PHASE 6: DEVELOPMENT PHASE



Similar documents
PHASE 6: DEVELOPMENT PHASE

PHASE 8: IMPLEMENTATION PHASE

PHASE 5: DESIGN PHASE

PHASE 9: OPERATIONS AND MAINTENANCE PHASE

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE

PHASE 1: INITIATION PHASE

STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD PHONE (410)

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

Template K Implementation Requirements Instructions for RFP Response RFP #

Appeals Case Management System Project. Scope Management Plan. November 20, 2014

Draft Documents RFP 3.2.4

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

Department of Administration Portfolio Management System 1.3 June 30, 2010

Independent Verification and Validation of SAPHIRE 8 Software Project Plan

<name of project> Software Project Management Plan

PROJECT SCOPE STATEMENT

Manag. Roles. Novemb. ber 20122

ITRM Guideline CPM Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

MNLARS Project Audit Checklist

Minnesota Health Insurance Exchange (MNHIX)

IT SYSTEM LIFE-CYCLE AND PROJECT MANAGEMENT

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

CDC UNIFIED PROCESS PRACTICES GUIDE

Assessment of NCTD Program Management Framework for Positive Train Control Program

Sample Quality Management Plan

Blend Approach of IT Service Management and PMBOK for Application Support Project

How To Write An Slcm Project Plan

Project Management Guidelines

An Application of an Iterative Approach to DoD Software Migration Planning

Colorado Department of Health Care Policy and Financing

The 10 Knowledge Areas & ITTOs

Project Management Certificate (IT Professionals)

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

System Development Life Cycle Guide

INFORMATION TECHNOLOGY PROJECT REQUESTS

July 2012 Report No An Audit Report on The ReHabWorks System at the Department of Assistive and Rehabilitative Services

IT Project Management Methodology. Project Execution Support Guide. Version 0.3

Program Lifecycle Methodology Version 1.7

PMAP. Project Management At Penn PMAP

Overview of Florida Information Technology Project Management and Oversight Standards. Jason M. Allison, Executive Director

Prepared by: Rick Leopoldi November 22, 2003

Overview. FedRAMP CONOPS

Develop Project Charter. Develop Project Management Plan

Managing and Maintaining Windows Server 2008 Servers

Project Roles and Responsibilities

Project Management Plan for

WHAT IS SOFTWARE PERFORMANCE ENGINEERING? By Michael Foster

Business Continuity Position Description

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION

Project Management Life Cycle (PMLC)

IT Project Management Methodology. Project Scope Management Support Guide

Certified Software Quality Engineer (CSQE) Body of Knowledge

Automated Office Systems Support Quality Assurance Plan. A Model DRAFT. December 1996

Attachment 7 Requirements Traceability Matrix (RTM) ATMS RFP. New York State Department of Transportation Advanced Traffic Management System

The Final Quality Gate: Software Release Readiness. Nancy Kastl, CSQA Kaslen Group, Inc. (630)

CDC UNIFIED PROCESS PRACTICES GUIDE

U.S. Department of Education Federal Student Aid

Input, Output and Tools of all Processes

Request for Proposal for Application Development and Maintenance Services for XML Store platforms

Project Management Professional (PMP) Certification: PMBOK Guide Fifth Edition

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION

Appendix 2-A. Application and System Development Requirements

Partnering for Project Success: Project Manager and Business Analyst Collaboration

EMR Implementation Planning Guide

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

IT Project Management Practices Guide

DOC Electronic Timekeeping System Quarterly Project Oversight Report: Comprehensive Review For Period January March 2015

Organization. Project Name. Project Overview Plan Version # Date

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date:

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

Systems Development Life Cycle (SDLC)

ID Task Name Time Pred

Project Management for Everyone

Internal Audit Report. Toll Operations Contract Management TxDOT Office of Internal Audit

SLCM Framework (Version ) Roles and Responsibilities As of January 21, 2005

Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010

Information Technology Project Oversight Framework

Project Lifecycle Management (PLM)

Maryland Health Benefit Exchange: Independent Verification and Validation (IV&V) Services Public Summary

PMLead. Project Management Professional. edition. Based on PMBOK Guide 4 th.

