Languages: : French (Mother tongue), English (Fluent), Portuguese (Basic Level)



Similar documents
Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

Facilities Asiaflex Products

UNDERSTANDING IN DEPTH, COMMITTED TO CORE.

Graduate Engineer Development Scheme (GEDS)

il Castorone la più avanzata nave posatubi al mondo: acquisti e logistica Paolo Daleffe Armando Favi

Worldwide Technip in Nigeria

Anchored by excellence

Life-of-Field. seabed-to-surface

Worldwide Technip in Norway

EMAS AMC. Floater & FPSO installation SURF installation Lewek Crusader EMAS MARINE. Lewek Fulmar and Lewek Lark

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011

Technip in Norway. 1 Technip in Norway

Kodiak Deepwater Project Challenges and Solutions

Delivering Riser Engineering and Software Solutions

Total Subsea Solutions

Worldwide Engineering centers in the Middle East

Offshore Structures. Offshore Drilling Equipment

Offshore Work Packages

Engineering and technologies Floating LNG

DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project

Technip Presentation. Knut Bø, Nyttårsoil Seminar, Orkanger 14. januar 2009

FIRST QUARTER 2006 RESULTS Earnings per Share Up 22.6%

OTC Jubilee Field FPSO--A Fast Track Delivery Success R. Cory Weinbel, Anadarko Petroleum Ronaldo Araujo, Anadarko Petroleum.

SAMPLE TRACK RECORD.

TECHNIP IN NORWAY GENERAL PRESENTATION

Facilities Pori construction yard

Offshore platform/facility provider

Subsea Market Review. Subsea 2011 February 9 10, Quest Offshore Resources, Inc. 1

Heerema Fabrication Group Zwijndrecht Yard. Bart Pluijmers Asset & Facility Manager 03 oktober 2014

Our mission is to be a solid and flexible partner by delivering unique and challenging projects. We are present in OFFSHORE OIL & GAS

Technip, Share Fair Caroline BENNETT Contracts & Insurance Manager Debbie WYNESS UKBU Supply Chain Manager 5 th November 2014, Share Fair

Competitive Edge through System Engineering

COMPANY PROFILE.

TECHNIP AT A GLANCE 2014

Technip Offshore Finland

SBM OFFSHORE Q TRADING UPDATE SOLID PERFORMANCE WITH IMPROVING MARKET

13. FPSO Operational Problems Don Smith, OGP

Marine integrity monitoring Offshore oil and gas

Saipem UK Ltd. Saipem. Eni. for graduate engineer recruitment

The Announcement of Organizational Changes

GE Oil & Gas Subsea Systems. 1 GE 2012 All Rights Reserved Unauthorised Reproduction Prohibited

TECHNICAL INFORMATION

Rockwell Automation in Oil & Gas

Bundle Pipeline Systems & Shell FRAM Development Iain Watson & Peter Walker

Nigerian/Local Content Policy

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

RENEWABLE ENERGY IN FIFE Skills and Supply Chain

TULLOW OIL SUPPLY CHAIN

NOTICE INVITING EXPRESSION OF INTEREST FOR FORMING AN ALLIANCE WITH COMPANY OWNING, OPERATING & EXPERIENCED IN CONVERTING/ BUILDING FPSO

Taking it further with Technip

and to mutually agree mitigation measures to reduce identified concerns and risks to acceptable levels.

EXPERTISE NEEDED EXPERTISE FOUND

Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd.

Integrated Consulting Cut Sheet

How To Build A Major Oil And Gas Project

SUBSEA 7 S.A. ANNUAL REPORT

COMPANY PROFILE IMCA MEMBER.

Depth-independent solution for Offshore Wind the WindFloat

Transparency Market Research

Offshore Oil and Gas. Experience and Capabilities

Agenda. Det norske always moving forward Ivar Aasen project learning points Field development what will it take? Observations

Parker Maritime AS. 11. AICON 3D Forum - March 12th Metrology subsea using AICON's photogrammetry - The timesaver.

Topsides, Floaters & Onshore Facilities

SUPPLIERS INFORMATION SESSIONS MARITIME LINK PROJECT. Contract for Submarine Cable Design, Supply and. Contract No. E11-18

UNDERWATER ENGINEERING SERVICES. Visit Us Online At Part of the ATR Group

Facilities Flexibras Tubos Flexíveis Ltda

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

27 February Nantes Conference of Peripheral Maritime Regions of Europe

The innovation and collaboration imperatives of the upstream oil and gas industry in Australia

The Technology Challenge. Agenda - The Technology Challenge

PROJECT MANAGEMENT SERVICES

GLOBAL RECRUITMENT AND RESOURCE MANAGEMENT SOLUTIONS FOR THE OIL & GAS INDUSTRY IN AUSTRALASIA AND BEYOND PROVIDING PEOPLE POWER

