ROADS AND MARITIME SERVICES QA SPECIFICATION G10 TRAFFIC MANAGEMENT REVISION REGISTER
|
|
|
- Willis Berry
- 10 years ago
- Views:
Transcription
1 ROADS AND MARITIME SERVICES (RMS) QA SPECIFICATION TRAFFIC MANAGEMENT NOTICE This document is a Roads and Maritime Services QA Specification. It has been developed for use with roadworks and bridgeworks contracts let by Roads and Maritime Services or by local councils in NSW. It is not suitable for any other purpose and must not be used for any other purpose or in any other context. Copyright in this document belongs to Roads and Maritime Services. Ed/Rev Number Ed 3/Rev 0 Ed 3/Rev1 Clause Number REVISION REGISTER Description of Revision Complete revision, most previous requirements either replaced or incorporated into the Traffic Control at Work Sites Manual. 1.1 Work to comply with the RTA Traffic Control at Work Sites Manual References to AS deleted and replaced with: - reference to RTA Traffic Control at Work Sites Manual; - definition of Regulatory Traffic Control Device. Authorised By Date GM, RNIC GM, RNIC Ed 3/Rev , Changes to safety clothing. GM, RNIC , 3.4 New heading, clarified use of the Works. 3.3 New clause for removal of pavement markings. 3.1 Work adjacent to traffic added. Annexure /3 Schedule of Identified Records added. Ed 3/Rev Use of vests at night clarified. GM, RNIC Ed 3/Rev Currency of reference documents remains. GM, RNIC , 3.1 Placing temporary pavement markings on the final wearing course is conditional 1.3 Six week Period of notice for Regulatory Traffic Control Devices deleted 1.7 Requirement for temporary speed zoning during the work to be indicated. 3.3 Treatment of redundant markings outside the limits of work added. 3.4 Minor editorial change. Edition 5 / Revision 3 November 2011 ROADS AND MARITIME SERVICES
2 Ed/Rev Number Clause Number Description of Revision 4.1 Last sentence. Six weeks changed to two weeks. Annexure /1 Heading changed. Sections B and C added. Ed 4/Rev 0 Various Formatting changed Contractor replaced by you Superintendent replaced by Principal 1.1 References to AS changed 1.2 Document structure explained 1.3 TMP must be consistent with PQP and may be submitted in stages. After hours contacts are required. 1.3, 1.7, 3.1, Annx /A, 0ld 3.2, 3.3 & 4 Some details deleted as they are now in the TCWS Manual 1.4 New subclause for TCP details 1.6 RTA will supply the vest. Vests to comply with AS References to Completion changed to suit RTA C2 3.1 Hold Point replaced by Hold Point in Clause 1.3 Annexure /B Transferred from Clause 5, SIMC pay items added. Authorised By Date GM, RNIC Ed 4/Rev 1 1.3, 3.2 Changes for SIMC s GM, RNIC Vests to be supplied by Contractor (P Wellings) 2.6, B2.3 Minor editorial changes Ed 4/Rev 2 Foreword New clause after the Table of Contents GM, RNIC , /M Changes to referenced documents Ed 4/Rev Requirement for RTA Registration Category G GM, IC Ed 4/Rev 4 Notice RTA PO Fox and Fax numbers updated. GM, IC High visibility fluorescent safety clothing requirement simplified. Ed 5/Rev 0 Spec Title Title changed to. GM, IC Ed 5/Rev 0 (cont d) Guide Notes Guide Notes expanded to include: - notes on customisation of, - example of project specific traffic management restrictions New clause on list of acronyms in Annex M List of definitions included. ii
3 Ed/Rev Number Clause Number Description of Revision Authorised By Date Authority to appoint Traffic Controllers clarified and formalised Qualifications of traffic control personnel specified New Hold Point introduced for submission of proposed Traffic Controllers details Requirements for RTA logo changed New clause on Traffic Control Site Manager. 2.2 Provision for project specific traffic management restrictions introduced. 2.4 New clause on Road Occupancy Licence included. 2.5 Additional requirements specified for Traffic Management Plan. Qualification of person preparing Traffic Management Plan specified. 2.6 New clause on Traffic Staging Plans introduced & Road design requirements expanded Design standards for pavement design inserted. Requirement for existing pavements and road shoulders used as temporary roadways to be upgraded Requirement for safety barrier product to have RTA Acceptance. 2.8 Traffic Control Plan requirements expanded. Qualification of person modifying standard Traffic Control Plans introduced. New requirements for project specific Traffic Control Plans introduced. New clause on Vehicle Movement Plans introduced. 2.9 Requirement for traffic management risk assessment workshop introduced Requirement for road safety audit of TCPs introduced. Ed 5/Rev 0 (cont d) 3.3 Requirement for inspection by qualified person prior to opening temporary roadways and detours introduced. 3.4 Requirement for road safety audit of TCP implementation introduced. iii
4 Ed/Rev Number Clause Number & & Description of Revision New clause Traffic Control Devices. Requirements for safety barriers, pavement markings and signs expanded. New clauses introduced for: - portable variable message signs, - radar activated speed signs. Clause on temporary traffic signals (previously contained within clause on Traffic Control Plan) inserted. 5 Requirement for daily inspection of traffic control measures introduced. 6 New clause Construction Work Adjacent To Traffic, grouping together previous clause 3.1 Construction under or adjacent to traffic, clause 1.7 Approved clothing for work personnel, and clause 1.8 Plant and equipment Annex A1 Annex A2 Annex A4 Annex B Annex C Annex M1 Annex M2 New clause Maintenance of Roadways for: - Existing roadways - Temporary roadways - New roadways. New table of project specific requirements. New Annexure for project specific traffic management restrictions. New Annexure for Road Occupancy Fees. Pay Item P1 modified. New Pay Items P2, P3 and P4 introduced. Suggestions for additional Pay Items introduced. Schedules of Hold Points and Identified Records updated. Reference Documents updated. List of acronyms inserted. Ed 5/Rev 1 Annex B Scope of work covered by Pay item P1 clarified. Ed 5/Rev Previous clause moved to clause 1.4. Subsequent clauses renumbered. Ed 5/Rev Details pertaining to RTA logo on safety vest deleted. Annex B Pay Item P4 Period for routine maintenance of newly constructed sections opened to traffic clarified to be the earlier of Contractual Completion Date or Completion. Authorised By Date GM, IC GM, IC GM, IC (M Andrew) iv
5 GUIDE NOTES (Not Part of Contract Document) Use of RMS Traffic Control at Work Sites Manual requires contractors to consult and comply with the Traffic Control at Work Sites Manual. The scope of recent editions of the Manual, in addition to applying to RMS works carried out by direct labour, has been expanded to include works carried out by contract. It contains both mandatory requirements and guidance which contractors should consider when planning and carrying out traffic control. Some details and terms in the Manual reflect RMS usage, and as such contractors will need to adapt them to suit their own organisation. The Manual contains information which can assist contractors to develop and implement their Traffic Management Plans and to assist Principal s staff in considering, approving and monitoring the Plans. Customisation of is a model specification that must be customised by the TENDER DOCUMENTER for each specific project. Suggestions for customisation are shown as italic boxed text, as illustrated below: NOTES TO TENDER DOCUMENTER: (Delete this boxed text after customising ) If Road Occupancy Fees are payable, attach a Schedule of Road Occupancy Fees here. If Road Occupancy Fees are not payable, insert Not Applicable in this section. If a particular matter is not relevant to your project, delete the boxed text. If the matter is relevant, remove the borders around the text, modify the text to suit the circumstances of the Contract, adjust the margins so the customised paragraphs line up with the general text, match the font type and set the customised paragraphs in bold italics. After completing the customisation, check the pagination of the whole document and insert page breaks if necessary to achieve continuity within clauses. Then return to the CONTENTS page to highlight and automatically update the clause listing and page numbers. Annexure /A2 Project Specific Restrictions and Additional Requirements Annexure /A2 provides for the TENDER DOCUMENTER to insert any restrictions and additional requirements for traffic management which tenderers must allow for when preparing their tenders and which the Contractor has to include in the Plans and Traffic Control Plans. An example is given below: v
