1 Contents Introduction Software Development Processes Project Management Requirements Engineering Software Construction Group processes Quality Assurance Software Management and Evolution Last Time - Software Development Processes What is Software Engineering? Software Development Processes What is that? The Waterfall Model The Spiral Model The V-Model Iterative and Incremental Development Agile Development CMM Systematic Process Improvement Today Project Management What is Project Management? Cost Estimation Project Planning and Scheduling Running and Documenting a Project 1
2 What is Project Management? Think first. Planning improve Activity produce input to Result Check results. Evaluation improve Project Management Activities Project acquisition Feasibility study (initial project planning) Resource assessment Option (and risk) analysis Cost estimation Project planning and scheduling Work breakdown structure Effort estimation and distribution Resource assignment Project tracking and control Risk management Reporting Project Resources People Required skills Availability Duration of tasks Start date Time Budget Office/lab space Hardware and software tools Description Availability Duration of use Delivery date 2
3 Option Analysis Compare different development alternatives Evaluate their risks Select best alternative Tools Polar graph Forms Decision tree... Polar Graphs Reliability Schedule Alternative A Alternative B Alternative C Reuse Cost Portabilty Efficiency Analysis Example Alternative Cost (SEK) Relative efficiency Tools investment Schedule (years) Staff utilization (%) Risk A B C
4 Analysis Example (Polar Graph) Cost 5 M Alternative A Alternative B Efficiency 1 Alternative C Risk K 250K Tools investment 2 y 1 y 100% Staff Schedule utilisation Objectives Constraints Alternatives Risks Risk resolution strategy Results Plans Commitment Analysis Example (Forms) Develop a software components catalogue Within one year Must support all existing component types Must cost less than 1 MSEK Buy existing information retrieval (IR) software Buy a database and develop the catalogue using the query language Develop a special-purpose catalogue May be impossible within the given constraints Catalogue functionality may be inappropriate Develop a prototype to clarify requirements Commission a consultants report on existing IR systems Relax the time constraints IR systems are too inflexible Identified requirements cannot be met The prototype using a DBMS may be enhanced to a complete system Special-purpose catalogue development is not cost effective Develop the catalogue using the existing DBMS by enhancing the prototype and building a GUI Fund further 12 months of development Analysis Example (Decision Tree) Simple (0.3) 3.8 MSEK Build Difficult (0.7) Minor changes (0.4) 4.5 MSEK 2.75 MSEK Goal: Develop System X Reuse Buy Simple (0.2) Major changes (0.6) Complex (0.8) Minor changes (0.3) 3.1 MSEK 4.9 MSEK 2.1 MSEK Contract Major changes (0.7) Without changes (0.6) 4 MSEK 3.5 MSEK With changes (0.4) 5 MSEK 4
5 Project Management What is Project Management? Cost Estimation Project Planning and Scheduling Running and Documenting a Project Cost Estimation General approach Decompose problem Check for experiences/ data on sub problems Make qualified estimations (Make at least two independent estimates) General problems What are good measures? Do the estimates effect the result? Does the type of software effect the result? Does the project environment effect the result?... Use empirical and historical data Algorithmic cost modelling COCOMO (based on LOC) FP (based on function points) COCOMO Constructive Cost Modelling [Boehm 81, Boehm 00] Based on publicly available historical data of 63 TRW projects Basic assumptions: Requirements change only slightly during the project There is good project management The historical data is representative Assigning more resources to the project does NOT result in linear decreasing development time Basic model: Effort = a KDSI b KDSI = Kilo Delivered Source Instructions ( LOC - comments) The a and b factors vary depending on the type of project Effort is measured in PM (Person Months = 152h of work) 5
6 COCOMO Project Types OM: Organic Mode projects Small teams which are familiar with the type of application Development in a familiar environment EM: Embedded Mode projects Large and inexperienced teams Many constraints SDM: Semi Detached Mode projects Between OM- and EM projects COCOMO Basic Model PM: Person Months 2.4 KDSI 1.05 for OM projects 3 KDSI 1.12 for SDM projects 3.6 KDSI 1.20 for EM projects TDEV: Time for DEVelopment 2.5 PM 0.38 for OM projects 2.5 PM 0.35 for SDM projects 2.5 PM 0.32 for EM projects N: Number of personnel PM / TDEV This is Too Simplistic!? There are many cost drivers that effect effort Programming language Development methods Tools and environments Experience and capabilities of the development team Available time Requirements volatility... 6