Crowley Maritime Corporation - Strategic SWOT Analysis Review

Offshore engineering. an Atkins company

Our business approach Technip PMC

Technip Offshore Finland

International Oil, Gas, Energy and Marine Specialists

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

MBA Experience Overview

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

2nd quarter results August 2011

TOMORROW. A Technip Technology Publication - Issue 6 - April Tomorrow-Technip-April 2015

INTEGRATED RISK MANAGEMENT SOLUTIONS

Oil and Gas Steve Oliver

Fugro-impROV Global Intervention Tooling Solutions

DELTA HOUSE PROJECT APPROVED; ARCLIGHT TO PROVIDE FINANCING. Covington, LA: December 13, LLOG Exploration Company,

How To Operate A Pipelay Vessel

Year Client & Destination Description Photo

5.3 Offshore Platforms Overview

Single Point Mooring System (SPM) for an Offshore LNG Terminal

Engineering g Procurement. 02-Feb-2015

2015 CT Offshore A/S Diving Assistance Sub Station Debris Clearance WODS Wind Farm

How to achieve and maintain market leadership position in subsea from Norway

Det norske a new large independent. Odd Ragnar Heum, Det norske oljeselskap ASA

SWIMMER. An innovative Subsea Intervention System for Deep Offshore Fields. Jean-Jacques QUESNEL CYBERNETIX S.A. Oil&Gas Division

OIL & MARINE PRODUCT RANGE. Dock & onshore Floating roof tank drain Mooring Rig supply

Maritime Human Resources Solutions Seminar. Robert Cadigan President & CEO Newfoundland & Labrador Oil & Gas Industries Association

Kongsberg Maritime Torfinn Kildal, President

Setting a Global Standard. SingleBore Subsea Completion System

Transcription:

curriculum vitae Name: : Jeremy de BARBARIN Position: : Engineering Manager Date/Place of Birth: : 14 th of June 1973 in Marseille (France) Nationality: : French Languages: : French (Mother tongue), English (Fluent), Portuguese (Basic Level) Profile: Over 15-years experience in engineering and project management of major offshore subsea development projects in the Oil & Gas industry, primarily in the design, fabrication and installation of subsea structures and flexible pipes, and design and installation of rigid pipes. Proven leadership skills gained from managing engineers and draftspersons from different nationalities, and managing subcontractors. Education: Sept 1998: June 1996 Oct 1995 June 1994 July 1991 Engineering degree from the school attached to the University of Toulon (I.S.I.T.V.) in Marine Engineering option MS in Aeronautics BS in Aeronautical Maintenance Polytechnic degree in Mechanics Baccalaureat (French equivalent of C.S.E. A levels, majors in Science) Courses: Major Internal courses while working with Coflexip Stena Offshore / Technip: - Project Management Level I; - Flexible Pipe Manufacturing; - GPRS: Global Presentation of Technip products and work; - OED Level II: Seminar for structural engineers (welding, fatigue ); - PED Level II: Seminar for structural and flexible design engineers. Major Internal and external seminars while working with Acergy / Subsea 7: - Manager Development Program; - Project management foundation program; - Engineering Management Development Program developed with Cranfield University, UK; - Proposing to Win; - Bridging the Gap between Leadership, Management and the People who really get the Results; - Powerful Presentation. Jeremy de BARBARIN - Page 1 of 5

Experience: Present Employment: Since September 2013 Subsea 7 Lisbon, Portugal Engineering Manager I m currently seconded to the newly open Subsea 7 office in Lisbon as Engineering Manager. I m in charge of creating and developing the new engineering office of Subsea 7 in Portugal; the objective of this office being to support the development of the group in countries like Angola, Brazil and Mozambique. March 2011 August 2013 Subsea 7 Lagos, Nigeria Engineering Manager October 2012 August 2013 September 2011 August 2013 Engineering Manager for Globestar. In addition to my role of Engineering Manager for Ofon 2 project, I created and started the development of the engineering department of Subsea 7 in Nigeria. The department employs about 40 Local and expatriate engineers working on hook-up preparation and completion scopes as well as supporting large EPCI contract such as Erha North Phase 2 for the topside design scope. Engineering Manager on Ofon 2 project (Total E&P Nigeria). EPIC contract for Rigid Flowlines, Spools, Risers and 2 power cables offshore Nigeria in 37m water depth. T&I contract for 2 jackets, 2 topsides and 2 bridges in between new and existing topsides. I was supervising all the design engineering scope done in Nigeria by Global Oceon (44,000 Manhours). Scope includes pipeline design and installation analysis, Spools and Risers design and structural design of riser clamps and riser guards. March 2011 September 2011 Engineering Manager of the Nigerian Design Engineering subsidiary, Global Oceon. I participated to the growth of Global Oceon. It included managing the engineering team of about 30 pipeline and structure engineers and draftsmen, participating to tendering and prequalification activities and managing small engineering Jeremy de BARBARIN - Page 2 of 5