6 A2 PROJECT SPECIFIC RESTRICTIONS AND ADDITIONAL REQUIREMENTS A2.1 Traffic on MR920 The following restrictions to traffic management on MR920 apply to this Contract: (a) (b) (c) The traffic capacity of MR920 existing at the Site at the Date of Contract must be maintained, except as provided elsewhere under this clause. Any delays to traffic must be kept to a minimum. Between the hours 7:00 am and 10:00 am, obstruction of the through or turning lanes on MR920 or the intersecting side streets is not permitted. Unless approved otherwise by the Principal, this requirement applies to all existing lanes, including any additional lanes constructed as part of the Works and have been opened to traffic. Restriction of traffic to a single lane traffic flow using Traffic Controllers will be permitted only for night time work. For this traffic arrangement, traffic in each direction must not be stopped for more than 5 minutes. A2.2 Traffic on Local Roads The following restrictions to traffic management on local roads apply to this Contract: (a) (b) (c) Current turning movements into and out of local roads must be maintained during construction. Traffic along MR920 must not be diverted on to local streets unless prior written approval has been obtained from Woop Woop City Council. Closure of side roads is not permitted unless prior written approval has been obtained from Woop Woop City Council. A2.3 Buses Provide facilities for bus commuters, including the following: (a) (b) (c) (d) (e) Temporary bus bays, 15m long, 3.5m wide with tapers 20m long at each end; Bus stop signs; Adequate areas to queue and for pedestrian movement; Pedestrian paths across active roadways and construction zones to the bus stops, and Signs directing pedestrians to and from the bus stops. Ensure also that all traffic staging can adequately cater for bus turning movements. Keep the bus companies informed of your construction activities which may affect their bus routes. vi
7 QA SPECIFICATION TRAFFIC MANAGEMENT Copyright Roads and Maritime Services IC-QA- VERSION FOR: DATE: Edition 5 / Revision 3 November 2011 ROADS AND MARITIME SERVICES
8
9 CONTENTS CLAUSE PAGE FOREWORD...III RMS Copyright and Use of this Document... iii Revisions to Previous Version... iii Project Specific Changes... iii 1 GENERAL Scope Structure of the Specification Definitions RMS Traffic Control at Work Sites Manual Traffic Control Personnel PLANNING General Project Specific Restrictions and Additional Requirements Temporary Speed Zoning Road Occupancy Licence Plan Traffic Staging Plans Temporary Roadways Design and Drawings Traffic Control Plan Risk Assessment Workshops Road Safety Audit of TCPs TEMPORARY ROADWAYS AND DETOURS Construction of Temporary Roadways and Detours Access to Side Roads and Properties Opening Temporary Roadways and Detours to Traffic Road Safety Audit of Temporary Roadways or Detours Removal of Temporary Roadways and Detours TRAFFIC CONTROL DEVICES Safety Barriers Pavement Markings and Signs Portable Variable Message Signs Radar Activated Speed Signs Temporary Traffic Signals MONITORING OF TRAFFIC CONTROL MEASURES ROAD CONSTRUCTION WORK ADJACENT TO TRAFFIC General Approved Clothing for Workers Working Adjacent to Traffic Plant and Equipment Used for Work Adjacent to Traffic MAINTENANCE OF ROADWAYS Existing Roadways Temporary Roadways and Detours New Roadways Opened to Traffic OPENING TO TRAFFIC UPON COMPLETION Ed 5 / Rev 3 i
10 ANNEXURE /A PROJECT DETAILS A1 Project Specific Requirements A2 Project Specific Restrictions and Additional Requirements A3 Design Standards for Temporary Roadways A4 Road Occupancy Fees ANNEXURE /B MEASUREMENT AND PAYMENT ANNEXURE /C SCHEDULES OF HOLD POINTS AND IDENTIFIED RECORDS C1 Schedule of Hold Points C2 Schedule of Identified Records ANNEXURES /D TO /L (NOT USED) ANNEXURE /M REFERENCED DOCUMENTS AND ACRONYMS M1 Reference Documents M2 Acronyms LAST PAGE OF THIS DOCUMENT IS ii Ed 5 / Rev 3
11 FOREWORD RMS COPYRIGHT AND USE OF THIS DOCUMENT Copyright in this document belongs to the Roads and Maritime Services. When this document forms part of a contract This document should be read with all the documents forming the Contract. When this document does not form part of a contract This copy is not a controlled document. Observe the Notice that appears on the first page of the copy controlled by RMS. A full copy of the latest version of the document is available on the RMS Internet website: REVISIONS TO PREVIOUS VERSION This document has been revised from RMS Specification Edition 5 Revision 2. All revisions to the previous version (other than minor editorial and project specific changes) are indicated by a vertical line in the margin as shown here, except when it is a new edition and the text has been extensively rewritten. PROJECT SPECIFIC CHANGES Any project specific changes have been indicated in the following manner: (a) (b) Text which is additional to the base document and which is included in the Specification is shown in bold italics e.g. Additional Text. Text which has been deleted from the base document and which is not included in the Specification is shown struck out e.g. Deleted Text. Ed 5 / Rev 3 iii
12
13 RMS QA SPECIFICATION TRAFFIC MANAGEMENT 1 GENERAL 1.1 SCOPE This Specification sets out the requirements for the management of traffic past, through and/or around a work site. It includes the provision for the safe movement of traffic, the protection of workers from passing traffic and the provision for access to adjoining properties located within the limits of the Contract. The scope includes the design, construction, maintenance, upgrading and removal of any necessary temporary roadways and detours, the provision of Traffic Controllers to direct and control traffic, and the installation of temporary signs, road markings, lighting and safety barriers. All temporary traffic arrangements required for the Works under this Contract are covered under this Specification unless stated otherwise. 1.2 STRUCTURE OF THE SPECIFICATION This Specification includes a series of annexures that detail additional requirements Project Specific Details Details relating to traffic control that is specific to this Contract are shown in Annexure /A Measurement and Payment The method of measurement and payment is detailed in Annexure /B Schedules of HOLD POINTS and Identified Records The schedule in Annexure /C lists the HOLD POINTS that must be observed. Refer to Specification RMS Q for the definition of HOLD POINT. The records listed in Annexure /C are Identified Records for the purposes of RMS Q Annexure Q/E Planning Documents The PROJECT QUALITY PLAN must include your Plan. If the Contract does not require you to implement a PROJECT QUALITY PLAN, you must still submit your Plan to the Principal in accordance with the requirements of Clause 2.5. Ed 5 / Rev 3 1