7 COCOMO Intermediate Model Takes into account 15 cost drivers, which are ranked on a scale from very low to extra high Product attributes (e.g., required reliability) Platform attributes (e.g., time/space constraints) Personnel attributes (e.g., programming language experience) Project attributes (e.g., tool usage) PM: Person Months 3.2 KDSI 1.05 ΠCifor OM projects 3 KDSI 1.12 ΠCi for SDM projects 2.8 KDSI 1.20 ΠCi for EM projects ΠCi [ ] TDEV and N as before Cost Drivers Cost Drivers Product attributes Required software reliability Size of application database Complexity of the product Platform attributes Run-time performance constraints Memory constraints Volatility of the virtual machine environment Required turnabout time Personnel attributes Analyst capability Applications experience Software engineer capability Virtual machine experience Programming language experience Project attributes Use of software tools Application of software engineering methods Required development schedule Very Low Low Ratings Nomin al High Very High Extra High Intermediate COCOMO Summary Works quite well in practice TRW data is publicly available Needs KLOC as input Problems: Estimating KLOC in early project stages Comparison of projects using different LOC counts Outdated project data base for basic constants (70s) Solutions: Cross-check using an other estimation technique Standardised LOC counts Continuous model calibration Use COCOMOII 7
8 COCOMO II Stage 1: Application Composition (resolving high-risk issues) Estimation base: Object points Single standard project type Stage 2: Early Design (exploration of architectures and concepts) Estimation base: Function points or KLOC Six project type factors Stage 3: Post-architecture (development has started) Estimation base: Function points or KLOC Six project type factors Formulas more complicated; takes care of more variation See simple online tool ( Function (Feature) Points Estimate functionality captured in requirements Very detailed and complex counting rules (IFPUG) # User inputs x (3,4,6) = # User outputs x (4,5,7) = # User inquiries x (3,4,6) = # Files x (7,10,15) = # External interfaces x (5,7,10) = (# Algorithms x (3,4,6) = ) Count-total Feature points only FP = Count-total x [ x ΣF i ] 14 i=1 Adjustment factors (F i {0,...,5}) Project Management What is Project Management? Cost Estimation Project Planning and Scheduling Running and Documenting a Project 8
9 Define Work Breakdown Structure Activity Major work unit Start and end dates Consumes resources Results in work products (and milestones) Phase 1 Project function Continue throughout the project Not bound to specific phases Step 1 Step 2 Activity 1 Activity 2 Activity 3 Project Phase 2 Step 1 Step 2 Activity 1 Activity 2 Task 1 Task 2 Task 3 Phase N Step 1 Step 2 Schedule Activities Almost all activities depend on the completion of some other activities Many activities can be performed in parallel Track usage of resources Organisation necessary to balance work-load, costs, and duration PERT chart (activity network/task graph) Critical path Project time-line (Gantt chart) Resource table PERT Charts Program Evaluation and Review Technique Graph Nodes = activities/tasks and estimated duration Edges = dependencies Compute Slack time = available time - estimated duration Critical path A path is critical when it contains an activity that, if delayed, will cause a delay of the whole project. 9
10 PERT Chart Syntax GetAhead There is a nice tutorial at An Example PERT Chart Time-motion study of existing hardware 3 2d 5/4/00 5/5/00 Get final report from PSU Designelectrical and Schedule down-time with Schedule contractor for Renovate electrical and Install new hardware pneumatic renovations production supervisor electrical and pneumatic pneumatic 1 5d 4 4d 5 2d 8 1d 13 2d 14 3d 4/27/00 5/3/00 5/4/00 5/9/00 5/10/00 5/11/00 5/12/00 5/12/00 5/17/00 5/18/00 5/19/00 5/23/00 Shut down productionline Remove old hardware 10 1d 11 2d 5/12/00 5/12/00 5/15/00 5/16/00 Get blueprints for old Schedule truck to pickup Inform PSU about pickup Transport hardware from Store old hardware (just hardware hardware at PSU PSU in case) 2 1d 6 1d 7 2d 9 2d 12 10d 4/27/00 4/27/00 5/4/00 5/4/00 5/5/00 5/8/00 5/9/00 5/10/00 5/17/00 5/30/00 A Gantt Chart (Project Time Line) 10
11 Another Gantt Chart A Resource Table Can be (partly) generated from Gantt and or PERT charts Resource assignment Useful for project tracking Start End Elapsed Utilisation Task name earliest latest earliest latest time Resource 1 time 1 Resource n Utilisation time n... Project Management What is Project Management? Cost Estimation Project Planning and Scheduling Running and Documenting a Project 11
