Flood Risk Management in Southwark



Similar documents
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON

Bolton s Flood Risk Management Strategy

2 ND SEPTEMBER Report of the Bi-Borough Executive Director for Transport and Technical Services

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Recommendations for future developments

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Croydon Local Flood Risk Management Strategy

Guidance Notes: GARDEN FLOODING

Development at 2 St Albans Road, Kingston, London, KT25HQ

Climate Change Adaptation in London. Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3

Newbiggin House Farm,

Flood Risk & Surface Water Management. Page 1 of 20

Strategic Flood Risk Assessment Update 2015

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

Sewer Flooding Alleviation in the Counters Creek Catchment

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY

Chapter 2 Spatial Portrait

Homes and Environment Scrutiny Committee. (Environment & Transport)

SURFACE WATER MANAGEMENT PLAN

SURFACE WATER MANAGEMENT PLAN

PRELIMINARY FLOOD RISK ASSESSMENT

SURFACE WATER MANAGEMENT PLAN

Storm water strategy of Turku City Citywater Storm water expert meeting Turku

PRELIMINARY FLOOD RISK ASSESSMENT

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

Strategic Flood Risk Assessment

London Underground Comprehensive Review of Flood Risk (LUCRFR)

Guidelines for. Permeable Pavement

Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011

Taylor Wimpey UK Ltd. December 2007

Essex County Council Flood Investigation Report

A Developer s Guide: Watershed-Wise Development

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148

Littleport Co-located Schools

SURFACE WATER MANAGEMENT PLAN Volume 1

SUFFOLK FLOOD RISK MANAGEMENT JOINT SCRUTINY PANEL ANNUAL REPORT Working in Partnership with

London Borough of Hammersmith and Fulham. Updated Surface Water Management Plan. April 2015 UNITED KINGDOM & IRELAND.

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

Climate Change Adaptation for London s Transport System

Planning, Health and Environment Division

FLOOD RISKS IN LONDON

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

SURFACE WATER MANAGEMENT PLAN Volume 1

Brighton & Hove City Council

Sustainable Drainage Systems (SUDS) A guide for developers

Managing flood risk in Camden The London Borough of Camden flood risk management strategy

Kirklees Surface Water Management Plan

Household customer. Wastewater flooding guidelines.

London Borough of Newham. Local Flood Risk Management Strategy

East Riding of Yorkshire Council

Home Drainage & Causes of Basement Flooding. Water

Click to edit Master title style

PRELIMINARY FLOOD RISK ASSESSMENT

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Vital Earth Composting Facility Flood Risk and Drainage Statement

Introduction to sustainable drainage.

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

PRELIMINARY FLOOD RISK ASSESSMENT

(

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Groundwater Flooding: a UK Perspective

Groundwater Flooding in Brighton and Hove City (February 2014)

Flooding Matters. Introduction

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Sustainable Urbanism with Green Roofs Natural Stormwater Management Wolfgang Ansel, Alfred Diem

Creating the environment for business

SURFACE WATER MANAGEMENT PLAN

Transcription:

Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11

IN BRIEF Background Legislation What have we done? What are we doing? What can you do? Questions and Answers 2

Background Flooding occurs when large amount of water accumulates on previously dry land. Historical Flooding Widespread flooding in 2004 Also affected Southwark Surface water flooding a National issue 3 Again, summer of 2007 Yorkshire, Gloucestershire and others Southwark, lesser extent Total cost of 3.2 billion Average cost, businesses 75-112k Average cost, households 23-30k

LET S BRING THE POINT HOME April 2004 Mainly South of borough Cost 1million Other minor events; in 2006 & 2007 4

Local flooding in Borough & Bankside (history) 5 BOROUGH & BANKSIDE COMMUNITY COUNCIL BOUNDARY GROUNDWATER FLOOD INCIDENT (Environment Agency records) GROUNDWATER FLOOD INCIDENT (Other records) SURFACE WATER FLOODING INCIDENTS

Future flooding could get worse! Climate Change Wetter winters More intense rainfall Rising water table (winter) Increased interaction between flooding sources Increased likelihood of flooding London clay; little infiltration, more run off 6

The Response Legislation EU Flood Directive (2007/60/EC) Flood Risk Regulations 2009 Flood and Water Management Act 2010 Pitt Review 7

Legislation LLFA duties Southwark is now Lead Local Flood Authority Responsible for Flood Risk from Ordinary water courses Surface water Ground water Sewer flooding Thames Water Tidal Flooding Environment Agency Reservoir Flooding Owner/Environment Agency 8

Actions - What have we done? Preliminary Flood Risk Assessment Significant flood risk Critical Drainage Areas Consequences of past and future flooding Surface Water Management Plan Flooding - sources and mechanisms Investment reduce likelihood of flooding Community engagement reduce impact 9

Local flooding in Borough & Bankside 10 BOROUGH & BANKSIDE COMMUNITY COUNCIL BOUNDARY POTENTIAL AREAS OF FLOODING

Actions - What are we doing? Set up internal and external partnerships Detailed investigations Develop flood mitigation solutions Source funding and implement Improve drainage maintenance Engaging the community 11

Approach Reducing flood risk Source Reduce flows entering the system Pathway Manage overland flow paths Ensure existing capacity is utilised Receptor Improve flood resilience and awareness 12 Who? The Council Specialist consultants Working partnerships Communities/Individuals

Interventions Ideas Source - new pervious paving 13 1. Permeable Block Paving 2. Self-Binding Gravel 3. Reinforced Gravel

Pathway interventions retrofitting SuDS in streets 14

Receptor interventions - rainwater harvesting & green roofs 15 1. On-site collection system (above) 2. Waterbutts (below) 3. Retro-fit existing roof (above) 4. Layered approach (below)

Examples of intervention ideas 16

Actions - What can you do? Individual flood plan http://publications.environment-agency.gov.uk/pdf/geho0709bqpu-e-e.pdf Water conservation Rain water harvesting More greening Community Flood Plans (volunteers needed) 17

Next Steps Capture your experiences of flooding Incorporate in our evidence base Submit ideas to EA for funding Initiate detailed consultation Develop and implement 18

Questions? 19

For more information on Flood Risk Management in Southwark John Kissi Flood Risk Manager john.kissi@southwark.gov.uk 020 7525 2062 20 http:///info/100011/transport_and_streets/586/flood_risk_management