14 1.2.5 Referenced Documents and Legislation Unless otherwise specified, the applicable issue of a reference document, other than an RMS Specification, is the issue current at the date one week before the closing date for tenders or, where no issue is current at that date, the most recent issue. Standards, specifications and test methods are referred to in abbreviated form (e.g. AS 1234). For convenience, the full titles are given in Annexure /M Acronyms The acronyms used in this Specification are listed in Annexure /M DEFINITIONS The terms you and your mean the Contractor and the Contractor s respectively. The following definitions apply to this Specification: Road Occupancy Road Occupancy Licence (ROL) Plan (TMP) Traffic Staging Plans Traffic Control Plan (TCP) Vehicle Movement Plan (VMP) Rigid safety barrier Non-rigid safety barrier Long-term temporary An activity that is likely to impact on the traffic flow of the road network, and may involve the closure of traffic lane(s). A Road Occupancy Licence allows the applicant to use or occupy a specified road space at approved times, provided that certain conditions are met. A plan showing how traffic is to be managed when construction works are being carried out. A TMP describes the work activities being proposed, their impact on the roadway and on road users, and how these impacts are being addressed. Road design drawings showing lane configurations to be provided for traffic passing through or around the construction site during the various construction stages, including details of road alignment and geometry, intersection layouts, provision for buses and cyclists, working areas and pedestrian areas, drainage, signs and pavement markings, etc. A diagram showing signs and devices arranged to warn traffic and to guide it around, past or if necessary through a work site or temporary hazard. A diagram showing the preferred travel paths for vehicles associated with a work site entering, leaving or crossing the through traffic stream. A physical barrier, separating traffic from work areas, which has little or no deflection when impacted by a vehicle. Examples of rigid barrier systems are given in RMS Road Design Guide Table 6.2. Concrete barriers such as Type F units are only considered to be a rigid barrier system if the series of barriers are fixed to the pavement. Barriers, including approved water filled units, wire rope barriers and metal guard rail which have lateral deflections of varying amounts when impacted by an out-of-control vehicle. Work requiring traffic control for duration longer than one work shift and 2 Ed 5 / Rev 3
15 work Short-term temporary work where some form of traffic control must be maintained when the site is left unattended and may need to operate both day and night. Work requiring traffic control for duration not longer than one work shift and where traffic control is not required when the work is completed and road conditions are returned to normal at the end of the shift. 1.4 RMS TRAFFIC CONTROL AT WORK SITES MANUAL When planning and carrying out traffic control, consult and comply with the RMS Traffic Control at Work Sites Manual (TCWS). Where the TCWS states a role and its corresponding responsibilities, you must nominate a person, who may be either your employee, your subcontractor or your agent, for that role and ensure that the specified duties and responsibilities of such persons are carried out. Where the TCWS provides options, advice or recommendations, consider such options, advice or recommendations when planning and implementing traffic control and adopt them, as necessary, for the safe movement of traffic and protection of people and property. 1.5 TRAFFIC CONTROL PERSONNEL Authority to Direct Traffic You are authorised, under section 6 of the Roads Regulation 2008 (NSW), to appoint Traffic Controllers solely for the purposes of the Contract to provide for the safe movement of traffic around, past or through the work site. Any such appointment must cease upon the completion of traffic control work under the Contract, or the termination of the Contract, whichever is the earlier Registration of Traffic Control Organisations The organisation undertaking the traffic control must be registered under the RTA s Registration Scheme Category G Traffic Control Qualifications of Traffic Control Personnel Personnel in traffic control roles must have attended and be qualified in the traffic control training courses relevant to their roles, as follows: Traffic Control Roles Control traffic using Stop/Slow bat Set up and work with Traffic Control Plans drawn up by others Select and make minor modifications to standard RMS Traffic Control Plans to suit work locations Design new Traffic Control Plans and inspect setting out of traffic controls at work sites RMS Traffic Control Training Course Traffic Controllers (Blue Card) Apply Traffic Control Plans (Yellow Card) Select/Modify Traffic Control Plans (Red Card) Design & Inspect Traffic Control Plans (Orange Card) Traffic Controllers must carry their Blue Cards on their person at all times when controlling traffic Proposed Traffic Controllers Prior to the commencement of any work on the Site involving controlling and directing traffic, submit to the Principal the names of your proposed Traffic Controllers, and the registration numbers and expiry dates of their Cards. Submission of these details constitute a Hold Point. Ed 5 / Rev 3 3
16 HOLD POINT Process Held: Submission Details: Release of Hold Point: Any work controlling and directing traffic on the Site. The names of your proposed Traffic Controllers, and the registration numbers and expiry dates of their Cards. The Principal will consider your proposed personnel, prior to authorising the release of the Hold Point. Where there is a change of personnel, submit the names and Card details of the new Traffic Controllers, and the Hold Point will apply to these new personnel Safety Vests and Logo Issue to your nominated Traffic Controllers high visibility fluorescent safety vests complying with AS/NZS 4602, clearly bearing the letters RTA, and the words Authorised Traffic Controller. Traffic Controllers must wear the vest as an outer garment only when controlling traffic for the purposes of the Contract, and not at other times Traffic Control Site Manager Where specified in Annexure /A1, nominate in your Plan (TMP) a full-time member of your site management team to be your Traffic Control Site Manager (TCSM). The TCSM must be qualified, as a minimum, in the RTA s Select/Modify Traffic Control Plans course (i.e. hold a current Red Card) and have recent experience in traffic management on road construction sites of equivalent complexity to the current construction project. Detail in the TMP the role and responsibilities of the TCSM, which should include: (a) (b) (c) (d) (e) (f) (g) ensuring that the approved traffic control measures are established, implemented and maintained in accordance with the approved plans; carrying out regular inspections and auditing of the traffic control measures to ensure that they are effective and are being followed; amending and updating the plans, as required, to ensure that they remain current as the work progresses; identifying locations and times where traffic congestion or unsafe conditions for vehicles, cyclists, pedestrians and workers are occurring, and providing recommendations for improvement; maintaining current copies of the Plan, Traffic Staging Plans, Traffic Control Plans, Vehicle Movement Plans, Lane Occupancy Licences and Speed Zone Authorisations, and their controlled distribution; liaising with the Principal and other authorities such as Transport Management Centre (TMC), New South Wales Police and local Councils on traffic management matters for the construction site; facilitating traffic awareness and giving toolbox talks to site personnel. 4 Ed 5 / Rev 3
