SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION



Similar documents
APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

CITY OF FLORIDA CITY Building and Zoning Department 404 West Palm Drive Florida City, FL ROOFING PERMIT APPLICATION

RESIDENTIAL ROOF PERMITTING A REFRESHER WORKSHOP September 11, 2014

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

Detached accessory structures that contain no conditioned floor area are exempt.

Wind Mitigation Inspection

NRCA s steep-slope manual is thoroughly revised for 2013

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

CITIZENS PROPERTY INSURANCE CORPORATION. STREET ADDRESS: Gulf Blvd, Maderia Beach, FL Six story masonry residence

Dollars & Sense of Compliance!

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Asphalt Shingle Application Requirements

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in one year.

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

Metal Roof Systems in High-Wind Regions

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: CONCRETE ROOF TILES REPORT HOLDER:

CHAPTER 7: Building Systems ROOFING SYSTEMS

(800) (562) A Subsidiary of the International Code Council *Revised April 2014

Residential Roofing Guide

The Florida Building Code

providing documentation that validates the year of construction. Acceptable documents include

RB271 06/07 R807.1 RB272 06/07 R Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN

ROOF ASSEMBLIES CHAPTER 9

Preventing Ice Dams on Roofs

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

TARRANT COUNTY DETAIL STANDARDS

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

The Florida Building Code

High Wind & Hail Standards

Bay County Builders Services Main Office FAX: (850) PHONE: (850)

Georgia State University. Urban Life Building Roof Replacement

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

CITIZENS PROPERTY INSURANCE CORPORATION BUILDING TYPE II AND III MITIGATION VERIFICATION AFFIDAVIT

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: CONCRETE ROOF TILES REPORT HOLDER: BORAL ROOFING

CLOSED-CELL SPRAY FOAM Resisting Wind Uplift in Residential Buildings

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

Sample Drawing Package for One and Two Family Dwelling Applications

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

ELIGIBILITY CHECKLIST:

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

ROOF INSPECTION REPORT

Roof Inspection. Summary Report

Mark Cramer Inspection Services, Inc.

HCD DSA OSHPD 1 2 1/AC AC SS

Florida Building Code Advanced Training: Residential Roofing Shingles

Please read the entire document before purchasing and installing any of these products

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

780 CMR ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

Page & Turnbull imagining change in historic environments through design, research, and technology

CHAPTER 5 ASPHALT-SHINGLE ROOFING

ANSI/SPRI WD-1 Wind Design Standard Practice for Roofing Assemblies. Table of Contents. 1.0 Introduction Methodology...2

University of California - Santa Barbara West Campus Point Faculty Housing

Estimated Cost of Repair

CODE IN EFFECT: 2010 FLORIDA BUILDING CODE PERMIT APPLICATIONS MUST BE FILLED OUT COMPLETELY

Protecting YOUR NEW HOME FROM Wind Damage

PETERSONS WATERFRONT CONDOMINIUMS

Retrofitting an Insulated Cold Roof

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

CITIZENS PROPERTY INSURANCE CORPERATION

Low-slope reroofing guidelines

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

Wind Mitigation Discount Plan

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

Metal Roofing Practical Design

How To Plan Out An Array Of Solar Panels

SECTION ROOFING TILE

DISTRICT OF BARRIERE REQUEST FOR PROPOSAL

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

metal Duil~ing manufacturers Association

ELIGIBLE REPAIR PROJECT PARAMETERS

Residential Decks. Planning and Development Services Department

CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs

ROOFING CONTRACTORS QUESTIONNAIRE

During storm events, a roof is expected to perform many functions from preventing water intrusion

Sheet A-1 KEY SHEET A-1. Football Roof Plan SHEET A-2 SHEET A-3 SHEET A-4. LaCross Roof Plan. Soccor 2 Roof Plan 88' 45' 87' 46' 45' 45' 10' 3' 25'

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

Protecting Roofing Systems Against Windstorm Damage

PERIMETER FLASHING. Table of Contents

Chapter 9: INSTALLING ROOFING

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Exterior Elevated Elements Inspection Guidelines

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, RBA Project No

Patio Covers / Carports

Transcription:

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable) will be required at first inspection Job address City Florida Statute 553.844 requires that certain hurricane mitigation upgrades must be performed when a detached single family residence is being re-roofed. Required upgrades include the installation of roof to wall connections, when the house was built prior to 1973, has a value of $300,000. or more (excluding land value) and the existing connections are less than 1/8 by 1 strap, attached with 3 16 D nails. Re-nailing of roof sheathing and the installation of a secondary water barrier are also required. The following must be completed to confirm compliance with these requirements. A. Was the dwelling permitted on or after 1973 (1957 in Hollywood)? Yes No If yes, provide year: If you answered yes, proceed to E; leave B, C and D blank B. As demonstrated by the attached documentation, the insured value of the house is $ C. The insured value of the house is not available; attached is a copy of the Broward County Property Appraiser s Advalorem value, which is $ D. If the value is $300,000 or more, the following must be provided prior to obtaining a re-roof permit The following Engineer, Architect, Contractor (General, Building, Residential) or Private Structural Inspector has been retained to provide the required roof to wall certification. Name Business Name License type License Number Business Address Phone # We understand that a separate permit is required if the existing connections are not adequate. The following Contractor (General, Building, Residential) has been retained for this work Name Business Name License type License Number Business Address Phone # E. The following secondary water barrier will be utilized (roofing application includes applicable documentation) 4 inches 40 mil polymer strip ASTM D 1970 on all sheathing joints, or an approved self-adhering polymer modified bitumen cap sheet, or an approved hot mopped cap sheet Signature of Roofing Company Qualifier Print Name Roofing Company Name Date

Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET As of March 1, 2009, the Building Code for Broward County has been changed to the 2007 Florida Building Code High Velocity Hurricane Zone Requirements. Following is a brief summary of the changes for Residential Roofing: Roofing requirements will be from Section R4402 of 2007 Florida Building Code and the supplemental Test Protocols for High Velocity Hurricane Zones. The High Velocity Hurricane Zone Uniform Permit Application form is required for every roof permit issued. (See Attached) All roofing work done shall be in accordance with the Dade County and State of Florida Notices of Acceptance and Roof Application Standards (R.A.S.). Other components such as roof vents must have Notices of Acceptance at time of permit. Gutters are required to be added to all roofs having a six (6) inch or less overhang eave. All Re-roofs require an Owner Notification for Roofing Considerations form filled at time of permit. (See Attached) Tile roofing permits require uplift calculations using method 1, 2, or 3 of Section E in the Uniform Permit Application. All nails used for roofing are to be ringshank and meet ASTM G85 standards for corrosion resistance. Adhesive set and mortar set tile roofs require uplift test to be performed before final approval. Re-nail affidavits or specific re-nail of sheathing inspections are not required in the new code. Hot mop inspections are required in progress for all deck types. Shingle roofs cannot be applied to roofs over 33 feet in mean height unless allowed by N.O.A. The only prescriptive roof system allowed shall be in accordance with R.A.S. 150 Built-up Roof Standard. (See Attached) You will need to purchase a copy of the 2007 Residential Florida Building Code and Test Protocols for High Velocity Hurricane Zones to understand all requirements. (Rev. 3/09) PC200938934

Urban Planning and Redevelopment Department BUILDING CODE SERVICES DIVISION 1 N. University Drive, Box 302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing Section RR4402.13 HIGH VELOCITY HURRICANE ZONES REQUIRED OWNERS NOTIFICATION FOR ROOFING CONSIDERATIONS RR4402.13 Scope. As it pertains to this section. It is the responsibility of the roofing contractor to provide the owner with the required roofing permit, and to explain to the owner the content of this section. The provisions of Section RR4402 govern the minimum requirements and standards of the industry for roofing system installations. Additionally, the following items should be addressed as part of the agreement between the owner and the contractor. The owner s initial in the designated space indicates that the item has been explained. I. Aesthetics-Workmanship: The workmanship provisions of Section RR4402 are for the purpose of providing that the roofing system meets the wind resistance and water intrusion performance standards. Aesthetics (appearance) are not a consideration with respect to workmanship provisions. Aesthetic issues such as color or architectural appearance that are not part of a zoning code should be addressed as part of the agreement between the own and the contractor. 2. Renailing Wood Decks: When replacing roofing, the existing wood roof deck may have to be renailed in accordance with the current provisions of Section RR4402. (The roof deck is usually concealed prior to removing the existing roof system.) 3. Common Roofs: Common roofs are those which have no visible delineation between neighboring units (i.e., townhouses, condominiums, etc.). In buildings with common roofs, the roofing contractor and/or owner should notify the occupants of adjacent units of roofing work to be performed. 4. Exposed Ceilings: Exposed, open beam ceilings are where the underside of the roof decking can be viewed from below. The owner may wish to maintain the architectural appearance; therefore, roofing nail penetrations of the underside of the decking may not be acceptable. This provides the option of maintaining this appearance. 5. Ponding Water: The current roof system and/or deck of the building may not drain well and may cause water to pond (accumulate in low-lying areas of the roof). Ponding can be an indication of structural distress and may require the review of a professional structural engineer. Ponding may shorten the life expectancy and performance of the new roofing system. Ponding conditions may not be evident until the original roofing system is removed. Ponding conditions should be corrected. 6. Overflow Scuppers (wall outlets): It is required that rainwater flows off so that the roof is not overloaded from a buildup of water. Perimeter/edge walls or other roof extensions may block this discharge if overflow scuppers (wall outlets) are not provided. It may be necessary to install scuppers in accordance with the requirements of RR4403 and RR4413. 7. Ventilation: Most roof structures should have some ability to vent natural air flow through the interior of the structural assembly (the building itself). The existing amount of attic ventilation shall not be reduced. It may be beneficial to consider additional venting which can result in extending the service life of the roof. Owner s/agent s Signature Date Contractor s Signature (Rev. 3/09) PC200938934

