DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST



Similar documents
TRANSPORTATION MANAGEMENT PLAN

Transportation Management Plan Template

Preliminary Transportation Management Plan (TMP) Constructing State Route 11 from State Route 905 to the Otay Mesa East Port Of Entry

Draft Transportation Management Plan for Via Verdi Repair Project

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts

The Need for Traffic Incident Management

Olympic Region Traffic Management Center. Olympic Radio

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

CHAPTER 500 TRAFFIC INTERCHANGES

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

Central Regional Traffic Management Center

How To Design A Crash Investigation Site

Module 2.1. Page 1 of 10. Slide 1

Idaho Transportation Department. Work Zone Safety and Mobility Program

3 Tappan Zee Bridge Rehabilitation Options

CHAPTER 2 LCCA APPROACHES

Guidelines. Work Zone Access and Egress

WRONG WAY CRASH DETECTION & NOTIFICATION

SR-18 Corridor Improvements in Wood County

MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB

Appendix A - Cost Estimate Spreadsheet

Los Angeles Regional Transportation Management Center

Maryland Invests $845 Million in New Highway and Bridge Projects

SF Bay Area Transportation Management Systems: An Innovative DOT and MPO Partnership

Metropolitan Intelligent Transportation Systems (ITS) Infrastructure 2010 Transportation Management Center

FOR IMMEDIATE RELEASE September 17, 2013 Contact:

Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

Construction Analysis for Pavement Rehabilitation Strategies

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

PRIORITIZATION PROCESSES

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

7.2 Warrants and Planning Considerations

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Kansas City Scout Traffic Management Center Monthly Report

I-66 Pavement Rehabilitation

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

Monitoring Program Results and Next Steps

CHAPTER 8 Integration of Systems

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

Table of Contents. Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

Appendix J Transportation Management Plan Report. Traffic Operational Analysis Report

TEMPORARY TRAFFIC CONTROL SAFETY

Integrated Data System Structure for Active Traffic Management - Planning and Operation

APPENDIX A Dallas-Fort Worth Region Transportation System Management Strategies and Projects

Traffic Management Plan - Depot Procedure

Incident Management Challenges and Solutions

Eastern RTMC.

Maryland SafeZones. Work Zone Automated Speed Enforcement Program. Eric Tabacek Deputy Director, Office of Traffic and Safety

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

11 p.m. to. Tuesday, June. will remain open. 14. closed

8+ %!0"% 8+1!%"'$%,$"$

Surface Transportation Program (STP)

Auckland Motorways Network Performance Monitoring

Appendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1

CHAPTER 2B. REGULATORY SIGNS

INDOT Long Range Plan

STANDARD OPERATING INSTRUCTION. Worksite Safety Traffic Management Procedure

INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY

FLEET MANAGEMENT SYSTEM FOR TRAFFIC CONTROL DEVICES.

SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT

EXHIBIT A Accessible Truck Routes Map

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Section 6 Traffic Analysis

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

SAN JOAQUIN COUNTY FLOOD EVACUATION PLAN TABLE OF CONTENTS. 1.1 Introduction 1.2 Notification of County Emergency Response Agencies

How To Build A City Of Virginia Beach Arena

SAMPLE TRANSPORTATION MANAGEMENT PLANS AND TEMPLATES. U.S. Department of. Transportation. Federal Highway Administration Office of Operations

ROADS AND MARITIME SERVICES QA SPECIFICATION G10 TRAFFIC MANAGEMENT REVISION REGISTER

Traffic Management Guidelines

Downtown Louisville Two-Way Street Study

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Active Traffic Management (ATM) Feasibility Study

TECHNIQUES FOR MANUALLY ESTIMATING ROAD USER COSTS ASSOCIATED WITH CONSTRUCTION PROJECTS

Transcription:

State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage of Project: Project Study Report Co.-Rte-KP: SAC-50-PM 15.1/17.5 Description: Hazel Ave / US-50 IC COMMENTS 1.0 Public Information 1.1 Brochures and Mailers X 1.2 Media Releases (& minority media sources) X 1.3 Paid Advertising X 1.4 Public Information Center X 1.5 Public Meetings/Speakers Bureau X 1.6 Project Telephone Hotline X 1.7 Local cable TV and News X 1.8 Traveler Information Systems (CHIN/Internet) X 1.9 Project Web Page X 2.0 Motorist Information Strategies 2.1 Changeable Message Signs X 2.2 Trailer CMS's X 2.3 Ground Mounted Signs X 2.4 Commercial Traffic Signs X 2.5 Highway Advisory Radio (fixed and mobile) X 2.6 Planned Lane Closure Web Site X 2.7 Radar Speed Message Sign X 3.0 Incident Management 3.1 Call Boxes X 3.2 COZEEP or MAZEEP X COZEEP During Construction 3.3 Freeway Service Patrol X 3.4 Traffic Surveillance Stations (loops or CCTV) X 3.5 911 Cellular Calls X 3.6 Transportation Management Center X 3.7 Traffic Control Inspector X 3.8 CHP Officer in TMC during construction X 3.9 Traffic Management Teams X 3.10 On-site Traffic Advisor (contractor) X 3.11 CHP Helicopter X 4.0 Construction Strategies 4.1 Incentive/Disincentive Clauses X 4.2 Delay damage clause X 4.3 Off peak/night work X 4.4 Weekend Work X 4.5 Planned Lane/Ramp Closures X Lane Closure during falsework 4.6 Project Phasing X erection/removal for overcrossing 4.7 Temporary Traffic Screens X 4.8 Total Facility Closure X COMPLETED REQUIRED RECOMMENDED NOT APPLICABLE TMP 1 of 2

State of California Business, Transportation and Housing Agency 4.9 Truck Traffic Restrictions X 4.10 Variable Lanes X 4.11 Extended Weekend Closures X 4.12 Reduced Speed Zones X 4.13 Coordination with adjacent construction X 4.14 Traffic Control Improvements X 4.15 Contingency Plans X 4.15.1 Material Plant on standby X 4.15.2 Extra Critical Equipment on site X 4.15.3 Material Testing Plan X 4.15.4 Alternate Material on site X (In case of failure or major delays) X 4.15.5 Emergency Detour Plan X 4.15.6 Emergency Notification Plan X 4.15.7 Weather Conditions Plan X 4.15.8 Emergency Funding Plan X 4.15.9 Delay Timing and Documentation Plan X 4.15.10 Late Closure Reopening Notification X 4.16 Ramp metering X 4.17 HOV Lanes/ramps X 4.18 Signal timing modification X 5.0 Demand Management 5.1 HOV Lanes/Ramps X 5.2 Park-and-Ride Lots X 5.3 Parking Management/Pricing X 5.4 Rideshare Incentives X 5.5 Rideshare Marketing X 5.6 Transit, Train, or Light-Rail Incentives X 5.7 Transit Service Improvements X 5.8 Variable Work Hours X 5.9 Telecommute X 6.0 Alternate Route Strategies 6.1 Ramp Closures X 6.2 Street Improvements X 6.3 Reversible Lanes X 6.4 Temporary Lanes or Shoulders Use X 6.5 Freeway to freeway connector closures X 7.0 Other Strategies 7.1 Application of new technology X 7.2 Improved specifications X 7.3 Staff Training/Development X 7.4 Upgraded Equipment X COMPLETED REQUIRED RECOMMENDED NOT APPLICABLE COMMENTS Approved by: DISTRICT TRAFFIC MANAGER TMP 2 of 2

