Estimating Cost at Completion - Judgment & EV Information

Similar documents
An introduction to Earned Value Analysis

INSE 6230 Total Quality Project Management

700 Analysis and Reporting

Brainstorm. What is Cost and Project Cost Management?

Chapter 7: Project Cost Management. Munawar

Earned Value Formulae

How To Manage A Project

EARNED VALUE MANAGEMENT. CASE STUDY USING MICROSOFT PROJECT

COINS EVA Earned Value Analysis

IST 302 : Project Cost Management

Introduction to earn value management in Civil Engineering

AACE International Recommended Practice No. 86R 14

Earned Value Management Changes to the Glossary and Chapter 7 of the PMBOK Guide Third Edition.

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

Using Earned Value Management for Improving Processes. By Cynthia K. West

IQPC IT Project Management Conference Sydney Recent Advances in Project Prediction Techniques

technical tips and tricks

CPM -100: Principles of Project Management

Project Management: Tracking Progress and Earned Value with MS Project 2003

L10: Budgeting and Cost Control. Olivier de Weck

This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.

Earned Value. Valerie Colber, MBA, PMP, SCPM. Not for duplication nor distribution 1

Project Execution - PM Elements

Earned Value and Agile Reporting

EVM.01. Earned Value Analysis Why it Doesn't Work

technical tips and tricks

Chapter 5: Project Cost Management

PERCEPTION. Tracking Progress & EAC

Earned Value Management Tutorial Module 6: Metrics, Performance Measurements and Forecasting. Prepared by:

Earned Value Management (EVM) is a technique that is used to track the progress and status of a project and forecast its likely future performance.

Simple Earned Value (Using MS Project 2010)

Tracking Budgets and Schedules

EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS

Appendix D Glossary Of Terms

DCMA DCMA-EA PAM October 2012

Earned Value Management Tutorial Module 8: Reporting. Prepared by:

Chapter 3: Project Cost Management

USING THE EARNED VALUE COST MANAGEMENT REPORT TO EVALUATE THE CONTRACTOR'S ESTIMATE AT COMPLETION. David S. Christensen, Ph.D.

Profesor: Francisco Javier Sanz Pérez. by fjspsv, PMP Test C07_01

Earned Value Management System Description

Contract Cash Flow & Performance Analysis. PERCEPTION Helping The Shipyard Stay On Budget

Unit 5: Cost Management (PMBOK Guide, Chapter 7)

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT Approval Date:

Project Control System Manual. Jefferson Science Associates, LLC. 600 Progress Status. Project Control System Manual Revision

Basics of Cost and Schedule Control

Applied Software Project Management

Earned Value Exercise. Su-Cheng Wu. MET AD 644: Project Risk, and Cost Management. Paul B. Cook, PhD PMP

Project Cost Management

plans based on actual cost, schedule and technical progress of work [1, 9].

Project Control with ProTrack

Earned Value Management Guidelines

Essential Views of the Integrated Program Management Reports. Thomas J. Coonce Glen B. Alleman

THE APPLICATION OF PERFORMANCE MEASUREMENT TECHNIQUE IN PROJECT MANAGEMENT : THE EARNED VALUE MANAGEMENT (EVM) APPROACH

CONVERTING TO PHYSICAL % COMPLETE METHOD OF EARNED VALUE IN MICROSOFT PROJECT

Applied Project Management ( APM )

// Benchmarking Project Schedules

Basic Concepts of Earned Value Management (EVM)

The Two Most Useful Earned Value Metrics: the CPI and the TCPI

Earned Value Management System (EVMS) and. Project Analysis Standard Operating Procedure (EPASOP)

What is the Health of my Project?

