Window Sill Details for Effective Drainage of Water



Similar documents
Window Installation Instructions

Clad Direct Glaze Window Installation Instructions

How To Repair A Boat Landing Deck With A Boat Bed

How To Control Water Penetration In A Window

10DBMC International Conference On Durability of Building Materials and Components LYON [France] April 2005

GreenGuard Housewrap Installation Guide

Asphalt Shingle Application Requirements

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

CHAPTER 7: Building Systems ROOFING SYSTEMS

WINDOW INSTALLATION GUIDE

FIELD TESTING SERVICES

research highlight Water Penetration Resistance of Windows - Study of Codes, Standards,Testing, and Certification

The Science of Rough Opening Preparation and Window Installation to Minimize Air Leakage

Selecting Energy-Efficient Windows

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Options in the Selection of Materials for Basement Construction

Housewrap Errors. By Steve Easley

Water Damage & Repair

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO

AAMA Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

Comment Form on Proposed Gut Rehabilitation Alternatives

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Sun Windows General Information Sun New Construction Window Installation Instructions

INSTALLATION OF A BAY WINDOW

Avoiding Air Barrier Pitfalls

PETERSONS WATERFRONT CONDOMINIUMS

DELTA Premium Moisture Management Systems for Foundations.

The WANZ Guide to Window Installation

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS WINDOWS

Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group

ROOFS, SNOW AND ICE DAMS

7 INNOVATIONS IN SECONDARY DRAINAGE SYSTEMS

Installer Training and Certification Overview

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Renovating Your Basement

DuPont Tyvek Commercial Air Barrier Assemblies Exceed Air Barrier Association of America, ASHRAE 90.1

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Measure Guideline: Water Management at Tub and Shower Assemblies

Evaluation Report CCMC R MemBrain

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Figure 1 The GENERAL CONTRACTOR blames the applicator (if available) for improper installation and

The Case for Cross Laminated Timber: Part 2

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

March 14, Installation of Bay, Bow and Garden Windows

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems

Maintenance Matters. Window and Door Replacement

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Residential Single Family Houses Using Vinyl, Brick and Stone Claddings VERSION 10/13

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

Tundra Series Windows January 2016

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings

2014 British Columbia Building Code Changes

Block Lofts Condominiums

Residential Roofing Guide

Roof Inspection. Summary Report

Foundation. Foundation

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

G VYCOR DECK PROTECTOR

The WANZ Guide to Window Installation

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

Signs of insulation problems In the winter. In the summer. conditioning system

k eeping walls dry Part 1 of 2 November 2004 by Dale Kerr, P. Eng ABSTRACT

Consumer Guide to window and Door Replacement

The Optimum Basement Wall

THE DOW CHEMICAL COMPANY Issued: August 1, LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN (989)

Basements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure

Most of my work is in exterior remediation, both as a builder. Adhered Concrete Masonry Veneer To avoid water damage, treat faux stone like stucco

Ver. 2. Guide to. Inspecting Residential Brick Veneer

EcoTouch Insulation with PureFiber Technology

bout your house before you start Renovating Your Basement Moisture Problems

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

MASTERFORMAT SPECIFICATION

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Building Owners Guide to a Duro-Last System!

Superform Products Ltd.

DuPont Flashing Systems Installation Guidelines

*Trademark of The Dow Chemical Company A business unit of The Dow Chemical Company and its subsidiaries Copyright 2003 The Dow Chemical Company.

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

Garden Window. Montecito Series Vinyl Garden Window Architectural Manual

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

Transcription:

Construction Technology Update No. 76 Window Sill Details for Effective Drainage of Water By M.A. Lacasse and M.M. Armstrong Satisfactory window performance demands a good product and proper installation. This Update presents results from a recent study of sill installation details for the effective drainage of inadvertent water entry at the wall-window interface. Inadequate detailing practices and improper installation of windows have led to numerous premature and costly building envelope failures caused by water entry. Because the watertightness of the window itself cannot always be assured over its life, measures should be taken to avert the damaging effects of inadvertent water entry. Water entry can cause damage to interior finishes and in the case of wood-frame construction, may lead to wood rot or the formation of mould in the wall assembly (Figure 1). There are a number of different approaches to window installation depending on the type of window (box or with mounting flange) and whether installation precedes or follows that of the sheathing membrane. But which methods are best to mitigate the effects of water entry and cope with the expected loss in watertightness over the life of an installation? Which installation features are most likely to ensure long-term performance? This Update focuses on sill details for effective drainage of inadvertent water entry at the wall-window interface or entry from a defective window. These details are intended for either new window installation or the replacement of existing windows. Figure 1. Damage caused by water entry NRC-IRC Research on Window Installation Details The NRC Institute for Research in Construction (NRC-IRC) undertook a research project to investigate the effectiveness of various wall-window interface details for managing rainwater. The intent was to assess the robustness of specified window installations by considering what occurs when windows leak, when jointing products at the window interface fail, or when the installation has reduced airtightness.

