From Data Migration to Optimization: The Full Project Lifecycle of MCT



Similar documents
DSP Data and System Planning

ISL ViTO. Virtual Terminal Optimisation Tool

XTM Web 2.0 Enterprise Architecture Hardware Implementation Guidelines. A.Zydroń 18 April Page 1 of 12

The Role of Virtual Terminals in Optimising Terminal Processes. Holger Schuett ISL Applications GmbH

NAVIS (SPARCS N4) a SIMPLIFIED USER GUIDE

Drive Towards an Analytics Driven Organization using the Navis BI Portal

Marine Terminal Management Training Program

Cloud Based Application Architectures using Smart Computing

Automated Testing of a Fully Automated Greenfield Terminal: A Case Study

WEBLOGIC ADMINISTRATION

MS-10750: Monitoring and Operating a Private Cloud with System Center Required Exam(s) Course Objectives. Price. Duration. Methods of Delivery

MOC 10964C: Cloud and Datacenter Monitoring with System Center Operations Manager

AuditMatic Enterprise Edition Installation Specifications

White paper: Unlocking the potential of load testing to maximise ROI and reduce risk.

SQL Server Virtualization 101. David Klee, Group Principal and Practice Lead. SQL PASS Virtualization VC,

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest.

Port and Container Terminal Analytics

MS Design, Optimize and Maintain Database for Microsoft SQL Server 2008

Use Case: Secure and Affordable SAP HANA Cloud- Based Solutions. Kevin Knuese, Symmetry SESSION CODE: SM1833

Distribution One Server Requirements

MagDiSoft Web Solutions Office No. 102, Bramha Majestic, NIBM Road Kondhwa, Pune Tel: /

ACTIVE MICROSOFT CERTIFICATIONS:

Cloud & Datacenter Monitoring with System Center Operations Manager

Course 10174B: Configuring and Administering Microsoft SharePoint 2010

Designing, Optimizing and Maintaining a Database Administrative Solution for Microsoft SQL Server 2008

1.0 Hardware Requirements:

COMPARISON OF VMware VSHPERE HA/FT vs stratus

Windows Server 2008 R2 Hyper V. Public FAQ

Monitoring Remedy with BMC Solutions

Migration Scenario: Migrating Backend Processing Pipeline to the AWS Cloud

Eliminate SQL Server Downtime Even for maintenance

High Availability & Disaster Recovery Development Project. Concepts, Design and Implementation

EUROGATE: The Leading Container Terminal Logistics Network in Europe. 100 % Screening Is security affordable?

6231A - Maintaining a Microsoft SQL Server 2008 Database

OBSERVEIT DEPLOYMENT SIZING GUIDE

Course: 10174B: Configuring and Administering Microsoft SharePoint 2010

A Middleware Strategy to Survive Compute Peak Loads in Cloud

Legal Notices Introduction... 3

itelligence Implements SAP ERP Powered by SAP HANA

Contents UNIFIED COMPUTING DATA SHEET. Virtual Data Centre Support.

המרכז ללימודי חוץ המכללה האקדמית ספיר. ד.נ חוף אשקלון טל' פקס בשיתוף עם מכללת הנגב ע"ש ספיר

EDI Modernization Case Studies and Best Practices

Winning the J2EE Performance Game Presented to: JAVA User Group-Minnesota

User Guide for VMware Adapter for SAP LVM VERSION 1.2

Diablo and VMware TM powering SQL Server TM in Virtual SAN TM. A Diablo Technologies Whitepaper. May 2015

Enterprise Architectures for Large Tiled Basemap Projects. Tommy Fauvell

IT Service Management with System Center Service Manager

Maintaining a Microsoft SQL Server 2008 Database

Microsoft Dynamics 2011: MS Installation and Deployment

Cisco Network Services Manager 5.0

Backup Exec System Recovery Management Solution 2010 FAQ

System Requirements for Microsoft Dynamics SL 2015

Project Manager 1 Post == Experience years in Project Management in reputed company, Salary Rs.1,20,000/-

City of Coral Gables

Relational Databases in the Cloud

Providing Self-Service, Life-cycle Management for Databases with VMware vfabric Data Director

IT Service Management with System Center Service Manager

Ease Server Support With Pre-Configured Virtualization Systems

SQL Server Business Intelligence on HP ProLiant DL785 Server

Performance White Paper

How To Migrate To Redhat Enterprise Linux 4

Course Syllabus. At Course Completion

Net Developer Role Description Responsibilities Qualifications

Using Multipathing Technology to Achieve a High Availability Solution

Best Practices for Virtualised SharePoint

DMS Performance Tuning Guide for SQL Server

Embedded Operating Systems in a Point of Sale Environment. White Paper

SQL Server 112 Success Secrets. Copyright by Martha Clemons

FUNCTIONAL OVERVIEW

ClearPass Policy Manager 6.3

IT Architecture Review. ISACA Conference Fall 2003

How Customers Are Cutting Costs and Building Value with Microsoft Virtualization

Moving SAP Off Mainframe to SQL Server Nets Australia s QR Limited U.S.$100,000 a Month

