Watts Towers of Simon Rodia State Historic Park



Similar documents
COMMONWEALTH OF VIRGINIA CITY OF RICHMOND REHABILITATION AGREEMENT W I T N E S S E T H:

Building Foundation and Structure

Historic Preservation Principles and Approaches

The Secretary of the Interior s Standards for Rehabilitation

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Reference: BRM A0 July 18 th, Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

VILLAGE OF SCHAUMBURG HISTORIC BUILDINGS RESTORATION GRANT PROGRAM

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, (68 pages)

Mezalick Design Studio, LLC Stained Glass ~ Mosaics ~ Promotions

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

GUIDE TO WINDOW REPAIR & REPLACEMENT FOR HISTORIC PROPERTIES

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Chapter. Restoration of Damaged Structures

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022

Dunbar Hotel S. Central Avenue, Los Angeles, CA (Constructed 1928)

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

POLICY NUMBER: C450B SUPERSEDES: C450A. Policy to Encourage the Designation and Rehabilitation of Municipal Historic Resources in Edmonton

2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award George Washington University Ross Hall Façade Restoration

Analysis II Façade Redesign: Architectural Precast Panels

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

Materials and Colors

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No December 2014

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Failing Coastal Wood Infrastructure on the Great Lakes

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

REQUEST FOR EXPRESSIONS OF INTEREST FOR THE STABILIZATION, REHABILITATION, DEVELOPMENT AND ADAPTIVE REUSE OF THE NEW YORK STATE PAVILION

Commercial Roof Inspection Form

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

PRE INSTALLATION MANUAL

SECTION STORM DRAINAGE SYSTEM

Garver Feed Mill Condition Evaluation

Vision Home Inspection

Conservation of Heritage Structures & Older Buildings

SECTION 807 PUMP STATION REHABILITATION

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California Prepared By

Repair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study

Prestressed Storage Tanks

LAYING BLOCK AND BRICK

Condition assessment and repair of antenna towers concrete foundations

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation

An ordinance pertaining to the Maya Angelou Birthplace, located at 3130 Hickory Street (the

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

6 RETROFITTING POST & PIER HOUSES

New York State Office and Historic Homeownership Rehabilitation Tax Credit

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Building Restoration

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes

CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST

Commercial Roof Management

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Construction Technologies Career Field Pathways and Course Structure

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: NORSE, INC.

The Secretary of the Interior s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring and

Building Code Clarifications - 7. Fire Resistance

EAST LYME HIGH SCHOOL

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Winterizing Your Building

Assessment Report for Windmill Rehabilitation Project. Anne Curren, Town Clerk Town of North Castle 15 Bedford Road Armonk, New York 10504

Roof Inspection. Summary Report

Stay Cable Replacement of the Luling Bridge

Hunter College school of Social Work Thesis Proposal

The Orange County Farmers Museum Emergency Preparedness Plan

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

First in Service First in Safety

CHAPTER 15 DISASTER COST RECOVERY PROCEDURES

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Photos showing the change in condition from 2006 to 2012 are located in Appendix A.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Building Condition Assessment: North Howard Street Baltimore, Maryland

Richmond Memorial Civic Center Rehabilitation Project

How To Replace A Roofing System In Florida

Protecting Your Pools Crack Treatments

Bolting: Attachment Of The Mudsill To The Foundation

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

SUMMARY. February 19, 2015

Asphalt Shingle Application Requirements

Elevating Your House. Introduction CHAPTER 5

Position Classification Flysheet for Exhibit Specialist Series, GS Table of Contents

Seismic Retrofitting for School Buildings in Japan Nonstructual Seismic Retrofitting

City of Kingston Information Report to Municipal Heritage Committee Report Number MHC

Specification for Pipe Coating Repairs Offshore

Residential Window Replacement Design Guidelines

Water Damage During Construction

Sewer Rehabilitation Design Requirements

Transcription:

Watts Towers of Simon Rodia State Historic Park Conservation Program Department of Cultural Affairs City of Los Angeles Mayor Antonio R. Villaraigosa Councilwoman, District 15 Janice Hahn Executive Director, Department of Cultural Affairs Olga Garay

History 1921 Simon Rodia began construction 1955 Construction ceased 1963 Historic-Cultural Monument #15 - City of Los Angeles 1977 National Register of Historic Places - National Park Service 1990 National Historic Landmark - National Park Service

History of Ownership 1921 1955 Simon Rodia (1879-1965) 1955 Louis Sauceda (neighbor) c1955 1959 Joseph Montoya 1959 1975 William Cartwright/Nicholas King (Committee for Simon Rodia s Towers in Watts) 1975 1978 City of Los Angeles Department of Public Works 1978 Present Department of Parks and Recreation, State of California Conservation and tour programs operated by Department of Cultural Affairs under an 50-year lease (1978-2028) with Department of Parks and Recreation.

