Main Projects in Qatar



Similar documents
Qatar Railway Company

A Tornado is about to take Doha by storm

Sydney Airport District

Marina Bay Sands. George Tanasijevich President and CEO of Marina Bay Sands

Hong Kong Convention and Exhibition Centre FAST FACTS

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS

THE SMART CITY OF THE FUTURE

THE NEW FORMAT OF BUSINESS

BASRA OIL & GAS INTERNATIONAL FREE ZONE PHASE 1A KHOR AL ZUBAIR BASRA INTERNATIONAL OIL & GAS HUB LIMITED IN PARTNERSHIP WITH THE FREE ZONE AUTHORITY

Ministry of the Environment Decree on accessible building

Impact Analysis: The Atlanta Braves new Stadium Project. March A Cushman & Wakefield Research Publication

SELECTED SPECIAL EVENTS PROJECTS

Welcome to our exhibition


Saint Cloud Business Center

Executive Flight Office & Hangar

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH YELLOW BOX STORAGE , LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Cairo Festival City. The Mixed-use Urban Community

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

think ahead CITY CENTER

Arab-German Yearbook Construction and Consulting.

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

Connect Transform Locate

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Schedule B to By-law

FOR SALE. The Friedman Building th Avenue South, Seattle Nicholas T. Gill Allan Friedman

PROJECT MANAGER / CONSTRUCTION

CITY OF HELSINKI. Introducing Major Urban Development Projects EXPO REAL, München, October

Building and Construction Sector in Qatar

800 EMAAR (36227) Marina Plaza

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN Festival Plaza Drive, Las Vegas, Nevada 89135

TAMPA S UNIVERSITY MALL ANNOUNCES MAJOR REDEVELOPMENT PLANS. Construction is slated to begin as soon as first quarter 2016

''The construction of the Public Urban Centre in Sikorskiego St. and Legionów Ave. in Łomża

The History of Globe International Holdings in Nigeria

LAND-USE ZONING OBJECTIVES

Architects. Engineers

APPENDIX A BUILDING SETBACKS AND HEIGHTS

RETAIL PROPERTY FOR SALE Biscayne Boulevard, Miami, FL 33161

For Sale - $11,000,000 - Negotiable Excellent User Opportunity -

Schedule B to By-law Part A Fees Payable for Permits

Highway Requirements Part 4

AEROTROPOLIS ATLANTA HARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT 175, SQUARE MILES 1 REGIONAL COMMISSION 4 INTERSTATE SYSTEMS

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

Hellinikon S.A. The Site

28.0 Development Permit Area #2 (Neighbourhood District)

Greenville Downtown Airport Aviation & Non-Aviation Parcels Available Greenville, South Carolina

Attached (townhouses) SC P P 4.2.3(A)1 Duplex SE SE P Accessory Dwelling Unit (ADU) to a primary residence SC SC SC SC P 4.2.3(A)2

Opal Service District Plan

Real Estate Dossier. Intermodal Station Area Master Plan of Zaragoza G-44-2 Area. El Portillo Area Master Plan of Zaragoza G-19-1 Area

QATAR RAIL DOHA METRO PROJECT BUSINESS OPPORTUNITIES FOR LOCAL MARKET Daniel Leckel Chief Program Officer. 7 May, 2015

t e c h n o l o g y BIM Services 1

ARTICLE 252. PD 252.

I. AMFITEATRU HOTEL ** For more details visit :

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect

Available for Lease or Sale

Leading Facilities Management Company

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Facilities & Energy Management Building Energy Efficiency Services

LOGISTICS FACILITY UNITS AVAILABLE FROM 17,500 TO 130,000 SQ FT NEW BUILD PLANNING APPROVED

Granger Bay Boulevard and Green Point Roundabout

THE REGION S PREMIER PARTNER FOR HOTELS RESIDENTIAL SERVICED OFFICES & RETAIL VENTURES.

