Site Establishment and Monitoring Report



Similar documents
Wildlife Habitat Conservation and Management Program

CITY UTILITIES DESIGN STANDARDS MANUAL

Restoration Planning and Development of a Restoration Bank

Application of Invest`s Sedimentation Retention model for restoration benefits forecast at Cantareira Water Supply System

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Markets for Ecosystem Services on Agricultural Lands: Experience and Outlook in the United States

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

Avison Management Services Ltd. COMPANY PROFILE

WATER RESOURCES ENGINEERING DESIGN LANDSCAPE ECOLOGY AND RIVER RESTORATION.

Natural Resource Management Profile

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011

Monitoring Riparian Areas With a Camera

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL

Multi-purpose Drainage Management (MDM) Plans

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

Integrated Restoration Prioritization

STATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC

Effects of Land Cover, Flow, and Restoration on Stream Water Quality in the Portland, OR and Vancouver, WA Metro Area

Ponds- Planning, Design, Construction

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

EFB / Online Wetland Restoration Techniques Class Syllabus

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute

E&SC Training & Certification

Thank you to all of our 2015 sponsors: Media Partner

EPA Grants Supported Restoring the Chesapeake Bay

Section 4 General Strategies and Tools

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S

UGIP Technical Committee Key Principles of Grazing Management

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

1.7.0 Floodplain Modification Criteria

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

HCP Team Meeting. November 18, icfi.com

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey

Pasture, Rangeland, and Forage Insurance: A Risk Management Tool for Hay and Livestock Producers

Colorado Natural Heritage Program

USE OF GIS AS A REAL TIME DECISION SUPPORT SYSTEM FOR IRRIGATION DISTRICTS. Gabriele Bonaiti, Ph.D. 1 Guy Fipps, Ph.D., P.E.

Weed Survey and Mapping

Prioritizing Wetland and Stream Restoration and Protection Using Landscape Analysis Tools

Since early 1994, The Northern Sacramento Valley Sustainable Landscapes

Increasing water availability through juniper control.

Risk Analysis, GIS and Arc Schematics: California Delta Levees

Waterway Technote Planning

LIVING LANDS Helping Land Trusts Conserve Biodiversity

JOB DESCRIPTION. GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12 $55,138 - $71,679 Annual/Full Benefits

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets

Michigan Tech Research Institute Wetland Mitigation Site Suitability Tool

Experience Summary. KINA MURPHY, M.S. Ecologist / Community Planner 9 Stone Ridge Road, Santa Fe, NM Cell: Education / Training

Barre City City-wide Policy and Program Options

GIS MAPPING FOR IRRIGATION DISTRICT RAPID APPRAISALS Daniel J. Howes 1, Charles M. Burt 2, Stuart W. Styles 3 ABSTRACT

Darryl Anderson PROJECT MANAGEMENT Harbour Authority Associa9on of Bri9sh Columbia March 6, 2014

Ecological Restoration Strategies for Cattle Ranching Landscapes of the Azuero

Management Plan Template For Conservation Easements Held by CPW

Vegetation Resources Inventory

Using Aerial Photography to Measure Habitat Changes. Method

Water Quality Management

Rocky EEP Preliminary Findings Report Summary February 2005

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Addendum D. Nomination of Moody Wash ACEC

Floodplain Connectivity in Restoration Design

DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, Values Statements.

Wildlife Habitat Conservation and Management Plan

USDA CROSS TRAINING PROGRAM ONLINE AGLEARN TRAINING

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208

3. The submittal shall include a proposed scope of work to confirm the provided project description;

SHAPING LAND-USE PRACTICES AND SUPPLY CHAINS THROUGH COMMODITY CERTIFICATION: THE EXPERIENCE OF THE RAINFOREST ALLIANCE

INTEGRATED NATIONAL ADAPTATION PILOT República de Colombia INAP

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

Short title: The PES Experience in Costa Rica, Colombia and Nicaragua.

