Engenharia de Software



Similar documents
Project management. Organising, planning and scheduling software projects. Ian Sommerville 2000 Software Engineering, 6th edition.

Project management. Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 1

Software Engineering. Project Management. Based on Software Engineering, 7 th Edition by Ian Sommerville

Project management. Organizing, planning and scheduling software projects

Project management. Objectives. Topics covered. Organizing, planning and scheduling software projects DISCUSSION

Project management. Organizing, planning and scheduling software projects. Objectives. Chapter 3. Chapter 3 Project Management. Learning Objective

Organizing, planning and scheduling software projects

Organising, planning and scheduling software projects. Software management distinctions

Management activities. Risk management

Chap. 4 Project management. Organising, planning and scheduling software projects

W h a t is m e tro e th e rn e t

M P L S /V P N S e c u rity , C is c o S y s te m s, In c. A ll rig h ts re s e rv e d.

A n d r e w S P o m e r a n tz, M D

EM EA. D is trib u te d D e n ia l O f S e rv ic e

B a rn e y W a r f. U r b a n S tu d ie s, V o l. 3 2, N o. 2, ±3 7 8

CIS CO S Y S T E M S. G u ille rm o A g u irre, Cis c o Ch ile , C is c o S y s te m s, In c. A ll rig h ts re s e rv e d.

w ith In fla m m a to r y B o w e l D ise a se. G a s tro in te s tin a l C lin ic, , K a s h iw a z a, A g e o C ity, S a ita m a

Project Management. Massimo Felici Room 1402, JCMB, KB

J a re k G a w o r, J o e B e s te r, M a th e m a tic s & C o m p u te r. C o m p u ta tio n In s titu te,

Understanding, Modelling and Improving the Software Process. Ian Sommerville 1995 Software Engineering, 5th edition. Chapter 31 Slide 1

/*

T ra d in g A c tiv ity o f F o re ig n In s titu tio n a l In v e s to rs a n d V o la tility

Chapter 22 Project Management. Chapter Summary. Chapter 22 Project management

i n g S e c u r it y 3 1B# ; u r w e b a p p li c a tio n s f r o m ha c ke r s w ith t his å ] í d : L : g u id e Scanned by CamScanner

AN EVALUATION OF SHORT TERM TREATMENT PROGRAM FOR PERSONS DRIVING UNDER THE INFLUENCE OF ALCOHOL P. A. V a le s, Ph.D.

Project management. Objectives

B rn m e d s rlig e b e h o v... 3 k o n o m i S s k e n d e tils k u d o g k o n o m is k frip la d s... 7 F o r ld re b e ta lin g...

Erfa rin g fra b y g g in g a v

Software Quality Requirements and Evaluation, the ISO Series

Creating a best fit between Business Strategy and Web Services Capabilities using Problem Frames Modeling approach

Business Idea Development Product production Services. Development Project. Software project management

H ig h L e v e l O v e r v iew. S te p h a n M a rt in. S e n io r S y s te m A rc h i te ct

How To Manage Project Management

SCO TT G LEA SO N D EM O Z G EB R E-

Software Project Management. Software Engineering SW Project Management Slide 1

Purpose of presentation

1.- L a m e j o r o p c ió n e s c l o na r e l d i s co ( s e e x p li c a r á d es p u é s ).


Project Planning. COSC345 Lecture 3 Slides: Andrew Trotman Dramatic presentation: Richard O Keefe. Software Engineering 2013

Up c om i n g Events

UFPA Brazil. d e R e d e s Ó p tic a s e s e u s Im p a c to s n o F u tu r o d a In te r n e t

C + + a G iriş 2. K o n tro l y a p ıla rı if/e ls e b re a k co n tin u e g o to sw itc h D ö n g ü le r w h ile d o -w h ile fo r

Software Engineering G Session 12 - Main Theme Risk Management in Software Engineering Projects. Dr. Jean-Claude Franchitti


Cloud Computing Strategic View

Health, Insurance, and Pension Plans in Union Contracts

How To Read A Book

Combinación de bandas óptima para la discriminación de sabanas colombianas, usando imagen Landsat ETM+ZYXWVUTSRQPONMLKJIHGFEDCB


P R E F E I T U R A M U N I C I P A L D E J A R D I M


T c k D E GR EN S. R a p p o r t M o d u le Aa n g e m a a k t o p 19 /09 /2007 o m 09 :29 u u r BJB M /V. ja a r.