P r o j e c t C a s e S t u d y

05 AREA/SITE SPECIFIC GUIDELINES

K+P. Munich Airport International Terminal 2. Architekten und Stadtplaner GmbH Koch Voigt Zschornack

Fully Automated multi-temperature and multi-user 3PL logistics solution


23 Glen Watford Drive - Zoning Amendment Application - Preliminary Report

74 Rivington Street. Planning Statement JULY 2013 DP Pall Mall. London SW1Y 5NQ. Tel: Fax:

BayArena Leverkusen. Progress is built on ideas.

SRISHTI TECHNICAL SERVICES L.L.C

Location Amenities HVAC Parking Technology Security and Life Safety Elevators Ownership and Management

Airports Architectural Design Solutions and New Design Technologies

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

Presented by: Rhonda Irby Business Development Ghazanfar Group. Ghazanfar Group. Afghanistan s Leading Energy Company

Squash a History of the Game.

Executive Summary. Does a Streetcar Make Sense in Anaheim

COMPLEX THE. Adding Value to Business and Quality of Life

Examples of Eligible Projects. Project Category Description Examples

How To Build A Luxury Apartment Complex In London

Table PARKING SPACE RATES AND PARKING SPACE OCCUPANCY

Instructions 1. trigger visit

LONDON ROAD SEVENOAKS

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

San Diego Convention Center Floor Plans

THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS


PLANNING DIVISION STAFF REPORT February 23, Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

Sector Design Concepts

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

londoneast-uk London s Newest Business and Technical Park INTERACTIVE EDITION Cover Contents Introduction Description Site Plan Data Sheets Contact

C-2 Construction, Inc. - NAICS Codes

A. NICOLAIDES HOLDINGS LTD PACKAGE NO. 6

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Transcription:

PROJECTS IN QATAR Here are some major projects in Qatar. Some projects have already started, other on the way. It is important to remind that date mentioned in the projects publication is not always respected. PEOPLE MOVER SYSTEM IN QATAR EDUCATION CITY Client: Qatar Foundation Habtoor Leighton Group $124 Million 3 years HLG has been awarded responsibility for the design and construction of Qatar s US$412 million People Mover System in Education City, which is one of the country s first rail projects. HLG s scope of works, valued at US$124 million, incorporates the design and construction of track-work, tram-stops and a depot facility, which includes maintenance workshops and administration buildings. HLG is part of the Siemens Tram Consortium with Siemens WLL Doha and Siemens AG from Germany. The People Mover System is located in Doha s Education City. Being built for Qatar Foundation for Education, Science and Community Development, and is intended to reduce the flow of traffic within Education City, by allowing students to park their cars in purpose-built multi-storey car parks and travel free of charge on a battery-powered tram system to their destination within Education City. LUSAIL DEVELOPMENT FOR PRIMARY INFRASTRUCTURE Client: Lusail Real Estate Development Company (LREDC) QPM MIDMAC YUKSEL JV 3 years The Project comprises of Engineering, Procurement, Construction and Commissioning of major parts of Road A1, A6, D11 & A10 at Lusail with Junctions 12, 13, and 14, Wadi Underpass, Tunnels T1 & T2, Southern and Marina Interchanges including Underpass, Bridges, Arch, and Tunnel. The total length of the roads is 7.5 km. The scope of works include design and construction of a 4.6 km deep storm water tunnel of 2.4-3 m diameter with 15 shafts. Utilities, irrigation, electrical substations, road lighting, traffic signals, district cooling and gas distribution are also in the scope. MESSAEEID Client: Qatar Petroleum Iberdrola Seattle Contracting Company Prepared by Mounif Kilani, ECC Kuwait Page 1/8

