, staffing and weather reasons 1.80 1.60 1.40 1.20 1.00 0.80 0.60 ER WEA THER ATC STAFFING ATC CAPACITY Forecast 0.40 0.20 0.00 LISBOA ACC/UAC OSLO ATCC NICOSIA ACC LANGEN ACC BARCELONA ACC MARSEILLE ACC AMSTERDAM ACC(245-) PARIS ALL ACC REIMS U/ACC PALMA ACC BREST U/ACC [ ] ANKARA ACC KARLSRUHE UAC COPENHAGEN ACC SEVILLA ACC WARSZAWA ACC ISTANBUL ACC ATHINAI CONTROL TIRANA ACC MAKEDONIA CONTROL CANARIAS ACC/FIC The effective capacity indicator increased by 6% over the whole European ATM network in 2012 (an increase of 9% for the summer season), when compared to the corresponding periods of 2011, the highest capacity on record. The 2012 monitoring results informed the preparation of the NOP 2013-2015 which foresees actions in the area of Week/Week-end planning, Inclusion of FAB Plans, and Planning of major projects/special events. Identification of additional measures for critical ACCs: Barcelona, Langen/Munich/Karlsruhe (Munich part), Marseille, Warsaw, Nicosia, Athens/Makedonia (close monitoring), Lisbon, and Oslo are also part of the new package. Major ATM changes Another topic successfully addressed by NOP and the Action Plan is the preparation of a transition plan for major projects which was published by NM as Transition Plan for Major Projects in Europe Winter 2012/2013. The plan was continuously updated during 2012. The good preparation of the transition plans for major projects resulted in negligible delay caused by those events. Route Network Design The NM ensures that European airspace can accommodate the additional capacity needs. This is the role of the European Route Network Design Function, for which the Network Manager developed, through a cooperative decision making process, the European Route Network Improvement Plan (ERNIP). The ERNIP was approved by NMB and is part of the Network Operations Plan. The ERNIP included 270 packages of airspace improvements which were implemented for the Summer season 2012. This helped to ensure that the 2012 flight efficiency target (route extension due to airspace design) was achieved. Route Design

Current Operations Delivering the operational daily delay performance is at the heart of the NM Operations Centre (NMOC). NMOC concentrates on anticipating problem areas and then providing network solutions. Network operations flow management procedures are mature and continue to provide benefit to the network. The Network Operations were constantly monitored against the 2012 objectives and targets, using state of the art systems and tools. For example, the Playbook process and tool ensured that the operational staff focused on the achievement of performance targets at network and ACC level. NM proposed CDM actions in pre-tactical and tactical operations to reduce the delays in line with the NMPP lines of actions. This amounted to a reduction of 730000 minutes of en-route delays, in excess of 10% below the en-route delay for 2012, achieving the NMPP target and related objectives related to re-routing proposals, weekend delays. NMOC played a central role in the NM activity for improving the network performance (see chapter II). Other actions targeted delay reduction initiatives at Zurich (effects of flight plan adherence has on individual sectors), Palma (first rotation delay), Bordeaux and Barcelona (work commenced on reducing complexity to bring capacity benefits for next summer), in Canaries (where NMOC operational staff offered support), in Langen (by encouraging consistent working practices between both units, excluding flows of traffic that it was not necessary to regulate). Events NM units contributed to the detailed planning of Euro 2012 and the London Olympics. This was done in close coordination with relevant stakeholders and aircraft operators. Actions included airspace changes, airport capacity simulations, staff exchanges, slot coordination with ACI. The preparation was successful and the increased event traffic was handled with little or no network delay. Industrial Action With the active support of NMB and NDOP, NM compiled a Repository of measures for industrial actions and contingency plans. The repository contains a list of current practices for managing industrial action as well as an initial set of best practices for the management of such situations at network level. Throughout 2012, NMOC continued to manage the industrial action events to minimise delay by activating existing procedures, providing alternative routing options, disseminating information and teleconferencing. Network Safety Recognising that safety is the key rationale for ATM, the NM has adopted and started to implement a safety approach to ATM network operations. A true partnership with the stakeholders ensured that the objectives set in the NSP and NMPP were achieved in 2012. For the first time NM in partnership with the stakeholders has identified the Top 5 ATM Operational Safety risks affecting the Network. These risks are associated with two spheres of operations - loss of separation in the en route environment and runway safety. NM has actively supported the stakeholders in achieving the RP1