SharePoint What's New, What's Not. Colin Phillips :: SharePoint MVP & Consultant :: itgroove

A customer relationship management tool for sea-freight forwarders

How to Prepare for the Upgrade to Microsoft Dynamics CRM 2013 (On-premises)

SAP BusinessObjects BI 4.0 Installation Deployment Tips Dhirendra Gehlot Shivaji Patnaik

10964C: Cloud & Datacenter Monitoring with System Center Operations Manager

10231B: Designing a Microsoft SharePoint 2010 Infrastructure

6445A - Implementing and Administering Small Business Server 2008

America s Most Wanted a metric to detect persistently faulty machines in Hadoop

Oracle RAC Services Appendix

Centralized Orchestration and Performance Monitoring

Course 2788A: Designing High Availability Database Solutions Using Microsoft SQL Server 2005

Out of the Fire - Adding Layers of Protection When Deploying Oracle EBS to the Internet

Mule Enterprise Service Bus (ESB) Hosting

redborder IPS redborder Just common sense IPS overview Common sense

Virtualization Technologies and Blackboard: The Future of Blackboard Software on Multi-Core Technologies

6231B: Maintaining a Microsoft SQL Server 2008 R2 Database

Day 1 - Technology Introduction & Digital Asset Management

GeoCloud Project Report USGS/EROS Spatial Data Warehouse Project

SolovatSoft. Load and Performance Test Plan Sample. Title: [include project s release name] Version: Date: SolovatSoft Page 1 of 13

IBM Tivoli Monitoring for Databases

Advanced Server Virtualization: Vmware and Microsoft Platforms in the Virtual Data Center

Cloud Computing: Meet the Players. Performance Analysis of Cloud Providers

Transcription:

From Data Migration to Optimization: The Full Project Lifecycle of MCT Marco Fehmer, DSP General Manager Session 204 - March 30 4:25 pm Telegraph Hill CONNECT. COLLABORATE. INNOVATE.

Nice to meet you Marco Fehmer DSP - General Manager Since 1986, DSP provides IT solutions and business operations consultancy for the shipping industry. DSP is certified NAVIS Implementation Partner and First Line Support Centre DSP is active on international TOS projects and collaborate with industry key players TOS Professional Services Project Management Data migration Installation and Configuration Product Training and Best Practice Go-Live assistance Field Development Operations Shadowing First line Maintenance & Support NAVIS SPARCS Optimisation: Prime Route, Expert Decking, Autostow Automation Integration EDI configuration

MCT January 30 th 2015 Contship Italia Group s MEGA-HUB in Gioia Tauro, received the largest ever containership to call at a port in Italy. MSC London 184.100 tons 16.652 TEU

MCT February 27 th 2015 Performance levels at Contship' maritime terminals continue to be stretched in support of our valued customers. During the first AM1 service call in Gioia Tauro, a record performance was achieved by Medcenter Container Terminal (MCT) on m/v MSC Bettina. Berth operations involved over 5,000 moves and during the third shift of February 17th on crane 19, our MCT team handled 237 container in just 5.5 hours for a Gross Crane Productivity (GCP) of 43 moves/h.

MCT Med Center Container Terminal 3.391 mt berth 1.600.000 sqm yard 22 Quay Cranes 110 Straddle Carriers 1.200 employees 3.5 Mio TEU

Past Functional Architecture Custom System Terminal Dashboard HR Roster Reporting and KPI Customs Technical Department Billing Finance, Treasury, Accounting, Cost Control, Purchase, Warehouse Payroll, Access Control, TVCC,.. Data interchange layer COSMOS EDI CTCS SPACE TRAFFIC SHIPS Web Access Reefer PDS

TOS Functional Architecture Custom System Terminal Dashboard HR Roster Reporting and KPI Customs Technical Department BILLIT Tariff and billing Finance, Treasury, Accounting, Cost Control, Purchase, Warehouse Payroll, Access Control, TVCC,.. Data interchange layer Container Control (bookings, Bill of Lading, Holds, Inspections) ECN4 N4 Mobile SPARCS N4 Rail Planning Ship Planning Yard Planning Berth Planning Optimisation: Prime Route Expert Decing Autostow XPS N4 Integration EDI Web Access Reefer PDS N4 Extensions

Project Scope BILLIT Tariff and billing Data interchange layer Container Control (bookings, Bill of Lading, Holds, Inspections) ECN4 N4 Mobile SPARCS N4 Rail Planning Ship Planning Yard Planning Berth Planning Optimisation: Prime Route Expert Decing Autostow XPS N4 Integration N4 Extensions

Project Team MCT Project Manager Operations Key Users IT developers IT systemist DSP Project Coordinator N4 Consultant XPS Consultant N4 Field Developer Contship Italia Operations Support IT development NAVIS Support N4/XPS consultant N4 Field Developer Optimisation consultants Infrastrcture consultant