Module 5 Cost Management PMP Exam Questions

Chapter 7: Project Cost Management. Information Technology Project Management, Fourth Edition

FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT. Head, Office of Project Management Oversight

Chapter 7. (PMBOK Guide)

Since 1985, the Test Program Set (TPS) development

Project Management Using Earned Value

Project Cost Management

Assessing Schedule Performance with Earned Value

Earned value method as a tool for project control

BEYOND EARNED VALUE: A Better Practice for Monitoring Project Performance 2012 Dr. Kenneth F. Smith, PMP ; Project Management Consultant

A Gentle Introduction to Earned Value Management Systems

Brief Introduction to Earned Value Management (EVM)

Project Cost Management. Richard Boser

LEADING EDGE FORUM CSC PAPERS 2012 EARNED SCHEDULE: FROM EMERGING PRACTICE TO PRACTICAL APPLICATION

COST PERFORMANCE INDEX STABILITY 1. David S. Christensen Scott R. Heise INTRODUCTION

Tracking Software Development Progress with Earned Value and Use Case Point

Orange County Convention Center Orlando, Florida June 3-5, Using SAP PS Earned Value to Manage IT Projects Michael Kim

Expert Reference Series of White Papers. Importance of Schedule and Cost Control

PROJECT SCHEDULING AND TRACKING

Earned Value Management Best Practices

Agile and Earned Value. A white paper. October Author Stephen Jones, Sellafield Ltd

Financial Management and Program Management: Integration and Intersections

PMP PREP QUICK STUDY GUIDE BY THE PERSIMMON GROUP

Accounting System. Page 1 of 9

EARNED VALUE MANAGEMENT SYSTEMS (EVMS)

Procurement Management S# What? Formula Additional Notes CPPC CPFF CPAF CPIF T&M FPEPA FPAF FPIF FFP

PROJECTS SCHEDULING AND COST CONTROLS

Pune, MH, India. 2 P.G. Student, Imperial College of Engineering & Research, Wagholi, Pune, MH, India. wit.vaishnavi@gmail.com

Over Target Baseline and Over Target Schedule Guide

300 Scheduling and Budgeting

Lecture Slides for Managing and Leading Software Projects. Chapter 8: Measuring and Controlling Work Processes

Earned Value Management Tutorial Module 1: Introduction to Earned Value Management. Prepared by:

Selftestengine..PMI-SP.270 questions PMI-SP. PMI Scheduling Professional

AN ANALYSIS OF COST OVERRUNS ON DEFENSE ACQUISITION CONTRACTS 1 INTRODUCTION

Is Poor Project Management a Crime?

Earned Value Analysis of Construction Project at Rashtriya Sanskrit Sansthan, Bhopal Ankur Verma 1, K.K. Pathak 2, R K Dixit 2

Sample Examination Questions

New Tools for Project Managers: Evolution of S-Curve and Earned Value Formalism

Transcription:

Page 1 of 10 Estimating Cost at Completion - Judgment & EV Information Cost estimating is often called a "black art" and, too often, estimates are structured to fit some predetermined idea of a number that is politically salable. When ranges of estimates are prepared, opponents of the program tend to focus on the high end while proponents want to look at the low end. In the final analysis, most cost estimates are "products of management judgment". They are affected by political considerations, budgetary considerations, important upcoming events, such as technical reviews, and other factors. There is also the feeling that more/better information will be available next month or next quarter, so perhaps the estimate update should wait until then. Advocates of Earned Value Management have been accused of concentrating too much on historical information while the program manager, company management and the customer are more interested in what lies ahead and what the final cost will be. However, to figure out what the cost will be at completion requires an evaluation of the work remaining, and to determine how much work is remaining requires a solid understanding of where the program is now. Earned Value Management provides that essential information because earned value represents the amount of work accomplished in terms of the overall program target. Subtracting earned value from the program target cost reveals the budget value of the work remaining. At the conclusion of this lesson, you will be able to estimate the cost to complete a project using earned value data.