12 Running a Project To know where you are you need A (detailed) plan/goal Measurements of project status 100% plan actual progress time in, e.g., weeks Example Effort Distribution 250 total time in h actual plan 0 week35 week36 week37 week38 week39 week40 week41 week42 week43 week Lectures Meetings Planning Requirements GUI design Analysis Design Testing Coding Presentations Subcontract Code subc. Evaluation of prototype Manual Final report weekly reports and meeting minutes Other Risk Management Risk management is concerned with identifying risks and drawing up plans to minimise their effect on a project A risk is a probability that some adverse circumstance will occur Project risks affect schedule or resources Product risks affect the quality or performance of the software being developed Business risks affect the organisation developing or procuring the software 12
13 Risk Management Activities Investigate potential risk factors Risk Likelihood of occurrence Impact Define mitigation strategies (i.e. be prepared) What can be done to avoid the problem(s) in the first place What can be done to solve the problem(s) in case they occur Monitor risks Determine if predicted risk occurs Properly apply risk aversion steps Collect info for future risk analysis Example Assume Risk = High staff turnover Likelihood of occurrence = 70% Impact = Increase project time by 15%, project cost by 12% Mitigation strategy Identify high turnover causes Reduce causes before project starts Develop techniques to assure work continuity in light of turnover For example... or... Risk Management Risk management Risk assessment Risk identification Risk analysis Risk prioritisation Checklist Decomposition Assumption analysis Decision driver analysis System dynamics Performance models Cost models Network analysis Decision analysis Quality risk factor analysis Risk exposure Compound risk reduction Risk control Risk reduction Risk management planning Risk resolution Buying information Risk avoidance Risk transfer Risk reduction leverage Development process Risk element planning Risk plan integration Risk mitigation Risk monitoring and reporting Risk reassessment 13
14 Top Ten Project Risks Staff deficiencies Unrealistic schedules and budgets Developing the wrong functions Developing the wrong interface Over-engineering Requirements volatility Externally developed items Externally performed tasks Performance problems Assumptions on technology See Jalote: An Integrated Approach to Software Engineering, Springer Introduction 1.1 Project overview 1.2 Project deliverables 1.3 Evolution of the SPMP 1.4 Reference Materials 1.5 Definitions and acronyms The Project Plan 2Project Organisation 2.1 Process model 2.2 Organisational structure 2.3 Organisational boundaries and interfaces 2.4 Project responsibilities 3 Managerial Process 3.1 Management objectives and priorities 3.2 Assumptions, dependencies and constraints 3.3 Risk management 3.4 Monitoring and controlling mechanisms 3.5 Staffing plan 4 Technical Process 4.1 Methods, tools and techniques 4.2 Software documentation 4.3 Project support functions 5 Work Packages, Schedule, and Budget 5.1 Work packages 5.2 Dependencies 5.3 Resource requirements 5.4 Budget and resource allocation 5.5 Schedule According to ESA Std PSS-05-0 The Message Without a detailed plan you never know where you are 14
15 Summary What is Project Management? Cost Estimation Project Planning and Scheduling Running and Documenting a Project Next time Introduction Software Development Processes Software Development Processes Project Management Project Management Requirements Engineering Guest lecture Software Construction Group processes Quality Assurance Software Management and Evolution 15
Phases, Activities, and Work Products. Object-Oriented Software Development. Project Management. Requirements Gathering
Object-Oriented Software Development What is Object-Oriented Development Object-Oriented vs. Traditional Development An Object-Oriented Development Framework Phases, Activities, and Work Products Phases,
More informationSoftware Engineering. Dilbert on Project Planning. Overview CS / COE 1530. Reading: chapter 3 in textbook Requirements documents due 9/20
Software Engineering CS / COE 1530 Lecture 4 Project Management Dilbert on Project Planning Overview Reading: chapter 3 in textbook Requirements documents due 9/20 1 Tracking project progress Do you understand
More informationICS 121 Lecture Notes Spring Quarter 96
Software Management Cost Estimation Managing People Management Poor managment is the downfall of many software projects Ð Delivered software was late, unreliable, cost several times the original estimates
More informationProject Planning and Project Estimation Techniques. Naveen Aggarwal
Project Planning and Project Estimation Techniques Naveen Aggarwal Responsibilities of a software project manager The job responsibility of a project manager ranges from invisible activities like building
