The Muddy River: A Century of Change



Similar documents
Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts

Muddy River Restoration Project Project Description

AN INITIATIVE TO IMPROVE

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Flood Risk Management

Flood Risk Management

Urban Waters and River Restoration. Pinja Kasvio, Finnish Environment Institute, SYKE RESTORE North Region Closing Seminar 14.8.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

PUBLIC NOTICE Application for Permit

Restoring Ecosystems. Ecosystem Restoration Services

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

RESTORING streams to reduce flood loss

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Pamela Birak, Jordan Lake State Park, Chatham County, NC

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

United States Army Corps of Engineers, Civil Works

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues

Greater Los Angeles County Region

Addendum D. Nomination of Moody Wash ACEC

Delivering multiple benefits through effective river restoration UK & EU

FOUR RIVERS RESTORATION PROJECT

Sims Bayou Federal Flood Damage Reduction Project

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

RESTORATION OF URBAN WATERWAYS AS A GREEN INFRA

U.S. Army Corps of Engineers Tulsa District

ANGORA FIRE RESTORATION PROJECT

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

SUSTAINABLE URBAN DRAINAGE SYSTEMS

MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT

Background Information: The Mamquam River Floodplain Restoration Project

How To Amend A Stormwater Ordinance

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

One Major Six Concentrations. Department of Environmental Conservation University of Massachusetts Amherst

Water Resource Issues in the 110 th Congress

Arkansas River Corridor Vision & Master Plan

NATURAL RESOURCE RESTORATION LESSON PLAN Fix It!

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute

Tax Exempt Property in Boston

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Risk Analysis, GIS and Arc Schematics: California Delta Levees

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

COMMUNITY CERTIFICATIONS

1.7.0 Floodplain Modification Criteria

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

Leveraging Ohio s Clean Water SRF Program to Fund Stream and Wetland Restoration and Protection Projects

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

Appendix H Dredging and Stream Channel Restoration

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Outlet stabilization structure

RE: Docket # COE ; ZRIN 0710 ZA05 Submitted via to NWP2012@usace.army.mil and Rulemaking Portal at

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Floodplain Connectivity in Restoration Design

WATER RESOURCES ENGINEERING DESIGN LANDSCAPE ECOLOGY AND RIVER RESTORATION.

CHAD R. GOURLEY SPECIALTY EMPLOYMENT

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

Rural Flooding: The Potential Role of Forestry

THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER


The Buffalo River Restoration Project Frequently Asked Questions

North Face. South Face. Figure Science Park Station Exteriors. Pg 1-3 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE

Neversink River East Branch

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

DRAFT SOUTH FORK SKYKOMISH RIVER

What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed

Transcription:

The Muddy River: A Century of Change Tom Brady, Brookline Conservation Administrator, Tree Warden, Town Arborist 617-730-2088 or tbrady@brooklinema.gov

Muddy River Flood Damage Reduction and Environmental Restoration Project A cooperative effort of the City of Boston, Town of Brookline, Commonwealth of Massachusetts and the U. S. Army Corps of Engineers Boston and Brookline, Massachusetts

Emerald Necklace Parks Master Plan 1894 Olmsted designed and built parks: Charlesgate, Back Bay Fens, Muddy River (now Riverway &Olmsted Park), and Franklin Park. Olmsted designed and built Parkways:Fenway, Riverway, Jamaicaway, and Arborway.

Sanitary Improvement of the Muddy River... to abate existing nuisances, avoid threatened dangers, and provide for the permanent, wholesome and seemly disposition of the drainage of the Muddy River Valley. and provide for Completing a Continuous Promenade from Boston Common to Jamaica Pond

1887 plan of the Back Bay Fens 1892 Plan of the Riverway shown over current conditions Developed by KZLA for the Emerald Necklace Conservancy

Environmental Problems Accumulated sediment impacting aquatic and benthic habitats (High SOD, low DO). Contaminated sediments pose a risk to aquatic life and wildlife (metals, PCB s, PAH s). Invasive species (Phragmites) impacting riparian biodiversity and encroaching on open water. Aquatic weed (fanwort) infestation in the Fens.

Flood Problems Widespread recent flooding - October 1996 and June 1998. Major damage to public and private buildings including flooding at numerous universities (Northeastern, Simmons, Emmanuel and Wentworth), the Museum of Fine Arts and many others. Major damage to the MBTA transit system. Primary causes are undersized culverts and channel restrictions.

Kenmore Station closed for 2 months

At peak in 1996 - river 11 feet higher than normal elevation.

$70 million in damage

History of Corps Involvement Flood control and environmental problems prompted Massachusetts, Boston and Brookline to develop a Master Plan for the Muddy River. WRDA 1999 directed the Corps to evaluate this Master Plan. WRDA 2000 authorized a project subject to the studies recommended in the Evaluation Report. Funds added in the subsequent Appropriation Bills for efforts on the Decision Document. Decision Document developed recommending a flood control and environmental restoration project for implementation under Section 522 of WRDA 2000 Director s Report submitted to ASA with recommendation to support project conclusions and recommendations.

Muddy River Flood Damage Reduction and Environmental Restoration Project The major features of the federally recommended plan include: improvements to protect against a flood, eradication of Phragmites from wetland and riparian areas, and... preservation and restoration of the historic park shoreline and vegetation in construction areas.

Consider two approaches to storm water conveyance systems Los Angeles River 4 th Street Bridge Muddy River Under Brookline Ave Bridge

Engineered systems Los Angeles River is manmade, but so is the Muddy...

Muddy River High Flow Storm Event (2010) The following day

Ecological Benefits and Habitat

Green Spaces and Gardens

Space Passive Recreation

Two storm water systems Courtesy of the Jamaica Pond Project

Flood Control Plan Accomplishments Protects against recurrence of Oct 1996 Flood (20-Year Event) Significantly reduces flood stages for all events including tributaries Environmental Restoration Restores over 40 acres of scarce urban aquatic habitat Restores anadromous fish spawning habitat (Fed. Significant Resource) Enhances diversity & productivity of benthic and warmwater fish communities Enhances biodiversity by eradicating extensive stands of Phragmites.

As they are lifted into place

Excavation support with culvert sections in place

Culvert sections as they are placed

Granite facing on the new culvert

Muddy River Restoration Project New ideas? A settling basin about 100 feet in length and three feet in depth has been built at the upper end of the channel, for the purpose of intercepting as much as possible the heavy material that will find its way into the channel from the open brook above. The basin will need to be cleaned out once or twice a year. If this work is neglected the basin will be filled to its top, and the surplus material flow along to Leverett Pond, from which it will have to be dredged at considerable extra expense. Alexis H. French, Town Engineer, Report to the Brookline Board of Selectmen, Feb. 20, 1894

As we close many thanks to the following: The Climate week planning committee U. S. Army Corps of Engineers Library of Congress American Memories Project and the Harvard University Graduate School of Design, Frances Loeb Library Map Reproduction Courtesy of the Norman B. Leventhal Map Center at the Boston Public Library The Boston Public Library, Print Department Muddy River Management and Maintenance Oversight Committee The Emerald Necklace Bird Club The Emerald Necklace Conservancy Emmanuel College Fenway Garden Society Margaret Dyson and the Boston Parks Department