Page 2 of 10 Assumptions & Baseline Achievement All estimating is based on assumptions. If the assumption is that this program is just like the last program, historical data provides the estimate. If it is similar, but more complex, a complexity factor can be applied to make the estimate more realistic. The Earned Value Management baseline represents the plan for doing the program and considerable effort is expended to make it a meaningful, workable plan. It is updated as the program moves along to incorporate changes in scope or direction, and revised to compensate for problems experienced along the way. Assuming that the baseline validity is maintained, a reasonable estimate of cost at completion can be derived by simply adding the baseline budget for work remaining to the actual costs to date or by adding the cumulative cost variance to the program target cost. Figure 11-1 (next page) illustrates this approach. NOTE: The DAU Gold Card, available in the Course Library, provides a handy quick reference to many EVM terms and EVM metrics. It may be helpful to print the Gold Card.

DAU Gold Card Translation: (translates the word picture into mathematical formulas) EAC = ACWP cum + Work Remaining or EAC = ACWP cum + (BAC - BCWP cum) This calculation implies the assumption that all remaining work will be accomplished as planned (at 100% efficiency or CPI = 1.0).

Page 3 of 10 Figure 11-1: Estimate Based on Baseline Achievement Figure 11-1 shows how an estimate based on the baseline achievement, (if baseline validity is maintained), can be derived, by either adding the baseline budget for work remaining to the actual costs to date, or by adding the cumulative cost variance to the program target cost. D

Page 4 of 10 Cost Performance Index (CPI) Figure 11-1: Estimate Based on Baseline Achievement (previous page) showed how the target cost (80) minus earned value (35) equals the budget for work remaining (45). Actual costs (45) plus the budget for work remaining (45) equals the estimate at completion (90). Since the current cost variance is -10, if the plan is achieved, the cost variance will not change and when added to the target cost, also provides an estimate at completion of 90; target cost (80) plus the cost variance (10). If, however, the program has been overrunning, using the baseline plan from now to completion represents improved performance, and an explanation should be provided as to how this improvement will be achieved. Studies of hundreds of programs have revealed that program performance does not tend to improve. In fact, once a program passes the 15% - 20% completion point, performance almost never surpasses the average performance to date, and often gets worse. Average performance to date can be easily calculated by dividing the cumulative earned value by the cumulative actual costs. The resultant value is called the Cost Performance Index (CPI) and a number less than 1 reflects unfavorable cost performance. For example, a CPI of 0.85 means that for every dollar spent, only 85 cents worth of work is getting done. Dividing the program target cost by the CPI of 0.85 will provide a cost estimate that reflects a continuation of performance to date to the end of the program. Program managers, in reports to senior management, should be asked to explain any estimate lower than that derived using the CPI approach. Figure 11-2 illustrates this CPI technique on the next page.

Figure 11-1 D Cost Performance Index (CPI) The average cost efficiency with which work has been performed. The CPI is computed by dividing the earned value by the actual costs. CPI = BCWP / ACWP D This calculation implies the assumption that all future work will be accomplished at the same level of efficiency (Cost Performance Index) as all the work that has already been performed to date. Long Description Formula for calculating EAC. The EAC equals the BAC divided by the CPI cumulative. The CPI cumulative equals the ACWP cumulative plus the quantity BAC minus BCWP cumulative divided by the CPI cumulative.

Page 5 of 10 Figure 11-2: Estimate Based on Continuance of Actual Performance Figure 11-2 illustrates an estimate based on the Continuance of Actual Performance. D Long Description Figure 11-2: Estimate Based on Continuance of Actual Performance is the same graph as Fig 11-1, with the addition of the CPI and EST calculations. CPI = 35/45 or.78; and EST = 80/.78 or 103. Also the difference between the final actual cost curve and the target cost of the budget curve shows a variance at completion of -23.