More informationHow To Manage Project Management
CS/SWE 321 Sections -001 & -003 Software Project Management Copyright 2014 Hassan Gomaa All rights reserved. No part of this document may be reproduced in any form or by any means, without the prior written
More informationMTAT.03.244 Software Economics. Lecture 5: Software Cost Estimation
MTAT.03.244 Software Economics Lecture 5: Software Cost Estimation Marlon Dumas marlon.dumas ät ut. ee Outline Estimating Software Size Estimating Effort Estimating Duration 2 For Discussion It is hopeless
More informationSoftware cost estimation. Predicting the resources required for a software development process
Software cost estimation Predicting the resources required for a software development process Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 23 Slide 1 Objectives To introduce the fundamentals
More informationSoftware cost estimation
Software cost estimation Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 26 Slide 1 Objectives To introduce the fundamentals of software costing and pricing To describe three metrics for
More informationSoftware cost estimation
Software cost estimation Sommerville Chapter 26 Objectives To introduce the fundamentals of software costing and pricing To describe three metrics for software productivity assessment To explain why different
More informationTopics. Project plan development. The theme. Planning documents. Sections in a typical project plan. Maciaszek, Liong - PSE Chapter 4
MACIASZEK, L.A. and LIONG, B.L. (2005): Practical Software Engineering. A Case Study Approach Addison Wesley, Harlow England, 864p. ISBN: 0 321 20465 4 Chapter 4 Software Project Planning and Tracking
More information(Refer Slide Time: 01:52)
Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This
More informationChapter 23 Software Cost Estimation
Chapter 23 Software Cost Estimation Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 23 Slide 1 Software cost estimation Predicting the resources required for a software development process
More informationCSSE 372 Software Project Management: Software Estimation With COCOMO-II
CSSE 372 Software Project Management: Software Estimation With COCOMO-II Shawn Bohner Office: Moench Room F212 Phone: (812) 877-8685 Email: bohner@rose-hulman.edu Estimation Experience and Beware of the
More informationProject management. Organising, planning and scheduling software projects. Ian Sommerville 2000 Software Engineering, 6th edition.
Project management Organising, planning and scheduling software projects Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 4 Slide 1 Objectives To introduce software project management and
More informationModule 11. Software Project Planning. Version 2 CSE IIT, Kharagpur
Module 11 Software Project Planning Lesson 29 Staffing Level Estimation and Scheduling Specific Instructional Objectives At the end of this lesson the student would be able to: Identify why careful planning
More informationSoftware Engineering CSCI 4490. Lesson 9 Project Management Part 1- Planning & Estimating. February 23, 2015
Lesson 9 Project Management Part 1- Planning & Estimating February 23, 2015 Projects and Project Managers Project a [temporary] sequence of unique, complex, and connected activities having one goal or
More informationCISC 322 Software Architecture
CISC 322 Software Architecture Lecture 20: Software Cost Estimation 2 Emad Shihab Slides adapted from Ian Sommerville and Ahmed E. Hassan Estimation Techniques There is no simple way to make accurate estimates
More informationSoftware Engineering. Objectives. Designing, building and maintaining large software systems
Software Engineering Objectives Designing, building and maintaining large software systems To define software engineering and explain its importance To discuss the concepts of software products and software
More informationPROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
More informationModule 11. Software Project Planning. Version 2 CSE IIT, Kharagpur
Module 11 Software Project Planning Lesson 28 COCOMO Model Specific Instructional Objectives At the end of this lesson the student would be able to: Differentiate among organic, semidetached and embedded
More informationProject Plan 1.0 Airline Reservation System
1.0 Airline Reservation System Submitted in partial fulfillment of the requirements of the degree of Master of Software Engineering Kaavya Kuppa CIS 895 MSE Project Department of Computing and Information
More informationProject management. Objectives. Topics covered. Organizing, planning and scheduling software projects DISCUSSION
Project management 1 Objectives 2 Organizing, planning and scheduling software projects DISCUSSION Project Managers? To introduce software project management and to describe its distinctive characteristics
More informationProject Planning and Control. Main issues: How to plan a project? How to control it?
