SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS



Similar documents
Saxe Middle School Auditorium Renovation February 4, 2015


Regulated Building Materials in Property Management. July 30, 2013

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Asbestos Procedures. Asbestos Products

Building Condition Assessment Report

Asbestos Management Program

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Safeway 691 Berkeley Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES

Asbestos Frequently Asked Questions

Appendix 2-A: Asbestos Assessment Summary Table

Asbestos Management POLICY

Asbestos Survey Form (See Instructions)

Restoration Specific Asbestos and Lead Based Paint Survey Report Logan Ave Colorado Springs, CO 80909

Estimating Database Checklist

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT AIP 84

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

Characteristics/Applications

How To Perform A Limited Asbestos Survey

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

Click to edit Master title style Maricopa County Asbestos NESHAP Overview. Valerie Brodeur Asbestos NESHAP Inspector

Renovation instructions

MEMORANDUM. General: Foundation:

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE O*NET CODE

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

WorkSafe BC Guidelines Regarding Demolition and Asbestos Waste Materials

DF Technical & Consulting Services Ltd Avenue, Edmonton, AB T6B 2N2 Ph: Fax: Toll Free:

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

1804 W. Colorado Avenue Colorado Springs CO Fax AlpineConsultInc.com

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.

17,280 square feet Overview:

Building Condition Assessment Report

AHERA 3-Year Asbestos Re-Inspection

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

DRAPER ELEMENTARY SCHOOL

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Copyright 2013 Kleinfelder. All Rights Reserved

UBC Plant Operations Asbestos Work Procedures April 2004

AsbestosSurveyingNationwide

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

Summary of Georgia s Lead-Based Paint (LBP) Renovation, Repair and Painting (RRP) Rules For Contractors, Property Managers, and Maintenance Personnel

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

6% Chrysotile NA White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Asbestos 2 hr. Awareness

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

BUNKER HILL ELEMENTARY SCHOOL

ASBESTOS CONTAINING MATERIALS (ACM) REFERENCE GUIDE

MEMORANDUM. DATE: January 6, Campus Community. Tim Ridley, CSP, ARM-P Director, Safety and Risk Management. SUBJECT: Asbestos Notification 2015

Rehab Inspection Report Page 1

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS

Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.

Professional Service Industries, Inc Gateway Drive Suite B Cypress, CA Phone 714/ Fax 714/

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

ASBESTOS INSPECTION REPORT 31 DUMONT AVENUE SOUTH BURLINGTON, VT AIP 78. December 16, 2011 Revised January 31, 2012

Addendum 1 Clarifications

IMPROVEMENT COST ESTIMATE powered by HomeFixers

How To Manage Asbestos At A University

NDSU TABLE OF CONTENTS

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

TAMPA ELECTRIC COMPANY ENERGY SUPPLY ASBESTOS AWARENESS PROGRAM

PROCEDURE 31 - Asbestos Safety. Table of Contents

1200 N. COLORADO WINSLOW, ARIZONA

ASBESTOS AWARENESS. Slide #1

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Western State College, ACM/Hazmat Consulting for Kelley Hall Remodel

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Asbestos in the Home and Workplace June 2012

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

June 29, 2015 Project

KIEWIT CM/GC Enabling/Utilities

NOTICE TO CONTRACTORS

Washington University Asbestos Operations and Maintenance Plan

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

Los Angeles Unified School District Maintenance and Operations. COMMUNITY INITIATED PROJECTS: A Manual for Complex Project Managers

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

"ASBESTOS ON CAMPUS" Published By CAL POLY. California Polytechnic State University Risk Management Office of Environmental Safety

Asbestos Inspection Project Procedure

Transcription:

PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition, repair, custodial and/or maintenance activities. The hazardous materials information has been provided through existing surveys conducted by the San Francisco Unified School District (District) and the District s environmental consultants. B. Some materials and items found at the Site either contain or may contain materials known to the State of California to be either hazardous, carcinogenic or reproductive toxins. These include but are not limited to asbestos, lead, PCB s, silica, and other materials. C. The Contractor shall hold the District and its consultants harmless for claims, damages, losses, and expenses, including attorney s fees arising out of the Contractor s hazardous materials related work including releases from any incidental disturbance of existing hazardous materials, on-site or off site spills of hazardous materials, or from non-compliance with the Contract Documents and regulatory requirements. 1.02 HAZARD COMMUNICATION A. The District may have conducted previous hazardous materials abatement projects at the site. The hazardous materials abatement oversight information is available for review by appointment only through the District s Asbestos Control Program at (415) 241-6226. B. Copies of previous hazardous materials report(s) and the AHERA Management Plan for the site are available for review by appointment only through the District s Asbestos Control Program at (415) 241-6226. C. Asbestos Hazards at McKinley Elementary School 1. Asbestos has been identified at concentrations greater than one percent (>1%) in the following materials: 1) Texture (2% Chrysotile asbestos) at gypsum board walls and ceilings throughout. Gypsum board with asbestos texture is located above acoustical ceiling tiles (suspended and glued) and behind plywood wall and acoustical panels at select locations. 2) Taping compounds (2% Chrysotile asbestos) at gypsum board walls and ceilings throughout. Gypsum board with asbestos taping compounds is located above all acoustical ceiling tiles (suspended and glued) and July 11, 2013 00335-1 Existing Hazardous Materials Conditions