17 The TCSM should have the authority to stop work on any activity if it is considered to be necessary to prevent traffic accidents, or to comply with the directions of the Principal, TMC or Police. 2 PLANNING 2.1 GENERAL Plan your work to cause the least possible disruption to traffic. Obtain all necessary approvals from the relevant authorities for the temporary traffic arrangements as necessary. Liaise with the Principal and other regulatory authorities when planning and implementing your traffic management proposals. 2.2 PROJECT SPECIFIC RESTRICTIONS AND ADDITIONAL REQUIREMENTS Any restrictions and/or additional requirements on traffic management specific to the Contract are stated in Annexure /A TEMPORARY SPEED ZONING Temporary speed zoning for the duration of the Works are stated in Annexure /A ROAD OCCUPANCY LICENCE When your planned activity requires an existing road to be used in such a way as to affect traffic flow, you must obtain a Road Occupancy Licence (ROL). The licence applies to the occupation of the road space only and does not grant permission for or approval to the actual/physical work being undertaken. Information on how to apply for a ROL is contained in the RMS Road Occupancy Manual, available from the RMS website at: Road Occupancy Fees for occupancy of RMS roads may be payable under the contract, notwithstanding anything to the contrary stated in the Road Occupancy Manual. Where such fees are applicable, it will be indicated in Annexure /A1, and their costs must be borne by you. Submit your application for ROLs to the relevant authority at least ten (10) working days prior to the planned commencement of the activities requiring the road occupancy. The activity must not commence until the ROL is obtained. Manage your work activities to comply at all times with the lane occupancy hours granted in the ROLs. The lane occupancy hours granted in your ROL may be less than, and will override, the working hours stated in the Contract, for any work that requires lane occupancy. Keep a copy of the ROL on site at all times. Notwithstanding any ROLs granted by the RMS for any lane or shoulder closure, you must co-operate with RMS and other authorities, such as the Police or State Emergency Services, to facilitate traffic flows on the roadway through the work site. In this regard, the Principal may at any time direct you to temporarily cease any work and re-open any closed lane or shoulder. Ed 5 / Rev 3 5
18 2.5 TRAFFIC MANAGEMENT PLAN At least four (4) weeks before undertaking work which affects traffic conditions, submit for the Principal s approval your Plan (TMP) for the Works. The Principal may agree to a reduced period of notice for the proposed traffic management measures if they do not involve pavement or drainage works, or for Minor Works Contracts. The TMP must include, as a minimum and where appropriate, the following elements: (a) (b) (c) (d) (e) (f) (g) (h) Details of any traffic staging arrangements associated with each proposed construction stage, including Traffic Staging Plans (refer Clause 2.6), and the time periods during which each stage will be in operation; Copies of any ROLs (refer Clause 2.4) and approvals from other relevant authorities obtained; Traffic Control Plans (refer Clause 2.8), including the specific traffic control arrangements associated with obtaining a ROL; Vehicle Movement Plan(s) showing the preferred travel paths for vehicles to enter, leave or cross the through traffic stream; Provision for access to adjoining properties affected by the construction; Provision for the safe passage of cyclists and pedestrians; Design drawings for any temporary roadways and detours, including alignment and surface levels, pavement widths, pavement cross-sections and drainage (refer Clause 2.7); Names and contact details of nominated personnel (including the TCSM if applicable) responsible for maintenance of traffic control devices and temporary roadways outside normal working hours, together with confirmation that these details have been provided to the Police. The TMP and associated documentation must be prepared by person(s) suitably experienced in the design and implementation of traffic management plans of equivalent complexity to those required in the Contract and holding qualifications acceptable to the Principal, including as a minimum, a qualification in the RMS Design & Inspect Traffic Control Plans (Orange Card) course. The TMP and associated documents may be submitted in stages in accordance with the requirements of RMS Q for the staged submission of the PROJECT QUALITY PLAN. HOLD POINT Process Held: Submission Details: Release of Hold Point: Construction work which affects traffic conditions. At least 4 weeks prior to the proposed commencement date for construction work which affects traffic conditions, or any shorter period agreed to by the Principal, submit your Plan, comprising the elements stated in Clause 2.5. The Principal will consider the submitted documents and resources proposed prior to authorising the release of the Hold Point. 6 Ed 5 / Rev 3
19 Acceptance of the TMP by the Principal will not relieve you of your responsibility to implement an effective traffic management scheme, particularly in cases where a risk has not been previously identified or adequately mitigated in your TMP. Review the effectiveness of the TMP at least once a month, or more frequently if additional risk areas are encountered. Revise the TMP and implement more appropriate procedures if the original traffic management practices prove not to be fully effective. 2.6 TRAFFIC STAGING PLANS If nominated in Annexure /A1, prepare Traffic Staging Plans to show how traffic will pass safely through or around the construction site during the various construction stages. Traffic Staging Plans may be integrated with any Construction Staging Plans prepared by you. The Traffic Staging Plans must show, for each stage, the following: (a) (b) (c) (d) (e) (f) (g) lane configurations on existing and new (temporary and permanent) pavements, indicating any departures from existing traffic lanes; intersection layouts and temporary traffic signals arrangements; working areas, and pedestrian and cyclist paths; access to residential properties, local businesses and community facilities; pavement markings; drainage system, both temporary and permanent, including any pollution control measures; utilities and their impact on the Works. If removal of pavement markings is required, the Traffic Staging Plans must provide details of the proposed methods for removal, the estimated durations to carry out the removal, and if necessary any proposed measures to restore the road surface. You are not entitled to any extensions of time, or additional payments, arising from any re-design, time required for approval or additional construction costs associated with your proposed arrangements for traffic staging. 2.7 TEMPORARY ROADWAYS DESIGN AND DRAWINGS General If temporary roadways and detours, or adjustments to existing lane configurations and geometry, are required as part of your traffic staging, they must be designed in accordance with the relevant design standards. These design standards also apply where existing or unused roadways, including road shoulders, are proposed as temporary roadways. Unless otherwise specified or shown on the drawings it shall be the responsibility of the Contractor to design, construct and operate any side tracks, detours or obstructions to traffic, to maintain these in good condition, to remove these when finished and restore the area to match existing or as required by the Contract. Engage a road designer, who must have at least 5 years recent experience in designing roads to RMS standards, to prepare the Traffic Staging road design drawings. Apply design control procedures in accordance with RMS Q Clause 7.3. Ed 5 / Rev 3 7
20 Provide a certification by the road designer that the Traffic Staging road design drawings comply with the relevant standards Where an arrangement for a side track, detour or obstruction is specified or shown on the drawings, and the Contractor chooses to utilise that arrangement, this in no way relieves the responsibility of the Contractor with respect to the adequacy in all respects of the design, construction and operation of any side track, detour or obstruction Road Design Comply with the RMS Road Design Guide for design of the road geometry and configuration. The minimum design travel speed and traffic lane and shoulder width are stated in Annexure /A3. If sealing of shoulders is required, this will also be stated in Annexure /A3. If no minimum design travel speed is stated in Annexure /A3, the minimum design travel speed will be the speed limit of the existing road 40 km/h, unless otherwise approved by the Principal. The road design drawings must show, as a minimum, the following details: (a) (b) (c) (d) (e) (f) (g) (h) (i) Alignment and grading at a horizontal scale of 1:2000 for rural roads or 1:500 (for urban roads) extending to 100 m beyond the limits of the temporary roadway or detour. Prepare full width cross-sections, showing levels, at 20 m intervals. A sight