RENOVATION OF SCHOOL #171 SPORT COMPLEX ADDRESS: NUTSUBIDZE PLATO III M/R TBILISI GEORGIA LTD SAKPROEKTI DESIGNED BY P. SAKHANBERIDZE N. SACHALELI G. MANDARIA
N SITUATION PLAN NUTSUBIDZE PLATO III M/R SCHOOL #171
N GROUND FLOOR BUILDING DESCRIPTION OFFICE CAFFE KITCHEN MEP AREA SPORT HALL 1 LOBBY SPORT COMPLEX LOCKERS /WC SPORT HALL 2 BUILDING FOR CLASSROOMS LEVEL 1 SOUTH FACADE OFFICE SECOND LIGHT BALLROOM POOL SPORT COMPLEX SPORT HALL 3 LOCKERS /WC BRIDGE BUILDING BUILDING FOR CLASSROOMS NORTH FACADE
PROBLEM DESCRIPTION Many of former soviet buildings, such are former sport complexes, or swimming pools are getting abandoned because of too high operational costs. These types of buildings were built without considering energy efficiency or energy saving schemes, that makes then currently rather unattractive for private investors.
PROJECT IDEA My project idea is to develop energy efficiency scheme for the secondary school s sport complex (including swimming pool) Availability of natural sulfate water in the district, could be reason to develop energy saving scheme for this particular object which will radically change costbenefit of the facility and make it available again for school pupils or people living in the neighborhood.
SPECIFIC PROJECT INFORMATION BUILDING CATEGORY : SCHOOL SPORT COMPLEX YEAR OF CONSTRUCTION: 1980 HEATED FLOOR AREA : 1 827.0 M2 TYPE OF HEATING SYSTEM : GEOTHERMAL, CONDENSING BOILER TYPE OF VENTILATION SYSTEM : AHU WITH PLATE TYPE RECUPERATOR TYPE OF DOMESTIC HOT WATER SYSTEM : SOLAR SYSTEM, FOR DOMESTIC HOT WATER TYPE OF AUTOMATIC CONTROL SYSTEM: CENTRAL (BMS) DEDUCTION OF CO2 EMISSION: 50 T/YR BUILDING FAÇADES AND ROOF INSULATION: POLIURETANE INSULATION
HVAC SCHEMATIC DRAWING SOLAR PANEL AHU WITH HEAT RECOVERY CHILLER POLIURETANE INSULATION CONDENSING BOILER CIRCULATION PUMP STORAGE TANK HEAT EXCHANGER
ENERGY CONSUMPTION Energy meters installed (yes/no) Annual consumption (last year) Today price (EUR) Gas yes 70 000 m3 0.33 m3 Electricity yes 6 000 kwh 0.07 /kwh
PROPOSED INVESTMENT INVESTMENT & FINANSING NEEDS DESIGN & ENGINEERING LAND INFRASTRUCTURE EQUIPMENT CONSTRUCTION OPERATION COST OTHERS TOTAL INVESTMENTS AND REVENUES DETAIL ESTIMATED INVESTMENT COST IN (EUR) 17 464 370 000 157 176 (INCLUDING ROOF & FAÇADE WALL INSULATIONS) 4 500 2 000 551 140 80 000 ESTIMATED REVENUES IN (EUR / YEAR) OWNER S EQUITY: 25% OTHER LOANS: 25% (interest rate 14%) GRANTS: 50%
CASHFLOW ANALYSIS YEAR 0 1 2 3 4 5 6 7 CAPITAL INVESTMENT 551.140 REVENUE ENERGY GENERATIONS OR SAVINGS 80.3 80.3 80.3 80.3 80.3 80.3 80.3 OTHER BENEFITS AND INCOMES OPERATION AND MAINTENANCE COST 4.5 4.5 4.5 4.5 4.5 4.5 4.5 OTHER COSTS
GOAL DESCRIPTION Usage of energy efficiency technologies and materials in the building are profitable investment in long run To create energy efficient sample building, for local investors. This initiative can serve as a pilot project for other same type of facilities and will demonstrate that smart attitude might give a new life to a property that seemed to be unprofitable.
N SITUATION PLAN NUTSUBIDZE PLATO IV M/R SIMILAR SCHOOL BUILDING NUTSUBIDZE PLATO III M/R NUTSUBIDZE PLATO II M/R SCHOOL #171 SIMILAR SCHOOL BUILDING
THANK YOU