Appendix C Related Studies



Similar documents
Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

RDA Development Opportunities

ASPEN HILL Minor Master Plan Amendment

ECONOMIC DEVELOPMENT. in this chapter. 8.1 Overview of Economic Conditions. 8.2 Priority Economic Development Needs

Attachment B Policy Audit Template

Restoration. a brief look at

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

VANDERBILT COMPARISON

CITY OF NORMANDY PARK MANHATTAN VILLAGE REDEVELOPMENT AREA STRATEGY AND CONCEPTUAL MASTER PLAN

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

TOWN OF CARY CONDITIONAL USE ZONING PERMIT. 412 Rutherglen Cary, NC Rutherglen Cary, NC

Iowa Smart Planning. Legislative Guide March 2011

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Land Use and Zoning. Land Use Within the Port Madison Indian Reservation

Salt Lake City Granary District. Transit Oriented, Mixed Use Development

Investment Incentives and Tax Savings Group HONIGMAN MILLER SCHWARTZ AND COHN LLP

ALACHUA COUNTY COMPREHENSIVE PLAN

S U S TA I N A B L E C O M M U N I T I E S : EAST NEW YORK

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Schenk-Atwood Neighborhood Business District Master Plan

Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity

Campus Partners, The Ohio State University. An Exercise in Enlightened Self Interest

Market Analysis for Padre Boulevard Initiative in the Town of South Padre Island, TX

Philadelphia County. Land Use and Growth Management Profile

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD

CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING

SECTION ONE CHAPTER 2: A LAND USE PROFILE OF MANCHESTER

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

MULTI-FAMILY DEVELOPMENT AND INVESTMENT

7.0 INTRODUCTION 7.1 BACKGROUND

Goals, Strategies, and Tasks

PORTLAND DEVELOPMENT COMMISSION Portland, Oregon RESOLUTION NO. 6564

BUSINESS TECHNOLOGY CENTER REDEVELOPMENT PLAN SUMMARY

Transit Oriented Development Economic Analysis and Market Study

1. Land Use. Chapter 1: Land Use 1-1 Adopted 10/2/09 Amended 3/22/11, 8/16/11

21.04 LAND USE. Managing amenity through land use strategies

2010 Salida Community Priorities Survey Summary Results

ECONOMIC RECOVERY BOARD FOR CAMDEN

HALFWAY HOUSES. Presented to the City Council. By the Planning and Development Department

The Urban Renewal Authority of Pueblo

Brownfields. Technical Report # 7

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Fiscal impact analysis of three development scenarios in Nashville-Davidson County, TN

Lents Town Center Mixed-Use Market Study Office Market Analysis Lents, Oregon

AVALON PARK WEST (FORMERLY NEW RIVER) PD/MPUD- NARRATIVE FOR DRI RESCISSION, PD SUBAREA AMENDMENT AND MPUD SUBSTANTIAL MODIFICATION.

Planning for the future. building a great city, great neighbourhoods

Downtown Tampa Transportation Vision

What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS

Leveraging Public-Private Partnerships to Advance Community Energy Systems. Michael Ahern SVP System Development

PINELLAS COUNTY COMPREHENSIVE PLAN

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT

Welcome to our exhibition

Request for Information

Multifamily Housing: Sustainable Development in Efficient, Walkable Communities

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN

Executive Summary. Does a Streetcar Make Sense in Anaheim

7.0 GOALS, OBJECTIVES & POLICIES

Frederick. Frederick. Maryland. Smart Growth Successes. Frederick. Maryland Department of Planning

COMMUNITY DEVELOPMENT TOOLS AND TRENDS BRIDGING THE FINANCING GAP APRIL 2, 2015

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

FOR SALE. The Friedman Building th Avenue South, Seattle Nicholas T. Gill Allan Friedman

DRAFT POLICIES COUNTY OF HALIBURTON OFFICIAL PLAN UPDATE

For the non real estate professional

HUDSON YARDS PROJECT. G r e g K e l l y P r e s i d e n t a n d C E O, U. S., C e n t r a l a n d S o u t h A m e r i c a

City of Tampa Zoning Districts

Alewife Working Group June 14, 2016

January 2015 BrowardNext Summary Survey Results for Focus Area Priorities. Ranking of Focus Area Importance

Market Summary. prepared by FXM Associates 6.1. North River Canal Corridor

Downtown Core Sub-district

EPA CLEANUP GRANT APPLICATIONS December 1, 2015 Anne Wallace, Deputy Director, Office of Redevelopment Sharon McKee, S&ME Inc. Rick Bruce, S&ME, Inc.

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT

Chapter 13: Implementation Plan

Revitalizing. Tulsa.

