Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems



Similar documents
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

2014 British Columbia Building Code Changes

HVAC Systems: Overview

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

SECTION MORTUARY REFRIGERATORS

Glossary of HVAC Terms

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

Energy Efficiency HOSPITALITY.

Glossary of Heating, Ventilation and Air Conditioning Terms

CODE NOTES. Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping

Greenhouse and Energy Minimum Standards (Air Conditioners and Heat Pumps) Determination

Energy Efficiency in Industrial HVAC Systems

HVAC Simplified Approach Option

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

ASTACEA4 Inspect complex/central air conditioning systems

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A Cover HVAC ENERGY EFFICIENT

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Australian/New Zealand Standard

Energy Efficiency. Bars & RestauRants.

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Maintenance for Energy Efficiency

Building Energy Systems. - HVAC: Heating, Distribution -

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Lesson 36 Selection Of Air Conditioning Systems

Nominal Life Expectancy for Building Components

AN AUDITAC PROPOSED PRELIMINARY AUDIT METHODOLOGY FOR AIR- CONDITIONING FACILITIES

Duct Construction Standards. Code Reference: 2013 Title 24, Part 6 Standards 150.0(m)1. UL Ratings

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

KINGDOM OF SAUDI ARABIA SAUDI ARABIAN STANDARDS ORGANIZATION SASO. SAUDI STANDARD DRAFT No. 3457/2005

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS

HVAC Processes. Lecture 7

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

HEATING, VENTILATION & AIR CONDITIONING

Creating Efficient HVAC Systems

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

Center for Energy Education Laboratory

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

State of the Art Energy Efficient Data Centre Air Conditioning

Direct Fresh Air Free Cooling of Data Centres

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

Study on Performance Evaluation of a Split Air Conditioning System Under the Actual Conditions

The Different Types of Air Conditioning Equipment for IT Environments

Element D Services Heating, Ventilating, and Air Conditioning

Building HVAC Load Profiling Using EnergyPlus

1.2 Refrigerant Equipment. General

RPV - RP - RA air handling units

) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

Florida Power & Light Company. Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards. Effective: November 9, 2015

LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS

How To Design A Building In New Delhi

B. Types of mechanical insulation specified in this section include the following:

Solicitation Items Report

State of Connecticut Department of Public Health RADON PROGRAM

ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE

Refrigeration & Air-conditioning Technician

AABC Specifications for Testing and Balancing HVAC Systems

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

SASO XXXX:2016. (Including the modifications approved in Saudi Council Board No. XXX/2016) LARGE CAPACITY AIR CONDITIONERS

ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014

Energy Efficiency in Buildings

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

Drives and motors. A guide to using variable-speed drives and motors in retail environments

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

B.C. Buildings Corporation. Mandatory Preventive Maintenance Standard. To Meet Section 4.78 of the WCB OH & S Regulation

Commissioning - Construction Documents (Page 1 of 6)

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Category Measure Minimum Efficiency / Certification Requirements

Resources for School Energy Managers

BEC 2012 Vs BEC Summary of Major Amendments

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

21.1 Functions, Basic Configuration, and Interfaces

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

Air Conditioning Clinic

Session 2: Hot Water Supply

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

Action Plan Template HVAC Page 1

Attachment J-C18.1. HVAC Work Instructions

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Chilled Water HVAC Systems

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

Building Services Engineering Technician

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

Decree of the Ministry of the Environment on fire safety of ventilation systems

AIR CONDITIONING TECHNOLOGY

Circuit breaker panel. Power supply for condensing unit. Power supply for furnace. Air handler (Furnace)

Technical Solution Sheet : Mechanical Services (Including duct heating)

Transcription:

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may be useful. It also contains technical information on ductwork insulation and sealing, and insulating piping, vessels, heat exchangers and tanks. Published on 1 August 2011 2nd edition Of interest to Building Consent Authority, Designers ISBN: 978-0478-38115-3 (Online) Introduction H1.3.6 HVAC systems must be located, constructed, and installed to (a) limit energy use, consistent with the intended use of space; and (b) enable them to be maintained to ensure their use of energy remains limited, consistent with the intended use of space. H1.3.6 only applies to buildings that are classified as commercial (refer NZBC clause A1 for definitions). This is not a compliance document and the decision of whether a design complies with clause H1.3.6 is for the BCA to make. Controls HVAC systems should be provided with appropriate controls to enable the achievement of reasonable standards of energy efficiency in use. In normal circumstances, the following features would be appropriate for mechanical heating, cooling, ventilation or air-conditioning system controls: 1.1 The systems should be sub-divided into separate control zones to correspond to each area of the building that