distance diagram if opposing traffic is to use a single carriageway. Sufficient cross-sections to indicate the feasibility of making connections between various parts of the work. Intersections, and any other locations where traffic may be required to make turning, merging or diverging movements, at a scale of 1:500. Pavement type, including wearing surface, base and subbase details. Stormwater drainage details. Pavement marking and signposting, safety barrier and traffic control device details, at a scale of 1:500. Roadside furniture. Street lighting details, if appropriate. Where side tracks not detailed on the approved Temporary Plan(s) are proposed, the standard of alignment and grading adopted shall be in accordance with the current edition of the AUSTROADS publication Rural Road Design Guide to the Geometric Design of Rural Roads. Intersections shall be designed in accordance with the current edition of the AUSTROADS publication Guide to Traffic Engineering Practice Part 13 Intersections at Grade. Unless otherwise approved, pavements shall be at least 6.4m wide with appropriate shoulders and widening as necessary at horizontal curves Stormwater Drainage Design Provide an effective drainage system for the temporary roadways to prevent runoff water flowing over the road surface in any storm of intensity less than a 1 in 5 year occurrence. Ensure that the drainage system does not result in water ponding at any point. 8 Ed 5 / Rev 3
21 2.7.4 Pavement Design Design the wearing surface of temporary roadways and detours to be firm, even and skid resistant under all weather conditions and remain structurally sound during use. This includes any widening of through carriageways for construction staging purposes. The wearing surface must be carried onto any connecting roadway so as to finish flush with the existing road surface. The types and thickness of the individual layers of the pavement for the temporary roadways and detours are stated in Annexure /A3. Where the pavement type is not nominated in Annexure /A3, design the pavement in accordance with the Austroads publication AGPT02/08 Guide to Pavement Technology - Part 2: Pavement Structural Design and the RMS Supplement to the Austroads Guide to the Structural Design of Pavements (available from the RMS upon request). Where the existing pavements, and road shoulders areas which will be used as part of the temporary roadways and detours, are not designed to carry the new traffic loadings which will be imposed or are unlikely to be able to support the new traffic loadings, they must be upgraded for the new traffic conditions and must be designed accordingly Safety Barriers Select safety barrier types and their end treatments in accordance with Section 6 of the RMS Road Design Guide, giving due consideration to design traffic speed, angle of departure from the road, separation between work areas, pedestrians and through traffic plus dynamic clearance requirements. The safety barrier products selected must be from the list of safety barrier products accepted by the RTA. This list can be viewed at the RMS website at: Submit to the Principal a statement of the basis for the selection and locations of safety barrier systems and their end treatments. Provide safety barrier systems on temporary embankments, including part-width construction of permanent embankments. Barriers shall be erected on all temporary embankments where the slope of embankment is steeper than 25 percent and vertical height between the edge of the shoulder and the intersection of the embankment batter slope and natural surface exceeds 2m. 2.8 TRAFFIC CONTROL PLAN General Traffic Control Plans (TCPs) are in the form of diagrams showing signs and devices arranged to warn traffic and to guide it around, past or if necessary through a work site or temporary hazard Standard Traffic Control Plans You may use standard TCPs contained in the TCWS, with minor modifications if necessary to suit a specific work location, if they are appropriate. Follow the procedures set out in the TCWS for the selection, approval and implementation of the standard TCP and keep records of the steps performed. Ed 5 / Rev 3 9
22 The selection and minor modification of a standard TCP to suit a specific work location must only be carried out by a person who is qualified in the Select/Modify Traffic Control Plans course (i.e. holds a current Red Card) Project Specific Traffic Control Plans Where required in Annexure /A1 or where standard TCPs (including TCPs with minor modifications) are not appropriate for the work being planned, draw up TCPs specifically for the project. This work must only be carried out by a person qualified in the Design & Inspect Traffic Control Plans course (i.e. holds a current Orange Card). These project specific TCPs must be designed using computer aided drafting software and not be hand-drawn, unless approved otherwise by the Principal. All text, dimensions and symbols must be clearly presented, legible to the naked eye and unambiguous. The chainages in the TCPs must match those shown on the construction drawings. Property accesses, side roads and any special features affecting the positioning of signs and other traffic control devices must be shown. Each TCP must include a statement describing the situation for which the TCP is applicable. If traffic staging is applicable, produce individual TCPs for each traffic stage. The project specific TCPs must show the following: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) Types and locations of permanent regulatory and advisory signs; Types and locations of temporary signs, including advance warning signs, Variable Message Signs (VMS) and speed zone signs; Pavement marking details, including types of delineation required, turning arrows, stop/holding lines and other road markings, types and positions of raised pavement markers and other delineation devices; Locations of permanent and temporary traffic signals; Locations and lengths of tapers and buffer zones; Locations of any required Traffic Controllers; Locations of entry and exit gates to the working areas, individually numbered and signposted; Pedestrians and cyclists paths; Details of side roads and access for adjoining properties and parking; Locations of any safety barriers, barrier systems and end terminals; Locations of temporary lighting. If lane occupancy is required, comply with the requirements of Clause Ed 5 / Rev 3
23 HOLD POINT Process Held: Submission Details: Release of Hold Point: Work which involves any obstruction to traffic. If not previously submitted as part of the Plan, submit your Traffic Control Plan (including the appropriate elements listed in Clause 2.8.3), your Vehicle Movement Plan and any ROLs obtained, at least 3 working days prior to its proposed use. If the Principal requests additional information or clarification, the 3 working day assessment period will apply from the date of submission of the additional information. The Principal will consider the submitted documents prior to authorising the release of the Hold Point Vehicle Movement Plans Vehicle Movement Plans (VMPs) must provide for traffic associated with the Works, such as trucks delivering materials and equipment and work supervisors vehicles, to safely manoeuvre into and out of traffic streams, and turn at work areas, depots, stockpile sites, etc and turn around. The VMP must show the vehicle entry and exit points to the worksite and indicate clearly that these are the only points where interface with the road traffic is permitted. A VMP may be combined with or superimposed on a TCP. 2.9 TRAFFIC MANAGEMENT RISK ASSESSMENT WORKSHOPS If nominated in Annexure /A1, undertake a Risk Assessment Workshop to identify and address the risks associated with road safety, traffic management and road network issues specific to the site. Use the workshop to raise awareness of good traffic management practices and for network planning provisions to be made known to site management personnel. The content of the workshop will be specific for each project. However, it must include at least the following: (a) (b) (c) (d) (e) (f) (g) Training and knowledge requirements; Planning for traffic switches; Traffic Control Plans; Contract requirements relating to traffic management; Safety barriers systems; Delineation, signage and guidance to motorists; Road safety auditing requirements. Participants must include your site management staff, your road designer (refer Clause 2.7.1), personnel responsible for preparing your Traffic Control Plans (refer Clause 2.8), any other personnel involved in reviewing/road safety auditing of Traffic Control Plans, and Police and local Council representatives, as appropriate. Advise the Principal of the Workshop so that representatives of the Principal may also attend the workshop. Ed 5 / Rev 3 11