Project Planning and Control Main issues: How to plan a project? How to control it? The systems view on software development systems view: input system output system in this lecture: a software system
More informationCost Estimation Strategies COST ESTIMATION GUIDELINES
Cost Estimation Strategies Algorithmic models (Rayleigh curve Cost in week t = K a t exp(-a t 2 ) Expert judgment (9 step model presented later) Analogy (Use similar systems) Parkinson (Work expands to
More informationSoftwareCostEstimation. Spring,2012
SoftwareCostEstimation Spring,2012 Chapter 3 SOFTWARE COST ESTIMATION DB Liu Software Cost Estimation INTRODUCTION Estimating the cost of a software product is one of the most difficult and error-prone
More informationProject Planning. COSC345 Lecture 3 Slides: Andrew Trotman Dramatic presentation: Richard O Keefe. Software Engineering 2013
Project Planning COSC345 Lecture 3 Slides: Andrew Trotman Dramatic presentation: Richard O Keefe Software Engineering 2013 Overview Assignment: The assignment sheet specifies a minimum Think about what
More informationProject management: an SE Perspective
Project management: an SE Perspective Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 1 Objectives To explain the main tasks undertaken by project managers To introduce software
More informationSOFTWARE PROJECT MANAGEMENT
SOFTWARE PROJECT MANAGEMENT http://www.tutorialspoint.com/software_engineering/software_project_management.htm Copyright tutorialspoint.com The job pattern of an IT company engaged in software development
More informationSoftware Engineering. Project Management. Based on Software Engineering, 7 th Edition by Ian Sommerville
Software Engineering Project Management Based on Software Engineering, 7 th Edition by Ian Sommerville Objectives To explain the main tasks undertaken by project managers To introduce software project
More informationProject Plan. Online Book Store. Version 1.0. Vamsi Krishna Mummaneni. CIS 895 MSE Project KSU. Major Professor. Dr.Torben Amtoft
Online Book Store Version 1.0 Vamsi Krishna Mummaneni CIS 895 MSE Project KSU Major Professor Dr.Torben Amtoft 1 Table of Contents 1. Task Breakdown 3 1.1. Inception Phase 3 1.2. Elaboration Phase 3 1.3.
More informationProject management. Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 1
Project management Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 1 Objectives To explain the main tasks undertaken by project managers To introduce software project management
More informationComparison of SDLC-2013 Model with Other SDLC Models by Using COCOMO
International Journal of Emerging Science and Engineering (IJESE) Comparison of SDLC-2013 Model with Other SDLC Models by Using COCOMO Naresh Kumar, Pinky Chandwal Abstract There exist a large number of
More informationProject planning and scheduling
Project planning and scheduling Project Planning Mel Rosso-Llopart (rosso@cs.cmu.edu) Version 1.1 Carnegie Mellon, 2005 1 Objectives 1. Introduce project planning 2. Examine the stages of project planning:
More informationSystems Analysis and Design
Systems Analysis and Design Slides adapted from Jeffrey A. Hoffer, University of Dayton Joey F. George, Florida State University Joseph S. Valacich, Washington State University Modern Systems Analysis
More informationCHAPTER 24 SOFTWARE PROJECT SCHEDULING. Overview
CHAPTER 24 SOFTWARE PROJECT SCHEDULING Overview The chapter describes the process of building and monitoring schedules for software development projects. To build complex software systems, many engineering
More informationOrganising, planning and scheduling software projects. Software management distinctions
Project management Organising, planning and scheduling software projects Software management distinctions The product is intangible The product is uniquely flexible Software engineering is not recognized
More informationVIDYAVAHINI FIRST GRADE COLLEGE
VIDYAVAHINI FIRST GRADE COLLEGE SOFTWARE ENGINEERING 5 th Sem BCA Vidyavahini First Grade College Near Puttanjaneya Temple, Kuvempunagar, Tumkur 572103. E-Mail:vvfgc.bca@gmail.com Website:www.vidyavahini.org/bca
More informationTECH. Tracking Progress. Project Schedule PHASE 1 STEP 1 ACTIVITY 1.1. Activity and Milestone STEP 1 STEP 2 : ACTIVITY 2.2 : ACTIVITY 1.
CH03 Planning and Managing the Project * Tracking Progress * Project Personnel * Effort Estimation * Risk Management * The Project Plan * Process Models and Project Management Tracking Progress Questions
More informationProject Management. Software Projects vs. Engineering Projects
Read Chapters (a) Project Management, (b) Project Scheduling and (c) Risk Management from Pressman for this lecture. Project Management Rahul Premraj + Andreas Zeller reliability of data questioned! Software
More informationA Case study based Software Engineering Education using Open Source Tools
A Case study based Software Engineering Education using Open Source Tools Sowmya B J Dept. of CSE M. S. Ramaiah Institute of Technology sowmyabj@msrit.edu Srinidhi Hiriyannaiah Dept. of CSE M.S. Ramaiah
More informationProject Time Management
Project Time Management Plan Schedule Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.
More informationOrganizing, planning and scheduling software projects
Project management Organizing, planning and scheduling software projects Ian Sommerville 1995 Modified by Spiros Mancoridis 1998 Software Engineering, 5th edition. Chapter 3 Slide 1 Objectives To introduce
More informationSoftware Project Management Part 2: Work Breakdown Structures
Software Project Management Part 2: Work Breakdown Structures Introduction into Software Engineering Lecture 20 Bernd Bruegge Applied Software Engineering Technische Universitaet Muenchen 1 Where are we?
More informationSWEBOK Certification Program. Software Engineering Management
SWEBOK Certification Program Software Engineering Management Copyright Statement Copyright 2011. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted
More informationrisks in the software projects [10,52], discussion platform, and COCOMO
CHAPTER-1 INTRODUCTION TO PROJECT MANAGEMENT SOFTWARE AND SERVICE ORIENTED ARCHITECTURE 1.1 Overview of the system Service Oriented Architecture for Collaborative WBPMS is a Service based project management
More informationPearson Education Limited 2003
156 Activities Activity 9.1 (PP. 357 358) [Project planning exercise] You are required to construct a project plan for the following information system development project. Your objective is to schedule
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More informationIntroduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
More informationProject Management. Lecture 3. Software Engineering CUGS. Spring 2012 (slides made by David Broman) Kristian Sandahl
Project Lecture 3 Software Engineering CUGS Spring 2012 (slides made by David Broman) Kristian Sandahl Department of Computer and Information Science Linköping University, Sweden A Software Life-cycle
More informationProject management. Organizing, planning and scheduling software projects
Project management Organizing, planning and scheduling software projects Ian Sommerville 1995 Software Engineering, 5th edition. Chapter 3 Slide 1 Objectives To introduce software project management and
More informationProject Management. Lecture 3. Software Engineering CUGS. Spring 2011 (slides made by David Broman)
Lecture 3 Software Engineering CUGS Spring 2011 (slides made by David Broman) Kristian Sandahl Department of Computer and Information Science Linköping University, Sweden A Software Life-cycle Model Which
More informationPeter Mileff PhD SOFTWARE ENGINEERING. The Basics of Software Engineering. University of Miskolc Department of Information Technology
Peter Mileff PhD SOFTWARE ENGINEERING The Basics of Software Engineering University of Miskolc Department of Information Technology Introduction Péter Mileff - Department of Information Engineering Room
More informationSOFTWARE ECONOMICS UNIT 15. Presented by. Stefano Street
SOFTWARE ECONOMICS UNIT 15 Presented by Stefano Street Objectives Software economics its importance and place in software systems Provide an empirical view of where money goes Why it is important to understand
More informationProject management. Objectives
Project management cmsc435-1 Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe its distinctive characteristics To discuss project
More information2 Evaluation of the Cost Estimation Models: Case Study of Task Manager Application. Equations
I.J.Modern Education and Computer Science, 2013, 8, 1-7 Published Online October 2013 in MECS (http://www.mecs-press.org/) DOI: 10.5815/ijmecs.2013.08.01 Evaluation of the Cost Estimation Models: Case
More informationGoals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management
Project Scheduling Goals of the Unit Making the WBS into a schedule Understanding dependencies between activities Learning the Critical Path technique Learning how to level resources!2 Initiate Plan Execute
More informationProject Risks. Risk Management. Characteristics of Risks. Why Software Development has Risks? Uncertainty Loss
Project Risks Risk Management What can go wrong? What is the likelihood? What will the damage be? What can we do about it? M8034 @ Peter Lo 2006 1 M8034 @ Peter Lo 2006 2 Characteristics of Risks Uncertainty
More informationLecture 14: Cost Estimation
Overview Project management activities Project costing Project scheduling and staffing Project monitoring and review General cost estimation rules Algorithmic Cost Modeling Function point model COCOMO