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Beasley Lake Watershed National Sedimentation Laboratory Water Quality & Ecology Research Unit USDA ARS Oxford, Mississippi

American Forest Foundation (AFF) Standards of Sustainability for Forest Certification

4.2 Buena Vista Creek Watershed

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

Hypoxia Task Force and LGU SERA-46 Priorities for Collaborative Work Working Document May 2015

Upper Roanoke River (Roanoke and Botetourt Counties, Cities of Roanoke and Salem, Town of Vinton) TMDL Implementation (Cleanup) Plan Development

Susan Iott U. S. General Accounting Office. Restoration of the South Florida Ecosystem

Using an All lands Framework for Conservation of Ecosystem Services

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Creating Green Jobs within the Environment and Culture sector.

Green Infrastructure Case Study Template

Standards: Human activity has consequences on living organisms and ecosystems. (94412, )

WEED MANAGEMENT PLAN FOR. (NAME of PROPERTY or MANAGED AREA) (TOWN or COUNTY, STATE) (TIME PERIOD; e.g )

Transcription:

Site Establishment and Monitoring Report Establishing and monitoring the demonstration sites for the Ecological Services Initiative Phase 2 Regional Pilot March 2014 Completed by: David Zehnder Proud owner: John Palmer is a rancher and owner of one of the demonstration sites along the Columbia River wetlands captured in the background of this photo. Funded and Supported by:

Introduction This portion of the Ecological Services Initiative (ESI) pilot required that the contractor complete the following steps to establish and monitor the demonstration sites involved in the pilot: 1. Establish sites a. Develop site selection criteria b. Screen potential sites c. Complete site selection form d. Establish site agreement 2. Conduct Assessments a. Office based portion b. Field based portion 3. Write report The site establishment component was completed to determine if there are significant barriers to establishing larger numbers of Paid Ecosystem Services (PES) sites within a regional context. Specifically would farmers be reluctant to sign on or are there other unanticipated barriers. The monitoring component consisted of conducting assessments of each targeted riparian areas. This would allow the project to evaluate the application of the previously developed monitoring tool on a larger number of sites within a regional context. For a full overview of the Ecological Services Initiative Phase 2 Regional Pilot see the Greening Regional Agriculture report and associated additional reports. The following sections describe the particular methods employed, and the results and recommendations for a wider application of the PES concept. Methods The following steps were carried out in order to complete this portion of the contract: 1. Establish sites a. Establish site selection criteria i. In order to establish the demonstration sites the contractors developed the site selection criteria. In order for a site to be selected the it was determined that is should be: Site Establishment and Monitoring Report April 2014 Page 1

1. located within the Upper Columbia Valley 2. on a working farm or ranch 3. situated on a riparian area on a water body associated with the Columbia River 4. on a farm or ranch that has completed and Environmental Farm Plan 5. on a property that is owned by a land owner who is interested in the concept and willing to share the details of the demonstration publicly 6. able to meet the additional criteria required by the site selection form (appendix 1) b. Conduct initial interviews with the owners of the potential sites i. While establishing the demonstration sites, potential sites were identified by the contractor who is familiar with the farmers and ranchers in the region. The potential sites that were thought to conform to the site selection criteria described above where interviewed to determine their suitability. 7 sites where interviewed and 5 sites were established. c. Complete site selection form i. Once the preliminary interviews were completed the contractor filled in a site selection form for each of the 5 sites. This step collected the relevant administrative information as well as allowed the project to further determine whether the site further conforms to the site selection criteria. d. Complete the site agreements (appendix 2) i. Each of the five demonstration sites had an agreement struck with the land owner which consisted of a map of the site and an accompanying agreement. ii. Create the map 1. A map was created for each site showing the location of the site and outlines the polygon showing the area that is to be included in the agreement iii. Complete the agreement 1. An agreement was completed for each site which outlines what practice the landowner will maintain as well as other relevant details. 2. Conduct Assessments a. In the previous phase of the ESI a monitoring tool was created (appendix 3) Site Establishment and Monitoring Report April 2014 Page 2