Presentation to Knox County Commission Monday, February 23, 2015

Downtown Fullerton. March SCAG Region: Compass Blueprint Case Study. Center for Transit-Oriented Development. A Project of

Transcription:

Appendix C Related Studies Intermodal Transit Village Concept Plan Appendix C Related Studies This appendix summarizes studies that are current at the time of this Plan. Intermodal Transit Village Concept Plan The City and Regional Transportation District commissioned the Intermodal Transit Village Concept Plan in 2002 to create a clear conceptual framework upon which future change can be managed and directed in order to ensure an outcome consistent with the DRCOG Urban Center planning principles. The City should use the plan as a policy document and tool to help with obtaining funding and implementing projects described in the plan. Location The plan covers the areas within the ¼- to ½-mile radius of the potential future Regional Transportation District (RTD) light rail stop and includes all of Olde Town Arvada and extends south into the urban renewal area south of Grandview. Policies The plan includes principles for a transit village, a compact, mixeduse, walkable community, centered around public transit that encourages residents, workers, visitors, and shoppers to drive their cars less and ride mass transit more. It describes how the new Olde Town area will function in the future, including: Becoming a Transit Center that strongly connects to the greater region; Being a recognizable and memorable place; and Enhancing the quality of the public realm. The plan also recommends specific site-based capital improvement projects for the area, such as a new transit plaza, new library site, new residential development, and new community parking structure. The plan also includes implementation strategies to carry out the specific projects. ARVADA COMPREHENSIVE PLAN C-1

Appendix C Related Studies Southeast Arvada Redevelopment Area: Opportunities and Challenges Southeast Arvada Redevelopment Area: Opportunities and Challenges The Southeast Arvada study done in 2004 focuses on the market conditions and factors influencing the Southeast area. It identifies opportunities and challenges for redevelopment by evaluating the relevant factors which may impact redevelopment including: existing conditions, economic and real estate market conditions, regional development trends, and transportation linkages. Location The 465-acre Southeast Arvada Redevelopment Area is generally bounded by Marshall/Lamar Streets to the west, I-76 to the south, Lowell Boulevard to the east, and the Burlington Northern Santa Fe/Union Pacific railroad to the north. Opportunities and Challenges Identified The study describes the mature industrial redevelopment area and identifies challenges to working in an area with a diversity of land uses, some of which are marginal industrial uses and structures such as yard storage and many kinds of aging structures. Opportunities include: Light Rail Transit as Context Modifier. A new light rail station built in this area for the Gold Line has the potential to transform land uses drastically. Economic Development. A number of industrial, service, and retail businesses have contacted Arvada looking for sites recently. The regional economic picture is looking brighter. Real Estate Trends/Location and Access. The Southeast Arvada area has historically had a lot of interest due to excellent highway and rail access. Challenges include: Political challenges. Arvada has not identified priorities for the area (e.g., to revitalize the area, or develop Transit- Oriented Development). Physical and infrastructure. The area has many edges and barriers, with an unclear hierarchy of streets and wayfinding, need for extension of water and sewer. In addition, there are C-2 ARVADA COMPREHENSIVE PLAN

Appendix C Related Studies Arvada Housing Needs Assessment many owners. In addition, some of the area is within the 100- year floodplain. Environmental. A former landfill is located beneath the aggregate piles, which may be difficult to clean up, and other soil and groundwater issues require investigation and probably remediation. Market. The area is an established industrial area with existing businesses that are relatively stable. Relocation would be difficult and costly. Arvada Housing Needs Assessment The Housing Needs Assessment, prepared in 2004, provides current information about the condition and characteristics of the housing market to help inform decisions about housing policies for Arvada. The Housing Needs Assessment process included: household surveys: interviews with realtors, developers, and employers; and it also used 2000 Census information and employment data. Definition of Affordable Housing for Arvada The housing study defines affordable housing as: Housing that does not cost more than 30 percent of monthly income (for rent or mortgage), and when the housing is of sufficient size to meet the needs of the household. Different terms for affordable housing are used, including: Workforce housing, assisted housing, permanently affordable housing, and/or attainable housing. Housing Conditions and Characteristics A summary of the Housing Needs Assessment characteristics and findings is provided in Appendix A: Planning Influences (see page A-7). Opportunities and Program Options The Housing Needs Assessment identifies the following opportunities for Arvada: Designate redevelopment areas and focus resources in the target areas; Locate future housing in areas of projected job growth; ARVADA COMPREHENSIVE PLAN C-3