More informationCSSE 372 Software Project Management: Software Project Scheduling
CSSE 372 Software Project Management: Software Project Scheduling Shawn Bohner Office: Moench Room F212 Phone: (812) 877-8685 Email: bohner@rose-hulman.edu Examination #1 Results Average Score 82.70% Median
More informationSoftware Development: Tools and Processes. Lecture - 16: Estimation
Software Development: Tools and Processes Lecture - 16: Estimation Estimating methods analogy method direct estimating method Delphi technique PERT-type rolling window Constructivist Cost Model (CoCoMo)
More informationBasic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort
Basic s Project Scheduling and Tracking The process of building a schedule for any case study helps really understand how it s done. The basic idea is to get across to break the software project into well-defined
More informationProject Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
More informationIntroduction and Overview
Introduction and Overview Definitions. The general design process. A context for design: the waterfall model; reviews and documents. Some size factors. Quality and productivity factors. Material from:
More informationPROJECT PLAN TEMPLATE
Treasury Board of Canada Secretariat Secrétariat du Conseil du Trésor du Canada Enhanced Management Framework for Information Management/Information Technology PROJECT PLAN TEMPLATE Document Revision Draft
More informationSOFTWARE DEVELOPMENT PLAN
SOFTWARE DEVELOPMENT PLAN This document outline is based on the IEEE Standard 1058.1-1987 for Software Project Management Plans. This is the controlling document for managing a software project, and it
More informationProject Management. Massimo Felici Room 1402, JCMB, KB 0131 650 5899 mfelici@inf.ed.ac.uk
Project Management Massimo Felici Room 1402, JCMB, KB 0131 650 5899 mfelici@inf.ed.ac.uk Project Management Software project management is an essential part of software engineering Concerned with activities
More informationProject Management Dr. James A. Bednar
Project Management Dr. James A. Bednar jbednar@inf.ed.ac.uk http://homepages.inf.ed.ac.uk/jbednar SAPM Spring 2006: Project Management 1 Project Management A project is a temporary endeavour to produce
More informationESKIPM2(SQA Unit Code- F9CX 04) Project management software
Overview This is the ability to use a software application that plans, organises and monitors completion of the component tasks within a project in logical sequence, given constraints of people and resource
More informationProject management. Organizing, planning and scheduling software projects. Objectives. Chapter 3. Chapter 3 Project Management. Learning Objective
Chapter 3 Chapter 3 Project Management Learning Objective...to give an appreciation for and to introduce project management and to place it into context and give some of the fundamentals to project management
More informationMinnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
More informationIT2403-SOFTWARE PROJECT MANAGEMENT 2 MARKS QUESTIONS
IT2403-SOFTWARE PROJECT MANAGEMENT 2 MARKS QUESTIONS 1. Define software project management. Software Project Management has key ideas about the planning, monitoring, and control of software projects 2.
More informationProject Management Planning
Overview of Project Scheduling Following the definition of project activities, the activities are associated with time to create a project schedule. The project schedule provides a graphical representation
More informationChapter 3 Managing the Information Systems (IS) Project
Content Chapter 3 Managing the Information Systems (IS) Project Process of managing IS projects Skills required to be an effective project manager Skills and activities of a project manager during project
More informationExample IEEE software project management plan (SPMP)
Example IEEE software project management plan (SPMP) Source: Object Oriented & Classical Software Engineering, 7 th edition, Stephen R. Schach, pg. 590 594 This plan is for development of the MSG product
More informationCS 389 Software Engineering. Lecture 2 Chapter 2 Software Processes. Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed.
CS 389 Software Engineering Lecture 2 Chapter 2 Software Processes Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed. Topics covered Software process models Process activities Coping
More informationSoftware Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC) Supriyo Bhattacharjee MOF Capability Maturity Model (CMM) A bench-mark for measuring the maturity of an organization s software process CMM defines 5 levels of process
More informationProject Plan Version 0.0
Software Development Templates Project Plan Version 0.0 DOCUMENT NO: VERSION: CONTACT: EMAIL: Authors Name xxx.xxx@xxx.xxx DATE: 15/07/2003 Unlimited distribution subject to the copyright. Project Plan
More informationNFSA Project Management Guidelines
NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and
More informationESKIPM3 Project management software
Overview This is the ability to use a software application that plans, organises and monitors completion of the component tasks within a project in logical sequence, given constraints of people and resource
More informationAIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
More informationSoftware Engineering. What is a system?