Watts Towers Restoration Handbooks The 1983 Ehrenkrantz Group Reports Preservation Plan Maintenance and Restoration Guide Secretary of the Interior s Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings Guidelines for Practice of the American Institute for Conservation of Historic and Artistic Works

DCA Conservation Staff 1987 1988 Conservator, Myrna Saxe (PT contractor) 1987 2000 Engineer, Bud Goldstone (PT contractor) 1988 1994 Conservator, Zuleyma Aguirre (PT contractor) 1991 present Historic Site Curator, Virginia Kazor (FT) 1994 2006 Conservator, Zuleyma Aguirre (FT contractor) 2000 present Structural Engineer, Melvyn Green (PT contractor) 2006 present Conservator, Zuleyma Aguirre (FT) 2006 present Conservation Technician, Clinton Peterson (FT)

DCA Conservation Staff Responsibilities Conservator Assesses condition and performs Conservation procedures; trains and supervises conservation technicians; reviews completed work Historic Site Curator Provides administrative support including: site management, grant and report writing Conservation Technician Executes repairs under the supervision of the conservator DCA Consultant Structural Engineer Examines damage and designs structural repairs

Preservation/Conservation Philosophy Adopted in 1978, the basic philosophy is to: repair all cracks in the mortar coverings; remove rust from steel; replace damaged reinforcements; and clean, reattach and preserve ornaments. Conservation of the Towers is endless. The problems are born of the nature of the towers and their creator on one hand, and the limits of building science on the other. Maintenance and Restoration Guide Much of Simon Rodia s... effort consisted of painstaking and persistent repair. Maintenance and Restoration Guide Permanent solutions are elusive because of structural indeterminacy. Melvyn Green, Structural Engineer

Method of Construction Metal armature made of short pieces of steel that overlap are held together with steel or copper wire (Rodia used no welds). Mortars of varying composition and consistency cover the framework. Decorative elements including tile, crockery, glass and sea shells are embedded in the soft mortar.

The Conservation Challenge Prevent water from penetrating through mortar cracks on: 17 sculptures 2,500 joints 54 slender columns 159 exterior bands 64 wall panels 160 overhead arches

Why do cracks occur? Seismic activity (1994 Northridge earthquake) Hail storms (2003) Wind storms Rain storms (2004-2005) Vibration Natural degradation of materials

Structural Conservation Procedure Photograph crack or compromised area Open existing crack to assess condition of steel armature and photograph Clean the exposed rusted steel where structural stability is not compromised Remove compromised steel and replace with new material Wrap steel with wire mesh Cover with mortar and reattach decorative materials if applicable Photograph finished repair

Description of a Typical Crack Repair Photograph crack Protect surrounding surface with polyethylene plastic Clean crack with tools, brushes, water or air pressure Degrease concrete with acetone Inject epoxy into crack leaving a shallow void Fill shallow void with custom concrete mix Remove excess fill material Either reattach original ornament or - apply color and/or carve designs into concrete to replicate original surface where appropriate Photograph and enter repair information into database

Baseline Photographic Documentation Begun in 1986 and completed in 1992 Comprised of approximately 5000 images Each keyed to a detailed grid and represents a four foot square area The foundation for all conservation work Photograph, Marvin Rand Ship of Marco Polo, North view, A level, Photograph 1, 10.13.87

Documentation Baseline photographs Access database (transferred in 2001 from Paradox now archived) Digitization of historic records Process Photograph area to be repaired and compare to baseline photograph Perform intervention including photography Photograph completed intervention Input data and images into database Send paper data to City archive for storage

Reviews of Conservation Practices and Records 2004 DCA contract staff Structural Engineer, Melvyn Green and and Conservator, Zuleyma Aguirre request State review of conservation work done to date 2005 State Parks retains Architectural Resources Group (ARG) Phase I - Evaluation and Conservation of Fissures Report 2006 State Parks commissions ARG report Phase II Documentation Synthesis and Materials Research 2008 F.E.M.A. awards $569,000 reimbursement for storm damage repair award based upon, sufficient, credible records document the condition of Watts Towers before and after the 2005 January winter storms...