M E M O R A N D U M To: Mr. John Holder Date: January 10, 2013 Project Manager, Special Funded Projects Department of Transportation, District 3 File: EA 03-3E380 03-SAC-50 PM 15.1/17.5 From: Subject: Mark Thomas & Company on behalf of County of Sacramento DOT Hazel Ave / US-50 Interchange PSR Transportation Management Plan (TMP) Data Sheet 1. PROJECT INFORMATION: Location: On U.S. Highway 50 between 0.4 miles west of the existing Hazel Ave interchange and 0.4 miles east of the Folsom Blvd interchange. Scope of Work: The project will grade-separate Hazel Ave over Folsom Blvd and extend to the south. Ramp reconfiguration will be required to conform to the new profile of Hazel Ave, as well as to accommodate future traffic volumes. All proposed alternatives will maintain the Aerojet Rd connection to Folsom Blvd, but will eliminate the separate exit from mainline, and provide the connection utilizing a ramp from the Hazel Ave interchange. There are two alternatives considered in this PSR, the first of which proposes an L-9 interchange configuration with a viaduct ramp over Hazel Blvd to carry EB traffic to Aerojet Rd. The modification to this alternative proposes an L-9 interchange, with a tunnel under Hazel Blvd to carry EB traffic to Aerojet Rd. The existing Hazel overcrossing over Route 50 will be widened to six lanes in Alternative 1. The second alternative is a modified L-9 interchange, with a separate EB ramp crossing under Hazel Blvd, splitting to a flyover over Highway 50 and a ramp connecting to Aerojet Rd. Cost: Estimated construction cost for the interchange is approximately: o Alternative 1: $51.1 Million. o Alternative 1A: $50.4 Million o Alternative 2: $52.4 Million Estimated Start of Construction: 2018 Caltrans Contact for TMP Issues: Christine Zdunkiewicz 2. RECOMMENDATIONS: An updated Transportation Management Plan and lane closure charts should be prepared during the Design Phase of the Project. 1

Hours of Work: The proposed project includes weekday construction and lane closures during off-peak hours. Weekends and night work will be required for the bridge widening over SR-50 (in Alternative 1 and Alternative 1A), ramp realignment construction, and during conditions where traffic capacity is reduced or detoured. Traffic Control Major Construction will be completed over the following primary stages: Alternative 1 and 1A Pre-Stage 1: 1. Construct a temporary EB diagonal ramp to the north side of the existing ramp. 2. Demolish gas station at NW quadrant of Hazel Ave and Folsom Blvd intersection. 3. Construct a temporary realignment of Hazel Ave to the west of the existing roadway between SR-50 and Easton Parkway/Jughandle intersection. Stage 1 Construction: 1. Construct widening of the Hazel overcrossing over SR-50. 2. Construct eastern portion of the Hazel overhead structure over Folsom Blvd and the railroad, and roadway approaches. 3. Construct EB off-ramp ( R1 Line), with retaining walls, barriers and undercrossing (Alternative 1A only). 4. Construct EB diagonal on-ramp ( R3 Line) with retaining walls and barriers. 5. [Alternative 1] Construct viaduct structure ( V Line), without roadway approach to the west. Stage 1 Traffic Handling: 1. Place temporary pavement delineation and delineators to shift traffic to the east side of Hazel Ave over the existing overcrossing. 2. Shift traffic on Hazel Ave south of US 50 to the temporary roadway connection to Folsom Blvd. Pre-Stage 2: 1. Close Aerojet off-ramp and construct tie-in to the viaduct alignment. 2. Construct connection between the new EB off-ramp and the portion of the Hazel OH constructed in Stage 1. Stage 2 Construction: 1. Construct ramp approach to viaduct structure 2. Construct western portion of Hazel overhead structure over Folsom Blvd and roadway approaches. 3. [Alternative 1A] Construct Hazel Ave undercrossing and EB Loop On-Ramp undercrossing. 2