Process Improvement. Process improvement. Process improvement stages. Understanding, Modelling and Improving the Software Process

E S T A D O D O C E A R Á P R E F E I T U R A M U N I C I P A L D E C R U Z C Â M A R A M U N I C I P A L D E C R U Z

Frederikshavn kommunale skolevæsen

LECTURE 5: SOFTWARE PROJECT MANAGEMENT. Software Engineering Mike Wooldridge

Critical Review MYSID CRUSTACEANS AS POTENTIAL TEST ORGANISMS FOR THE EVALUATION OF ENVIRONMENTAL ENDOCRINE DISRUPTION: A REVIEW

4. Software Project Management

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort

C o m p u te r M o d e lin g o f M o le c u la r E le c tro n ic S tru c tu re

re:think creativity ICT and tourism: gaming and creative technologies & applications

Farmers attitudes toward and evaluation and use of insurance for income protection on Montana wheat farms by Gordon E Rodewald

S y ste m s. T h e D atabase. D atabase m anagem e n t sy ste m

Campus Sustainability Assessment and Related Literature


GlasCraft Air Motor Repair Kits

3rd Annual Eclipse Global Enterprise Survey Research Findings. Public Version

1st Int. Workshop on ACM Analysis and Documentation of knowledge-intensive Processes

THE UNIVERSITY OF SAN DIEGO CRIMINAL CLINIC: IT'S ALL IN THE MIX

Put the human back in Human Resources.

Introduction to Software Engineering. 9. Project Management

Génie Logiciel et Gestion de Projets. Project Management

Space Liability Insurance

Public Health is Like..

A Practical Usage of Innovative Web Design Methodology: The Relational Modeling Methodology

An E mpir ical Analysis of Stock and B ond M ar ket Liquidity

L a h ip e r t e n s ió n a r t e r ia l s e d e f in e c o m o u n n iv e l d e p r e s ió n a r t e r ia l s is t ó lic a ( P A S ) m a y o r o

I n la n d N a v ig a t io n a co n t r ib u t io n t o eco n o m y su st a i n a b i l i t y

Create. Increase. Accelerate. TM. New Rules for Finding and Creating Leads

A Unified Approach to Statistical Estimation and Model Parameterisation in Mass Calibration

Contents. Today Project Management. Project Management. Last Time - Software Development Processes. What is Project Management?

Goals of the Unit. spm adolfo villafiorita - introduction to software project management


BMC ITSM Suite - nabité skúsenosťami. Juraj Izák,

1. Oblast rozvoj spolků a SU UK 1.1. Zvyšování kvalifikace Školení Zapojení do projektů Poradenství 1.2. Financování

Overcoming CMDB Deployment Challenges. A White Paper Prepared for SunView Software Inc. January 2008

SEARCH WARRANTS IN AN ERA OF DIGITAL EVIDENCE

Material Design and Production subprocess - 1/12



BENEFITS OF AN INTEGRATED (PROSECUTION & DEFENSE) CRIMINAL LAW CLINIC

(Refer Slide Time: 01:52)

Transcription:

Engenharia de Software Gerenciamento de Projeto Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 1 Gerenciamento de Projeto Organização, planejamento e agendamento de projetos de software Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 2

Objetivos Introduzir o gerenciamento de projetos de software e descrever suas características distintas Discutir o planejamento do projeto e o planejamento do processo Mostrar como representações gráficas de agendamento são utilizadas em gerenciamento de projetos Discutir as noções de riscos e o processo de gerenciamento de riscos Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 3 Tópicos Abordados Gerenciamento de atividades Planejamento de projeto Agendamento de projeto Gerenciamento de riscos Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 4

Gerenciamento de Projeto de Software Concerned with activities involved in ensuring that software is delivered on time and on schedule and in accordance with the requirements of the organisations developing and procuring the software Project management is needed because software development is always subject to budget and schedule constraints that are set by the organisation developing the software Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 5 Software management distinctions The product is intangible The product is uniquely flexible Software engineering is not recognized as an engineering discipline with the sane status as mechanical, electrical engineering, etc. The software development process is not standardised Many software projects are 'one-off' projects Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 6