some projects for MPN (Mobil Production Nigeria). Aug 2006 March 2011 Acergy / Subsea 7, Singapore Discipline Manager As part of the engineering management team, I have been participating to the development of the growth and the expertise of the engineering department in the AME region (Asia & Middle East). I have been leading a group of more than 35 people spread over the region (Perth, Jakarta, Singapore and the joint venture in Kuala Lumpur). My team has been supporting projects and tenders for engineering scopes such as Permanent equipment and Installation Aids design, Assets modifications, Welding, Material, Fabrication, Naval Architecture, Structure Lowering Method and Analysis, Pipelay Method and Analysis 2009 2011 Discipline Manager for the Marine, Structure and Pipeline Group 2006 2009 Discipline Manager for the Design and Fabrication Group. Previous Employment: In addition to my role of Discipline Manager, I have been: - Coordinating the Structures discipline seminars, which objectives are to share knowledge, challenges and lessons learned and to set up the Acergy Group s Best Practices. - Managing some pre-feed and FEED studies, prequalifications and bids: - Liuhua FPS mooring disconnection, chain replacement and re-hook-up FEED study for CNOOC. - Corrosion Resistant Alloy (CRA) Pipe Samples welding and mechanical tests for Inpex Ichthys. - CRA Pipe Samples welding and mechanical tests for Woodside Sunrise. - Steel Catenary Riser (SCR) and Pipelay installation pre-feed for Woodside Browse - Managing the technical part of pre-qualifications and bids: - Inpex Ichthys Pre-Qualification - Gorgon Heavy-Lift Pre-Qualification Jeremy de BARBARIN - Page 3 of 5

Aug 1998 July 2006 Coflexip Stena Offshore / Technip, France Structural Design Engineer Integrated in project teams, I participated to offshore field developments in shallow to deep waters and mainly located in Western Africa. It included: - Leading teams of engineers; - Design of subsea structures, permanent equipment. seafastening and installation aids; - Follow up of sub-contractors and suppliers; - Preparation of installation procedures; - Mobilisation of Barges, Transport vessels, flexible pipe laying vessels and construction vessels; - Offshore missions on flexible pipe laying vessels, construction vessels and offshore platforms. 2004 2006 Lead of the structural design team (8 engineers) for DALIA project (Total, Angola). EPIC contract for Rigid Flowlines, Flexibles Risers and Umbilicals offshore Angola in 1,500m water depth. My team was in charge of the design of all the permanent equipment and installation aids required for the projects, as well as seafastening design. Main equipment designed were 28off 12 production PLET, 33off 10 ILT, the riser connection systems to the FPSO and export buoy. It also included the follow up of the sub-contractor in charge of the design and manufacturing of a 300t winch located on a gantry beam for Riser pull-in at FPSO, the suction pile design for FPSO anchoring, flowline laying initiation and flowline restraints. 2001 2003 Lead of the structural design team (6 engineers) of EPS Projects: XIKOMBA (ExxonMobil, Angola), ZAFIRO SEA & Ekanga Notch (ExxonMobil, Equatorial Guinea). EPIC contracts for Rigid Flowlines, Flexibles Risers and Umbilicals offshore in West Africa in 800m to 1,500m water depth. My team was in charge of the design of all the permanent equipment, installation aids and seafastening required for the projects. In addition to leading the team, I was also in charge of the technical follow-up of the sub-contractors and was sent to Angola to prepare and participate to the 1st Mobilisation of the vessel and the 1st offshore trip. 2000 2001 Structural design engineer on K1A & KEN/C Rigid Sealines project (TotalFinaElf E&P Nederland B.V., Netherlands). Jeremy de BARBARIN - Page 4 of 5

EPIC contract for Rigid Flowlines in shallow water in North Sea. Design of subsea equipment and follow-up of manufacturers (Subsea structures and spool pieces manufacturing). Follow-up of flowlines testing sub-contractor. Client representative on the production platform during precommissioning activities. 2000 Engineer on ERIKA Tanker Cargo Recovery Project (TotalFinaElf, France). EPIC contract for the recovery of the oil located in the tanker ERIKA which sank offshore south Brittany in December 1999. Logistic at the onshore base in Brest. Organisation of the mobilisations. Mission on-board the diving support vessel. 2000 Structural design engineer on TERRA NOVA project (Petro- Canada, Newfoundland). EPIC contract for Flexible Flowlines and Risers. Design of Installation Aids. Mobilisation of the construction vessel. 1999 Structural design engineer on KUITO Phase 1A & 1B projects (Chevron, Angola). EPIC contract for Flexible Flowlines and Risers and Umbilicals offshore West Africa in 500m water depth. Design of subsea equipment. Mission for risers hook-up and risers and flowlines hydrotesting on the production platform (FPSO). 1998 1999 Structural design engineer on ZAFIRO Gas Lift project (Mobil, Equatorial Guinea). EPIC contract for Flexible Flowlines and Risers offshore West Africa in 100m water depth. Design of subsea equipment and follow-up of manufacturers. Mission on the flexible pipe laying vessel. Jeremy de BARBARIN - Page 5 of 5