Architectural Resources Group (ARG) Evaluation and Conservation of Fissures Report -2005 Assessed existing condition and evaluated potential treatments for the fissures found in the upper portions of the three tallest structures and ornamental floor. RECOMMENDATIONS 1. Implement routine inspections every 2-5 years 2. Do further documentation research and materials testing 3. Perform tests to determine the concentration of moisture 4. Replace existing incompatible repairs

Architectural Resources Group (ARG) Evaluation and Conservation of Fissures Report - 2005 Action Taken to Date on Recommendations 1. Most recent inspection completed in 2009 2. Selected testing completed by Conservation Consultant, Rosa Lowinger temporarily on hold due to lack of funding 3. Moisture testing on hold due to lack of funding 4. Existing incompatible repairs are being corrected as part of the F.E.M.A.- funded repairs

Architectural Resources Group (ARG) Documentation Synthesis and Materials Research Final Report -2006 Synthesized previous documents and researched materials and methods for crack mitigation and repairs. RECOMMENDATIONS 1. Create a web-based, three-dimensional computer model to facilitate public access to documentation 2. Identify appropriate archive for record retention 3. Update computer technology 4. Update baseline photograph documentation 5. Regularize maintenance program

Architectural Resources Group (ARG) Documentation Synthesis and Materials Research Final Report - 2006 Action Taken to Date on Recommendations 1. A dedicated server needs to be acquired to implement recommendation 2. Paper records are now sent to the City archive for record retention 3. Hardware has been acquired software on hold pending funding 4. Photographic updating is part of crack repair documentation 5. F.E.M.A.-funded disaster work in progress but regular maintenance is unfunded

Reviewer s Comments The on-going conservation work is being carried out in an appropriate manner consistent with generally accepted standards of conservation of works of art and architecture. ARG - 2005 Sufficient, credible records document the condition of Watts Towers before and after the 2005 January Winter Storms... FEMA - 2007 The work of the DCA conservation crew has been scrutinized and vetted many times by the Getty Conservation Institute, Architectural Resources Group as well as DRP staff. We are confident the Cultural Affairs staff is doing everything possible (given the current fiscal environment) to follow the correct conservation standards and procedures in all their work at the Towers. California, Department of Parks and Recreation - 2008

Funding Sources (1991 2009) City of Los Angeles Administration and Salaries $ 1,520,395 State & Federal Government Grants $ 3,320,000 Foundation Grants $ 155,000 TOTAL = $ 4,995,395

DCA Wish List State Parks Master Plan New Materials Testing Structural Analysis Tests Conservation Handbook Update Digitization of Historic Documentation Virtual 3-D Model

Disaster Claim Process Emergency & Permanent Work Emergency Work The immediate response to a disaster (reimbursable even if claim is later deemed ineligible) Stabilization of site, photographic documentation and fragment collection Estimate of damage repair submitted to CAO CAO submits request to F.E.M.A. through O.E.S. F.E.M.A. conducts site visit and reviews claim Permanent Work The second phase response where cracks are temporarily sealed pending complete restoration Disaster work subject to F.E.M.A. deadline Disaster expenses are reimbursable

Summary The Watts Towers historical landmark is vulnerable to natural disaster and suffers from the deterioration that is accelerated by atmospheric conditions. To preserve this masterpiece, Watts Towers requires constant monitoring and on-going conservation. All current conservation work follows strict guidelines established for the site in the Ehrenkrantz Reports. All work is documented for present and future generations.

City of Los Angeles Department of Cultural Affairs Olga Garay, Executive Director Saul Romo, Assistant General Manager Historic Preservation Division Staff Virginia Kazor, Curator Jeffrey Herr, Curator Zuleyma Aguirre, Conservator Clinton Peterson, Conservation Technician Prepared by Jeffrey Herr, 15 May 2009 Photography by Zuleyma Aguirre and Clinton Peterson Baseline photograph by Marvin Rand