Management activities Proposal writing Project planning and scheduling Project costing Project monitoring and reviews Personnel selection and evaluation Report writing and presentations Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 7 Management commonalities These activities are not peculiar to software management Many techniques of engineering project management are equally applicable to software project management Technically complex engineering systems tend to suffer from the same problems as software systems Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 8

Project staffing May not be possible to appoint the ideal people to work on a project Project budget may not allow for the use of highly-paid staff Staff with the appropriate experience may not be available An organisation may wish to develop employee skills on a software project Managers have to work within these constraints especially when (as is currently the case) there is an international shortage of skilled IT staff Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 9 Project planning Probably the most time-consuming project management activity Continuous activity from initial concept through to system delivery. Plans must be regularly revised as new information becomes available Various different types of plan may be developed to support the main software project plan that is concerned with schedule and budget Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 10

Types of project plan Plan Description Quality plan Describes the quality procedures and standards that will be used in a project. Validation plan Describes the approach, resources and schedule used for system validation. Configuration management plan Describes the configuration management procedures and structures to be used. Maintenance plan Predicts the maintenance requirements of the system, maintenance costs and effort required. Staff development plan. Describes how the skills and experience of the project team members will be developed. Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 11 Project planning process Establish the project constraints Make initial assessments of the project parameters Define project milestones and deliverables while project has not been completed or cancelled loop Draw up project schedule Initiate activities according to schedule Wait ( for a while ) Review project progress Revise estimates of project parameters Update the project schedule Re-negotiate project constraints and deliverables if ( problems arise ) then Initiate technical review and possible revision end if end loop Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 12

Project plan structure Introduction Project organisation Risk analysis Hardware and software resource requirements Work breakdown Project schedule Monitoring and reporting mechanisms Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 13 Activity organization Activities in a project should be organised to produce tangible outputs for management to judge progress Milestones are the end-point of a process activity Deliverables are project results delivered to customers The waterfall process allows for the straightforward definition of progress milestones Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 14

Milestones in the RE process ACTIVITIES Feasibility study Requirements analysis Prototype development Design study Requirements specification Feasibility report Requirements definition Evaluation report Architectural design Requirements specification MILESTONES Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 15 Project scheduling Split project into tasks and estimate time and resources required to complete each task Organize tasks concurrently to make optimal use of workforce Minimize task dependencies to avoid delays caused by one task waiting for another to complete Dependent on project managers intuition and experience Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 16

The project scheduling process Identify activities Identify activity dependencies Estimate resources for activities Allocate people to activities Create project charts Software requirements Activity charts and bar charts Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 17 Scheduling problems Estimating the difficulty of problems and hence the cost of developing a solution is hard Productivity is not proportional to the number of people working on a task Adding people to a late project makes it later because of communication overheads The unexpected always happens. Always allow contingency in planning Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 18

Bar charts and activity networks Graphical notations used to illustrate the project schedule Show project breakdown into tasks. Tasks should not be too small. They should take about a week or two Activity charts show task dependencies and the the critical path Bar charts show schedule against calendar time Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 19 Task durations and dependencies Task Duration (days) Dependenci es T1 8 T2 15 T3 15 T1 (M1) T4 10 T5 10 T2, T4 (M2) T6 5 T1, T2 (M3) T7 20 T1 (M1) T8 25 T4 (M5) T9 15 T3, T6 (M4) T10 15 T5, T7 (M7) T11 7 T9 (M6) T12 10 T11 (M8) Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 20

Activity network 8 days 14/7/99 15 days M1 T3 15 days T9 4/7/99 start T1 15 days T2 25/7/99 M3 5 days T6 20 days T7 4/8/99 M4 25/8/99 M6 7 days T11 10 days T4 25/7/99 M2 10 days T5 11/8/99 M7 15 days 5/9/99 M8 18/7/99 M5 T10 10 days T12 25 days T8 Finish 19/9/99 Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 21 Activity timeline 4/7 11/7 18/7 25/7 1/8 8/8 15/8 22/8 29/8 5/9 12/9 19/9 Start T4 T1 T2 M1 T7 T3 M5 T8 M3 M2 T6 T5 T9 M4 M7 T10 T1 1 M6 M8 T12 Finish Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 22

