PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE



Similar documents
SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

SECTION STORM DRAINAGE TABLE OF CONTENTS

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

SECTION 7- STORM SEWER

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

SECTION G SEWERS (STORM, SANITARY AND FDC)

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

STORM DRAINS CHAPTER 7

CHAPTER 5. Storm Sewer

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

SECTION 5: SANITARY SEWER SYSTEM DESIGN

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS

CW GRAVITY SEWERS TABLE OF CONTENTS

SANITARY SEWER SPECIFICATIONS

City of West Linn Public Works Design Standards Table of Contents

Storm Drainage Systems

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

SECTION INLETS INLET LOCATIONS

SECTION 5 DRAFTING STANDARDS

CHAPTER 4 STORM DRAINAGE SYSTEMS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

SECTION STORM DRAINAGE SYSTEM

New Road 11.0m Asphalt 23m ROW

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SEWER LINE EXTENSION DESIGN CHECKLIST

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Fabricated Drainage Products

2011 HYDRAULICS MANUAL

CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS

Design Specifications & Requirements Manual

LS 2540 SEWER LATERALS AND INSPECTION TEES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

CHAPTER 3 STORM DRAINAGE SYSTEMS

SECTION STORM DRAIN SYSTEM

Beacon Hill Sewer District Standard Specifications

CHAPTER 11 STORM DRAINAGE

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

ITD Pipe Materials Selection & Specification Procedures. July 2011

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS

Drainage DR-701. Materials Field Sampling. Purpose of the Guidance Manual. General DR 701-1

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

Chapter Thirty-six OVERVIEW Introduction Inadequate Drainage POLICY AND GUIDELINES

Chapter 9 Storm Sewers

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

Table 4.9 Storm Drain Inlet Protetion Applicable for

STORMWATER MANAGEMENT CHECKLIST

SECTION 5 - STORM DRAINS

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

Chapter 9 Sanitary Sewers

SECTION GRAVITY SANITARY SEWERS

MUNICIPAL ENGINEERING RESIDENTIAL SUBDIVISON STANDARDS

Table of Contents Con Cast Pipe Price List - Page 1

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

SUBDIVISION REQUIREMENTS SECTION 2 - DESIGN REQUIREMENTS INDEX

FY08 SEWER POINT REPAIRS BID TABULATION

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Section 402. STORM SEWERS

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

VDOT 2001 Road and Bridge Standards Section Drainage Items

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Guidelines for Fiber Optic Cable Permits

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

550 PIPE CULVERTS, SEWERS AND DRAINS

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW CHECKLIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS)

City of Shelbyville Site Inspection Checklist

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

CD i -STREETS- Detail #

WATER SERVICE 2

Transcription:

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009

PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 GENERAL...1 3.0 DRAINAGE...2 4.0 DESIGN FLOWS...2 5.0 PIPE SPECIFICATIONS...3 6.0 MAINTENANCE HOLES...4 7.0 CATCHMENT POINTS...5 8.0 STORM LATERALS...6

Page: 1 1.0 INTRODUCTION Designs of municipal services in the Region of Peel are to be based upon the current Public Works Design, Specification & Procedures Manual. All plans are to be reviewed and accepted by the Region prior to construction of services. Such Regional acceptance of drawings shall not relieve the designer from primary responsibility for the design to meet all Federal, Provincial, Regional and local government requirements and/or codes. 1.1 Geotechnical Investigation The designer and/or Regional staff shall determine the need for soils investigation. The purpose of an investigation would be to determine the soil composition, bearing strength and type, and to verify that no contamination is present. Pavement design will also be required where applicable. 2.0 GENERAL Region of Peel storm sewers are generally designed to convey run-off from the Right-of-Way of a Regional Road only. Where possible, flows from outside the Regional road allowance are to be directed to the local municipality s storm sewer system. In case of: (i) Rural road - ditches and corrugated steel culverts (or approved equivalents) shall be provided for conveyance of storm water flow to outlet(s). (ii) Urban road with curbs and gutters - provide storm sewers and catchment points equipped with catchbasins. No grading will be permitted within any Region of Peel Right-of-Way to support adjacent development.