head jambs sill Figure 2. (a) Sample wall-window test assembly; (b) Diagram of wall-window assembly showing locations of wall-window interface details The laboratory testing was designed to represent residential window installation practice. Testing was conducted on wallwindow interface details incorporating vinyl windows with mounting flanges and variations in approaches to their installation. The wall-window assemblies (see Figure 2) were subjected to watertightness performance tests that mimic significant wind-driven rain loads. These test loads match those of significant rainfall events of 5, 15 or 30 minutes duration that might occur every 10 to 30 years. Response of Wall-Window Interface to Wind-Driven Rain Water may enter at the window because of deficiencies in the window components, either inherent or after the window has aged. It may also enter because of incorrect window installation. When rain water is driven to the window, the risk of water entry at any deficiency increases, given that water may enter small openings due to the actions of gravity, capillary forces, or wind. Water entering a defective window or along the perimeter interface between the window and cladding may find its way into the wall assembly, but ultimately some water drains downwards and collects at the sill (Figure 3). ΔP (wind) Rain Figure 3. (a) Vertical section of a window with mounting flanges illustrating water entry at the base of the window and collection at sill; (b) Water accumulating at the sill must be drained 2

Figure 4. Vertical section of window showing key elements for adequate management of inadvertent water entry at the window sill Water collecting at the sill must be managed as it may eventually seep into the wall assembly, causing damage to moisturesensitive components. Stagnant water is also to be avoided as it may lead to the growth of mould. Installation Details for Managing Rainwater Entry Results derived from the laboratory testing of different window installation designs showed that the window should be installed with a sill flashing system. Key elements of a sill flashing system for a window with a mounting flange that provides adequate protection to inadvertent water entry are provided in Figure 4 and include: Back dam (1) Sloped sill (2) Sill flashing membrane wrapping up the jambs and over the sheathing membrane at the sill (3) Proper lapping of flashing layers and the sheathing membrane (4) Drainage gap behind the window flange (5) Backer rod and sealant to provide continuity of the air barrier (6) Insulation to the interior side of the sill, leaving the drainage path unobstructed (7) The back dam, as the name suggests, provides a stop to water being driven into the wall assembly at the innermost part of the window opening; the sloped sill (the unprotected sloped sill and back dam are also shown in Figure 5) ensures that any water entry at the window sill is simply directed to a gap between the window frame and the edge of the sill where it drains to the exterior simply by the action of gravity. To promote adequate drainage, the slope at the sill should be at least 1/15 the depth of the window sill (i.e. ¼-in. rise over 3¾ in. depth). Figure 5. Sloped sill and back dam 3

Figure 6. Pan flashing (black, self-adhered membrane) extends up the jambs A sill flashing membrane is installed to protect the sloped sill; this same protection is extended up the jambs (Figure 6). Proper lapping of the flashing layers over the sheathing membrane at the sill, but beneath the sheathing at the jambs, helps ensure proper drainage and averts water entry behind the sheathing membrane (Figure 7). If the window has an installation flange, the flange must not come into direct contact with the sill, as this has been shown to retard or prevent the drainage of water present at the sill. A small gap (2-3 mm) between the flange and sill edge is all that is necessary to provide drainage at this location (see Figure 4). For example, this can be accomplished through the use of cap nails installed behind the flange at the sill. Figure 8. Sealing the window frame to the air barrier at the interior side Ensuring continuity of the air barrier is a crucial element in the installation of the window. This is achieved by incorporating a sealant and backer rod at the interior perimeter seal of the window assembly (Figure 8). The seal must be made to the interior air barrier element (e.g., a polyethylene vapour barrier) to ensure continuity. The final element in the installation is insulation. Insulation should be placed at the head and jambs and, as shown in Figure 4, at the sill as well. Note that the sloped sill should remain unobstructed so as to allow for proper drainage. Selection of Components and their Assembly Regarding the selection of components, sill pan products can be obtained as flexible membranes, preformed flexible or rigid plastic or metal elements. Some of the flexible membranes are the self-adhering type; this can help ease the installation process. Although there are several types of sill pan products on the market, results from testing, although not focused on evaluating the products as such, did not reveal any advantages to one type over the other. However, it was revealed that self-sealing products, such as self-adhered flexible membrane products, help reduce the risk of water entry at fastener locations. Figure 7. Proper lapping of sheathing membrane and self-adhered flashing (shingle fashion) 4