Staff allocation 4/7 11/7 18/7 25/ 1/8 8/8 15/8 22/8 29/8 5/9 12/9 19/9 Fred Jane Anne Jim Mary T4 T1 T2 T3 T7 T8 T6 T5 T9 T10 T11 T12 Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 23 Risk management Risk management is concerned with identifying risks and drawing up plans to minimise their effect on a project. A risk is a probability that some adverse circumstance will occur. Project risks affect schedule or resources Product risks affect the quality or performance of the software being developed Business risks affect the organisation developing or procuring the software Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 24

Software risks Risk Risk type Desc ription St aff turnover Projec t Exp eri enc ed staff will le ave he t proj et cbe fore t is finish ed. Man agement hang c e Projec t The re will be a hang c eof orga nisa tiona lman agement with diff erent pri oriti es. Ha rdwa re unava ila bil ity Projec t Ha rdwa re which is essentia l for th e proj et cwi ll not b ed elivere d on sche dul e. Requireme nts cha nge Projec tand produc t The re will be a larg er numbe rof cha nges to the requireme nts than ant icipa td. e Spec ifi cat ion d ela ys Projec tand produc t Spec ifi cat ions of essentia l inte rfaces are not ava ila ble on sch edule Si ze under estimate Projec tand produc t The size of th esystem has b en unde rest imate d. CASE ool t unde r- pe rformanc e Product CASE ools t whic h support the proj et cdo not perform as a nti cip ated T ehnology c cha nge Business The nderlying u t echnology on whi ch the syst em is bu ilt is sup ersede dby ne wt ehnology. c Product c ompe tition Business A competi tiv eproduct is ma rkete d be fore he t syst em is comple td. e Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 25 The risk management process Risk identification Identify project, product and business risks Risk analysis Assess the likelihood and consequences of these risks Risk planning Draw up plans to avoid or minimise the effects of the risk Risk monitoring Monitor the risks throughout the project Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 26

The risk management process Risk identification Risk analysis Risk planning Risk monitoring List of potential risks Prioritised risk list Risk avoidance and contingency plans Risk assessment Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 27 Risk identification Technology risks People risks Organisational risks Requirements risks Estimation risks Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 28

Risks and risk types R is k ty p e T e c h n o lo g y P o s s ib le ris k s T h e d a ta b a s e u s e d in th e s y s te m c a n n o t p ro c e s s a s m a n y tra n s a c tio n s p e r s e c o n d a s e xp e c te d. S o ftw a re c o m p o n e n ts w h ic h s h o u ld b e re u s e d c o n ta in d e fe c ts w h ic h lim it th e ir fu n c tio n a lity. P e o p le It is im p o s s ib le to re c ru it s ta ff w ith th e s k ills re q u ire d. K e y s ta ff a re ill a n d u n a v a ila b le a t c ritic a l tim e s. R e q u ire d tra in in g fo r s ta ff is n o t a v a ila b le. O rg a n is a tio n a l T h e o rg a n is a tio n is re s tru c tu re d s o th a t d iffe re n t m a n a g e m e n t a re re s p o n s ib le fo r th e p ro je c t. O rg a n is a tio n a l fin a n c ia l p ro b le m s fo rc e re d u c tio n s in th e p ro je c t b u d g e t. T o o ls T h e c o d e g e n e ra te d b y C A S E to o ls is in e ffic ie n t. C A S E to o ls c a n n o t b e in te g ra te d. R e q u ire m e n ts C h a n g e s to re q u ire m e n ts w h ic h re q u ire m a jo r d e s ig n re w o rk a re p ro p o s e d. C u s to m e rs fa il to u n d e rs ta n d th e im p a c t o f re q u ire m e n ts c h a n g e s. E s tim a tio n T h e tim e re q u ire d to d e v e lo p th e s o ftw a re is u n d e re s tim a te d. T h e ra te o f d e fe c t re p a ir is u n d e re s tim a te d. T h e s iz e o f th e s o ftw a re is u n d e re s tim a te d. Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 29 Risk analysis Assess probability and seriousness of each risk Probability may be very low, low, moderate, high or very high Risk effects might be catastrophic, serious, tolerable or insignificant Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 30

