MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS



Similar documents
Electrical. This section applies to the design and installation of building power distribution systems.

Canadian Regulatory Compliance for Stationary Battery Systems North American Update

Data Center Infrastructure & Managed Services Outline

SECTION MECHANICAL: ELECTRICAL: PLUMBING

FIRE SAFETY ONLINE TRAINING

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

Element D Services Plumbing

How To Write An Infrastructural Standard For Data Center Infrastructure

Medicine Hat Fire Department. Special Event Requirements. medicinehat.ca/fire. August 2012

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

Data Center Due Diligence List

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

Manual for Fire Suppression & Methane Detection System

NMSU FIRE DEPARTMENT Commercial Kitchen Fire Suppression Worksheet

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

MOBILE DC POWER SYSTEMS FOR SUBSTATION APPLICATIONS

File: Spill Response Plan for Hazard Chemicals and Mercury Spills. Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010

Element D Services Heating, Ventilating, and Air Conditioning

Subject: County of Los Angeles Data Center Space Requirement

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

EXHIBIT A SCOPE OF WORK

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Containment Requirements

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Exhibit Space & Booth Layout Guidelines

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

ESTABLISHMENT OF A NEW BUSINESS

BUILDING OWNERS - SERVICE RELATED ISSUES FOR FIRE ALARM SYSTEMS

Mechanical, Plumbing, and Fire Protection Conditions

Mixing Sodium and Lead Battery Technologies in Telecom Applications

BATTERY CHARGING GUIDELINES FOR 6-VOLT DEEP CYCLE BATTERIES

Original Document 10/16/07 Revised 01/30/09 2 nd Revision rd Revision- 12/18/14

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

OPERATOR - FACILITY ADDRESS - DATE

Restaurant & café guide

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).

Inspection Item COMMENTS

21.1 Functions, Basic Configuration, and Interfaces

North Carolina State University Emergency Facilities Closure Checklist- Part I

ANNEXURE 07: CHECK-LIST FOR OFF-SITE STORAGE FACILITIES

PLAN SUBMITTAL INFORMATION

The City of Basehor, Kansas

Recommended Practice for Installation of Transit Vehicle Fire Protection Systems

Name Of Occupancy Date. Yes No Describe

Hazardous Waste Determination and Management Plan

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

DATA CENTRES UNDERSTANDING THE ISSUES TECHNICAL ARTICLE

Bold items are particular to the City of Euless

Tel.X Ni-Cd battery. The compact maintenance-free solution for telecom networks

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Planned, Limited Notice and Emergency Outage Guidelines

Inspection, Testing and Maintenance

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

SAFETY SELF-INSPECTION PROGRAM

ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS

ABOVE-GROUND STORAGE TANKS

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Effective June 27, TEXT (CO Detection Commercial Buildings)

N O W A V A I L A B L E

Dear Neuton Owner, This is a helpful hint to guide you in getting the most out of your NEUTON Battery and Charger.

Building Condition Assessment Report

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

Planned and Emergency Utility Outage Guidelines

Network Router Monitoring & Management Services

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

IUB Water Damage Restoration Guideline

If you accidentally get battery acid on your skin, flush it with lots of water

SECTION 8 Industrial Facilities Field Investigation

TEXT (CO Detection Commercial Buildings Final) Part 1228 of Title 19 NYCRR is amended by adding a new section , to read as follows:

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

Forklifts, Battery Charging and Material Handling

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

In accordance with NFPA 30, these containers are not to store Class I flammable liquids.

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Laboratory Safety and Environmental Health Assessment Program

RHODE ISLAND. Downloaded

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

Quality Assurance Calendar Maintenance Responsible Party Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

SMOKE DETECTOR INSTALLATION PROGRAM The Burlington Ordinance Perspective

The Use and Application of the Benchmarking Assessment Tool for the Recovery and Recycling of Used Lead Acid Batteries in India

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN SLUG CONTROL PLAN

Transformer Deluge Systems

Model 1756 Test Lead Kit

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive

DATA CENTER FIRE PROTECTION

Transcription:

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively argued that the heart of any UPS system supporting a mission critical facility is the battery plant. Examples of mission critical facilities include large corporate data centers, Web hosting facilities, and telecom carrier hotels. When commercial power is interrupted in mission critical facilities, businesses are placed at significant risk to lose revenues, clients, and/or corporate image. The emergency power systems, which the UPS battery plant is a significant piece of, must perform up to expectations and support the facility through any and all power outages. This paper will highlight those environmental design features that must be taken into consideration when designing, constructing, and fitting out a UPS battery room that will result in more than just a physical room to house the strings of batteries. Properly designed and constructed battery rooms in mission critical facilities will provide a safe, efficient, environmentally friendly place to house and care for critical UPS battery systems, enabling them to provide optimum performance when needed. Battery Room Positioning and Layout BATTERY ROOM DESIGN CRITERIA The positioning of the battery room must be in close proximity to the UPS modules being supported. For voltage drop considerations, the UPS modules and battery systems should be in adjacent spaces either side-by-side or vertically stacked. Battery room layouts should be clean and designed to maximize space usage. Proper code clearances must be maintained in and around battery strings for required maintenance support and life safety systems. Egress aisles, exit ways, and maintenance aisles also must be maintained. NEC, NFPA Life Safety Code, BOCA and local codes must be taken into consideration and complied with when appropriate. The attached drawing is an example of a large multi-module UPS battery room layout. 18-1

18-2

Battery Rack/Cabinet Issues Battery racks and cabinets should be designed and installed to meet the requirements for the seismic zone they are installed in. The racks and cabinets should be designed and purchased to accommodate the weight and size of the batteries ordered and the quantity of batteries to be installed. (See attached picture.) Where space constraints permit, flooded wet cell batteries should be installed in a two tiered racking configuration to make maintenance activities easier and safer to perform. A uniform average cell temperature also is somewhat easier to obtain with a two-tiered configuration instead of a three-tiered configuration. Building Structural Issues Due to the weight of lead acid batteries, column and floor loading can quickly become a problem. Flooded wet cell batteries racked two or three tiers high in a limited floor area can easily impress a 250 450 lbs./sf floor loading on the structural floor and which transfers to columns and footers. Although this issue arises in new construction and existing renovation and reuse projects, the greater challenges occur in the renovation projects. While extensive, expensive reinforcing of structural elements is usually required to accommodate heavy battery loading in renovation projects, building floor slabs, columns, and footers in new construction can be much more easily designed and constructed. Figure 1. Battery Rack And Structural Issues Fire Compartmentalization Issues In a properly designed facility, battery rooms will be isolated from each other, other equipment areas (UPS modules, electrical switchgear, etc.) and people spaces by a two hour fire rated wall. Additionally, where space constraints permit and there are multiple, multi-module UPS systems serving the facility's computer loads, individual UPS 18-3

battery support systems should be located in separate, fire compartmentalized rooms. This design strategy would also apply to the large multi-module UPS systems themselves. The principle is one of containment and isolation of a catastrophic failure on one system from affecting other systems and occupancies in the facility. A failure on one battery system supporting UPS A will not also disrupt power to UPS B. This is particularly important in facilities where completely separate and independent dual power path systems supporting dual power cord IT equipment is the objective. Fire Detection/Suppression Systems Individual battery rooms should be treated as separate zones for fire detection and suppression purposes. Each room should have a digitally addressable, early warning fire detection system installed and connected into the central fire detection system. Additionally, a pre-action sprinkler system should be installed to suppress any battery fire within the room, should one occur. This system should be tied into the central fire monitoring system for the facility. Care should be taken in the design and installation of these systems to assure that they meet all applicable federal, state, and local fire and life safety codes. Grounding Issues All battery racks and cabinets associated with UPS systems should have NEC code green wire grounds linking all racks, for safety reasons. Periodic inspections should be made of the grounding system to assure that continuity is maintained. Battery Room EPO Systems Battery rooms should be equipped with a centralized Emergency Power Off (EPO) system that can disconnect power in the room from the UPS common battery buss or individual UPS module(s) being supported by this room. This EPO system enables the facility management team to quickly isolate a battery system experiencing problems and thereby mitigate a potentially dangerous situation. An EPO device should be located at all egress points from the room and be tied into the central alarm system and monitored. Figure 2. Emergency Power Off (EPO) Device 18-4