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500

Quick Reference Guide Interactive PDF Project Management Processes for a Project

LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN

Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:

Course Syllabus. Project Management Certificate

HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM

How To Write A Project Management Plan

Project Integration Management

Capability Maturity Model Integrated (CMMI)

Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy>

Managing Small Software Projects - An Integrated Guide Based on PMBOK, RUP, and CMMI

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Project Management Standards: A Review of Certifications/Certificates

Transcription:

PHASE 6: DEVELOPMENT PHASE The Phase features a key step in the project: system construction. The previous phases lay the foundation for system development; the following phases ensure that the product functions as required. To complete the Phase successfully, two elements are required: 1) a complete set of design specifications and 2) proper processes, standards, and tools. Multiple-release projects require multiple iterations of the Phase one for each release. 1.0 OBJECTIVE/GOALS Objectives Successful completion of the Phase should comprise: Building the system Testing and integrating the units into larger components Preparing the technical environment for the system Approval to progress to the Test Phase Goals The purpose of the Phase is to convert the system design prototyped in the Design Phase into a working information system that addresses all documented system requirements. At the end of this phase, the working system will enter the Test Phase. 2.0 DELIVERABLES AND APPROVALS SDLC deliverables help State agencies successfully plan, execute, and control IT projects by providing a framework to ensure that all aspects of the project are properly and consistently defined, planned, and communicated. The SDLC templates provide a clear structure of required content along with boilerplate language agencies may utilize and customize. State agencies may use formats other than the templates, as long as the deliverables include all required content.. The development and distribution of SDLC deliverables: Ensure common understanding among members and stakeholders, Serve as a reminder of specified plans as projects become increasingly complex, Provide agency senior management and other State officials insight into project risks and ongoing performance, Encourage the execution of repeatable and consistent processes, Facilitate the implementation of project management and agency IT best practices, and Result in a comprehensive record of project performance useful for many purposes (e.g. staff knowledge transfer, budgetary and other assessment activities, lessons learned). During the development of documentation, the should: Write comprehensive, easy to understand documents with no redundant information. Develop an organized document repository for critical project information, so members can easily access, store, and reference project documents and other deliverables from all life cycle phases. Multiple Release Hardware Page 1 of 13 Phase 6:

Implement routine deliverable reviews to correct inaccuracy, incompleteness, and ambiguities. Recognize that sample templates for deliverables are available; agencies might accept deliverables in different formats as long as all required information is present. The content of these deliverables might expand or shrink depending on the size, scope, and complexity of the project. Recycle or reference information from earlier documents where possible and beneficial. The following is a listing of deliverables required of all projects for this phase of work. Deliverables need to be updated for each iteration of the Phase. Deliverable Goals Developed By Approved By System Document (Update) establishes the hardware and network development approach including methodologies, tools, and procedures to be employed; also includes development procedures for issue tracking and configuration management and any other information that aids in the implementation of the system. Document all preparations related to the development of the system Describe development methodologies, tools, and procedures System integrated hardware, network, and/or firmware components that meet all requirements. Provide system that meets the business needs and all requirements Integration Document describes the assembly and interaction of the hardware, network, and any other components of the system. Document planned approach and activities for the integration of hardware, network, and other system components Multiple Release Hardware Page 2 of 13 Phase 6:

Deliverable Goals Developed By Approved By Test Analysis Report(s) presents a description of the unit tests and the results mapped to the system requirements; also identifies system capabilities and deficiencies. Record results of tests Present the capabilities and deficiencies for review Provide a means for assessing system progression to the next stage of installation or testing Sponsor Conversion Plan (Update) describes the strategies and approaches for migrating data from an existing system to another hardware/network environment. This document is only applicable for projects involving the migration of data. Document all planned activities to ensure a smooth data migration from a legacy system to a new environment Sponsor Implementation Plan describes how the information system will be deployed as an operational system. Define all planned activities to ensure successful implementation to production operations Sponsor Operations Manual or Systems Administration Manual The Operations Manual focuses on mainframe systems; the Systems Administration Manual is oriented toward distributed (client/server) systems. Provide detailed instruction for system operations Release Notes provides summary information regarding the current release of the system being built; typically includes major new features and changes and identifies known problems and workarounds. Document critical information regarding the system release Multiple Release Hardware Page 3 of 13 Phase 6:

Deliverable Goals Developed By Approved By Maintenance Manual details effective system maintenance. Appendices might document maintenance procedures, standards, or other essential information. Training Plan outlines technical and user training needs on the new or enhanced information system. Provide maintenance personnel with the information necessary to maintain the system effectively Ensure the schedule accounts for all necessary training needs to implement, operate, and maintain the system successfully Sponsor All deliverables other than those identified as Updates should be developed in this phase. Deliverables identified as Updates should be revisited and enhanced as necessary as prescribed in this phase. Deliverables produced during this phase must be reviewed in detail and should follow the approval path as defined in the above table (for each iteration). A signature page or section should accompany each deliverable requiring approval. DoIT will periodically request copies of these documents as part of its oversight responsibilities. 3.0 ROLES The following personnel participate in the work activities of this phase: Sponsor Executive Sponsor Manager Stakeholders RACI Key Responsible Describes role that executes the activities to achieve the task. Accountable Describes roles that own the quality of the deliverable and sign off on work that Responsible provides. Consulted Describes roles that provide subject matter expertise. Informed Describes roles that receive information about the task. Multiple Release Hardware Page 4 of 13 Phase 6:

Deliverable Executive Sponsor Sponsor Manager System Document I I A R I I System I A A R I I Integration Document I A A R I I Test Analysis Report(s) I I A R I I Conversion Plan I I A R I I Implementation Plan I A A R I I Operations Manual or Systems Administration Manual I I A R I I Release Notes I I A R I I Maintenance Manual I I A R I I Training Plan I A A R I I Possible RACI Matrix The Roles and Responsibilities page has detailed descriptions of these roles and their associated responsibilities. Stakeholders Multiple Release Hardware Page 5 of 13 Phase 6:

4.0 TASKS AND ACTIVITIES Multiple Release Hardware Page 6 of 13 Phase 6:

Phase 6 Phase Executive Sponsor Agency CIO Sponsor Manager 4.6 Build and Test System 4.7 Integrate Hardware 4.8 Conduct Integration Testing 4.9 Plan the System Integration 4.10 Update the System Implementation Plan Deliverables System Test Analysis Report(s) Conversion Plan Integration Document Implementation Plan Multiple Release Hardware Page 7 of 13 Phase 6:

Phase 6 Phase Manager 4.11 Plan for Operations & Maintenance Activities 4.13 Perform Phase-Closure Activities END Executive Sponsor Agency CIO Sponsor 4.12 Complete the System Documentation Deliverables Operations Manual or Systems Admin Manual Release Notes Maintenance Manual Training Plan 4.1 Review Phase Prerequisites. The Manager ensures the following prerequisites for this phase are complete: The Management Plan is current, and the schedule showing the target termination date for the system is current. Multiple Release Hardware Page 8 of 13 Phase 6:

The has completed: o System Design Document o System Security Consensus Document o Security Plan o Disaster Recovery Plan o System Document o Test plans for unit and integration testing (draft) o Conversion Plan (draft) o Implementation Plan (draft) o Data Retention Plan o Operations or System Administration Manual (draft) o Maintenance Manual (draft) o Training Plan (draft) 4.2 Monitor Performance. The Manager monitors project performance by gathering status information about: All changes to baseline data Change management information Activity progress with status details List of complete and incomplete deliverables Activities initiated and finished Estimated time to completion Resource utilization data Changes to project scope The Manager also organizes and oversees systematic quality management reviews of project work as a part of monitoring the project performance. To measure project effort at all phases of the life cycle, the Manager establishes timelines and metrics for success at each phase of work when planning project tasks. The PMBOK provides additional details on controlling project work in sections 4.4 and 4.5 and on project scope control in section 5.5. 4.3 Update PMP and Communication Management Plan. The Manager updates the PMP routinely (at least quarterly) to ensure the PMP reflects project performance accurately. Review project performance controls and risks for deviations from the baseline. Information distribution is one of the most important responsibilities of the Manager. The Manager reviews and updates the Communication Management Plan at least quarterly to account for potential changes in project stakeholders. The Manager distributes the updated PMP and risk management information according to the revised Communication Management Plan. PMBOK, Chapter 10 contains additional details on project communications and information distribution. Multiple Release Hardware Page 9 of 13 Phase 6:

4.4 Perform Risk Management Activities. The Manager conducts risk management activities during the Phase; these activities include: Identification determination of initial risks that might affect the project and emerging risks as well as each risk characteristic Risk Analysis conducting quantitative and/or qualitative analysis of each identified risk. Usually, qualitative risk management techniques are the most applicable for State projects. These risk analysis methods, as well as the conditions under which each method might be used, are described in detail in PMBOK, section 11. Response Planning planning of methods for developing mitigation, transfer, or avoidance strategies to reduce risk Monitoring and Control definition of procedures to track risks, monitor residual risk, identify new risks, execute response plans, and evaluate risk management effectiveness These activities occur throughout the project duration to track and mitigate any new or changed project risks. PMBOK has details for risk management activities in section 11, particularly sections 11.2 through 11.6. 4.5 Initiate Activities. The begins development by: Verifying selection for standards, methods, tools Consulting with the Maryland EA Repository for available tools and components of the system Carrying out Phase activities according to the detailed project WBS prepared during the Planning Phase. activities need to be performed for each release. Performing configuration management and change control Documenting and resolving problems and non-conformances found in the system products and tasks with an issue-tracking process stakeholders should be involved periodically throughout the Phase to ensure that the development team understands their expectations and that it develops the system in accordance with requirements. 4.6 Build and Test System. The establishes the hardware/network development environment and builds, installs, and documents each system component in accordance with the System Document developed in the Design Phase. The also prepares the installation site for the hardware (including cabling and furniture if applicable). The creates test procedures for testing each system component (e.g., main CPU, work stations, network software, and peripherals). The performs unit tests of each system component and documents the results in the Test Analysis Report(s). The also updates the RTM to include pointers to test results and updates the test requirements. Ensure that hardware components are Multiple Release Hardware Page 10 of 13 Phase 6:

tested independently of one another to validate that they perform in accordance with acceptance criteria. The conducts routine project reviews to monitor progress and quality according to: Traceability to the requirements and design of the system Test coverage of units Resolution of testing deficiencies Appropriateness of methods and standards used The builds and tests software for each Phase iteration. 4.7 Integrate Hardware. The integrates the hardware and network components and tests as the aggregates are developed. The must ensure that each aggregate satisfies the requirements of the item and that the item is integrated at the conclusion of the integration activity. The repeats this activity for each iteration associated with a release to production. 4.8 Conduct Integration Testing. The conducts integration testing of integrated hardware and network components. Integration testing involves the testing of aggregated hardware and network components, which were previously unit-tested. Through integration testing, s are able to verify requirements of major groupings of the system. The repeats this activity for each iteration associated with a release to production. The summarizes the testing results in the Test Analysis Report(s). The also updates the RTM to include pointers to test results. 4.9 Plan the System Integration. The develops an Integration Document to assemble the hardware and network components into the system. The document includes procedures, responsibilities, and a schedule for combining the components into a working information system. The repeats this activity for each iteration associated with a release to production. The Manager and review the Integration Document while considering: Traceability to the system requirements Consistency with system design Quality of units based on test results The Manager conducts project-level and technical reviews of the Integration Document. Multiple Release Hardware Page 11 of 13 Phase 6:

4.10 Update the System Implementation Plan. The updates the implementation procedures as necessary for the system in the target environment. 4.11 Plan for Operations & Maintenance Activities. The Manager and review Phase deliverables, and the Manager adds any necessary tasks to the project plan for the Operations & Maintenance Phase. Each release will require separate operations and maintenance planning. 4.12 Complete the System Documentation. The finalizes the following documents: Conversion Plan Implementation Plan Maintenance Manual Operations or Systems Administration Manual Training Plan Release Notes 4.13 Perform Phase-Closure Activities. The Manager and the prepare and present a project status review for the, Sponsor, Executive Sponsor, and other project stakeholders after completion of all Phase tasks. This review addresses: Status of Phase activities Planning status for all subsequent life cycle phases, with significant detail about the next phase Status of resource availability scope control as described in the Scope Statement/System Boundary Document and any required adjustments to the scope Changes to the project schedule and estimated completion date Go-No Go decision made to proceed to next phase, based on Phase information Verification that all changes are conducted in accordance with the approved Change Management Plan The Manager compares actual project performance to the PMP and the projected cost of the project to detect and understand any variances from the cost baseline during the phase-end review. The Manager also performs a comprehensive risk assessment of the project to update the risk analysis. The Manager updates the Maryland EA Repository with any new or updated components before beginning the next phase, Test. The Manager must obtain deliverable approval signatures before proceeding to the Test Phase. Update the project documentation repository upon completion of the phase-closure activities. Multiple Release Hardware Page 12 of 13 Phase 6:

5.0 CONCLUSIONS At the end of the Phase, the has created a working information system. The completion of the System, approval of the Phase deliverables, the completion of the project status review, and the approval to proceed to the next phase, signify the end of the Phase. Multiple Release Hardware Page 13 of 13 Phase 6: