State of Good Repair Assessment Dallas Area Rapid Transit



Similar documents
Multi Year Budget Plan Development

GUIDANCE FOR TRANSIT FINANCIAL PLANS

Budget Used Balance Obligation Based Budget: Infrastructure Renewal Program $290.1 $251.2 $38.9

Chapter 8 Funding Considerations

Transit Asset Management System. Chicago Transit Authority (CTA) July 2011

Scheduled Maintenance

Entrepreneurship Chapter 10 1

Power Point Presentation

RTA ASSET MANAGEMENT PROGRAM

Cost and Financial Analysis

Asset Management Solution For Utah Transit Authority

Enterprise Asset Management

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT TRANSPORTATION AUDIT PROGRAM

CAPITAL ASSET CONDITION ASSESSMENT REPORT

From the FTA 5310 Circular (C9070.1F): 1. ELIGIBLE CAPITAL EXPENSES. Funds for the Section 5310 program are available for capital expenses as defined

Smart Cities & Integrated Corridors: from Automation to Optimization

Proposed Capital Improvement Program (CIP) for FY

Transit Asset Management MBTA Initiatives

Frequently Asked Questions (FAQs) about DART

Transit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28

Federal Transit Administration. Options for Financing Public Transportation in the United States

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination Attachment A

Fleet Management. Fleet Management is responsible for supporting the transportation and equipment needs of Pinellas County.

Great Bridge Primary School - Modernization/Renovation

Flagship Fleet Management, LLC. Replacement Analysis

Triangle Transit Financial Plan. Durham Orange Light Rail Transit Project

Maximizing Fleet Efficiencies with Predictive Analytics

Trends in Aviation & Impact on MROs. Khwaja M. (KM) Ali Director, Maintenance Economics

Seoul Metro line 9 O&M Contract

Laura J. Zale. Southeastern Pennsylvania Transportation Authority. Transportation Research Board 10 th Conference on Transportation Asset Management

Task Order Manager. Project Planning, Engineering, Architecture service contract with experience in passenger rail or other modes, and

OM-13: Transportation Management and Operations

Riding Program - Feasibility and Insurance Options

NY State Rail Summit Alstom Transportation Inc.

Capital Asset Inventory and Condition Assessment

Virginia's Transportation Performance Management System

Asset Management Systems Information

Twenty Year Capital Needs Assessment. September 16, 2013 Briefing to CPOC

MANAGEMENT PLAN. Fiscal Year

1 FIXED ROUTE OVERVIEW

ATTACHMENT K 5310 ELIGIBLE COST

Including Climate Change Risks in Prioritization for Asset Management. Emily Grenzke CH2M HILL, Transit and Sustainability Washington, DC

Operating Budget. MARIN TRANSIT SHORT RANGE TRANSIT PLAN Chapter 5: Financial Plan

METRO. Fiscal Year 2013 Monthly Board Report. June 2013 (Third Quarter Fiscal Year-to-Date)

Transportation Alternatives

Transport Assessment Tool

The Roads to Recovery. Facts About Transportation Funding and Spending

March 2015 Prepared by the Department of Finance & Performance Management Regional Peer Review PERFORMANCE MEASURES

Fares Policy In London: Impact on Bus Patronage

WORKING CAPITAL MANAGEMENT

Transit Asset Management Pilot Projects MBTA Initiatives & Lessons Learned

How To Improve Short Range Service On A Bus Line

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

SCHOOL BUS ADMINISTRATIVE, MAINTENANCE AND MECHANICAL SERVICES AGREEMENT

ADOPTED CAPITAL ASSET MANAGEMENT AND INVESTMENT PROGRAM Tri-County Metropolitan Transportation District of Oregon

Performance Elements

Enhanced Mobility of Seniors and Individuals with Disabilities

Impact of Reliability Centered Maintenance Program

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff

Financial Plan & Implementation. Matrix

Impact of Hurricane Ike

History of the Interurban Railway System and Monroe Shops. Dallas Area Rapid Transit

2014 SFMTA Transit Fleet Management Plan March 2014

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Fleet Management Services

CHARLESTON COUNTY COMBINING STATEMENTS - INTERNAL SERVICE FUNDS

Chapter 10: TRANSPORTATION SAFETY

Integrated Solutions. GoldCare. Take Your Fleet to the Next Level

ARTICLE IV: Transportation

A Review of Transit Technology Specifications

Transcription:

State of Good Repair Assessment Dallas Area Rapid Transit Mike Hubbell Vice President, Maintenance Dallas Area Rapid Transit FTA Roundtable Chicago IL July 23, 2010