Battery Remote Monitoring Alarm Systems All battery systems should be equipped with an individual cell monitoring system to alert owners to the condition of their batteries serving mission critical IT equipment. Without an adequate cell monitoring system, individual battery cells problems can be masked until they are actually called upon during utility power failures. These systems provide continuous battery performance data for short and long duration outages. Additionally, these systems can be remotely alarmed to alert operations personnel when UPS systems transfer to battery. Remote alarming allows for timely response to investigate potential UPS or battery problems. Temperature Control Considerations For optimal battery performance, battery room HVAC systems should be designed to maintain a uniform average ambient room temperature of 77 F. Battery room temperatures below 77 F increase battery life but degrade battery performance during periods of heavy discharge. However, battery room temperatures above 77 F increase battery performance but degrade battery life. In situations where battery rooms border outside walls and unconditioned spaces, wall and ceiling surfaces should be insulated to help achieve the uniform ambient room temperature objective. Hydrogen Gas Detection and Ventilation Systems Battery rooms should be designed with an adequate exhaust system, which provides for continuous ventilation of the battery room to prohibit the build up of potentially explosive hydrogen gas. During normal operations, off gassing of the batteries is relatively small. However, the concern is elevated during times of heavy recharge of the batteries, which occurs immediately following a rapid and deep discharge of the battery plant. A secondary and larger volume fan is usually installed and connected to the hydrogen detection system, which senses a gas build up, causing the secondary fan to activate. The secondary fan also is automated to sense the failure of the smaller fan, in which case the larger fan would activate. These systems should be installed with remote alarming capability, to report a hydrogen gas build up and abnormal operating conditions. Battery Room Lighting and Miscellaneous Power Designs The battery room light fixtures should be designed and installed to properly coordinate with the battery racking for maximum usable illumination of lower tier racks. This usually means installing fixtures over the maintenance aisles. An objective to shoot for would be 50 to 60 foot-candles at the maintenance task level. In many cases, supplemental portable lighting systems will be used to achieve adequate light levels in all areas of the battery room. Miscellaneous power receptacles (wall receptacles) should be strategically and liberally placed throughout the room for ease of use of power tools, portable battery chargers, and other battery maintenance equipment. Environmental Spill Containment Code required spill containment must be provided to adequately contain potential acid spills from cracked or otherwise leaking flooded wet cell batteries. Localized under-rack containment systems can be utilized or a whole room containment concept can Figure 3. Spill Containment/Cleanup Kit 18-5

be employed by adequately curbing the entire perimeter of the battery room. Adequate quantities of absorbent materials and acid neutralizing agent should be maintained in the room for use in spill containment and clean up operations. Additionally, battery room floors should be sealed and all floor drains that exist within the battery room or otherwise in proximity to flooded wet cell batteries should be capped, sealed or curbed to prevent spilled acid from reaching storm or sanitary drainage systems. Eye Wash/Deluge Shower Station Every battery room should have a combination eye wash/deluge shower station to provide a means of decontaminating personnel exposed to and contaminated by battery acid. These systems should be located in close proximity to the battery systems but separated from them by the proper code clearances. Each battery eye wash/shower system should be remotely alarmed and monitored to identify and annunciate any indication of water flow. Water flow in one of these systems could mean that someone is in need of help, and personnel could and should be dispatched to investigate and render assistance as required. Summary As noted above, there are many critical design elements and issues to be taken into consideration when planning, designing, and constructing a mission critical UPS battery room. Additionally, there are numerous relevant federal, state, and local code issues that must be addressed in the design. Figure 4. Eye Wash / Shower Station in Background The above discussion topics are not necessarily an all-inclusive list of topics to be considered at all locations. However, it is a good overview of most of the universally relevant items that need to be addressed to be successful in providing a modern, safe, efficient, and updated battery room environment. At the "end of the day," local operations personnel must be able to meet ongoing battery maintenance and monitoring needs, and the site management team must have confidence that the battery systems will perform as expected, when needed! 18-6