Appendix C Related Studies Arvada Economic Analysis Sponsor educational forums about Reverse Mortgage programs; and Continue rehabilitation pprograms. What is Next for Housing? The Housing Needs Assessment poses questions for discussions and next steps, including: 1. Consider Program Options. 2. Prioritize Needs and Opportunities. 3. Identify Partners. The Housing Needs Assessment identifies the following program options: Establish a clear vision for housing; Become educated about affordable housing and how to produce it; Encourage a mix of type and prices in all areas; Understand housing, jobs, and transportation relationships; Selectively redevelop areas of Arvada; Support mixed-use development; Use Tax Increment Financing (TIFs) for housing in redevelopment areas; Create higher density areas; and Establish fee waivers or deferrals for projects meeting community goals. Arvada Economic Analysis The City hired Economic & Planning Systems, Inc. (EPS) to prepare the Arvada Economic Analysis. This 2004 Economic Analysis provides updated population and employment forecasts and evaluates the demand for residential and non-residential land uses in the City. The primary purpose of the land demand analysis is to determine the potential market support for prospective land uses as input to this Plan update. The forecasts are addressed in Appendix A: Planning Influences. In addition, the Economic Analysis evaluates development potential and appropriate land uses for a number of specific sites in the City that have been undergoing development pressures for uses that do not comply with 2005 zoning or the 1995 Plan. Findings 2030 Land Demand The Economic Analysis finds by 2030, demand for: 690 acres of industrially zoned land (including warehousing and manufacturing to high tech and flex uses); 520 acres of land zoned for office uses; C-4 ARVADA COMPREHENSIVE PLAN

Appendix C Related Studies Arvada Economic Analysis 115 acres of land for retail and other commercial services in neighborhood and convenience centers (e.g., anchored by a supermarket that may be as large as 125,000 square feet); and 190 acres of regional retail space with at least one major-level retail location (i.e., up to 1.5 million square feet, including shopping centers, discount department stores, lifestyle centers, big box retail, and others). Other Land Use Findings The City should consider amending the zoning code to allow for a mix of development uses based on intensity; The existing ʺPUD-Iʺ and ʺPUD-BPʺ zone districts prohibit certain uses, including offices, warehouses, and retail. This has created difficulties in these areas; and Retaining industrial designation on a number of smaller parcels in commercial corridors may be unwarranted. These parcels may be more appropriate for commercial, office, residential, or service uses if such development is compatible with surrounding development. Site Evaluations The Economic Analysis finds the following land uses appropriate for the following specific sites: Cimarron Park Large business park; allow higher density housing to provide housing for workers. Vauxmont Large amount of industrial and commercial space. 64 th Avenue and McIntyre Street Maintain residential uses; allow neighborhood-level commercial or service uses. Indiana Corridor Commercial or retail; employment or residential. 80 th Avenue and Kipling Multi-family residential; neighborhood level commercial or service development. 80 th Avenue and Simms Street Single family; neighborhoodlevel commercial uses (with road improvements). 72 nd Avenue and Kipling Street Maintain semi-rural character. Mixed use; multi-family and commercial uses. 64 th Avenue and Miller Multi-family or service uses. Flexibility important. South-Central Industrial Develop a subarea plan to determine appropriate land uses. Ridge Road Residential, light industrial, and office development; or Transit-Oriented Development. ARVADA COMPREHENSIVE PLAN C-5

Appendix C Related Studies Brownfields Project 52 nd Avenue and Ward Road Industrial and business park uses; smaller amount of retail. 86 th Parkway and Indiana Street Retail or commercial development; office or residential development. Brownfields Project The City received a grant from the U.S. Environmental Protection Agency to assess the Brownfields. The purpose of the Brownfields Project, completed in 2002, was to obtain information on the environmental conditions in the project area to ensure that future redevelopment activities protect human health and the environment. The intent of the project is to determine feasibility of site redevelopment. Location The Brownfields project includes an area approximately 300 acres in size that is bounded by Marshall Street to the west, the Burlington Northern Santa Fe Railroad line to the north, Sheridan Boulevard to the east, Highway 76 to the southeast, and 52 nd Street to the south. It includes a variety of existing land uses and activities. Findings The City conducted a Phase I ESA of the entire area first, which allowed the City to identify seven priority areas as having the potential for redevelopment to commercial business park and green space. The results of the Phase I ESA generally indicated that all of the Priority areas could be considered for redevelopment. Priority 1 and 2 areas potentially contain a methane hazard. Additional groundwater monitoring is needed in Priority area 4. The area has excellent access and has been attractive for smaller light manufacturing and service-oriented industries. Over the long-term, RTD is planning a station in the area, which will result in transitoriented land use opportunities. The results of the Brownfields Project are being used in developing a plan for Southeast Arvada. C-6 ARVADA COMPREHENSIVE PLAN