b. This tool applied the ecosystem service assessment tool (appendix 4) and includes four steps: 1. Collecting administrative Information: administrative data is required to identify the site of interest and note important characteristics; 2. Assessing the ecosystem service site potential: this is a desktop exercise that evaluates the landscape context for each site considered for the ESI program in order to identify the potential of the site to function as a service providing area; 3. ESI site selection: based on results of the ecosystem service site potential, selection criteria are applied to identify sites with the highest potential to support the delivery of ecosystem services based on ESI goals and priorities for participation in the program 4. Field assessment of ecological condition: for all sites selected for participation in the ESI program, the Riparian Health Assessment protocol is used to evaluate the ecological condition of each site. Depending on which type of riparian area the site consists of one of three workbooks (appendix 5) would be used; a wetland, river, or small stream assessment workbook. c. The ecological site assessments where completed for each site. These assessments focused primarily on steps 1, 2, and 4. Step 3 portion of the tool was not utilized since the site selection process was completed by the process required by the contract. Site Establishment and Monitoring Report April 2014 Page 3

3. Figure 1 the following is an example of content generated by the assessment process: 3. What is the soil erosion risk of the site? Results of soil erosion risk assessment: Figure 2. Pink area represents <= 2 degrees Slope gradient Risk Category Results: 0 to 10 Low Average slope of 2 degrees, therefore rated as flat 11 to 20 Moderate 21 to 50 High >50 Very High 4. Write report a. The writing of this report and the associated appendices is intended to meet this requirement of the contract. Results and Recommendations The steps described in the Methods section consisted mainly of the site establishment and monitoring. This work served to answer some important questions that relate to the potential future expansion of the concept. In general the process went well with few challenges, producers were very supportive and willing to participate, and the monitoring tools were successfully completed. Site Establishment and Monitoring Report April 2014 Page 4

Since this project was initiated there has been significant progress in advancing the ESI. The potential expansion to a multiregional concept has been supported by a large number of key stakeholders and funders. One of those positive developments is the formalization of the relationship between the ESI and the Environmental Farm Plan (EFP)(appendix 7). In an effort to keep this report to a reasonable length the specifics will be spared. The reader will see the EFP program referenced below. For more detail on that program the reader could follow the link provided. The following describes the results and recommendations that relate to each of the completed steps: 1. Establish sites a. Develop site selection criteriai. The contractor was able to develop selection criteria based on previous experience and input from regional experts. ii. Recommendation-These criteria should be established according to regional priorities and funding opportunities. The process to establish priorities should be collaboration between funders, stakeholders, and regional experts. The output of the process should be a series of specific ecosystem goals, and a defined sub region that the program should focus on. b. Screen potential sitesi. The contractor was able to establish the required 5 sites. 7 site owners were approached but two were screened out. One land owner expressed interested but was away at the time that sites were being established, and the second felt their project didn t conform to the criteria. There was strong interest and support from all land owners who where approached. ii. Recommendation-The screening process should be integrated with the EFP process, and there is particular opportunity to connect to the EFP s Group Planning component. iii. Recommendation-The screening process should be connected to the site selection criteria which should be developed for a regional program. c. Complete site selection formi. Administration information was collected successfully ii. Recommendation- Future programs should integrate with EFP to create efficiency. By creating integrated forms and databases less time would be required to collect the same administrative information. Site Establishment and Monitoring Report April 2014 Page 5