European wide performance indicators notably through the deployment of the Risk Analysis Tool, through the Experience Sharing to Enhance SMS (ES2) programme to support ANSPs improve the effectiveness of their SMS and by conducting initial safety culture surveys. Additionally, SKYbrary, a web-based electronic repository of safety data related to ATM and aviation safety continues to thrive there were more than one million visits during 2012. Airports There are no airport related targets at network level in RP1. However, from a network perspective the impact of disrupted operations at an airport can have a far reaching impact on network performance. The focus of NM airport activities in RP1 is to assist airport stakeholders to enhance airport performance and to integrate airport operations into the Network. Greek Airports Delay reduction The Greek airports delay reduction was a successful initiative which showed significant delay reduction at these airports with limited capacity compared to previous summers. NM brought together Hellenic CAA, Greek airport slot ATFM AD delays, min 400.000 350.000 300.000 250.000 200.000 150.000 100.000 50.000 Traffic and ATFM AD delay 30 April - 30 September coordination, ATC and Aircraft Operators which enabled better management of demand and the reduced need for regulations. Compared to 2010 - a year with similar traffic load - delays were reduced by more than 60 percent, equivalent to more than 160000 minutes. 0 2010 2011 2012 Delay min 260.764 387.770 104.795 Traffic 78.021 85.471 79.045 A key process to facilitate the major airports integration in the network is the Airport Collaborative Decision Making (A-CDM). Munich, Brussels, Paris Charles De Gaulle and Frankfurt are the airports that fully implemented A-CDM. London Heathrow implemented A-CDM on 31 May 2012; due to local issues, the exchange of DPIs with the network was suspended in July 2012 but aim to re-establish that link as soon as feasible. The benefits of A-CDM implementation are visible at a network level, with more accurate departure information DPI - feeding into the air traffic flow and capacity management system run by NM. The network will be able to use the available capacity more efficiently. NM is also supporting the flight efficiency at the airports through Continuous Descent Operations (CDO). By the end of 2012, 16 additional airports introduced CDOs, which makes a total of 87 airports using CDOs to date. 87.000 85.000 83.000 81.000 79.000 77.000 75.000 73.000 number flights

Scarce Resources CCAMS and Mode S - Mid 2013 CCAMS Mode S 2012 witnessed the definition and operational beginnings of the Radio Frequency Function (RFF) and Transponder Code Function (TCF). The Collaborative Decision Making arrangements were established and approved in 2012 for both functions. Two Europe-wide data management exercises were conducted in 2012 that enabled European states to improve the quality of the information contained in the NM central register of frequency assignments, which is the reference database for the search of new frequencies. The Centralised Code Assignment and Management System (CCAMS) for TCF entered into operation in February. By the end of 2012 six States have joined CCAMS. The expansion of CCAMS will continue in 2013, with another nine States planning to join during the year. Also, special temporary arrangements ensured no code shortages were reported for EURO 2012 hosted by Poland and Ukraine, or the 2012 London Summer Olympic Games. Network Crisis Management The new European Aviation Crisis Coordination Cell (EACCC) was formally established in 2012 to be in line with NM regulation and held three meetings in 2012 in the new configuration. A major milestone was reached in November 2012 when the NMB approved the EACCC Rules of Procedure. In 2012 EACCC played a key role in the implementation of the Safety Risk Assessment (SRA) approach in the management of volcanic ash events across Europe. Moreover, in April 2012 EACCC participated in the ICAO VOLCEX 12/01 exercise and in May 2012 at the first Aviation Crisis Management Workshop that took place in Brussels. Even though the EACCC was not activated in 2012, a number of events with a potential to develop into a crisis were dealt with by NM. Further improvements can be achieved by implementing harmonised procedures across Europe in support of the Safety Risk Assessment method.