behind plywood wall and acoustical panels throughout. 3) Fire door insulation (5-10% Chrysotile asbestos, 15-30% Amosite asbestos) at interior doors throughout. 4) Floor Tile (12 x12 orange) (5% Chrysotile asbestos) and mastic (black) (8% Chrysotile asbestos) at Cafeteria 101, Storage 102, Work Room 104, Nurse 106, Speech 110, Special Ed. 119, Electrical 123, Elevator Machine Room, Elevator, Storage 218, Teacher s Prep. 220, Storage 229A, Storage 229B and Electric 230B. 5) Floor Tile Mastic (black) 8% Chrysotile asbestos) below non-asbestoscontaining floor tile (12 x12 brown) at Electrical 123. 6) Sheet Flooring (orange) (40% Chrysotile asbestos) at Kitchen 103, Toilet 106T, Toilet 115T, Toilet 116T, Toilet 117T, Toilet 118T, 7) Sink undercoatings (black) (4-5% Chrysotile asbestos) on stainless steel sinks at Work Room 104, Speech 110, Special Ed. 119, Teacher s Prep. 220 and Teacher s Prep 229. 8) Glazing compound (black tarry) at interior door at Custodian Storage 220A. 1) No building finishes were identified to contain detectable concentrations of asbestos. c. Exterior Site 1) Waterproof membrane (tar paper) (40% Chrysotile asbestos) at exterior concrete foundation walls above and below grade. 2) Asphalt paving and top coatings (gray/brown) (2% Chrysotile asbestos throughout Main Play Yard. 2. The following materials have not been sampled and shall be assumed to contain asbestos at concentrations > 1%: a. Asbestos cement underground sewer, water and drain piping located throughout the entire site. 3. Asbestos has been identified at concentrations less than one percent (<1%) in the following materials: a. Vinyl base mastic (brown) (0.14% Chrysotile asbestos) at Elevator Machine Room 4. The following sampled suspect materials had results that reported NO detectable concentrations of asbestos by PLM analysis: 1) Gypsum board at walls and ceilings (Note: the taping compounds and texture were identified to contain asbestos at concentrations >1%). 2) Acoustical ceiling tiles and glue (12 x12 white spline and glued to July 11, 2013 00335-2 Existing Hazardous Materials Conditions

gypsum board substrate with taping compounds and texture coatings (Note: the taping compounds and texture were identified to contain asbestos at concentrations >1%). 3) Carpets and carpet glues. 4) Marmoleum sheet flooring, backing and glues. 5) Floor tile (12 x12 white) and mastic at all Stairs. 6) Floor tile (12 x12 blue) and mastic at the 2 nd Floor at Custodian Storage 220A. 7) White floor leveling compounds. 8) Vinyl stair treads and risers and associated mastics at all Stairs. 9) Vinyl base (brown/red) and mastics throughout. 10) Sinks undercoatings (gray) at all Classrooms. 11) Ceramic floor tiles (4 x6 red brick pattern) grouts and mortars at Lobby C90. 12) Ceramic wall and floor tiles, grouts and mortar / glues at Toilets. 13) Heat shield gaskets at incandescent light fixtures at Toilets. 14) Chalkboards (metal) with white packing material at Classrooms. 15) Window gasketing (black rubber) at interior hollow metal windows and doors. 16) Seam tape (white) at metal ducting throughout. 1) Stucco plaster and paint coatings 2) All roofing materials 3) Mastic / Sealants (gray) at roof mounted HVAC units and metal ducting. c. Exterior Site: 1) Asphalt paving and slurry top coat at Upper Play Yard, 2) Paints (various colors) on exterior concrete retaining walls throughout the site. 5. Areas and/or Spaces known or presumed to be contaminated with asbestos containing materials, dust, and debris include: a. Not used. 6. Areas and/or Spaces where asbestos abatement was conducted include: a. Not used. D. Lead Hazards at McKinley Elementary School 1. Lead has been detected in individual painted surfaces and surface coatings in concentrations greater than 5,000 parts per million (ppm) lead or 1.0 milligram of lead per square centimeter (mg/cm 2 ). Where ranges of lead levels are indicated, Contractor shall presume the highest level is typical. These lead containing surfaces include, but are not limited to the following: July 11, 2013 00335-3 Existing Hazardous Materials Conditions