Roof System Florida Building Code Edition 2007 INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING PERMIT APPLICATION FORM AND ATTACH THE RE QUIRED DOCUMENTS AS NOTED BELOW: Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A,B,C 1,2,3,4,5,6,7 Prescriptive BUR-RAS 150 A,B,C 4,5,6,7 Asphaltic Shingles A,B,D 1,2,4,5,6,7 Concrete or Clay Tile A,B,D,E 1.2.3.4.5,6,7 Metal Roofs A,B,D 1,2,3,4,5,6,7 Wood Shingles and Shakes A,B,D 1,2,4,5,6,7 Other As Applicable 1,2,3,4,5,6,7 1. Fire Directory Listing Page 2. From Notice of Acceptance: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings ATTACHMENTS REQUIRED: 3. Design Calculations per Chapter 16, or If Applicable, RAS 127 or RAS 128 4. Other Component Notice of Acceptances 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Re-Roofing Only) 7. Any Required Roof TestinglCalculation Documentation

Florida Building Code Edition 2007 Section A (General Information) Master Permit No. Process No. Contractor s Name Job Address ROOF CATEGORY l Low Slope l Mechanically Fastened Tile l Mortar/Adhesive Set Tile l Asphaltic Shingles l Metal Panel/Shingles l Wood Shingles/Shakes l Prescriptive BUR-RAS 150 ROOF TYPE l New Roof l Re-Roofing l Recovering l Repair l Maintenance ROOF SYSTEM INFORMATION Low Slope Roof Area (SF) Steep Sloped Roof Area (SF) Total (SF) Section B (Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets.

Florida Building Code Edition 2007 Section C (Low Sloped Roof System) Fill in Specific Roof Assembly Components and Identify Manufacturer (If a component is not used, identify as NA ) System Manufacturer: NOA No.: Design Wind Pressures, From RAS 128 or Calculations: Pmax1: Pmax2: Pmax3: Max. Design Pressure, From the Specific NOA System: Deck: Type: Gauge/Thickness: Slope: Anchor/Base Sheet & No. of Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insulation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bondlng Material: Ply Sheet(s) & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment Field: oc @ Lap, # Rows @ oc Perimeter: oc @ Lap, # Rows @ oc Corner: oc @ Lap, # Rows @ oc Number of Fasteners Per Insulation Board Field Perimeter Corner Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counter- Flashing, Coping, Etc. Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16. s t s t FT. FT. Parapet Height Mean Roof Height

Florida Building Code Edition 2007 Section D (Steep Sloped Roof System) Roof System Manufacturer: Notice of Acceptance Number: Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Pmax1: Pmax2: Pmax3: Maximum Design Pressure (From the NOA Specific System): Method of Tile Attachment: Sloped System Description Deck Type: Type Underlayment: Roof Slope: : 12 Insulation: Fire Barrier: Fastener Type & Spacing: Ridge Ventilation? Mean Roof Height: Adhesive Type: Type Cap Sheet: Roofing Covering: Type & Size Drip Edge:

Florida Building Code Edition 2007 Section E (Tile Calculations) For Moment-based tile systems, choose either Method 1 or 2. Compared the values for M r with the values from M f. If the M f values are greater than or equal to the M r values for each area of the roof, then the tile attachment method is acceptable. Method 1 Moment-Based Tile Calculations Per RAS 127 (P 1 : x l = ) - Mg: = M r1 NOA M r (P 2 : x l = ) - Mg: = M r2 NOA M r (P 3 : x l = ) - Mg: = M r3 NOA M r Method 2 Simplified Tile Calculations Per Table Below Required Moment of Resistance (M r ) From Table Below NOA M r M r Required Moment Resistance* Mean Roof Height Roof Slope 15' 20' 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 *Must be used in conjunction with a list of moment-based tile systems endorsed by the Broward County Board of Rules and Appeals. For Uplift-based tile systems use Method 3. Compared the values for F 1 with the values for F r. If the F 1 values are greater than or equal to the F r values for each area of the roof, then the tile attachment method is acceptable. Method 3 Uplift-Based Tile Calculations Per RAS 127 (P 1 : x l: = x w: = ) - W: x cos q: = F r1 : NOA F 1 (P 2 : x l: = x w: = ) - W: x cos q: = F r2 : NOA F 1 (P 3 : x l: = x w: = ) - W: x cos q: = F r3 : NOA F 1 Where to Obtain Information Description Symbol Where to find Design Pressure P1 or P2 or P3 RAS 127 Table 1 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope q Job Site Aerodynamic Multiplier l NOA Restoring Moment due to Gravity M g NOA Attachment Resistance M r NOA Required Moment Resistance M r Calculated Minimum Attachment Resistance F 1 NOA Required Uplift Resistance F r Calculated Average Tile Weight W NOA Tile Dimensions l = length NOA w = width All calculations must be submitted to the Building Official at the time of permit application.