The evolution of the Safety Management Information System (SMIS)



Similar documents
Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy

Holistic Approach to Barrier Integrity: Managing an Effective Safeguarding Strategy. San Burnett

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT

Welcome to the Future of Fleet Management & Vehicle Tracking Business Transformation Today

Safety. Standards. Asset Management Planning Inspection and Assessment Route asset planning Contracting strategy Annual work plans

CAPABILITY MATURITY MODEL & ASSESSMENT

ICT Digital Transformation Programme

Asset Management Policy March 2014

PROJECT MANAGEMENT FRAMEWORK

RISQS FAQs. About RISQS. services provided by

Performance Detailed Report. Date. Last saved: 12/10/ :18:00. Property asset management. Bristol City Council. Audit 2006/07

Preparation of a Rail Safety Management System Guideline

Health and Safety Management Standards

Procurement policy Working with our suppliers to support strategic growth

Compliance. Group Standard

Asset Management. Enabling effective estates strategies >

Innovation in Work Health and Safety Solutions

Contents. visualintegrator The Data Creator for Analytical Applications. Executive Summary. Operational Scenario

Project Management Manual

THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT

Risk & Hazard Management

HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM

Improve productivity and reduce costs with industry leading Enterprise Asset Management (EAM) solutions.

Agenda Item No.6 (j) DERBYSHIRE COUNTY COUNCIL CABINET. Report of the Director of Transformation

TRUST BOARD - 25 April Health and Safety Strategy Potential claims, litigation, prosecution

BUSINESS INTELLIGENCE STRATEGY - SUMMARY

Balance collections with retention for each customer. Decision Analytics for debt management in telecommunications

Infor Enterprise Asset Management (EAM)

Update on Programme Management Controls & Risks

Information & Communication Technology Strategy

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement

, Head of IT Strategy and Architecture. Application and Integration Strategy

Second Clinical Safety Review of the Personally Controlled Electronic Health Record (PCEHR) June 2013

Contract Management Guideline

DOCUMENT MANAGEMENT FROM FILESTREAM

Oxford City Council ICT Strategy

DOCUMATION S SELF-SERVICE PORTAL

Job Description. Line Management of a small team of staff administrating and managing patient and professional feedback and incidents.

Enfield Council solving problems with HANDD Business Solutions and GlobalSCAPE EFT Server

Health and safety policy

Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF)

Monitoring & Testing

Network Rail Infrastructure Projects Joint Relationship Management Plan

Five Star Occupational Health and Safety Audit Specification document 2013

STL Microsoft SharePoint Consulting and Support Services

Lead Provider Framework Draft Scope. NHS England / 13/12/13 Gateway Ref: 00897

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

AMS Asset Management Redkite Asset Management System When only the best will do.

How To Manage Risk In Ancient Health Trust

Finding your balance Top tips for successful HR delivery in multiple countries across Europe

Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS. April

Derbyshire Trading Standards Service Quality Manual

e-procurement A Guide For Suppliers

All CCG staff. This policy is due for review on the latest date shown above. After this date, policy and process documents may become invalid.

Industry. Head of Research Service Desk Institute

Defending against modern cyber threats

Retail store systems for high performance

GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY. 1. Occupational Health and Safety Policy Statement 1

Risk Management Policy and Framework

The National Commission of Audit

Guide to manual tasks high impact function (HIF) audit 2010 March 2010

ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW 15 DECEMBER 2011 SUMMARY REPORT

Information Governance Committee. Scope for the BCU Telephony Infrastructure development. Underpinning BCU Three Year operational plan

North Middlesex University Hospital NHS Trust. Annual Audit Letter 2005/06. Report to the Directors of the Board

End to End Secured e-tendering Solutions. Procurement ERP From MobileERP

THE WEB S FAVOURITE INTEGRATED SOURCE TO PAY SOLUTION

How To Ensure That Sovini Is A Successful Business

HSCIC IT Hosting Strategy

Case Management powered by Microsoft Dynamics CRM

Qlik UKI Consulting Services Catalogue

JOB PROFILE. Deputy Finance Manager

Job ad reference HSQ Classification AO8 Role title Change Lead Salary $ $ Per Fortnight Status

The anglo american Safety way. Safety Management System Standards

G-Cloud Service Definition Lotus Notes to Microsoft SharePoint Migration Discovery Service

Policy Document Control Page

Government has set an aspiration of 25% of expenditure to flow through SMEs either directly or indirectly through the supply chain.

Proven deployments across different Industry verticals; Being used by leading brands

Guidance on the preparation and use of company risk assessment profiles for transport operators

Safety Assurance Guidance

YOUR ETHICAL FLEET MANAGEMENT PARTNER.