IV. Network Strategy Plan The approval of Network Strategy Plan (NSP) for 2012-2019 4 was an important milestone for the NM. NSP is not just another plan; it is a new tool for improving ATM from a network perspective and in a structured way. The Network strategic vision is driven by the need for ATM Operations to achieve the SES objectives, and in particular the EU-wide performance targets. This vision incorporates six operational drivers that are the building blocks of network operations evolution for the next decade. They describe the main challenges that need to be addressed by the ATM community. NSP The Strategic Operational Drivers Flexible Flexible Airspace & Reactive Structure Capacity Free Route Management implementation Ten strategic operational objectives aimed to materialise the six operational drivers into concrete actions, based on 3 areas of work: Network Management; ATM Network Operations; Preparing for the future. These ten strategic operational objectives (SO) address the two reference periods. Increase Measure This report presented the main Operational Operational achievements of NM towards Predictability Performance achieving the performance targets of RP1. This is compliant with the implementation of the first nine strategic objectives of NSP. The good results of 2012 should not however leave room for complacency. The objective of NM is to build on and consolidate the achievements of 2012, especially in the relatively new areas like scarce resources, airports and network safety. The SO 10 deals with the preparation of RP2. This will be impacted by the publication during 2013 of the updated Performance regulation and associated EU ATM performance targets for the Reference Period 2 (2015-2019), which will contain a number of significant additions in both KPIs (targets) and PIs (monitoring). The recent traffic forecast data for the European region and the expected European economic general context will be taken into account in the revision of the NSP. In addition, technological, institutional and economic developments need to be considered, especially the SESAR deployment. 4 EC Decision C(2012) 9604 of 19 th December 2012

V. Challenges for the Future In 2012 the NM has gone from being a concept on paper to a reality recognised by our stakeholders and partners as bringing tangible daily performance benefits to the network as a whole. The 2012 performance targets for the network and for the NM in 2012 were achieved in several areas. The capacity/delay target of en-route ATFM delay of 0.7 min/flight was achieved. Through its actions, NM contributed to a delay reduction in excess of 10% of what has been delivered in 2012. The flight efficiency indicator due to airspace design was met and is on the right track to meet its RP1 target. The flight efficiency indicator due to flight planning was missed by just 0.04 percentage points, but is on track for RP1. The good performance gave NM credibility in the eyes of both Industry and EC and this was recognised by the NMB, the governance body. The future requires NM to maintain the good performance, which is the best way to consolidate its credibility and added value to European ATM. There are substantial challenges for 2013 and beyond. NM has to meet more ambitious 2013 network performance targets. Although traffic levels remain lower than expected, there is no room for complacency. NM through its pro-activity will still need to tackle systemic issues and the critical capacity areas. Similarly NM will need to tackle flight efficiency targets through initiatives with aircraft operators to improve airspace utilisation while respecting their flight cost efficiency needs. NM has to prepare for RP2 (including the preparation of an updated NSP and a standalone Network Performance Plan). There is greater emphasis on airport and safety performance monitoring in RP2; therefore NM will need to refocus its efforts in these two areas, which NMB recognised as improvement areas for 2013 and beyond. NM will need to keep a close watch on the evolving SESAR deployment and prepare accordingly. NM s role in the deployment framework will bring new challenges. Finally, the industry continues to suffer from the current economic crisis and cost efficiency is an important objective. NM will need to perform its current and new activities in line with the Network Performance Plan cost objective. The cooperative work between the Network Manager and the FABs will continue to enable the consolidation of all the projects in the context of individual single FABs and the integration of these into the overall network.

GLOSSARY NM regulation Commission Regulation (EU) 677/2011 of 07 July 2011 laying down detailed rules for the implementation of air traffic management (ATM) network functions ATFM regulation Commission Regulation (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management Performance regulation Commission Regulation (EU) No 691/2010 of 29 July 2010 laying down a performance scheme for air navigation services and network functions ACC A-CDM AIS ANSP ATC ATFM ATM CAA CCAMS CDM CDO CFMU CNS DNM DPI EACCC EASA EC ERNIP EUROCONTROL EU FAB FMP KPI NDOP NETOPS NM NMB NMOC NMPP NOP NSP RFF RP RTE-DES RTE-FPL SES SESAR SMS SO SWIM TCF Area Control Center Airport Collaborative Decision Making Aeronautical Information Services Air Navigation Service Provider Air Traffic Control Air Traffic Flow Management Air Traffic Management Civil Aviation Authority Centralised Code Assignment and Management System Cooperative Decision Making Continuous Descent Operations Central Flow Management Unit Communication, Navigation & Surveillance Directorate Network Manager Departure Planning Information European Aviation Crisis Coordination Cell European Aviation Safety Agency European Commission European Route Network Improvement Plan European Organisation for the Safety of Air Navigation European Union Functional Airspace Blocks Flow Management Position Key Performance Indicator Network Directors of Operations Forum Network Operations Team Network Manager Network Management Board Network Manager Operations Centre Network Manager Performance Plan Network Operations Plan Network Strategy Plan Radio Frequency Function Reference Period Route extension due to network design Route extension due to last filed flight plan Single European Sky Single European Sky ATM Research Safety Management System Strategic Objective of the NSP System-Wide Information Management Transponder Code Function