has a significantly different solar exposure, or pattern, or type of use. 1.2 Each separate control zone should be capable of independent temperature control, and independent control of ventilation and recirculation rate where the HVAC design provides the ability for such independent control without significant additional control hardware. 1.3 The provision of the service should respond to the requirements of the space it serves. If both heating and cooling are provided to an individual control zone, they should be controlled so as not to operate simultaneously within that zone. 1.4 Central plant should only operate as and when the zone systems require it, except that where noncommunicating controls are used, central plant may be controlled by time schedule and outdoor air temperature such as to minimise plant operation when not needed to satisfy zone requirements. The default condition should be off. 1.5 In addition to these general control provisions, the systems should meet specific control and efficiency standards as provided in the other sections. Air-conditioning and ventilation systems An air-conditioning unit or system should (i) be capable of, where the air-conditioning unit or system has motorised outside air and return dampers, closing the dampers when the air-conditioning unit or system is inactivated (ii) have all conditioned supply-air ductwork insulated in accordance with the suggested Specification H1 where; it passes through an external area, unconditioned space, or zone which is not the final intended destination, and the temperature difference between the ambient air and the supply air is greater than ±5 degrees Celsius at any time (iii) have an outdoor air economy cycle when the unit capacity is over 50 kwr (iv) when the air flow rate is greater than 1000 L/s, be designed so that the total motor shaft power of the fans in the system does not exceed 2 2 (a) 1 2 W/m for a building of not more than 500 m floor area adjusted by 1.15 W/(L/s) for each increase of 1 (L/s)/m 2 in air flow rate above 10 (L/s)/m 2, and 2 2 (b) 15 W/m for a building of more than 500 m floor area adjusted by 1.7 W/(L/s) for each increase of 1 (L/s)/m 2 in air flow rate above 9 (L/s)/m2 (v) the suggested requirements of (iv) should not apply to (a) fans in package air-conditioning plant complying with Paragraph 4.3, and (b) the input power for an energy reclaiming system that preconditions outdoor air, and (c) the input power for process-related components such as high efficiency particulate air filters (vi) when serving a conditioned space, not provide mechanical ventilation in excess of the minimum quantity

required by NZBC G4 by more than 50% other than where there is (a) additional outside air supplied to provide free cooling, or (b) additional exhaust ventilation needed to balance the required mechanical ventilation; or (c) an energy reclaiming system that preconditions outside air. Smoke and ventilation to balance required exhaust ventilation such as toilet exhaust, or to balance process exhaust such as from a health-care building or laboratory; or The suggested requirements in the Controls and Air-conditioning and ventilation systems sections should not inhibit (i) the smoke hazard management operation of air-conditioning and mechanical ventilation systems; and (ii) essential ventilation (such as for a garbage room, lift motor room, gas meter enclosure or gas regulator enclosure or the like). Heating and chilling systems 4.1 Systems that provide heating or chilling for air-conditioning systems should (i) have any piping, vessels, heat exchangers or tanks containing heated or chilled fluid insulated in accordance with the suggested Specification 2, except those whose insulation levels are covered by Minimum Energy Performance Standards (MEPS), and (ii) where water is circulated by pumping at greater than 2 L/s (a) be designed so that the total of the motor shaft power does not exceed 2 2 2 3 W/m for a building of not more than 500 m floor area adjusted by 330 W/(L/s) for each increase of 1 (L/s)/m in water flow rate above 8.6 (L/s) / 1,000 m 2; and 2 2 2 4 W/m for a building of more than 500 m floor area adjusted by 470 W/(L/s) for each increase of 1 (L/s)/m in water flow rate above 10 (L/s) / 1,000 m 2; and (b) except where the pump is required to run at full speed for safe or efficient operation, have the pump capable of varying its speed when it is operating for more than 3,500 hours per year; or is more than 11 kw of motor shaft power; and (iii) if the system contains more than one each of a water heater, chiller or coil used for heating or cooling the building, be capable of stopping the flow of water to non-operating heaters, chillers or coils. 4.2 A water heater, such as a boiler in a heating system for a building, should achieve a minimum thermal efficiency of 80% when gas fired and 78% when oil fired when tested in accordance with BS 7190 or BS 845. A boiler with capacity equal or greater than 500 kw should be fitted with a modulating burner. 4.3 Package air-conditioning equipment, including a split unit and a heat pump, should have an energy efficiency