Page 6 of 10 CPI vs. Combined Cost and Schedule Performance Figure 11-2 (previous page) illustrates the CPI technique where the earned value (35) is divided by the actual costs (45) to produce a CPI (0.78). Dividing the target cost (80) by the CPI (0.78) results in an estimate for the program of 103. This approach is simply a linear extrapolation and does not take schedule projections into consideration. In essence, it assumes that if the program is 29% overrun today, it will be 29% overrun at completion. If desired, a CPI can be calculated for a recent period of performance (e.g., last 6 months) if there is reason to believe it would produce a higher quality estimate. If dividing earned value by actual costs provides a cost performance index, then dividing earned value (35) by the cumulative budget (40) provides a schedule performance index (SPI) (0.88). If the program is not only overrunning cost, but is also behind schedule, additional cost impact can be expected either due to potential schedule slippage or from acceleration of the effort to finish on time; both alternatives cost money. Multiplying the CPI (0.78) by the SPI (0.88) provides a composite index (0.69) that can be applied to the budget for work remaining (45 divided by 0.69 equals 65) and added to the actual costs (45) to produce yet another estimate (110). Figure 11-3 (next page) illustrates this concept.

D This calculation implies the assumption that all future work will be accomplished at the same level of efficiency (Cost Performance Index) as all the work that has already been performed to date. Long Description Formula for calculating EAC: The EAC equals the BAC divided by the CPI cumulative. The CPI cumulative equals the ACWP cumulative plus the quantity BAC minus BCWP cumulative divided by the CPI cumulative. (SPI) SPI or Schedule Performance Index reflects the efficiency scheduled effort is being accomplished based on the plan. The SPI is computed by dividing the earned value by the budgeted cost for work scheduled (BCWS). SPI = BCWP / BCWS Composite Index D

Long Description Three formulas: First is EAC equals the Actuals to date plus the quantity Work Remaining divided by the Composite Index. The second is Budgeted work remaining equals Target minus BCWP cummulative. The third is Composite EAC equals ACWP cummulative plus the quantity BAC minus BCWP cummulative divided by the product of CPI cummulative and SPI cummulative.

Page 7 of 10 Figure 11-3: Estimate Based on Combined Cost and Schedule Performance Figure 11-3 illustrates an estimate based on the combined cost and schedule performance. D Long Description Figure 11-3: Estimate Based on Combined Cost and Schedule Performance is the same graph used in Figure 11-2, with the final actual cost projected out to 110. The vertical area on the graph between the end of the budget curve and the actual cost curve is labeled Projected slippage.

Page 8 of 10 EAC Calculations and Assumptions Thus a range of estimates (90, 103, 110) can be derived quickly and easily from the Earned Value Management data elements of budget, earned value and actual costs. These estimates should not be used as the final cost estimates, but as a sanity check for cost estimates derived through other methods, such as engineering estimates, grass roots estimates, parametric estimates, other statistical estimates, and estimates based on management experience. The following presentation is an essential supplement to the above discussion of EAC calculations: EAC Calculations & Assumptions (Click the link to download the PowerPoint file or access a narrated version of this presentation from the following web site; Estimate at Completion) We strongly recommend that you review this presentation before attempting the EACrelated questions in the Knowledge Review and Final Exam. At least annually, the contractor should perform a comprehensive estimate of cost at completion using a variety of estimating techniques. This estimate is needed in support of business base projections, the annual financial plan, and baseline revisions and cash flow management. The statistical techniques described above are used to update the estimate as time passes and as a cross-check against unrealistic projections.

Page 9 of 10 Estimate at Completion Knowledge Review Given the following program data, CPR Data June 2000 and Schedule Data June 2000 BCWS = $82.2M. Overall schedule slip of 8 months BCWP = $70.5M and Critical path impact milestone 5 months slip ACWP = $95.4M BAC = $105.5M Select the answer that reflects your calculated EAC (answers are approximate). $105M $145M $95.4M $185M Corrrect.

Page 10 of 10 End of Lesson You must click the Next button in order to receive credit for this lesson.