What is a system? Software Engineering Software Processes A purposeful collection of inter-related components working together to achieve some common objective. A system may include software, mechanical,
More informationMICROSOFT OFFICE PROJECT - SYLLABUS
MICROSOFT OFFICE PROJECT - SYLLABUS Sessions Session 1 Description 1. INTRODUCTION a. Introduction to CADFORUM and PPM b. Project c. Examples of project d. Project Triangle e. Project Management f. Life
More informationProject Planning and Scheduling
Project Planning and Scheduling MFS606 Project Planning Preliminary Coordination Detailed Task Description Objectives Budgeting Scheduling Project Status Monitoring When, What, Who Project Termination
More informationA Comparison between Five Models of Software Engineering
International Journal of Research in Information Technology (IJRIT) www.ijrit.com ISSN 2001-5569 A Comparison between Five Models of Software Engineering Surbhi Gupta, Vikrant Dewan CSE, Dronacharya College
More informationIntroduction to Software Engineering. 9. Project Management
Introduction to Software Engineering 9. Project Management Roadmap > Risk management > Scoping and estimation > Planning and scheduling > Dealing with delays > Staffing, directing, teamwork 2 Literature
More informationProject Planning, Scheduling and Control: Assignment 2 D. U. Singer Hospital Products Corp.
Project Planning, Scheduling and Control: Assignment 2 D. U. Singer Hospital Products Corp. Code for Course: MBL45-5 Assignment Number: 2 Student number: 75-163-3 Group Code Number: BOT1 Table of Contents
More informationPM: Project management software
This is the ability to use a software application that plans, organises and monitors completion of the component within a in logical sequence, given constraints of people and resource availability. This
More informationSoftware Project Management Plan (SPMP)
Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.
More informationPROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
More informationSoftware Project Management. Software Engineering SW Project Management Slide 1
Software Project Management Software Engineering SW Project Management Slide 1 Objectives To introduce software project management and to describe its distinctive characteristics Explain the advantages
More informationScheduling Glossary Activity. A component of work performed during the course of a project.
Scheduling Glossary Activity. A component of work performed during the course of a project. Activity Attributes. Multiple attributes associated with each schedule activity that can be included within the
More informationRisk Management (3C05/D22) Unit 3: Risk Management. What is risk?
Risk Management (3C05/D22) Unit 3: Risk Management Objectives To explain the concept of risk & to develop its role within the software development process To introduce the use of risk management as a means
More informationPROFESSIONAL SERVICES SPECIFICATION
R64 - PAVEMENT MARKING August 1996 PROFESSIONAL SERVICES SPECIFICATION PM2 PROJECT MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT of INFRASTRUCTURE,
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationGuidelines: Project Schedule Project Management Office (PMO)
Guidelines: Project Schedule Project Management Office (PMO) Process The project Schedule outlines the tasks and activities of the project; the duration; start and end dates for each individual task and
More informationSoftware Project Management Plan. Team Synergy Version: 1.0 Date: 1/27/03
Team Synergy Version: 1.0 Date: 1/27/03 Revision History Document Owner: Goran Momiroski Date Revision Description Author 11/26/2002 1.0 Document creation Goran Momiroski Team Synergy Page 1 1/27/2003
More informationThe Plan s Journey From Scope to WBS to Schedule
The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)
More informationInformation Systems Development Process (Software Development Life Cycle)
Information Systems Development Process (Software Development Life Cycle) Phase 1 Feasibility Study Concerned with analyzing the benefits and solutions for the identified problem area Includes development
More informationSoftware Engineering Introduction & Background. Complaints. General Problems. Department of Computer Science Kent State University
Software Engineering Introduction & Background Department of Computer Science Kent State University Complaints Software production is often done by amateurs Software development is done by tinkering or
More informationCS 6361, SPRING 2010 Advanced Requirements Engineering Web Based Meeting Scheduler- Project Plan
1 W E B B A S E D M E E T I N G S C H E D U L E R S Y S T E M Project Plan Version 4.0 CS 6361 ADVANCED REQUIREMENTS ENGINEERING, SPRING 2010 UNIVERSITY OF TEXAS AT DALLAS R E Q U I R E M E N T S E N G
More information