24 Record the identified risk issues and close them out when finalising your Plan and Traffic Staging Plans. Undertake additional workshops as appropriate to train your site personnel regarding implementation of the TMP and TCPs and when traffic management issues need to be reinforced or reviewed ROAD SAFETY AUDIT OF TCPS If nominated in Annexure /A1, TCPs must be independently audited, prior to implementation, by a Road Safety Auditor, who must as a minimum be certified to Level 2 in the Institute of Public Works Engineering Australia (IPWEA) Road Safety Auditor Register. In undertaking the audit, follow the guidelines contained in the Austroads publication AGRS06/09 Guide to Road Safety Part 6: Road Safety Audit. Include copies of the Road Safety Audit report, and any subsequent correspondence between you and the Road Safety Auditor, together with the TCP. 3 TEMPORARY ROADWAYS AND DETOURS 3.1 CONSTRUCTION OF TEMPORARY ROADWAYS AND DETOURS Construct the temporary roadways and detours in accordance with your approved Traffic Staging road design drawings. This includes modification and strengthening of existing pavement and road shoulders, where they are unlikely to be able to support the new traffic loadings. Construction of temporary roadways must comply with the relevant RMS Specifications for the particular roadworks element. HOLD POINT Process Held: Submission Details: Construction of temporary side tracks not detailed on the approved Temporary Plan(s). At least ten (10) working days prior to proposed construction of the side track the Contractor shall submit the design of temporary side track for assessment by the Superintendent. Release of Hold Point: The Superintendent will review the design for compliance with the relevant standards prior to authorising the release of the Hold Point. OPENING OF SIDE TRACK TO TRAFFIC All sign posting, pavement marking, safety barriers and traffic control devices shall be completed before the opening of side tracks to traffic. 12 Ed 5 / Rev 3
25 HOLD POINT Process Held: Submission Details: Opening of side tracks to traffic (including portable or temporary traffic signals sites) At least one (1) working day prior to proposed opening of the side track provide notice that work is conforming and ready for inspection. Release of Hold Point: The Superintendent will inspect the site for compliance with the specification prior to authorising the release the Hold Point. 3.2 ACCESS TO SIDE ROADS AND PROPERTIES Provide at all times a safe and convenient passage for vehicles, pedestrians and livestock to and from side roads and property connecting to the roadway under construction. Do not undertake any work which affects the use of side roads and access to properties without providing an adequate alternative access to the satisfaction of the Principal. 3.3 OPENING TEMPORARY ROADWAYS AND DETOURS TO TRAFFIC Complete all pavement markings, retro-reflective raised pavement markers, signposting and safety barriers and installation of portable or temporary traffic signals, before opening the temporary roadways to traffic. Arrange for an inspection by a person qualified in RTA s Design and Inspect Traffic Control Plans course (i.e. hold a current Orange Card) to verify that regulatory signs, warning signs and traffic control devices have been suitably located to be visible and effective under the site conditions and expected traffic speeds before opening the temporary roadways to traffic. HOLD POINT Process Held: Submission Details: Release of Hold Point: Implementation of traffic switch or opening of temporary roadways and detours to traffic. At least one day prior to the intended date of opening the temporary roadways to traffic, notify the Principal in writing that the work, including pavement markings, is conforming and ready for inspection by the Principal. The Principal will undertake a joint inspection of the site for compliance with this specification prior to giving approval and authorising the release of the Hold Point. If either your inspection or the Principal s inspection identifies a need for adjustments to any signs or traffic control devices or the provision of additional signs or traffic control devices, amend the applicable TCPs as needed, to show the final traffic control arrangement in place. Unless otherwise approved by the Principal, traffic may only be switched to a temporary roadway or detour where your usual workforce will be on site for a minimum of two successive days thereafter. Unless otherwise approved by the Principal, do not disturb sections of existing roadway being replaced for at least two days after opening a temporary roadway or detour to traffic, to provide for the Ed 5 / Rev 3 13
26 event where failure of the temporary roadway or detour occurs and there is a need to redirect traffic back onto the existing roadway. The need to redirect traffic back onto the existing roadway will determined by the Principal, and any costs associated with the redirection of traffic back will be borne by you. 3.4 ROAD SAFETY AUDIT OF TEMPORARY ROADWAYS OR DETOURS If auditing by a Road Safety Auditor is required (refer Clause 2.10), then within 24 hours of implementation of any TCPs for long-term temporary work, arrange for the Road Safety Auditor to carry out an inspection of the traffic control measures during both daytime and night time. If the original measures prove not to be fully effective, then in consultation with the Road Safety Auditor and the Principal, revise the TCPs without delay and implement appropriate measures. Submit a report to the Principal within 7 days of implementation of the TCPs. This report must also include findings from the Road Safety Auditor s inspections, and any changes implemented to longterm work TCPs. 3.5 REMOVAL OF TEMPORARY ROADWAYS AND DETOURS Upon completion of the Works, remove the temporary roadways and/or detour arrangements and restore the area to a condition equivalent to that which existed prior to the commencement of the work. 4 TRAFFIC CONTROL DEVICES All traffic control devices in use for temporary traffic management shall be maintained in accordance with AS , so that they are in good order and in the correct positions day and night. Traffic control devices shall be neat, clean, and signs shall be clear and legible at all times. The Contractor may need to be in attendance outside normal working hours to arrange for adjustments or maintenance of traffic control devices. The Contractor shall notify the Superintendent and the Police where necessary, in writing, the names, addresses and means of communicating with personnel nominated for this purpose, and to maintain such information as current. The arrangements and placement of traffic control devices shall be carried out in accordance with the approved Temporary Plan(s) and AS AS Figures 4.1 to 4.11 inclusive are indicative and should be regarded as minimum requirements. Arrangements used in particular cases must provide fully for the guidance and safety of vehicles, cyclists and pedestrians.where a temporary speed limit has been incorporated on the approved Temporary Plan(s), the Contractor shall arrange for the supply of the appropriate signage in accordance with AS , including posts and fittings, for erection. The Contractor shall erect these signs, cover the signs when the speed zone is not in use and remove the signs when the speed zone is no longer required as part of the provision for traffic. WARNING LAMPS Warning lamps shall be of robust construction complying with AS Photometric performance shall comply with the requirements of Part 1 of that Standard for the intended application. 14 Ed 5 / Rev 3