Construction of asphalt access road Car park, boundary walls, temporary and permanent fencing Excavation and installation of electrical cable conduits including electrical power line and supply and erection of perimeter lamp post. Work includes supply of equipment material manpower and supervision. SOUQ WAQIF UNDERGROUND CAR PARK Client: Private Engineering Office (PEO) JAIN Sustainable Engineering Solutions & Parsons Arabian MEP Contracting 18 months Arabian MEP Contacting, secured subcontract award from the project main contractor UrbaCon to carry out full Mechanical, Electrical and Plumbing (MEP) works for 3 levels of underground car park at Souq Waqif One of Doha s most popular souqs. The project overseeing full MEP work on 106,381.73 sqm underground car park and will have the capacity of 2,400 cars. The project is scheduled for completion in 18 Months from award date. NDIA EMIRI TERMINAL Client: NDIA Steering Committee Overseas Bechtel Incorporated CDC QR 2.000.000.000 The NDIA (New Doha International Airport) Project is a Joint Venture of CDC and Takenaka. The components included in the works are as follows: - Emiri / V.V.I.P. Terminal Building - Passenger Terminal Parking Facilities - Mosque and related facilities The Emiri Terminal Architecturally elaborated building of reinforced concrete and steel structure of approximately 8,000m² in two levels. It is divided into three main parts: 1. Emiri Terminal to accommodate ceremonial reception and departure of guest of state, private terminal for Emir, His family and selected ministers. 2. Ministers Lounge to serve as a terminal lounge for ministers. 3. V.V.I.P Lounge to accommodate V.V.I.Ps, both those travelling via private aircraft and those travelling by commercial airline flights. Passenger Terminal Parking Facilities These facilities include three-level structures to accommodate 50.000 square meters of public vehicle parking, a commercial parking structure with shaded parking on the ground level and two at Grade Parking Lots with a state of the art parking management system. Mosque is a three-level circular concrete structure with glass exterior at the upper two levels. The structure is approximately 47 meters in diameter and 13 meters in height above the plaza level. The ground level accommodates storage areas, elevator & mechanical room. The plaza level of the mosque accommodates assembly, circulation, office and storage areas, including the men s prayer hall. The Prepared by Mounif Kilani, ECC Kuwait Page 2/8

upper mezzanine level accommodates assembly and circular areas, including the women s prayer hall. The mosque also accommodates an Imam s residence and Muesins residence. Mosque Plaza and Minaret paved plaza above the commercial parking structure complete with landscape lighting, planters, pools, walkways and bridges connecting to the Vertical Circulation Node which provides access to the Passenger Terminal Building and Minaret. NEW DOHA INTERNATIONAL AIRPORT, QATAR Client: Government of the State of Qatar Bechtel Corporation Bechtel is providing engineering, project management, and construction management services for the New Doha International Airport, now being built in Qatar. It will replace an existing facility, increase passenger and cargo-handling capacity, and accommodate the new Airbus A380 super jumbo jets. When it opens, the new airport will accommodate 24 million passengers and 750,000 metric tons of cargo annually. It will feature two of the longest commercial runways in the world, an 85 meter high control tower, a 510,000-square-meter passenger terminal with 40 gates, a separate terminal for the Emir of Qatar, a general aviation terminal, a cargo terminal, a 150,000 square meter aircraft maintenance center, one of the world s largest airport catering facilities, state-of-the art air traffic control equipment and security systems, and other facilities. LUSAIL ICONIC SOLAR STADIUM FIFA WORLD CUP STADIUMS Client: $662 million Status: Planning The project involves construction of a fully retractable cable net roofed stadium with a crowd capacity of 86, 250. The dhow sail styled stadium s outer skin is a concave structure incorporating louver system for ease and pleasure of the fans and players. The stadium would be surrounded by a pool of water with its roof supported by arching columns. The solar powered stadium which can be accessed by 6 bridges, will have its own metro station and will be linked to highways and bus routes. DOHA METRO Client: Ministry of Communications and Transport Parsons Brinckerhoff 3bn USD From Q1 2010 Estimated To Q1 2015 Estimated Status: Bidding Doha metro is an 85-KM railway network in Qatar. The railway will include an east coast link, a high-speed link, a freight link and a light rail system. The railway will Prepared by Mounif Kilani, ECC Kuwait Page 3/8