ratio complying with Table 4.3 when tested in accordance with AS/NZS 3823.1.2:1998 at test condition T1. Table 4.3 suggested minimum energy efficiency ratio for packaged air-conditioning equipment Equipment Capacity 65 kwr TO 95 kwr More than 95 kwr TO 125 kwr Suggested minimum energy efficiency ratio Air-conditioner cooling 2.7 2.8 Heat pump cooling 2.6 2.7 4.4 A refrigerant chiller over 125 kwr capacity should have an energy efficiency ratio complying with Table 4.4 when determined in accordance with ARI 550/590. Table 4.4 suggested minimum energy efficiency ratio for refrigerant chillers Suggested minimum energy efficiency ratio Full load Part load Water cooled chiller More than 125 kwr but not more than 525 kwr 4.2 5.2 More than 525 kwr but not more than 1000 kwr 4.5 5.6 More than 1000 kwr 5.5 6.1 Air cooled or evaporatively cooled chiller More than 125 kwr but not more than 525 kwr 2.2 3.0 More than 525 kwr 2.5 3.1 4.5 An air cooled condenser fan motor, other than one that is part of package air-conditioning equipment referred to in Paragraph 4.3, should not use more than 40 W of motor shaft power for each kw of heat rejected from the refrigerant when determined in accordance with ARI 460. 4.6 The fan of a cooling tower should not use more than (i) if a propeller or axial fan, 310 W of motor shaft power for each L/s of cooling water circulated, and (ii) if a centrifugal fan, 590 W of motor shaft power for each L/s of cooling water circulated. 4.7 The fan of a closed circuit cooler should not use more than (i) if a propeller or axial fan, 500 W of motor shaft power for each L/s of cooled fluid circulated; and (ii) if a centrifugal fan, 670 W of motor shaft power for each L/s of cooled fluid circulated. 4.8 The fan of a evaporative condenser should not use more than (i) if a propeller or axial fan, 18 W of motor shaft power for each kw of heat rejected, and (ii) if a centrifugal fan, 22 W of motor shaft power for each kw of heat rejected. 4.9 The spray water pump of a closed circuit cooler or evaporative condenser should not use more than 150 W of pump motor shaft power for each L/s of spray water circulated. Miscellaneous exhaust systems

5.1 A miscellaneous exhaust system with an air flow rate of more than 1000 L/s, that is associated with equipment having a variable demand such as a stove in a commercial kitchen or a chemical bath in a factory, should (i) have the means for the operator to (a)reduce the energy used, such as by a variable speed fan, and (b) stop the motor when the system is not needed, and (ii) be designed to minimise the exhausting of conditioned air. 5.2 The suggested requirements of Paragraph 5.1 above should not apply (i) where additional exhaust ventilation is needed to balance the required outside air for ventilation, or (ii) where air flow must be maintained for safe operation. Access for maintenance At the design and construction stages regard should be given to all requirements of space, position, access and repair (or replacement) in order to commission and maintain the equipment in an efficient operating condition, without undue difficulty, when using normally accepted maintenance procedures. Ductwork insulation and sealing Suggested specification 1 1.1 Scope This Specification contains guidance for sealing and insulating supply and return ductwork used in a system that heats or cools a building. 1.2 Ductwork sealing (a) Heating or cooling ductwork and fittings should be sealed against air loss (i) by closing all openings in the surface, joints and seams of ductwork with adhesives, mastics, sealants or gaskets in accordance with the duct sealing requirements of AS 4254:2002 for the static pressure in the system, or (ii) for flexible ductwork at an operating static pressure of less than 500 Pa, with a sealant and draw band encased with adhesive tape.