Approach 1 2 3 4 SANDBOX WOODBOX BRICKBOX CRYSTALBOX O&A GAP analysis Solution design (interfaces, modules, ) Project plan definition Core N4 configuration Key users and project team training Procedure reviews In house SW Development N4 configuration and customization Interfaces Test cases definition Tests by modules Tuning requirements IT infrastructure Data Migration strategy Delivery of solutions Integration End-to-end process tests Final training Procedures approval Soft Go Live Go Live Post Go Live Support Tuning of operations process optimisation (i.e. SC global pooling) Role assessment Yard Planning Strategy

Key Milestones Feb 2013 Kick off meeting Jan 2014 DSP Billing System Go Live May 2014 Soft Go Live Wi Fi Go Live 12th June 2014 Go Live October 2014 Upgrade Jun 2013 Feb 2014 Oct 14 sandbox woodbox brickbox crystalbox 5 months 8 months 8 months 5 months SN4 2.4.3.4 SN4 2.5.2.1 SN4 2.5.6 SN4 2.5.9.2 2.5. 6.1 2.5. 13

Challenge General risks Day by day business. Terminal is working H24 at high capacity IT Infrastructure New Wi-Fi deployment Hardware architecture to be renewed (from AS400 to Microsoft platform) EDI concept EDI engine in house product Business logic out of N4 (no business rules) Training Huge number of users to be trained New TOS and new operations process

EDI Elements: N4 Integration Development Tools: Java, Spring, Hibernate, Quartz Scheduler Application Server: Tomcat Database: PM,JEDI,JTOS JMS Queue Manager: ActiveMq (open sourse) N4

Challenge Interfaces and integrations Interface with in-house operational monitoring systems Connection to exisiting Customs system on AS400 Interface with Maintenance Department Reefer management GPS and PDS integration New automated billing system DSP «BILLIT» Go Live

Main Gaps MULTI TRAILER Management (in house development + ECN4web) Split move concept (state model yard move filters) Prevent 4th tier SC to serve older and smaller QCs (groovy) SC activity recording (in house development + ECN4web)

Testing

Infrastructure stress test @ 3.5 Mio Teu 3.5 Mio TEU avarage peak reccomandation N4 center and cluster 17% 35% nn XPS 33% 66% nn ECN4 20% 27% nn Database 30% 40% 24 CPU Cores - 64 Gb RAM - 1.5 TB Disk Phisical hardware for SQL ECN4 Database XPS N4 cluster 5 May 2014 Infrastructure audit

The Go Live Chronicles Gioia Tauro, June 12th 2014

Key Facts 16 months : from kick off to go live 40.000 hrs : Total man hours deployed 1.200: Number of MCT people trained 1 pm : Stop of commercial operation 2 hours : Data Migration 35.674 : Containers in yard migrated 7 pm: Go Live with NAVIS N4

Go Live Strategy Complete vessel operations along quayside Send EDI Stop all activities Data Migration Legacy software parameter changes Switch of first pool of equipment RDTs to ECN4 Check of data migration Start operation on 1 vessel 2 gangs

Customer is always right Intial Go Live plan has been re-worked 2 hours before stop of operations Strong pressure from the customer forced to add a new Vessel to initial go live planned scenario: Discharge shall be completed with Cosmos Load shall be performed with N4 (..think about restows, EDI, customs declarations) Go live has been performed on 2 vessels and 7 QCs in few hours

Forcing the TBD process

Ship Planners Ship planners had to change their habits: From «stand alone» to real time operations Setting up the Quay Commander Monitor the paper process quayside Communicate all changes to dispatchers

Drivers and Checkers SC Drivers: With Cosmos they pushed for instruction, with XPS they are pooled by the system Initial Job stepping unreliability Hatch Clerks: Hard to monitor their actions and support them All system warning should have been translated in Italian Differente habit, tally in real time, not stick on paper and than update off line in checker cabin

IT systemists AS400 (i5) mainframe is a different in respect of Microsoft Server and Microsoft SQL Server IT Infrastructure is not running in the backgroung anymore shall be maintened and monitored Some example: Database crash MS SQL Server patch to be applied Temp DB oversize: stop of updates DB crashed huge queue of messages from XPS that took hours to recover DB slow down importing simultaneously 2 big BAPLIES

Post Go Live To reduce risks, OPTIMISATION and planning strategies updates/changes have been postponed, waiting for personnel to be confident and pratical on N4 reviewyard planning strategy (from SPACE to Expert Decking) Pooling by Vessel as a must decrease of yard shiftings by use of weight classes and weight inversion penalties Fill the training weakness More attention to Hyperic

Next Steps Global Pooling Review of terminal viability to facilitate mix of SC flows from to yard/berth Equip all SCs with new radio (automatic group switch) Tune PR parameters Optimised discharge load transition dispatching of load moves before completion of discharge (double cycling) shall be enabled automatically accordingly to each QC buffer capacity

Larned Lessons do not underestimate the role of the IT systemist and the key role that infrastructure plays on terminal perfomances TRAINING to end users performed by terminal key users shall be double checked. Collecting signatures «I was there» is not enough, better request a formal certification/exam Staff properly the TOS team, with special attention to Post Go Live support Don t break agreed rules, sometimes customers comes second

Thank you for your attention! Meet us at DSP booth Contact us: www.dspservices.ch info@dspservices.ch Linkedin DSP