1) No painted surfaces identified to contain lead at concentrations greater than 5,000 ppm or 1.0 mg/cm 2. 1) Ceramic wall tile project (yellow) adjacent to the front entry of the school (3.7 mg/cm 2 ). c. Exterior Site: 1) Chain link fencing, posts, gates and hardware throughout the site (1.0 mg/cm 2 ). 2) Metal railings and pickets (blue and silver) (1.0 mg/cm 2 ). 3) Metal handrail brackets (silver) at all stairs (1.4 mg/cm 2 ). 4) Metal bike rack (red) (1.0 mg/cm 2 ). 5) Play stripping (yellow) at Main Play Yard (1.0 mg/cm 2 ). 6) Stair treads stripping (yellow) at all stairs (1.0 mg/cm 2 ). 7) Metal flag pole base (1.0 mg/cm 2 ). 2. Lead has been identified in individual painted surfaces and surface coatings in concentration less than 5,000 ppm lead or 1.0 mg/cm 2. Where ranges of lead levels are indicated, Contractor shall presume the highest level is typical. These lead containing surfaces include, but are not limited to the following surfaces: 1) Gypsum board walls and ceilings (-0.3 to -0.2 mg/cm 2 ). 2) Metal window sash (-1.1 to -0.6 mg/cm 2 ). 3) Metal window framing (-0.5 to -0.1 mg/cm 2 ). 4) Wood window casing and trim (-0.2 to -0.1 mg/cm 2 ). 5) Wood wall paneling (-0.0 mg/cm 2 ). 6) Ceramic floor tile (red brick pattern) at Lobby C90 (-0.2 mg/cm 2 ). 7) Wood baseboards (-0.1 mg/cm 2 ). 8) Elevator doors and door frames (0.5 to 0.6 mg/cm 2 ). 9) Metal handrails and handrail brackets (0.2 to 0.4 mg/cm 2 ). 10) Metal chalkboards (-0.1 mg/cm 2 ). 11) Tack boards (0.0 mg/cm 2 ). 12) Fire sprinkler piping (0.2 mg/cm 2 ). 13) Roof access ladder (0.0 mg/cm 2 ). 1) Stucco plaster walls (-0.1 to 0.0 mg/cm 2 ). 2) Metal doors and door frames (-0.1 to 0.0 mg/cm 2 ). 3) Metal window sash and framing (0.0 mg/cm 2 ). 4) Metal conduits (0.2 mg/cm 2 ). 5) Metal downspouts (0.5 mg/cm 2 ). 6) Metal gutters (-0.1 mg/cm 2 ). July 11, 2013 00335-4 Existing Hazardous Materials Conditions

7) Wood fascia (0.0 mg/cm 2 ). 8) Metal flashing (0.3 mg/cm 2 ). 9) Metal roofing (-0.2 mg/cm 2 ). c. Exterior Site: 1) Concrete retaining walls (0.0 mg/cm 2 ). 2) Metal light posts (0.3 mg/cm 2 ). 3) Play stripping (white) (-0.3 mg/cm 2 ). 4) Paint coating on Asphalt (blue) (-0.2 mg/cm 2 ). 5) Basketball posts (-0.1 mg/cm 2 ). 6) Metal hand rails at all stairs (0.0 mg/cm 2 ). 7) Play structures at Main Play Yard and Upper Play Yard (-0.2 to 0.0 mg/cm 2 ). 8) Planter boxes (0.0 mg/cm 2 ). 9) Wood benches at Upper Play Yard (-0.1 to 0.0 mg/cm 2 ). 10) Metal flag pole (-0.3 mg/cm 2 ). 11) Fire stand pipe (0.0 mg/cm 2 ). 3. The Contractor shall assume that all paints and surface coatings contain detectable quantities of lead requiring compliance with CAL/OSHA lead regulation in the absence of objective data to the contrary. Additionally, the Contractor shall assume that, at a minimum, lead is present in all of these materials at levels that have a potential, until proven otherwise, to create a lead hazard. 4. The District has not verified that any paints, coatings, dusts, or materials are lead free or below 600 ppm. The Contractor shall treat all paints, coatings, dusts or materials as having a lead content greater than 600 ppm requiring dust controls and personal protective procedures for construction activities in conformance with the Cal/OSHA Lead Construction Standard, 8 CCR 1532.1 lead. Any paint, varnish, or other coating or finish not listed above shall be considered to be lead-based paint with lead levels at or exceeding 5000 ppm lead or 1.0 mg/cm 2 for this contract. 5. All firms, including sub-contracted firms who impact lead-based paint (LBP) (5,000 ppm lead or 1.0 mg/cm 2 or greater) at Child Occupied Facilities shall conduct all work in accordance with 40 CFR Part 745. This includes but is not limited to being an EPA certified firm; having an EPA Certified Renovator ; providing on-the-job training for workers; conducting pre-renovation notifications; following specific work practice procedures for containment, disturbance and final clean-up; and inspection requirements. Renovation is defined in 40 CFR Part 745 as the modification to any existing structure or portion that results in the disturbance of LBP surfaces, unless the activity is performed as part of an abatement. In essence this regulation includes all work activities that disturb LBP surfaces. 6. The EPA certified Contractor or Sub-contractor(s) Certified Renovator shall be responsible for identifying the specific job activities which impact lead-based paint (LBP) during renovation that requires the use of containment as described in 40 CFR Part 745. Work also includes but is not limited to provide on-the-job July 11, 2013 00335-5 Existing Hazardous Materials Conditions