Risk analysis R is k P ro b a b ility E ffe c ts O rg a n is a tio n a l f in a n c ia l p ro b le m s fo rc e L o w C a ta stro p h ic re d u ctio n s in th e p ro je c t b u d g e t. It is im p o s sib le to re cru it s ta ff w ith th e s kills H ig h C a ta stro p h ic re q u ire d fo r th e p ro je c t. K e y sta ff a re ill a t c ritic a l tim e s in th e p ro je c t. M o d e ra te S e rio u s S o ftw a re co m p o n e n ts w h ic h s h o u ld b e re u s e d M o d e ra te S e rio u s c o n ta in d e fe cts w h ic h lim it th e ir fu n ctio n a lity. C h a n g e s to re q u ire m e n ts w h ich re q u ire m a jo r M o d e ra te S e rio u s d e sig n re w o rk a re p ro p o se d. T h e o rg a n is a tio n is re s tru c tu re d s o th a t d iffe re n t H ig h S e rio u s m a n a g e m e n t a re re sp o n sib le fo r th e p ro je c t. T h e d a ta b a s e u se d in th e s y ste m c a n n o t p ro c e ss M o d e ra te S e rio u s a s m a n y tra n s a c tio n s p e r s e c o n d a s e x p e c te d. T h e tim e re q u ire d to d e ve lo p th e so ftw a re is H ig h S e rio u s u n d e re s tim a te d. C A S E to o ls c a n n o t b e in te g ra te d. H ig h T o le ra b le C u s to m e rs fa il to u n d e rsta n d th e im p a c t o f M o d e ra te T o le ra b le re q u ire m e n ts ch a n g e s. R e q u ire d tra in in g fo r s ta ff is n o t a v a ila b le. M o d e ra te T o le ra b le T h e ra te o f d e fe c t re p a ir is u n d e re s tim a te d. M o d e ra te T o le ra b le T h e siz e o f th e s o ftw a re is u n d e re s tim a te d. H ig h T o le ra b le T h e co d e g e n e ra te d b y C A S E to o ls is in e ffic ie n t. M o d e ra te In s ig n ifica n t Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 31 Risk planning Consider each risk and develop a strategy to manage that risk Avoidance strategies The probability that the risk will arise is reduced Minimisation strategies The impact of the risk on the project or product will be reduced Contingency plans If the risk arises, contingency plans are plans to deal with that risk Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 32

Risk management strategies Risk Organisational financial problems Recruitment problems Staff illness Defective components Requirements changes Organisational restructuring Database performance Underestimated development time Strategy Prepare a briefing document for senior management showing how the project is making a very important contribution to the goals of the business. Alert customer of potential difficulties and the possibility of delays, investigate buying-in components. Reorganise team so that there is more overlap of work and people therefore understand each other s jobs. Replace potentially defective components with bought-in components of known reliability. Derive traceability information to assess requirements change impact, maximise information hiding in the design. Prepare a briefing document for senior management showing how the project is making a very important contribution to the goals of the business. Investigate the possibility of buying a higher-performance database. Investigate buying in components, investigate use of a program generator. Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 33 Risk monitoring Assess each identified risks regularly to decide whether or not it is becoming less or more probable Also assess whether the effects of the risk have changed Each key risk should be discussed at management progress meetings Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 34

Risk factors Risk type Technology People Organisational Tools Requirements Estimation Potential indicators Late delivery of hardware or support software, many reported technology problems Poor staff morale, poor relationships amongst team member, job availability organisational gossip, lack of action by senior management reluctance by team members to use tools, complaints about CASE tools, demands for higher-powered workstations many requirements change requests, customer complaints failure to meet agreed schedule, failure to clear reported defects Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 35 Key points Good project management is essential for project success The intangible nature of software causes problems for management Managers have diverse roles but their most significant activities are planning, estimating and scheduling Planning and estimating are iterative processes which continue throughout the course of a project Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 36

Key points A project milestone is a predictable state where some formal report of progress is presented to management. Risks may be project risks, product risks or business risks Risk management is concerned with identifying risks which may affect the project and planning to ensure that these risks do not develop into major threats Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 37