1.3 Ductwork insulation (a) Ductwork and fittings for heating or cooling should be thermally insulated with insulation complying with AS/NZS 4859.1:2002 to (i) achieve the Total R-Value specified in Tables 1.3a and 1.3b, or (ii) achieve a minimum Total R-Value of 1.0 for flexible ductwork of not more than 3 m in length from an outlet or the like. (b) Insulation on ductwork conveying cold air should be protected by (i) a vapour barrier on the outside of the insulation, and (ii) overlapping adjoining sheets of the membrane by 50 mm and bonding or taping the sheets together where the vapour barrier is a membrane. (c) Ductwork insulation should (i) be protected against the effects of weather and sunlight, and (ii) abut adjoining insulation to form a continuous barrier, and (iii) be installed so that it maintains its position and thickness, other than at flanges and supports. (d) The suggested requirements of Paragraph 1.3(a) should not apply to heating and cooling ductwork and fittings located within the last conditioned space served. Table 1.3a Ductwork - suggested minimum total R-Value (for systems of no more than 65 kwr and 65 kw heating capacity) Ductwork element Suggested minimum total r-value for ductwork and fittings Evaporative cooling system Heating-only system or refrigerated cooling system Combined heating and refrigerated cooling system Ductwork 0.6 1.0 1.5 (see note) Fittings 0.4 Note: The suggested minimum Total R-Value may be reduced by R0.5 for combined heating and refrigerated cooling systems if the ducts are- (a) under a suspended floor with an enclosed perimeter; or (b) in a roof space that has insulation of not less than R0.5 directly beneath the roofing. Table 1.3b Ductwork - suggested minimum total R-value (for systems greater than 65 kwr and 65 kw heating capacity) Location of ductwork and fittings Suggested minimum total r-value for ductwork and fittings Evaporative cooling system Heating-only system or refrigerated cooling system Within a conditioned space other than where the space is the only or last space served. Nil 1.3 All other locations 0.9 1.8

All other locations 0.9 1.8 Location of ductwork and fittings Suggested minimum total r-value for ductwork and fittings Evaporative Heating-only system or Insulating piping, vessels, cooling system heat refrigerated exchangers cooling system and tanks Suggested specification 2 This Specification contains guidance for insulating piping, vessels, heat exchangers and tanks containing heated or chilled fluid. 2.1 Scope This Specification contains guidance for insulating piping, vessels, heat exchangers and tanks containing heated or chilled fluid. 2.2 Insulation (a) Insulation should (i) be protected against the effects of weather and sunlight, and (ii) be able to withstand the temperatures within the piping, and (iii) for piping, achieve the Total R-Value in Table 2.2, and (iv) for vessels, heat exchangers and tanks, achieve a suggested minimum Total R-Value of (A) 2.5 if the content is low temperature brine or glycol, or (B) 1.8 if the content is chilled water, or (C) 1.3 if the content is heated water, or (D) 2.5 if the content is steam. (b) Insulation on piping, vessels, heat exchangers and tanks containing chilled fluid should be protected by a vapour barrier on the outside of the insulation. (c) The suggested requirements of Paragraph 2.2(a) should not apply to heating water piping (i) located within the space being heated where the piping is to provide the heating to that space, or (ii) encased within a concrete floor slab which is part of a floor heating system. Table 2.2 piping - suggested minimum total R-Value Location Suggested minimum total R- Value 1. Heating water piping for systems of no more than 65 kw heating capacity (a) Located internally 0.2

(b) Location Located within a wall space, an enclosed sub-floor area or an enclosed roof 0.45 Suggested minimum total R- space Value (c) Located outside the building or in an unenclosed sub-floor area or an unenclosed roof space 0.6 2. Heating water piping for systems of more than 65 kw heating capacity (a) Located internally 0.6 (b) Located within a wall space, an enclosed sub-floor area or an enclosed roof space (c) Located outside the building or in an unenclosed sub-floor area or an unenclosed roof space 0.7 0.8 3. Cooling water piping for systems of more than 65 kwr capacity but less than 250 kwr capacity (a) Located internally 0.9 (b) Located within a wall space, an enclosed sub-floor area or an enclosed roof space (c) Located outside the building or in an unenclosed sub-floor area or an unenclosed roof space 1.0 1.1 4. Cooling water piping for systems of more than 250 kwr capacity (a) Located internally 1.2 (b) Located within a wall space, an enclosed sub-floor area or an enclosed roof space (c) Located outside the building or in an unenclosed sub-floor area or an unenclosed roof space 1.3 1.4 Note: Piping should be insulated includes flow and return piping, cold water supply piping and pressure relief piping within 500 mm of the connection to the heating or cooling system. This information is published by the Ministry of Business, Innovation and Employment s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: with compliance with the Building Act, it is published under section 175 of the Building Act with a Weathertight Services claim, it is published under section 12 of the Weathertight Homes Resolution Services Act 2006.