iii. Recommendation-Selection Criteria should be established by regional experts based on priority targeted ecosystem services. d. Establish site agreement i. 5 site agreements were established. Farmers were receptive to the idea of maintaining the BMPs and where willing to sign the agreements ii. Recommendation-The agreement template should be reviewed by a legal expert to ensure both the legality and efficacy. 2. Conduct Assessments a. The Assessments where completed on the 5 sites with the following results and recommendations: 1. Collecting administrative Information: administrative data is required to identify the site of interest and note important characteristics; 1. The administrative information was collected and recorded for this form. Some of the information was redundant because it had been collected by the site selection process. 2. It took longer to complete the office based portion initially though significant efficiencies where gained as more were completed. 3. A precise step by step guide to completing the office based portion of the assessment (appendix 6). 4. It was determined that Environmental Farm Plan Advisors could complete this portion of the assessment. 5. Recommendation-Future assessors should use the step by step guide that was created. 6. Recommendation-This portion of the assessment should be integrated into the EFP as mentioned previously. 2. Assessing the ecosystem service site potential: this is a desktop exercise that evaluates the landscape context for each site considered for the ESI program in order to identify the potential of the site to function as a service providing area; 1. This information was collected which went relatively smoothly though there have been some changes in the GIS websites since the tool was created. The guide mentioned above captures those changes. Site Establishment and Monitoring Report April 2014 Page 6

2. Some of the data sets referred to are either incomplete or at a scale that is too coarse for some sites. 3. Recommendation-Future programs should attempt to develop the necessary data sets where they are insufficient for the process. 3. ESI site selection: based on results of the ecosystem service site potential, selection criteria are applied to identify sites with the highest potential to support the delivery of ecosystem services based on ESI goals and priorities for participation in the program 1. The site selection process outlined in the assessment tool was not used in this exercise though the relevant details were captured. The site selection was done using an alternative method. 2. Recommendation-In future programs this portion of the tool should replace the alternative method used in this project to ensure a fully integrated approach. 4. Field assessment of ecological condition: for all sites selected for participation in the ESI program, the Riparian Health Assessment protocol is used to evaluate the ecological condition of each site. Depending on which type of riparian area the site consists of one of three workbooks (appendix 5) would be used; a wetland, river, or small stream assessment workbook. 1. This portion of the assessments was completed by making the field visits to the sites. Since the assessments require an analysis of vegetation they were delayed to the spring due to the snow cover in the fall. 2. The assessor completed one of the three types of assessment depending on the site: wetlands, small streams or large river assessments. 3. One step in this process requires the assessor to choose an assessment site and choose whether that site is a representative or critical site. From the Riparian Management Workbook: a critical site, one that may be sensitive, or already has some specific problems, for assessment; or Site Establishment and Monitoring Report April 2014 Page 7

a representative reach of stream and that will provide an overall impression of health. To determine a site that is representative, become familiar with the entire length of stream and riparian area. What you are picking is a short reach that will represent the average condition of a long stretch of river or stream. Vegetation, use/utilization, channel characteristics and stream gradient in the representative reach should all reflect what is found in and is common to a longer reach. If there is too much variation, or a tributary joins, divide the stream into similar units and then select a representative piece from each unit. The reasons for picking either or both critical and representative reaches may include: 4. Recommendation-Depending on the design of the regional program it will be important for future assessors to be given specific directions as to what type of site to capture with their assessment. 5. The contractor spoke with Noreen Ambrose a Riparian Assessment Expert who manages the Cows and Fish program to determine if the RHA scores could be wrapped up to create an amalgamated regional score. She said it is possible and that they are using these amalgamated scores in Alberta now. Site Establishment and Monitoring Report April 2014 Page 8

6. Recommendation-Future programs should replace the whole farm assessment portion with a regional set of criteria to guide where the assessment should be targeted on the individual farm. 7. Recommendation-Future programs should determine if the assessors should be choosing a representative or critical site. 8. Recommendation-Future programs should investigate how the resulting RHA data should be wrapped up to create an amalgamated regional score. Fence line: The fence shown in this picture is protecting the riparian area and the associated wetlands allowing both food and ecosystem service production. Site Establishment and Monitoring Report April 2014 Page 9

Appendix The following appendix items are attached to this report: 1. Site selection forms 2. Site agreements 3. Monitoring tool 4. Monitoring reports 5. Riparian assessments wetland, river and small stream workbooks 6. Office based steps summary doc 7. Link to the Environmental Farm Plan Programhttps://www.bcac.bc.ca/ardcorp/program/environmental-farm-plan-program Site Establishment and Monitoring Report April 2014 Page 10