Business Plan. Recycling Project



Similar documents
Smarter Resources Smarter Business Recycling

Fairfax County Solid Waste Management Objectives

The London Waste and Recycling Board business plan November London Waste and Recycling Board 169 Union Street London SE1 0LL

TOOLKIT FOR SETTING UP ELECTRONICS RECYCLING PROGRAMS SECTION II

LIMASA takes delivery of new waste collection fleet at Málaga football stadium

EXECUTIVE SUMMARY. Introduction. Waste Characterisation. Public Perception Survey

Capital Financing and Debt Management Policy

6 STEP 6 - PREPARING THE ACTION PLAN 2

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION INVESTMENT AND TECHNOLOGY PROMOTION BRANCH INDUSTRIAL INVESTMENT AND TECHNOLOGY PROJECT PROFILE

PARASTATAL SECTOR REFORM AND PRIVATISATION IN TANZANIA

Mapping and geolocation technology for waste collection services West Suffolk and Northamptonshire.

2013/2014 Annual Service Report. West Berkshire Integrated Waste Management Contract

SMALL BUSINESS OWNER S HANDBOOK

APPENDIX C. PERFORMANCE INDICATORS FOR SOLID WASTE SERVICES

Introduction to Waste Treatment Technologies. Contents. Household waste

Alternative infrastructure funding and financing

Swallow Street recycling facts and figures in partnership with Bywaters

European Stability Mechanism Draft Guideline on Financial Assistance for the Direct Recapitalisation of Institutions

Fund 110 Refuse Disposal

Provision of Household Waste & Recycling Service

Materials Recovery Facility for Athens and Hocking Counties Feasibility Study: MRF Operation Considerations and Financial Projections October 25, 2012

The Corporation of the TOWN OF MILTON

Aspects of Waste Management and Recycling in South Africa Marba Visagie Environment Directorate Department of Trade and Industry (the dti)

Waste management and disposal:

Costs related to health-care waste management

Memorandum SAN JOSE CAPITAL OF SILICON VALLEY ENVIRONMENT COMMITTEE RECOMMENDATION

ENVIRONMENTAL POLICY STATEMENT

Community Recycling Trailer Policy

Methodology. Figure 1 Case study area

Policy document on the provision of waste & recycling collection and storage facilities. Includes both domestic and commercial premises

Prevent & Save. Best Practice Guidelines in Waste Management. Waste Management for the Hospitality Industry

Waste Management Strategy

Community and Renewable Energy Scheme Project Development Toolkit

1.1. UNDERSTANDING THE IMPORTANCE OF RAISING FUND

Waste Collection Consultation. Frequently Asked Questions

Product and Process Solutions for Material Recovery Facilities and Recycling Centers

Buying or Setting up a Small Business

Waste Management Strategy Communication and Education Action Plan

compactor baler WASTE WIZARD: CAPACITY/COST PERFORMANCE ANALYSIS innovative simple versatile VAT No Executive Summary

Consultation Focus Groups. Household Waste & Recycling Collection Contract 2017

ALTERNATIVE FINANCING SOURCES FOR YOUR SMALL BUSINESS

Page 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration

HEALTH SERVICE EXECUTIVE NATIONAL FINANCIAL REGULATION LEASE AND RENTAL ARRANGEMENTS NFR-30

LIGHT FLEET, PLANT & HEAVY VEHICLE REPLACEMENT & MANAGEMENT Light Fleet, Plant & Heavy Vehicle Replacement & Management

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

SOL PLAATJE LOCAL MUNICIPALITY

Oman Environmental Services Holding Company

Household waste & recycling storage requirements

Paschall Truck Lines, Inc. Frequently Asked Questions Regarding our ESOP

REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL

Best Practice Guide BPGCS007

COMMERCIAL WASTE SERVICES. sharing responsibility

Annex 4D.2. Economic and Financial Analyses - a Worked Example

GUIDELINES FOR PREPARING A WASTE MANAGEMENT PLAN

White Goods Accounting Worksheet

19th Commission meeting, 19 June WORKING DOCUMENT of the Commission for the Environment, Climate Change and Energy

Draft waste strategy

MEMORANDUM 1. INTRODUCTION 2. METHODS FOR FINANCING AND WASTE FLOW MANAGEMENT. John Sedley. Russ Smith, Anke Bergner, Capital Regional District

Improvement Plan for Recycling and Waste Collection Services in Chelmsford

The Village of North Aurora Small Business Loan Program General Loan Policy

MAKE RECYCLING BUSINESS

Waste and Recycling Storage and Collection Guidance for Houses, Flats, Houses of Multiple Occupancy, New Builds, and Conversions.