serve suburb of Doha and developments such as Lusail, Education city and West Bay. Phase 1 of the Doha Metro, which includes a Red Line from the south of Doha through the city toward Lusail. BARWA FINANCIAL DISTRICT Client: Barwa Real Estate Bouygues Construction 1.3bn USD From Q1 2010 Actual To Q3 2013 Actual The Barwa Financial District is a giant project conceptualized to serve the global, regional and local financial sector. The Financial District will house facilities attracting regional and international banks seeking specialized infrastructure to benefit from. The Barwa Financial District will be located in the new business city of Doha, West Bay. The site for the Financial District has an approximate square area of 71, 600 plus sq. m and is situated along Majlis Al Taawon Street with secondary roads surrounding the perimeter allowing access to it from multiple sides. LUSAIL DEVELOPMENT LIGHT-RAIL-TRANSIT SYSTEM Client: Diar Real Estate Development Company TBC From: Q4 2011 Estimated To: Q1 2016 Estimated Status: Bidding The project calls for construction of Light-Rail-Transit System for Lusail Development. The light-rail-transit system will cover 22 kilometres and include with around 35 stations. BARWA CITY DEVELOPMENT Client: Barwa Real Estate Company (Barwa) Consult Maunsell 1.35bn USD From Q2 2007 Estimated To Q1 2015 Estimated Barwa City will cover a 2.7 million square meter land in Musameer, just outside the heart of Doha. The development offers its home owners and investors 128 apartment buildings, 6000 flats, and 1024 studio units. The city will also include schools, a hospital, mosques, parks, shopping complexes, health facilities and all other conceivable amenities. City capacity is 20,000 families. It will have its own district cooling system and total wireless internet coverage. LUSAIL LIGHT RAIL TRANSIT SYSTEM PHASE 1 Client: Qatar Railways Company (QRail) Qatari Diar Vinci Construction (QDVC) 5 b USD From Q4 2012 To Q1 2015 Prepared by Mounif Kilani, ECC Kuwait Page 4/8

Pase 1 covers civil engineering works in seven underground stations, construction of a viaduct over the highway between Doha and the northern part of the country and preliminary work for the LRT depot and maintenance workshop. The Lusail LRT project entails four lines covering a distance of 30km, with ten underground stations and 25 at grade stations, being developed in several phases. The entire project is executed in several engineering study and construction phases, where the next and final phase will include rolling stock and systems. Integrated into 19 mixed-use districts, the project will transport 200,000 people and around 400,000 visitors a day in the new city of Lusail and is being developed on a 37km² waterfront site 15km north of Doha. DOHA FESTIVAL CITY Client: Bawabat Al Shamal Real Estate Company WLL (BASREC) Qatar Islamic Bank (QIB), DP Architects, Arab Engineering Bureau (AEB) (Project Architect), Mace International (Project Manager) QAR 6 billion From Q1 2011 Estimated To Q1 2014 Estimated The total area of Doha Festival City is 433,847m2 and located 15km north of downtown Doha on Al Shamal Road. The plot will include 260,000sqm gross leasable area of retail space offering over 500 retail units which will include a large number of new brands to Qatar. In addition, the project will boast the first Ikea store in Qatar, and will feature an entertainment and leisure complex, automotive showrooms, international hotels and convention centre. UMM SALAL STADIUM Client: Qatar Football Association Albert Speer & Partner CH2M Hill 251m USD 2012 to 2015 Umm Slal Stadium will have 45,120 seats. The design is a modern interpretation of traditional Arab forts. After the FIFA World Cup, seating capacity will be reduced to 25,500. LUSAIL LIGHT RAIL TRANSIT SYSTEM Client: Qatar Railway Development Company Turner and Townsend Qatari Diar, Vinci Construction 1.8bn USD 2011 to 2016 The network is composed of four main tram lines extending over 30.5 kms underground and over ground and 36 passenger stations. In the southern part of the city, a 5.5 kilometre underground railway is under construction. Joining various residential districts across the city and serving the Marina, Energy City and Qatar Entertainment City. Prepared by Mounif Kilani, ECC Kuwait Page 5/8