27 TRAFFIC GUIDANCE FLAPS AND CONES Traffic Cones, bollards and Guidance Flaps shall comply with the requirements of AS At no time shall cones or flaps be used as a substitute for barriers and signs at any location within the work site. Traffic guidance cones shall not be left in position at night unless there is a watchman in attendance who can reposition cones dislodged by traffic. Otherwise they shall be removed and replaced with flaps or barriers. Flaps fixed to the pavement may be left in position at night. Traffic guidance cones to be used at night shall be reflective in accordance with AS USE OF SIGNS FOR BLASTING OPERATIONS During blasting operations, stop traffic at a safe distance, but not less than 200m from the site of the blasting. Barricade the road and erect signs in accordance with AS A traffic controller shall always be in attendance at each barricade to ensure that all traffic is halted. In the event of a large queue a second traffic controller should be assigned to walk ahead of the queue to warn approaching vehicles of the traffic stoppage Where electric detonators are being handled or used, within 100m of a road, erect additional sign T4-2 BLASTING AREA, SWITCH OF RADIO TRANSMITTERS. DELINEATION OF EXCAVATIONS Where traffic is operating in a lane immediately adjacent to an excavation greater than 150mm deep, delineate the lane edge in accordance with the requirements of AS OBSTRUCTIONS Where a side track or a detour is not provided or available, then construction under or adjacent to traffic may be permitted. Operation and control of obstructions in existing carriageways shall be planned in accordance with the principles laid down in AS and SAA HB81 which give specific guidance as to the minimum requirements for arrangement and placement of warning devices for lane closure(s) and single lane operations in various circumstances. In addition to measures which may be indicated or specified in AS or SAA HB81, unless specified or approved otherwise the following requirements shall apply. Single lane operation will not be permitted at night or at times when work is not in progress. In all cases of single lane operation, the minimum lane width shall be 3.0m On multi-lane roads, closure of more than one lane in the direction of peak traffic flow will not be permitted during peak periods. At least one lane shall be left open for traffic travelling in the direction opposite to the peak flow. Where it is noted on the drawings that the simultaneous closure of several lanes of a multi-lane road would cause undue disruption to traffic, then all or part of the work concerned shall be done during off peak periods or at weekends or at night. The Contractor shall ensure the carriageway(s) is restored to a safe and trafficable state for through traffic prior to cessation of work each day. Ed 5 / Rev 3 15
28 All permanent sign posting, pavement markings, safety barriers and traffic signals where required under the Contract shall be completed or reinstated prior to opening completed work to traffic. 4.1 SAFETY BARRIERS Where identified in your TCP for the work, provide safety barriers to protect the work areas and pedestrian areas from the traffic. The safety barriers must be from the list of safety barrier products accepted by the RTA, in accordance with clause Water filled plastic barriers may be used at those locations that preclude the use of rigid barriers, such as at corners or intersections and any other locations approved by the Principal, provided that their use complies with the TCWS and the Acceptance conditions for the safety barrier product. Provide the manufacturer s recommended buffer zones on the approach side of water filled barriers. Erect the safety barriers in accordance with Specification RMS R132 and the Acceptance conditions for that safety barrier product. Establish an exclusion zone behind barriers as required and do not permit construction work or pedestrian movement within the deflection or impact zone of safety barriers. Do not use safety barriers or safety barrier systems for delineation in place of linemarking. DELINEATION BARRIERS Barrier boards shall comply with AS Trestles supporting barrier boards shall be constructed of metal, sawn timber or other suitable materials and shall be yellow. Trestles shall serve as firm support for the barrier board but the bases of the trestles shall not protrude beyond the ends of the boards. The trestles shall be kept in place by sandbags or other suitable means. Tapes, mesh fencing, interconnected lightweight units and bollard fences may all be used as delineation barriers. 4.2 PAVEMENT MARKINGS AND SIGNS Notwithstanding anything else contained in this Specification the Contractor shall only place, erect, or remove road signs in accordance with the approved Temporary Plan(s), for roads used by the public. Install all pavement markings, retroreflective raised pavement markers and signposting proposed for use in the temporary works in accordance with the requirements of Specifications RMS R141, RMS R142 and RMS R143 respectively, to the same standard as for permanent work. Unless otherwise specified, use waterborne paint for pavement markings for temporary works. The method of removal of redundant pavement markings from wearing surfaces, other than final wearing surfaces, must comply with the requirements of the TCWS. Removal of redundant linemarking within traffic lanes by covering with paint is not acceptable. Supply and erect Temporary Speed Zoning signs at the locations indicated in your TCP. Keep the signs covered when the speed zone is not in use. Remove the signs when the Temporary Speed Zoning is no longer in force. 16 Ed 5 / Rev 3
29 4.3 PORTABLE VARIABLE MESSAGE SIGNS If nominated in Annexure /A1 or if required by your TCP, place variable message signs (VMS) at prominent locations on each end of the site as agreed with the Principal, to keep road users informed of changes to road conditions and of possible delays as a result of construction work. The VMS must be portable, Type C size, and solar powered, complying with AS Ensure that the messages displayed on the VMS remain current over the duration of the Contract. Move the locations of the VMS, as needed, during the progress of the Works. The locations of the signs and the messages displayed must be approved by the Principal. Use the VMS to publicise any pending changes in traffic arrangements for five days prior to those changes, and for changed traffic arrangements for five days after making those changes. Maintain and make secure the VMS. Clean the VMS perspex face and solar panels and check the battery distilled water levels at least once each month. 4.4 RADAR ACTIVATED SPEED SIGNS If nominated in Annexure /A1, or if required by your TCP, provide trailer mounted Radar Activated Speed Signs (RASS) for use during the construction period. Locate the RASS in positions suitable for influencing the speed of motorists entering the reduced speed zone. The locations of the RASS and the message displayed must be as agreed with the Principal. Obtain calibration details from the RASS supplier(s) to confirm that each RASS is accurately calibrated within the manufacturer s specified tolerances. Periodically check each RASS for accuracy and carry out recalibration to within the manufacturer s specified tolerances promptly as needed. Monitor the effectiveness of the speed limit reductions and furnish a detailed log of the speeds each week to the Principal. 4.5 TEMPORARY TRAFFIC SIGNALS Traffic Signals for the control of traffic, either portable or temporary may be used in accordance with AS If nominated in Annexure /A1 or if required by your TCP, install portable traffic signals complying with the TCWS or temporary fixed traffic signals complying with the RMS Traffic Signals Equipment Specification No SI/TCS/8 and associated Drawings. Portable traffic signals may be used for shuttle control where a single lane has to be used alternately by traffic from opposite directions or at road crossings or intersections. They are intended for relatively short term applications. Temporary fixed traffic signals may be used for long term shuttle operations or for non-shuttle control of intersecting traffic flows. Ed 5 / Rev 3 17