WELFARE REFORM COMMITTEE WELFARE FUNDS (SCOTLAND) BILL SUBMISSION FROM COMMUNITY RESOURCES NETWORK SCOTLAND

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES

Application for a Waste Management Licence

The Companies Act Private Company Limited by Guarantee and not. having a Share Capital. Memorandum of Association. Children North East

Auto v. Mobile Equipment in the CGL

Waste Management System for the City of Poznan PPP Incineration Plant Project. December 2011

GUIDE TO SYNDICATED LEVERAGED FINANCE

How To Make Money From Property In Austria

Ipx!up!hfu!uif Dsfeju!zpv!Eftfswf

Guidance on the template contract for social impact bonds and payment by results

Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

SCORE. Counselors to America s Small Business SMALL BUSINESS START-UP FINANCING OVERVIEW

Sort it! Bag it! Tote it! Recycle it!

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

Biomass Supply Chains in South Hampshire

Core description: The successful candidate will be responsible for the following functions:

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION INVESTMENT AND TECHNOLOGY PROMOTION BRANCH INDUSTRIAL INVESTMENT AND TECHNOLOGY PROJECT PROFILE

Annex 2.2. Questionnaire for Solid Waste Management Survey

UNDERGROUND WASTE STORAGE FACILITY. sharing responsibility. for the future

Revenue and Financing Policy

ARID (Accelerating Reprocessing Infrastructure Development) External Programme Evaluation: Summary Report (February 2015)

FINANCIAL SERVICES BOARD COLLECTIVE INVESTMENT SCHEMES

CABINET 26 JULY 2011 PROCUREMENT OF LONG TERM WASTE TREATMENT FACILITIES REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT

Waste Management Action Plan

ReCommunity Delaware. NERC CONFERENCE April 7, 2015 Robert Anderson Regional Business Development Manager

Blackburn with Darwen Borough Council Deferred Payments Scheme

How to Assess Your Financial Planning and Loan Proposals By BizMove Management Training Institute

Transcription:

Business Plan Recycling Project Prepared by Sustainable Environmental Technologies For Makana Municipality Contact Mark Horan - m.horan@ru.ac.za Tel. 046 603 8834 Cell. 072 186 7518 Shirley Horan - s.horan@ru.ac.za Cell. 072 839 8124 Jos Welman - j.welman@ru.ac.za Tel. 046 603 8249

Contents A. Introduction... 2 B. Background... 2 C. Rationale and description of proposed venture... 2 D. Objectives... 3 E. Products... 3 F. Proposed Ownership and Management Plan... 4 F.1. Municipal involvement... 4 G. Operational plan... 5 G.1. Infrastructure required for operation... 6 G.2. Non-infrastructural requirements... 6 G.3. Human resource requirements... 7 H. Financial PLan... 7 H.1. Capital expenses required:... 7 H.2. Monthly income... 8 H.3. Monthly running costs... 8 I. Funding... 9 2005/01/18 1 of 10

A. Introduction This business plan has been drawn up as a basis for starting a process of creating or restructuring a recycling company in the Makana district. This business plan has been drawn up for an operation that would form a public private partnership with the Makana Municipality. It is intended to guide the planning phase of such a business. This document is by no means final and still requires approval by the municipality and any potential investors or funding agencies. The municipal involvement in this project is at this stage being assumed. The municipality has shown interest in the project via the Director: Community and Social Development Mr. Ramie Xonxa as well as the Local Environmental Action Plan steering committee. This committee has raised the issue that the municipality currently provides no support to recycling businesses in Makana district. Currently the committee has asked consultants to investigate ways in which the municipality can support recycling. B. Background Recycling has been undertaken for the past four years in Grahamstown by Grahamstown Recycling. This business has a single owner and employs about 11 people. This business is currently in the process closing down largely due to high costs of maintenance and increasing debt. The closing of the current recycling company has placed the municipality in a situation where there is a possibility that the burden of recycling will be borne by the municipality. This may be felt via the creation of further stresses on the already overburdened municipal waste collection system. Further more 11 jobs will be lost in a district where jobs are much needed. Another longer term problem is that the existing landfill site will fill a lot faster without recycling and thus the ultimate cost (environmental and fiscal) will be higher. C. Rationale and description of proposed venture The proposed venture will involve the establishment of a recyclables recovery and sorting operation at the Grahamstown municipal dump site. This has been the outcome of the investigations and discussion with Mr. Sean Haydock (owner Grahamstown Recycling). 2005/01/18 2 of 10