The northern sector of Lusail City will have 24 stations at grade to serve the areas of Fox Hills district, the Northern Residential district, the Medical and Educational districts, the Golf district and to Lusail City s plaza at the heart of the city. In the near future, the rail network will connect to Doha s metro network at a network interchange located on Khor highway. BARAHA MOTOR CITY Client: Barwa Real Estate 533m USD 2012 to 2017 Status: FEED (front end engineering design) Motor City will be located next to Qatar Racing Club and will cover almost 2mn sqm. Baraha Motor City will create a self-contained integrated community to attract motorists seeking a broad range of automotive related services. AL KHOR STADIUM Client: Qatar Football Association Albert Speer & Partner, CH2M Hill 250m USD 2015 to 2019 Status: Planning Al-Khor is a 45,330-capacity stadium with a seashell motif and a flexible roof. The permanent lower tier seats 25,500 and the modular upper tier seats 19,830. The stadium offers spectators a view of the Arabian Gulf from their seats and will be located in a sports and recreation zone. FOUR STAR HOTEL PROJECT Client: Qatar Airways Gulf Contracting Company The 4 Star Airport Hotel, is a 400 Room Hotel, is located near the existing Doha Airport. Approximate Gross Built-Up Area is 43,135 M2 and the development consists of Basement, Ground and First Floor plus two 6-Storey towers (B+G+7). Basement (7048 M2) is for Car Park & Plant Room The Ground Floor to include Front Office, Foyer, Lobby Lounge, Retail, Shops, Restaurants, Administration,Loading Dock & Back of Houses. The First Floor is to include Restaurant, Lounge, Meeting Rooms, Business Centre, Health Club and Swimming Pool. Above First Floor there are 6 Floors dedicated to the Guest Rooms (400 Rooms). MUSHEIREB DEVELOPMENT Client: Dohaland Adjaye Associates, Allies & Morrison, John McAslan & Partners, Mossessian & Partners, Prepared by Mounif Kilani, ECC Kuwait Page 6/8

Bauer International, Drake & Skull International 5bn USD From Q1 2010 Estimated To Q1 2016 Estimated The development covers an area of 750,000 square metres and will be divided into several districts, including a residential and mixed-use quarter, a retail quarter, a heritage quarter and a commercial area called the Headquarters Gateway. It will also include a shopping mall, hotels and entertainment area. Surgery Hospital Area: Al Sadd Sector: Health Total Cost: 900,000,000 Q.R. Status: In progress Type: Buildings Start Date: 01 May 2013 Expected completion date: Second quarter of 2015 Construction company: MIDMAC Consulting company: KEO Consultants Roads projects East-West Corridor Area Industrial Area Sector Expressway Programme Projects Total Cost 3,900,000,000 Q.R. Status In progress Type Roads Start Date 01 September 2013 Expected completion date Second quarter of 2017 Construction company - East Corridor: China Harbour Engineering Company - West Corridor: Joannou & Paraskevaides (Overseas) Limited/J&P Avax S.A. (JV) Consulting company Design Parsons International Supervision CH2M Hill Halcrow Ltd Dukhan Highway East Area Multiple Areas Sector Expressway Programme Projects Total Cost 3,700,000,000 Q.R. Status In progress Type Roads Start Date 01 October 2011 Expected completion date Second quarter of 2017 Construction company QD/SBG Group Consulting company Design Consultant 1: Parsons International Design Consultant 2: Dar Al Handasah Supervision Parsons International Prepared by Mounif Kilani, ECC Kuwait Page 7/8

Lusail Expressway Area Multiple Areas Sector Expressway Programme Projects Total Cost 3,500,000,000 Q.R. Status In progress Type Roads Start Date 17 November 2012 Expected completion date Second quarter of 2017 Construction company Hyundai Engineering and Construction Consulting company Design AECOM Middle East Ltd Supervision consultant: CDM Smith Programme Manager: KBR AlMuntazah Street Area Multiple Areas Sector Expressway Programme Projects Total Cost 2,300,000,000 Q.R. Status In progress Type Roads Start Date 01 July 2012 Expected completion date Fourth quarter of 2016 Construction company Al Jaber Transport & General Contracting LLC Consulting company Design AECOM Middle East Ltd. Supervision Parsons International Prepared by Mounif Kilani, ECC Kuwait Page 8/8