Green Globes for New Construction Pre-Assessment Checklist for Project Managers



Similar documents
FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com

GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

BOMA BESt Assessment Overview

HIGH PERFORMANCE and SUSTAINABLE BUILDINGS GUIDANCE Final (12/1/08)

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

BOMA BESt AND LEED EBOM COMPARISON

Monitoring Water Use

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Green Plumbing and Mechanical Code Supplement

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

GREEN SCHOOL DESIGN (Revision no.1, Dated 07/14/2010)

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

COOLING WATER MANAGEMENT

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

ENERGY STAR Data Verification Checklist

The Integrated Design Process

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

COMPLETING THE GREEN APPRAISAL ADDENDUM FOR AN NGBS GREEN CERTIFIED HOME

Whistler Green: Project Checklist

Sika Sarnafil World Class Roofing and Waterproofing

How To Calculate Cost Of An Eco-Friendly Building

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009

IEQ Management Plan. Denver Museum of Nature and Science ECF Addition

Operating Sustainable Facilities

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

CITY OF FERNDALE EAGLE Checklist

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

LEED for Homes Rating System

Introduction to Energy Codes & Green Building Programs

Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP

MSHDA Affordable Green Enterprise Green Communities USGBC LEED

DRAFT ONLY ORDINANCE NO.

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

Code for Sustainable Homes Guidelines

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University.

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS

PREPARING INDUSTRIAL ENGINEERING REPORTS

2013 BUILDING ENERGY EFFICIENCY STANDARDS

7.1 Conservation Programs for Industrial, Commercial, and Institutional Accounts

LEED PRESENTATION OUTLINE

How To Make A Green Building Plan

HHHHH Outstanding 85%

Facilities Maintenance Standards rev

Metering of Individual Units

Green Buildings Guidelines for Harvard

The Potential for Energy Retrofits within the City of Sacramento s Rental Housing Inspection Program

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

Backflow Bulletin #1

Walkthrough Inspection Checklist

Risk Bulletin. Mold Prevention and Control for Mechanical and HVAC Contractors. XL Group Insurance

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD

TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers

Energy Savings Performance Contracting. Guidelines for State Agencies. Part 2

ENERGY EFFICIENCY ENERGY EFFICIENCY: Saving Dollars While Clearing the Air

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

Fiberglass Storage Tanks for Green Building Applications

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87

Carbon Monoxide Detection in Commercial Buildings (

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

This material is confidential and may not be copied, used or distributed without the written permission of Safeguard Properties LLC.

Our Triple Bottom Line...

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Final Walk-Through Checklist

Building Permit Application


Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Green Codes & IGCC Update

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS


Contract for Weatherization Management Address City & State

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Before You Start an Energy Efficiency Retrofit The Building Envelope

Transcription:

1 Green Globes for New Construction Pre-Assessment Checklist for Project Managers What is Stage I assessment? As the design phase draws to a close, and your Green Globes questionnaire is completed through the construction documents section, it is time for a GBI authorized Green Globes Assessor to compare the answers in your self-evaluation with the construction documents. The assessor will respond with a report describing the initial findings and notify you of additional documentation needed during the onsite visit. The report will indicate a projected building rating of one, two, three or four Green Globes assuming you provide requested documentation, and the building is built according to the documentation provided. What is Stage II assessment? As the construction phase approaches substantial completion, it is time to contact GBI to schedule the Stage II assessment, which is an on-site review of the building and documentation. The ideal time to notify GBI is two months prior to the final punchlist completion and/or beneficial occupancy. Upon notification GBI will arrange for a third-party assessor to perform an on-site assessment and issue a scheduling letter. Although it is recognized that circumstances vary by project, the optimal time for the visit is toward the end of the punchlist completion period and before occupancy. The Assessor will contact you to discuss the details of the visit after receipt of the scheduling letter. The assessor will generate and submit a report of their findings to GBI with a recommended rating. GBI will review the recommendations and issue the report with the final rating and certification. How long will it take? The duration of the site visit varies considerably with the scope and size of the completed building project. For smaller buildings less than 50,000 square feet, please allow approximately 3-5 hours for the assessor to review new documentation onsite, conduct a thorough walk-through audit of your facility, and interview you and/or other designated representatives. Larger and more complex buildings may take one full day or more. What documentation is required? Below is a sample list of documents to gather prior to the completion of the survey and to be made available to the assessor as part of the Stage I and/or Stage II assessment. The assessor will be responsible for bringing the original documentation submitted for the Stage l review to the Stage II onsite visit. Coordinate with your assigned assessor to ensure that you have secured the required documentation for both the Stage I and Stage II review processes. In addition to providing the documentation below, it is recommended that you maintain a list of any Green Globes criteria for which you have questions, may be seeking partial credit, or want to claim as N/A (non-applicable). The Green Globes online program provides N/A responses for some criteria; however, assessors may use their professional judgment to classify additional items as N/A where justified. Ineligible for the N/A designation are all management type criteria, Energy Performance, and Water Performance; and the final assessment score is capped at 100 points of verified N/A responses.

2 The following list is the suggested documentation for a Green Globes assessment: Section 1 Project Management: List of written performance goals. Progress meeting agendas and meeting minutes. EMS plan to be used by the general contractor. Description of supplemental clean diesel practices.(applicable for ANSI only) Manufacturer s specifications, cut sheets and performance documentation. (needed for a significant number of criteria in the other Environmental Assessment Areas) Photographs of protected building materials. Baseline indoor air quality test.-move to Indoor Environment section Commissioning Plan Commissioning reports. Operations and maintenance manual (including all plans, protocols, strategies and contracts). Section 2 Site Site civil plans and existing site civil plans. Site plans that show the building, parking, street access, etc. and civil engineering plans that show topography, drainage and infrastructure. Documentation by EPA, municipal, or other governmental authority of Superfund and Brownfield site. Construction Documents.* Manufacturer s specifications, zoning maps, cut sheets and performance documentation. Pre-construction site documentation. Landscaping plans. Floodplain map. Photo documentation Manufacturer s specifications and/or interior design plans that show interrupted spaces. Erosion and Sediment Control plan. Shade site plan. Roofing plans. Percolation test results. Area rainfall charts Storm water discharge plan. Exterior lighting plans Electrical engineer s site lighting plan with illumination map. Zoning ordinance requirements. Section 3 Energy Energy design, modeling and simulation program s input and results. Power demand factor calculations. (Applicable for ANSI only) Energy metering reporting plan. Measurement and verification program details. Energy certification or label. References to specifications and drawings of sub-metering equipment. Cut sheets for meters and meter reading equipment. Description of the monthly monitoring and verification reports that will be sent to building management. Landscaping plans.

3 Site plans. Effective aperture for vertical fenestration calculations. Equipment specifications, control schedules and diagrams. Results of leak-testing. Drawings and specifications of vertical transport equipment. On-site renewable energy generation documentation. Copy of the off-site renewable energy contract. Section 4 Water Construction documents.* Manufacturer s specifications, cut sheets, and performance documentation for all plumbing fixtures, fittings and appliances. Manufacturer s specifications, cut sheets and performance documentation for cooling equipment, makeup meter, blowdown meter, drift eliminators, conductivity controllers and wet/dry cooling towers. Plumbing plans. Manufacturer s specifications, cut sheets, and performance documentation for pre-rinse spray valves, ice machines, food steamers, dishwashers and combination ovens. Manufacturer s specifications, cut sheets, and performance documentation for steam sterilizers, laboratory or medical equipment using non-potable water for once through cooling, water recycling units, and wet scrubbers. Description of alternate sources of water to be used. Manufacturer s specifications, cut sheets and performance documentation for clothes washers. Manufacturer s specifications, cut sheets, and performance documentation for all special water features. Irrigation system equipment and fittings, and for all meters. Manufacturer s specifications, cut sheets and performance documentation for filtration systems, pressure drop gauges, reverse osmosis systems, water softeners, and recharge controls. Description of alternate source of water and implementation for non-potable water applications. Manufacturer s specifications, cut sheets and performance documentation for the Meter Data Management System and meters. Section 5 Materials and Resources Construction documents.* Input and results from the Green Globes LCA Eco-Calculator for Building Assemblies. Input and results from any BEES or Athena Impact Estimator or other LCA instrument. Manufacturer s specifications, cut sheets and performance documentation. List of recycled content materials and percentage calculations. List of bio-based materials and percentage calculations. List of harvested, reclaimed, salvaged or extracted materials and transportation distance calculations. List of processed or manufactured materials and transportation distance calculations. List of salvaged materials. Wood-based products certification documentation. Calculation for percentage of façade retained. Calculation for the percentage of existing major structural systems re-used. Calculations for area of existing non-structural elements re-used. Waste minimization plan. (Applicable for ANSI only) Landscaping and Site Development Plans showing incorporation of existing on-site materials. Tipping records. Letters and building models from architects or design professional. Formal Building Service Life Plan. (Applicable for ANSI only)

4 Field testing reports Manufacturer s laboratory test results. Plan for foundation systems, flashings, roof and wall openings, roofing, and cladding systems. Construction plans. Section 6 Emissions, Effluents, and Pollution Reduction Manufacturer s specifications, cut sheets, and performance documentation for boilers and furnaces. Manufacturer s specifications, cut sheets, and performance documentation for cooling equipment, leak detection equipment and alarms. Section 7 Indoor Air Quality Construction documents* and specifications. Ventilation schedules. Manufacturing specifications for ventilation systems, CO₂ sensing and ventilation control equipment. Ventilation air quantity design data. Local ventilation codes or standards. Manufacturer s specifications, cut sheets, and performance documentation for HVAC systems, humidification/dehumidification systems, CO₂ monitoring devices, wet cooling towers and domestic hot water systems list of mold resistant materials. Documentation demonstrating compliance with ASHRAE 62.1-07: section 5.14, HVAC Duct Construction Standards: Metal and Flexible, and ICC s International Building Code.(Applicable for ANSI only) Materials Safety Data Sheets or proof of certification for low-voc products or materials. Description of radon assessment. Description of pest management strategies. Percentages and calculations for occupied areas with daylight illumination levels. Percentages and calculations for views to building exterior or atria. Percentages and calculations for primary occupied spaces with IESNA recommended task lighting levels. Specifications for solar shading devices and luminaries. Lighting plans. Documentation demonstrating compliance with ANSI/ASHRAE Standard 55-04. Sound level measurements taken at the property line. Description of acoustic design strategies and all design targets. FIIC value for flooring assemblies. Acoustic mitigation measures for mechanical equipment and plumbing systems. Specification that includes Annex E of ANSI S12.60 2006. (Applicable for ANSI only) Test report indicating compliance with ANSI S12.60 2006. (Applicable for ANSI only) *Construction documents are defined as: all of the written and graphic documents prepared or assembled by the architect/engineer for communicating the design and administering the project. The term Construction Documents also includes the Project Manual that contains the bidding forms and instructions, contract forms and conditions, and specifications, as well as documentation of all modifications made after the construction agreements are signed.

5 Any initiatives taken by the Green Globes-NC program participants should be, first and foremost, in full and legal compliance with applicable municipal, state, and federal regulations. Legal requirements may prohibit the implementation of suggested initiatives in specific circumstances. For more information, please contact GBI at:(503) 274-0448 or info@thegbi.org. We look forward to working with you!