POSITION DESCRIPTION Number: PD:

The Victorian Public Sector values dictate the way we interact with each other, with our the market and guide the way that we make decisions.

Ellipse The Enterprise Asset Management (EAM) solution for asset intensive industries

Transcription:

MEETING: AGENDA ITEM: RSSB Board Meeting DATE: 06 November 2014 SUBJECT: SPONSOR: AUTHORS: The evolution of the Safety Management Information System (SMIS) Chris Fenton George Bearfield/Jeff Brewer/Steve Enright A1 1. Purpose of the paper 1.1 The purpose of this paper is to: Outline work already underway to redevelop SMIS to meet industry s immediate needs. Present the strategic vision for the evolution of the SMIS system to better meet future industry need. Present initial estimates of the cost of the full project, and outline how the business case will be fully developed for approval at the next board meeting in January. 2. Strategic Vision 2.1 Over recent years enterprise safety management system software packages have been developed which provide a comprehensive toolset for managing the safety of an organisation and its operations. These systems are intended to support a change in approach from reactive management of safety to a more proactive, risk-based approach. 2.2 The packages broadly cover elements such as: Occurrence reporting Managing corrective / preventive actions Audit management and document management Hazard identification and risk management Performance measurement 2.3 These systems allow safety incidents to be captured in real time via mobile devices and processed seamlessly, so that the right incidents are documented and investigated by the right people at the right time. Events can be geographically tagged, stored with pictures and documents, and automatically alerted to those who need to know, when they need to know. This learning can be efficiently stored, analysed and presented to the right RSSB Board Meeting Final: 06 November 2014 Page 1 of 6

people in the business through integrated analytical tools. Such systems can also be designed such that effective safety management activities are demonstrably compliant with relevant standards and legislation. 2.4 Some, of the functions described above are already automated in the GB railway industry, some in systems managed for the industry by RSSB and others meeting the individual requirements of particular organisations. 2.5 The Data and Risk Strategy Group (DRSG) has been formed to support the industry in the achievement of a vision for the development of risk tools in the GB railway industry. The DRSG s vision is: The risk intelligence that a world class railway needs, efficiently provided in the right format, to the right people at the right time. 3. Where we are now 3.1 The SMIS is the GB rail industry s primary safety database and reporting system and has been in operation since 1997. Network Rail and the train and freight operators are required 1 to enter information into it. The system is used for a number of purposes at both national and company level, for example: Meeting regulatory reporting and investigation requirements and tracking progress and closure of recommendations. Safety performance reporting and provision of safety intelligence Risk assessments and modelling including to support development of the industry Safety Risk Model (SRM). 3.2 SMIS was innovative at the time of its introduction; it has been instrumental in delivering a strong safety reporting culture in the GB rail industry, and in developing risk information and models which are currently recognised across the international railway community as being world class. However, there are now a number of difficulties with its continued use. In particular: Because it was developed as a bespoke application to meet the industry s particular requirements, it is expensive to host and support For similar reasons, it is costly and time-consuming to develop new functionality in the system. In many cases new functionality that the industry might want for SMIS will be the same functions which are readily available in modern enterprise SMS software. Over time a separate internal RSSB database (the Safety Intelligence Database SIDB) has been developed to capture additional data to complement the data in SMIS. This data includes better causal classification to support the SRM, and asset data and 1 Railway Group Standard GERT8047. RSSB Board Meeting Final: 06 November 2014 Page 2 of 6

information, including fault data. The existence of this additional database creates inefficient working practices and the potential for inconsistent data being stored in separate databases. 3.3 A number of train operators including Southern, Southeastern and Virgin have purchased enterprise SMS software to help them manage their businesses. This creates the need to link such systems directly to the current SMIS system so that companies can readily meet their mandatory reporting requirements through it. As individual companies are choosing their own systems from a wide range of potential suppliers this approach risks creating significant complexity and cost over time. 3.4 Given that most, if not all, companies are now actively considering the use of such systems, it has been recognised that the industry is at a tipping point where, there will not be the business case for developing a core industry safety system, if the decision is not considered now, and the benefits of a common industry system will not be able to be realised. 3.5 Removed for publication. 3.6 At initial meetings of the DRSG, a project to build the SIDB functionality into SMIS, and a project to link SMIS to enterprise SMS software to deliver Network Rails requirements were being considered separately. Initial work to develop the requirements for these projects was undertaken in early 2014. Sentence removed for publication. 3.7 The DRSG therefore proposed the migration of SMIS to Commercial off-theshelf (COTS) software whilst implementing the required functionality. This was considered to be the preferred approach as long as a business case could be made and the project could be delivered in timescales acceptable to the industry 4. Proposed way forward 4.1 In response to the recommendation of the DRSG, RSSB has started to investigate the preferred option and begin any initial assessment that is needed in order to meet the industry s desired timescales. 4.2 The approach being followed is based on making rapid progress, whilst still delivering the best possible solution and is in three stages: The development of a high level specification for the work by December 2014 A fast track procurement process resulting in a successful bidder by April 2014 An agile approach to software development, working closely with the delivery partner it is currently estimated that the project would RSSB Board Meeting Final: 06 November 2014 Page 3 of 6