Stage 2 Traffic Handling: 1. Place temporary pavement delineation and delineators to shift traffic to either side of Hazel Ave to construct the east and west portions of the Hazel Ave undercrossing. 2. Shift traffic to the eastern portion of the new Hazel Ave overhead over Folsom Blvd. 3. [Alt 1A] Detour SB Hazel to EB 50 traffic east to Folsom Blvd interchange. Alternative 2 Pre-Stage 1: 1. Construct a temporary EB diagonal ramp to the north side of the existing ramp. 2. Demolish gas station at NW quadrant of Hazel Ave and Folsom Blvd intersection. 3. Construct a temporary realignment of Hazel Ave to the west of the existing roadway between SR-50 and Folsom Blvd. Stage 1 Construction: 1. Construct eastern portion of the Hazel overhead structure over Folsom Blvd and the railroad, and roadway approaches. 2. Construct EB off-ramp ( R1 Line), with retaining walls and barriers. 3. Construct Flyover structure ( BK Line) and roadway approach in the southern quadrants. 4. Construct Aerojet connector ramp ( AJ Line) 5. Construct WB to SB off-ramp ( R6A Line). Stage 1 Traffic Handling: 1. Place temporary pavement delineation and delineators to shift traffic to the east side of Hazel Ave over the existing overcrossing. 2. Shift traffic on Hazel Ave south of US 50 to the temporary roadway connection to Folsom Blvd. 3. Close EB diagonal on-ramp. Detour NB Hazel to EB 50 traffic east to the Folsom Blvd interchange. Pre-Stage 2: 1. Close Aerojet off-ramp. 2. Close EB Loop on-ramp. Detour SB Hazel to EB 50 traffic east to Folsom Blvd interchange. 3. Construct temporary ramp realigning the EB off-ramp in a tight diamond configuration to an intersection with Hazel Ave near the overcrossing. 4. Construct temporary realignment of the WB off-ramp diverge from SR-50. Stage 2 Construction: 1. Construct western portion of Hazel overhead structure over Folsom Blvd and roadway approaches. 2. Construct connection between EB off-ramps to Hazel Ave and to undercrossing under Hazel. 3. Construct WB 50 to NB ramp ( R6B Line) and flyover ramp connection to Hazel Ave. 4. Construct Aerojet ramp ( AJ Line). 3

Stage 2 Traffic Handling: 1. Shift traffic to the eastern portion of the new Hazel Ave overhead over Folsom Blvd constructed in Stage 1. 2. Shift traffic on WB 50 off-ramp to new ramp ( R6A ) constructed in Stage 1. 3. Detour SB Hazel to EB 50 traffic east to Folsom Blvd interchange. 4. Shift EB 50 traffic to temporary off-ramp. Stage 3 Construction: 1. Remove temporary EB off-ramp. 2. Construct EB loop on-ramp ( R2 Line). Construction of WB loop-on ramp and auxiliary lane to Folsom Blvd interchange may occur during any stage for all alternatives. Lane closures on U.S. 50 will not be allowed during holidays and most daytime hours. During lane closures, a minimum of one lane, in each direction of travel, shall be open to public traffic at all times. Work that does not impact mainline traffic (i.e., work that is more than 6 feet from mainline ETW, or behind K-rail) will be permitted during all hours without restriction. Gawk screens may be required on K-rail to prevent excessive slowing of traffic through the project limits. Due to the high speed of traffic on U.S. 50, Portable Changeable Message Signs (PCMS) are recommended for the approach to the construction zone. PCMSs should be used to warn the public 3 to 7 days prior to implementation of any closure that will require a detour. A minimum of 4 PCMSs may be needed during the construction of this project. Modifications to all detour/stage construction intersections shall be done to ensure trucks can safely make all necessary turning movements. COZEEP is required in traffic control areas where speed zone reductions may be needed. The use of COZEEP along detour routes is also recommended. For all other areas, the Resident Engineer should have the option to use COZEEP where conditions warrant additional traffic control and enforcement. COZEEP is estimated at an hourly rate of $65.00. COZEEP estimate should include two officers per vehicle when performing night work. Lane closure charts based on anticipated demands and realistic construction zone capacities should be prepared during the PS&E design phase. Any active or future development that will cause serious increases in current traffic volumes should be considered when developing lane closure charts for this project. Cost: For estimating purposes, the cost for TMP elements during construction is estimated at $5M, which is 5% of the construction costs for this project. The assumed TMP elements include traffic control 4

systems, portable changeable message signs, maintenance of traffic, COZEEP, and traffic management public information. The cost to prepare a Traffic Management Plan was estimated at $50,000. Robert Himes Mark Thomas & Company, Inc. Date Concurrence Date Caltrans District 3 TMP Manager 5