1,714 vehicles 232 track miles ROW 63.5M sf facilities 84 miles HOV lanes 2

Policy Guidance Board Financial Planning Parameters 20yr Financial Plan Operating/Expansion/Asset Replacement (Revenues & Expenses) Reserve funding for asset maintenance & replacement Reserve levels based on asset condition assessment Asset condition assessment done every 5 years Operating cost escalation capped at 90% of inflation excluding new services & fuels Limits administrative cost ratio increases Future capital programs escalate at no less than CPI 3

Millions Lost Decade (2000 2010) $600 $1,250 $1,000 FY09 FP As Approved FY09 FP As Amended / FY10 FP As Approved March 2010 Projections $400 $374 $358 $326 $312 $332 $342 $371 $389 $416 $378 $373 $750 $200 $500 $0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 P $0 10 years of flat sales tax receipts and lower longterm growth projections $250 Additional Downward Revision: $3.0 B (2011 2030) 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 result in: Sales tax revenues down $3.0 B Total sources down $8.7 B Capital spending down $6.4 B Operating spending down $0.6 B Debt service costs down $1.6 B 4

Decade of Accomplishments Despite decade of zero sales taxes growth, DART has: More than doubled Light Rail System /20 miles to 45 miles Set up to double again in the next few years More than tripled the length of commuter rail service Quadrupled the number of HOV lane miles Provided nearly 700,000,000 fixed route and over 1,100,000,000 total system trips 5

Goals Asset Condition Assessment Obtain high level assessment of asset inventory Results comparative to previous assessment Ensure rate of physical degradation is consistent with plan Validate maintenance & financial plans aligned with results Adjust maintenance & financial plan where necessary 6

Asset Condition Assessment Approach Inspection performed by in-house team of 8 Team trained on rating and documentation systems to provide continuity Grouped assets into 8 categories Rolling stock (buses, rail cars, light duty) Operating Facilities Passenger Facilities Rail Wayside Systems (track, electrification, signals) Communications Paratransit Commuter Rail HOV 7

Asset Condition Assessment Approach Unique categories identified Information Technologies Network Bridges & Tunnels Interviewed asset owners to validate criteria, key issues & asset maintenance status Sampling size ranged from 20% - 100% of assets by type Additional administrative staff to compile data 15 3 Binders 512 Inspection Sheets 3,547 - Photographs 8

Asset Condition Assessment Sampling Sizes Total Assets Sampled % of Total Facilities 1,018 148 15% Vehicles 1,714 341 20% HOV & Other 19 19 100% ROW Systems 4 4 100% 9

Asset Condition Assessment Rating System Rating Description 5 In basically like-new condition, any difference being minor cosmetic damage or deterioration. 4 In typically good working order and requiring only routine maintenance. May have major cosmetic damage or deterioration or may have a minor defect indicative of possible fleet-wide issue. 3 Has non-critical defect needing attention or the asset is nearing the end of life requiring overhaul or replacement. 2 Has critical or safety related defect. Not suited for revenue service before repair. 1 Non-functional requiring major repair, structural repair, or replacement. 10

Examples Clearly #5 Clearly #1 11

Form Examples 12

Form Examples 13

Statistical Analysis 14

Overall Assessment Conclusions Assets are generally in good to excellent condition Asset owners understand conditions of assets Long & short term maintenance programs appear effective Financial Plan reserves appear adequate to support assets to planned end-of-life 15

Exceptions Assessment Conclusions Obsolescence of older light rail propulsion systems Bus fleet retirement delay & impact on overhaul program Administrative building escalators & chilled water system Bus washer effluent runoff at two facilities Roof condition at two facilities 16

Results Projected 29% reduction in funds over 20 yrs Major plan amendments Description FY10-20 Year Total FY11-20 Year Total Sources of Funds $27,245,400,000 $19,440,700,000 Operating Expenses ($11,090,100,000) ($10,831,500,000) Capital & Non-Operating Expenses ($11,431,300,000) *($ 4,178,800,000) Debt Service Expenses ($5,609,700,000) ($ 4,407,100,000) Net Available Cash $335,100,000 $ 205,000,000 * ~$2.452B (58%) reserved for SGR activities 17

Lessons Learned Commit to the assessment on regular interval Use consistent process & scoring system Document method of data capture, storage & analysis Train assessment evaluators Don't get mired in numbers. Step back and consider assets from an overall sub-group perspective. Analyze the data to determine trends Use the data to make informed financial plan decisions 18

Lessons Learned Choose asset evaluation pool carefully Utilize a higher level approach- the goal is to determine state of good repair and to help forecast capital requirements. Resist urge to start with financial capital asset list- this presents an unmanageable population of assets for assessment. Select assets and asset classes that can impact safety or service or have a significant impact on operating or capital expense. Group assets into classes that have a reasonable similarity (i.e. vehicles, facilities, structures, etc.) and utilize evaluators knowledgeable about each class. For asset classes with large populations, select a statistically significant pool of assets in each class for asset assessment. 19

20