His business spends a large amount of money on transportation and collecting of recyclable material. Mr. Haydock has stated that a sorting operation on the dump would allow the recycling of 75% of the incoming refuse and at lower cost than the current operation. Though this will address the issue of the burden on municipal collection system, this will secure jobs and minimise landfilling. Potentially a sorting operation on the dump could separate more that just the current recycled materials as cost of handling and separation would be much reduced. The exact dimensions of the unit and specifications cannot be determined until further investigations around feasibility have been made. D. Objectives 1. To form a recycling company in partnership with Makana municipality. 2. To develop a business centred around sound business practice 3. To ensure that recycling is sustainable in Makana 4. To minimise landfilling 5. To create jobs 6. To investigate options for processing and value adding to recycled products. E. Products Many different products are recycled in South Africa and around the world, some of which are already being recycled in Grahamstown. Not all recycling is, however, financially viable. The list below consists of the materials currently recycled by Grahamstown Recycling as well as other items that could be recycled should this business plan be implemented. Product Price Estimated Annual Income Paper R 700 / tonne 300 tonnes Cardboard R 360 / tonne 900 tonnes PET bottles Unknown Unknown Plastic packaging R 200 / tonne 100 tonnes Tins R 17 per thousand tins Unknown 2005/01/18 3 of 10

F. Proposed Ownership and Management Plan The ownership of the company will not reside purely with the proposed recycling company to be formed, but also with the Makana Municipality. Although only preliminary discussions have been had with councillors, at this stage it is envisaged that their involvement is critical to the project. The company should be run by a board of trustees which will include members of the recycling company as well as municipal officials and councillors. The diagram below shows the proposed management structure: Board of trustees: Managing director, municipal officials and councillors Role: Corporate decision making, appointments, auditing Managing director Role: Day to day management, appointments, financial management, contractual agreements Site manager Role: Production oversight, sales, supervision Drivers, workers, clerks, labourers Role: day to day operations F.1. Municipal involvement Municipal involvement is critical to the creation of a successful recycling enterprise in Makana. At this stage the proposed involvement is in no way finalised but could be done in numerous ways: 1. Municipality could own and run the entire business using contractors to undertake a large proportion of the work 2. A recycling company could do the recycling on municipal land (dump site) with assistance from the municipality via the refuse collection trucks. 3. Municipality could have limited supervisory involvement but pay a fee for every tonne or cubic metre of material recycled. 2005/01/18 4 of 10

4. Municipality does not get involved at all in recycling but implements plans to secure sustainability of recycling enterprises through source separation initiatives, by-laws, fines and general recycling awareness campaigns. There may be other options, but at this stage the actual municipal involvement must be negotiated and the council must take a stand on what the involvement will be. This business plan is intended to be starter document for that process to begin. This business plan and the figures shown below have been based on the assumption that a sorting centre will be created on the Grahamstown landfill site and that the business will be created which will be sustainable only with municipal involvement. This is the safest option at this stage due to the fact that the current recycling company could potentially become sustainable with this framework. For the purposes of this business plan it has been assumed that most of the capital equipment must be purchased and that very little can be carried over from the existing business. G. Operational plan The plan created has been developed by interviewing the current owner of Grahamstown recycling and from looking at successful recycling operations countrywide. Two sorting centres are proposed for recycling general refuse. The first would be started with this funding and the second is proposed to come from natural expansion. It is proposed that a sorting centre be created at the existing municipal dump site, where the general refuse will be separated into different streams. This site will consist of a dumping platform where the municipal trucks will dump the general refuse. The refuse will be dumped into a bag breaking area where bags will be broken open to allow contents to move onto a conveyor belt, where pickers will remove recyclable items into bins. These bins will then be removed by a forklift and the recyclable products will be taken to different areas where they will be packaged or processed for sale to agents or other buyers such as Mondi, Collect-a-Can, Consul etc. Two sites are being proposed: the first at the dump, as described above, and the second located in the Grahamstown East area. This second site will not form part of this proposal but 2005/01/18 5 of 10