Page: 2 3.0 DRAINAGE All external lands that drain to a Regional storm sewer must conform to the following rule; Post-Development flows must be equal to or less than Pre- Development levels Flows are to be designed as per section 4.0 DESIGN FLOWS. A storm water management report may be required, illustrating appropriate storm water management techniques and design flows, please refer to the Functional Servicing & Storm Water Management Report section of the Environment, Transportation and Planning Services Design Specifications & Procedures Manual for additional information. 4.0 DESIGN FLOWS Storm sewers are to be designed using the local municipality s intensity, duration and frequency rainfall curves for a 10-year storm with 15 minute inlet time for the roadway right of way only. In the event the storm water catchment area includes areas beyond the right of way, the inlet time shall be calculated using the local municipality drainage calculation sheets and appropriate rainfall intensity tables. Post-Development flows must be equal to or less than Pre- Development levels. Methods of quantity and quality control shall be based on established storm water management practices. Typical storm water storage methods include but are not limited to parking lot storage, rooftop storage, SWM ponds and oversized infrastructure. Pipe sizing shall be for full flow with a minimum velocity of 0.75 metres per second and a maximum velocity of 3.5 metres per second.

Page: 3 5.0 PIPE SPECIFICATIONS The following specifications are guidelines only; reconstruction projects may require alternate locations and design specifications. 5.1 Location Storm sewers shall be located as per local municipality s standard cross sections, generally 1.50m south or west of the centerline of the road allowance unless conflicts with other utilities require a revised location. A 2.0m horizontal separation between the sanitary sewer and storm sewer will be permitted to allow for common trench construction as long as the inverts of both sewers are relatively at the same elevation. Should the sewer inverts vary by more than 1.0 meter, a 3.0 meter separation shall be maintained. 5.2 Depth Storm sewers shall be installed at a minimum depth of 1.5m cover below centerline of the road to obvert of the pipe. Less than 1.5m cover will be considered on industrial sites. 5.3 Bedding Storm sewers shall be installed with bedding as per Region Standard Drawing 2-3-1. 5.4 Materials Pipe material shall be as per the latest Region of Peel material specifications and standard drawings. Maintenance holes, stormceptors and catchbasins shall be as per O.P.S.D. standards.

Page: 4 6.0 MAINTENANCE HOLES Storm maintenance holes shall conform to current O.P.S.D. standards. Although these standards provide details for maintenance holes up to certain maximum depths and sizes, the Consulting Engineer shall analyze, individually, each application of the standards related to soil conditions, loading and other pertinent factors to determine structural suitability. In all cases where the standards are not applicable, the maintenance hole shall be individually designed and detailed. A reference shall be made on all profile drawings to the type and size of storm maintenance holes. All storm maintenance holes shall adhere to the following criteria: a) Maximum spacing shall be 120 m between maintenance holes for sewers up to 600mm diameter. For sewers greater than 600mm diameter spacing up to 170 metres may be used. b) Drops through storm maintenance holes shall be calculated using the following formula: Velocity Head = 2 V 2g 90 o bends = ½ Velocity Head 45 o bends = ¼ Velocity Head Where: g = 9.8 m/sec 2 c) At maintenance holes where pipe sizes change, the above criteria shall be altered such that the obverts of the pipe are matched. d) Where depth from the invert to top of a maintenance hole exceeds 5.0 m, a safety platform is to be provided as per Regional Standard 2-2-1. The platform shall be located to allow 2.0 m below manhole cover and 2.6 m above benching. e) Drop maintenance holes shall be provided where the difference in invert elevation is greater than 1.2m. The drop pipe shall be one size smaller than the sewer line (minimum 250mm diameter). The economic feasibility of providing a deeper storm sewer instead of a drop maintenance hole shall be explored. The use of 45 o bends and Y s for drops is acceptable.