training for workers; conduct pre-renovation notifications; follow specific work practice procedures for containment, disturbance and final clean-up; and inspection requirements as defined by regulation. 7. In addition to lead-containing paints and coatings, the Contractor shall assume that lead is present at detectable levels over 600 ppm in existing plumbing components and solders, glazing compounds, roof jacks, and surficial soils. E. Metallic Mercury and mercury compounds are present at this site in fluorescent lighting tubes, high intensity discharge lamps, and mercury thermostats. All demolition and disposal of these items shall be conducted in accordance with applicable safety and environmental regulation and the requirements of the Contract Documents. F. Polychlorinated biphenyl (PCB)-containing fluorescent lighting ballasts. This site contains fluorescent lighting fixtures manufactured or installed prior to 1979. All fixtures known or presumed to have been installed prior to 1979 shall be considered to contain PCB ballasts unless otherwise noted in the contract documents. Removal, handling and disposal of PCB ballasts are subject to applicable regulation and requirements of the Contract Documents. G. Crystalline Silica is presumed present in all concrete, plaster, ceramic tile, grouts, and other cementitious materials at this site as well as soils. Worker protection and control of air dust during cutting, drilling, demolition and other construction operations is the responsibility of the Contractor. H. The Contractor shall take into consideration all existing known and presumed hazardous materials that may be disturbed or otherwise impacted by the Work of this project. All work of this project that disturbs or otherwise impacts hazardous material shall be considered included in the Work of the project and shall be conducted in accordance with all applicable regulations and the Contract Documents. The Contractor shall use appropriately trained and qualified personnel to conduct all hazardous material related work and shall adhere to the requirements for handling, removal, clean-up, and disposal in accordance with the Contract Documents and all applicable Cal/OSHA, Cal/EPA, Department of Health Services (DHS), and Bay Area Air Quality Management District (BAAQMD) regulations. 1.03 RELATED DOCUMENTS A. Contract Documents including hazardous material-related plans and specifications and all other project construction documents. Refer to Section 01011 Summary of Hazardous Materials Work, Article 1.04 Related Documents for a more detailed listing. 1.04 USE OF HAZARDOUS MATERIALS INFORMATION A. Hazardous material information identified herein was obtained for the use of the District and its Consultants for planning and design stages of the Project. The above mentioned survey data and reports are not, as a whole, part of the Contract Documents, but can be relied upon by the Contractor to characterize general site conditions, although quantities, friability and other factors may have changed or altered since the published report dates. July 11, 2013 00335-6 Existing Hazardous Materials Conditions

B. All statements, findings and interpretations in the above mentioned reports are those of the Survey or Environmental Consultant. The District makes no representation, either expressed or implied, as to the completeness or adequacy of the above mentioned reports. Bidders are advised that the limited testing of components allows for generalizations in describing the extent of hazardous materials. Contractors may visit the site and investigate to identify locations of hazardous materials identified herein. Specific components or materials, should be checked against the referenced survey reports and the Contract Documents, or be tested at affected locations, prior to disturbance of such components. PART 2 PRODUCTS: NOT USED PART 3 EXECUTION: NOT USED END OF SECTION July 11, 2013 00335-7 Existing Hazardous Materials Conditions