take of the order of 12 months, and therefore the estimated delivery date is April 2016. 4.3 This approach has been endorsed by the DRSG and supported by Network Rail IT team. 4.4 To be in a position to go to tender in April 2015 RSSB needs to specify industry requirements to a sufficient level of detail that potential suppliers would be able to provide an accurate estimated cost for the work. A small number preferred suppliers would be selected. 4.5 RSSB has allocated funds to bring in expert resource to assist in the capturing of the high level system requirements and to undertake the tendering exercise. Note that further expenditure of this nature might prove necessary as the project progresses. 4.6 The scope of work includes: Introducing electronic reporting forms utilising business workflow to assist with data capture. Incorporating functionality from SIDB into SMIS and decommissioning it. Expanding the SMIS data warehouse to include more data types, and to meet the future reporting needs of industry, including creating more capacity for stored asset data. Better integration with industry s control logging and bespoke safety management systems software. Introducing investigation management workflow software. 4.7 It is estimated that this work could be delivered within 12 months of contract award i.e. by April 2016. 4.8 As the requirements are developed, a full business case will be produced. This will be reviewed at the next RSSB board meeting in January. At this stage appropriate funding options would be discussed. 5. Benefits 5.1 For the reasons outlined in section 3 it has become increasingly clear over recent years that a modernisation of the SMIS platform is needed to put it on a firm footing to continue to fulfil its role in the industry. The project outlined here, will deliver that strategic objective whilst also delivering a number of significant further benefits. 5.2 Firstly, the approach allows the industry s immediate needs for making data collection and accident investigation processes more efficient to be met. This will have tangible benefits for all SMIS users. 5.3 Removed for publication. RSSB Board Meeting Final: 06 November 2014 Page 4 of 6

5.4 The updated platform will also have the advantage that it will be easier to link it to existing databases so that data can be uploaded to SMIS from these databases automatically. The project is being specified in such a way as to ensure that linking to other databases is as simple as is possible. 5.5 The plan of work includes elicitation of safety reporting and information requirements from the railway companies such that existing needs can be met by the new system wherever possible. This creates the potential for members to minimise their reliance on third party systems with potential cost savings for them. 5.6 Another benefit is that the packages being considered have integrated analytical software allowing easy development of safety performance dashboards. In recent months provision of dashboards has been limited because of incompatibility issues with third party business intelligence software. 5.7 Because enterprise SMS software is developing in a strongly commercial cross industry market it is being innovated constantly. In the longer term the project will open up a range of future possibilities for the evolution of the system to take advantage of additional functionality that enterprise SMS software has, some of which are currently unclear. 5.8 An early consideration would be the longer term potential for migrating other safety data collection systems in the industry (such as Close Call, CIRAS and NIR online) onto SMIS infrastructure. This would create the opportunity for richer safety analysis and reporting across the data sets those systems hold. At a recent RSSB hosted Close Call seminar (held on 16 October) there was strong support from the across the industry that the Close Call system should develop as an industry system. 5.9 The project also potentially opens up further areas of innovation to be considered by the DRSG, such as: Greater use of hand held devices for data collection and safety monitoring. Replacement of Control Centre Incident Log (CCIL) with software that would be fully integrated with SMIS and have the capability to trigger investigation. Integrated Bow-Tie modelling functionality, to help understand and manage hazards and safety requirements in compliance with regulatory requirements. Greater use of geospatial data, fault data and asset data in the estimation of risk, potentially creating more predictive risk models. RSSB Board Meeting Final: 06 November 2014 Page 5 of 6

6. Recommendations 6.1 The board is asked to: DISCUSS the strategic vision presented. NOTE the expenditure already committed at risk in order to meet industry s required milestones, and to develop a robust business case. NOTE approval of the full project will be requested at the January board and DISUCSS any specific issues to address at the time. RSSB Board Meeting Final: 06 November 2014 Page 6 of 6