Page: 5 f) When a PVC sewer is installed into a maintenance hole, one of the following methods is to be used: i) Couplings providing an elastomeric gasket seal are to be grouted into the maintenance hole wall. ii) A manufactured length of PVC pipe that has been softened with solvent and covered with sand for adherence to grout in the maintenance wall. h) The maximum distance to the first joint from the maintenance hole wall when using PVC pipe shall be 0.60 m (see diagram). Special care shall be taken in compacting the over-excavated area at the maintenance hole wall. As an alternative, concrete fill may be used to 100 mm below the sewer invert. Standard bedding is then used for the remainder. i) As per Regional Standards storm sewer maintenance holes shall be benched to the obvert of the outlet pipe on a vertical projection from the springline of the sewer. STD DWG 2-1-4. 7.0 CATCHMENT POINTS a) Catch basins shall be selected, located and spaced in accordance with conditions of design; the spacing shall not exceed 75m. The design for catch basin location and type shall take into consideration the lot areas, lot grades, road widths and road grades. Double catch basins are required at sag locations where drainage is received from more than one direction.

Page: 6 b) Road grading shall be assessed for efficient drainage of storm water to provide safe passage of vehicles. b) At street intersections, catch basins shall be located immediately upstream of sidewalk or pedestrian crosswalks. c) Catch basins and connections shall provide for the expected maximum flow. d) OPSD-400.081 (latest version), Cast Iron, Curb Inlet Frame with Two Piece Raised Cover for Catch Basins shall be used. When design will not permit a side inlet catch basin, OPSD-400.100 (latest revision), Cast Iron, Square Frame, with Square Flat Grate for Catch Basins, Perforated Openings shall be used. 8.0 STORM LATERALS 8.1 Residential All residential connections shall be in accordance with the current Manufacturer s Approved Products list, Wastewater. The minimum diameter within the road allowance shall be 125 mm for a single connection and 150 mm for a double connection. If necessary, risers shall be provided for connection with the main sewer as per STD DWG. 2-4-1 to 2-4-3. These risers are to be shown on the profile portion of the drawings. Grades of 1% minimum shall be used for laterals. Connections directly into maintenance holes shall be minimized and reviewed on an individual basis. 8.2 Commercial In commercial areas, the maximum connection size shall be 250 mm in diameter, installed with a minimum grade of 1%. The maximum drop across the property line manhole shall be 0.03 m. The maximum depth is as required by design. A maintenance hole will be required if the lateral diameter is equal to or greater than half the diameter on the main line sewer, except for a 150 mm diameter pipe connecting to (connection to) a 250 mm diameter mainline or a 200mm diameter pipe connecting to (connection to) a 375 mm diameter (see matrix below). If necessary, risers shall be provided at the main sewer and shown on the profile drawings as per STD

Page: 7 DWG. 2-4-1 to 2-4-3. Connection numbers are to be established prior to construction of the lateral. Pipe materials shall be in accordance with the current Manufacturer s Approved Products List, Wastewater. 8.3 Industrial The maximum connection size shall be 250 mm diameter, installed on a minimum grade of 1%. The maximum drop across the property line manhole shall be 0.03 m. A maintenance hole will be required if the lateral diameter is equal to or greater than half the diameter on the main line sewer, except for a 150mm diameter pipe connecting to a 250mm diameter mainline or a 200mm diameter pipe connecting to a 375mm diameter mainline (see matrix below). If necessary, risers shall be provided at the main sewer and shown on the profile drawings as per STD DWG. 2-4-1 to 2-4-3. Connection numbers are to be established prior to construction of the lateral. Pipe materials shall be in accordance with the current Manufacturers Approved Products List, Wastewater. Maintenance Hole Requirements Matrix MH required = Y MH not required = N Lateral 150 mm ø 200 mm ø 250 mm ø Mainline Sewer 250 mm ø N Y Y 300 mm ø N Y Y 375 mm ø N N Y 450 mm ø N N Y 9.0 CROSSINGS Storm crossings under a Regional Road shall meet the following criteria: Storm sewers and culverts that cross the roadway are to be designed for a 25 year storm with a 10 minute inlet time.

Page: 8 Driveway Minimum 375mm diameter (inside diameter) Roadway Minimum 600mm diameter Major crossings are to be designed for a regional storm event and a HECII analysis may be required. Prior to storm sewer design, advise the affected area municipality of the proposed design and obtain confirmation of acceptability of the design criteria. In an event area municipality design criteria is higher, design storm sewers to meet their requirements.