is included here so as to develop understanding of an expansion strategy. This second site will function as a transfer waste and sorting station. Removal of the recycled material from the general refuse will be done here by waste pickers and then as far as possible, only the nonrecyclable products will be taken to the dump by the municipality. The rest will be packed for transportation to agents or buyers (Mondi, Sappi etc). G.1. Infrastructure required for operation The following infrastructure, machinery or equipment will be required to undertake such an operation: 1. One light delivery vehicle (purchased by vehicle finance) 2. One conveyor belt 3. Two or three balers (two could be rented from agent as happens currently) 4. One forklift 5. One tractor or front end loader 6. One large tractor trailer 7. One shed 8. One office 9. One comprehensive set of tools 10. One computer G.2. Non-infrastructural requirements The following list contains various activities or administrative tasks that must be undertaken to get such an operation running. 1. Business training for recycling company management 2. Computer training for one or more employees 3. Extensive consultation with the Makana municipality on the private-public partnership approach. 4. Investigations and site visits of similar recycling and composting operations in other parts of the country. 5. Community involvement in recycling 6. Contacting markets and development of agreements with buyers 2005/01/18 6 of 10

G.3. Human resource requirements The recycling company members could be employees, but other people may have to be brought in as labourers to fulfil certain tasks. The list of possible jobs and the number of employees will be as follows: Job Title Number of people Managing Director 1 Dump site Manager 1 LDV Driver 1 Forklift Driver 1 Tractor Driver 1 Administration Clerks 1 Sorters 10 General labour/cleaners 2 Total human resources 18 H. Financial Plan H.1. Capital expenses required The capital expenses have been estimated according to the current recycling operations assets as well as projecting requirements for the sorting operation on the dump site. The assumptions are that the equipment will have to be purchased from scratch, although they may be second hand, and that the balers will not be purchased, but will be hired in a similar fashion to the current recycling operation. It is also assumed that a light delivery vehicle will be purchased through vehicle finance and that this loan will be on a monthly basis. The purchase value of these items has been estimated and may vary, most of the machinery would be sought second hand as the prices of many of these items new would exceed the projects capability for repayment. Item Cost Conveyor belt + associated construction R 60 000 One forklift R 60 000 One tractor or front end loader R 30 000 One tractor trailer R 10 000 2005/01/18 7 of 10

One shed R 40 000 Office construction R 25 000 One comprehensive set of tools R 5 000 One computer R 10 000 Total R 240 000 H.2. Monthly income The expected monthly income has been calculated assuming that the use of the dump site as a sorting centre is possible and that this will increase sales by 50%. It is also assumed that previously non-recycled materials such as tins, will be feasible to recycle and that this will contribute to income without incurring excessive cost. It is also assumed that the municipality will contribute an amount of money, possibly for the first 5 years towards the business sustainability of approximately R5 000 per month or R 60 000/ annum. Item Amount Paper and card board sales R 45 000 Tin sales R 5 000 Plastic sales R 10 000 Recycling fee from municipality R 5 000 Total monthly income R 65 000 H.3. Monthly running costs Item Cost Managing director/ general manager R 10 000 1 Site manager R 4 000 3 Drivers R 6 000 Admin. Clerk/ Bookkeeper R 5 000 12 General labour R 12 000 Fuel R 2 000 Maintenance for all vehicles R 5 000 Insurance R 1 000 Baling wire R 1 000 Security R 600 2005/01/18 8 of 10

Office admin, bank charges etc. R 2 000 Rent and utilities R 2 000 Vehicle finance R 2 000 (for a loan of about R80 000) Bond repayments R 13 000 (calculated at 14%) Total monthly expenses R 63 600 I. Funding The funding for the project would be could be sought from the Department of Trade and Industry or ECDC or other donors related to job creation and development, on condition that the ultimate owners or shareholders of the enterprise are previously disadvantaged persons. The funding would be repaid monthly from production, failure to do this would jeopardise the sustainability of the project. The municipality could potentially source funding for the municipal involvement for example preparations, training, public participation, workshops and where necessary feasibility studies. The municipality should however regard this venture as an external service provider and as such the recycling company should be paid a fee for the services. Ultimately this fee should be reduced as time passes and once sustainability of the recycling business is established. The funding that should be sought for this venture could be done in a number of ways: 1. The potential beneficiaries could bring R 80 to R 100 000 to the business and thus approximately R 340 000 would be needed. 2. The potential beneficiaries would bring nothing initially but ultimately as the project proceeds they would be required to bring R 100 000 or else face the possibility that they do not get equity The second option is preferred due the fact that the beneficiaries could then come from impoverished backgrounds and will n0ot be given equity but will be required to raise finance of about R 100 000 amongst all beneficiaries before the end of the project. 2005/01/18 9 of 10