When selecting components that help ensure air and water tightness such as gaskets, sealants, and spray-in-place foams thought needs to be given to whether the combination of components that come into contact with one another will remain intact over the life of the assembly. For products that rely on adhesion to provide air and water tightness of the assembly, the issue of compatibility between products should be considered. Compatible products will likely remain attached whereas incompatible products may lose adhesion prematurely. Gaskets are typically preformed closed-cell foam or rubber products that provide a seal by being compressed into a joint; the desired seal is achieved by selecting a gasket size slightly larger than the expected joint width. Since exposure to heat causes such products to lose their elasticity or resilience over time and thus their ability to provide a seal, gaskets need to be replaced periodically. Of particular importance to ensuring a successful sill pan flashing is the sequence of installation of the different components. This cannot be overemphasized as without it, it is unlikely that sheathing membranes and flashing will be properly lapped to ensure positive drainage. This proper lapping (shingle fashion) is shown in Figure 7. Implications Results from these NRC-IRC tests indicate that window installation designs that do not permit drainage from the sill are vulnerable to excessive water retention when exposed to extreme rainfall events. Window installation details that provide a proper route for drainage, and include the related installation features as described in this Update, are adequate to manage even the most significant rainfall events occurring in North America. Other issues in window installation There are a number of other important issues to consider when installing windows, beyond what has been covered in this Update. These will be explored in three future Updates: Airtightness: How the degree of airtightness, and the location of the plane of airtightness of the wall-window interface, affect water entry. Condensation risks: To what degree do wall-window drainage details and airtightness affect the risk to condensation on windows? Wind-driven rain loads: How winddriven rain loads vary across Canada, why knowledge of these loads is important to window installation design and how this affects installation details. Summary This Update focused on providing key window installation details that ensure effective drainage of inadvertent water entry at the wall-window interface. The prescribed practice was based on results of NRC-IRC laboratory watertightness testing on different types of windows. A sill pan flashing system that incorporates a back dam, sloped sill, protective membrane for the rough opening and takes into consideration the proper sequence of installation of components, are all key features of an adequate system. Window installation details that provide a proper route for drainage, as described in this Update, are adequate for managing even the most significant rainfall events occurring in North America. 5

Project partners Canada Mortgage and Housing Corporation DuPont Weatherization Systems Building Diagnostic Technology Inc., Public Works and Government Services Canada Bibliography Design of Durable Joints between Windows and Walls, Canada Mortgage and Housing Corporation, Ottawa, 2002. Building Envelope Guide for Houses: Part 9 Residential Construction, Homeowner Protection Office, BC Ministry of Housing, Burnaby, BC, 2010. Water Penetration Resistance of Windows Study of Codes, Standards, Testing and Certification, RDH Building Engineering Limited, for Canada Mortgage and Housing Corporation, Ottawa, 2002. Water Penetration Resistance of Windows Study of Manufacturing, Building Design, Installation and Maintenance Factors, RDH Building Engineering Limited, for Canada Mortgage and Housing Corporation, Ottawa, 2003. Lacasse, M.A.; Manning, M.M.; Ganapathy, G.; Rousseau, M.Z.; Cornick, S.M.; Bibee, D.; Shuler, D.; Hoffee, A., Assessing the effectiveness of wall-window interface details to manage rainwater selected results from window installation to a wall sheathed in extruded polystyrene, Journal of ASTM International Vol. 6(9), 43 p. NRCC 50031, 2009. Lacasse, M.A.; Rousseau, M.Z.; Cornick, S.M.; Manning, M.M.; Nicholls, M.; Nunes, S.C., Evaluating the effectiveness of wall-window interface details to manage rainwater Phase 1 watertightness, air leakage and rainwater management of CMHC specified assemblies, Client Report, B-1229.1, National Research Council Institute for Research in Construction, Ottawa, 254 p., 2008. Lacasse, M.A.; Manning, M.M.; Rousseau, M.Z.; Cornick, S.M.; Plescia, S.; Nicholls, M.; Nunes, S.C., Results on assessing the effectiveness of wall-window interface details to manage rainwater, 11th Canadian Building Science and Technology Conference, Banff, Alberta, pp. 1-14, NRCC 49201, March 2007. Web site: http://www.nrc-cnrc.gc.ca/eng/projects/ irc/manage-rainwater.html Dr. M. A. Lacasse is a Senior Research Officer in the Building Envelope and Structure program at the National Research Council s Institute for Research in Construction. Ms. M.M. Armstrong is a Research Council Officer with the same program. 2011 National Research Council of Canada March 2011 ISSN 1206-1220 Construction Technology Updates is a series of technical articles containing practical information distilled from recent construction research. For more information, contact Institute for Research in Construction, National Research Council of Canada, Ottawa K1A 0R6. Telephone: (613) 993-2607; Facsimile: (613) 952-7673; Internet: http://www.nrc-cnrc.gc.ca/irc