30 5 MONITORING OF TRAFFIC CONTROL MEASURES As a minimum, check at the commencement and conclusion of each day s work that all required traffic control measures and signs are in place as detailed on the TCP for each stage. Record the details of this inspection daily. The person conducting this check must be qualified in RTA s Apply Traffic Control Plans course (i.e. hold a current Yellow Card). 6 ROAD CONSTRUCTION WORK ADJACENT TO TRAFFIC 6.1 GENERAL Where a temporary roadway or a detour is not provided or available, then subject to the approval of the Principal, construction under or adjacent to traffic may be permitted provided that at least one 3.7 m lane remains open to traffic on a two lane roadway and at least one 3.7 m lane remains open in each direction on divided multi-lane roads. Alternatively, subject to the approval of the Principal, the lanes may be linemarked to a reduced width. Prior to cessation of work each day, restore the carriageway(s) to a safe and trafficable state for through traffic, unless otherwise stated in the approved TCP. 6.2 APPROVED CLOTHING FOR WORKERS WORKING ADJACENT TO TRAFFIC All personnel working in close proximity to traffic must wear high visibility fluorescent safety clothing complying with AS/NZS 4602 which are suitable for daytime, night time and/or wet weather conditions, as applicable. 6.3 PLANT AND EQUIPMENT USED FOR WORK ADJACENT TO TRAFFIC Equip all vehicles used in traffic control operations with the appropriate vehicle mounted warning devices in accordance with the TCWS. During daytime, plant and equipment working in a position adjacent to traffic and having a projection beyond the normal width of the item, for example, a grader blade, must have a fluorescent red flag attached to the outer end of the projection. During poor light conditions or at night, an additional Traffic Controller with an illuminated red wand must direct traffic around such plant and equipment. During night time, where traffic is permitted to use the whole or portion of the existing road, remove all plant items and similar obstructions from the normal path of vehicles, to provide a lateral clearance of at least 6 m where practicable, with a minimum clearance of 1.2 m. Illuminate any plant and equipment which are within 6 m of the normal path of vehicles with not less than two yellow steady lamps suspended vertically from the point of the obstruction nearest to a traffic lane, and one yellow steady lamp at each end of the obstruction on the side furthest away from the traffic lane. 18 Ed 5 / Rev 3
31 7 MAINTENANCE OF ROADWAYS 7.1 EXISTING ROADWAYS If stated in Annexure /A1, carry out routine maintenance of the pavement and drainage on existing roads (including shoulders and kerb and gutter) within the Limits of the Contract. Your obligations under this Clause will start when you commence any work on site other than site establishment. This maintenance work includes repairing potholes, cleaning kerbs and gutters, clearing drainage blockages, removal of debris from roadway, straightening and cleaning roadside furnishings, grass mowing and trimming of vegetation, as needed. Maintenance of existing roads outside the Limits of the Contract will be undertaken by others. You must co-operate with the RTA, local Councils or their agents in carrying out their maintenance responsibilities. 7.2 TEMPORARY ROADWAYS AND DETOURS Maintain any temporary roadways and detours in use during construction and any local roads used by construction traffic, to provide a safe, trafficable condition for all classes of vehicles that may use them. Areas that were road shoulders prior to commencement of your work but have become pavements for your temporary roadways are considered to be temporary roadways and detours and must be maintained by you. The work includes maintenance of the existing pavements, linemarking, kerb and gutter, road shoulders and verges, ancillary services, roadside environment, drainage, signage, trimming of vegetation and housekeeping. Repair any potholes, surface drainage blockages or other failures without delay. Remove debris of any type, including animal carcasses, without delay. Re-apply linemarking as needed to clearly delineate traffic lanes for the duration of the temporary traffic arrangements. All costs associated with this maintenance are to be borne by you. 7.3 NEW ROADWAYS OPENED TO TRAFFIC If specified in Annexure /A1, carry out routine maintenance of newly constructed sections of road, after opening to traffic in accordance with Clause 8 of this Specification, until Completion or as otherwise directed by the Principal. This includes cleaning of kerbs and gutters, clearing of drainage blockages, removal of debris from roadway, grass mowing and trimming of vegetation, as applicable. Where you are not responsible for such routine maintenance, cooperate with the RTA, local Councils or their agents in carrying out their maintenance responsibilities. 8 OPENING TO TRAFFIC UPON COMPLETION Complete all relevant permanent signposting, pavement markings, safety barriers and traffic signals required under the Contract prior to opening of the whole of the Works or any part of the Works to traffic. Ed 5 / Rev 3 19
32 Remove all temporary traffic control devices no longer required for the safety of traffic, when the whole of the Works or part of the Works are opened to traffic. Give the Principal at least ten working days written notice of the date of opening the whole of the Works or part of the Works to traffic. Determine the procedure for opening through consultation between you, the Principal and the Police. 20 Ed 5 / Rev 3
33 ANNEXURE /A PROJECT DETAILS A1 PROJECT SPECIFIC REQUIREMENTS Clause Description Required? Nomination of a person as Traffic Control Site Manager required? Yes / No 2.3 Temporary speed zoning available for implementation? (If yes, insert details below) Yes / No Temporary speed zone speed limit: km/hr 2.4 Road Occupancy Fee payable? (If yes, attach a Schedule of Road Occupancy Fees in Annexure /A4) Yes / No 2.6 Traffic Staging Plans required? Yes / No Traffic Control Plans to be designed specifically for project? Yes / No 2.9 Risk Assessment Workshop required? Yes / No 2.10 Road Safety Audit of Traffic Control Plans required? Yes / No 4 Traffic Control Devices: 4.3 Portable variable message signs required? Yes / No 4.4 Radar activated speed signs required? Yes / No 4.5 Temporary traffic signals required? Yes / No 7 Maintenance of Roadways: 7.1 Contractor required to maintain existing roadway? Yes / No 7.3 Contractor required to maintain sections of newly completed roadway after Yes / No opening until Completion? (delete as applicable) Ed 5 / Rev 3 21
34 A2 PROJECT SPECIFIC RESTRICTIONS AND ADDITIONAL REQUIREMENTS NOTES TO TENDER DOCUMENTER: (Delete this boxed text after customising ) List here any restrictions and/or additional requirements on traffic management specific to the project that the Contractor must provide for (see GUIDE NOTES). If no restrictions or additional requirements are applicable, insert Not Applicable in this section. A3 DESIGN STANDARDS FOR TEMPORARY ROADWAYS Design parameters (values stated below are minimum values): Design travel speed: kilometres per hour Traffic lane widths: metres Shoulder widths: metres Sealing of shoulders required? Yes / No (delete as applicable) Wearing surface Type: Thickness: millimetres Base Type: Thickness: millimetres Subbase Type: Thickness: millimetres A4 ROAD OCCUPANCY FEES NOTES TO TENDER DOCUMENTER: (Delete this boxed text after customising ) If Road Occupancy Fees are payable, attach a Schedule of Road Occupancy Fees here. If Road Occupancy Fees are not payable, insert Not Applicable in this section. 22 Ed 5 / Rev 3
35 ANNEXURE /B MEASUREMENT AND PAYMENT Refer to clause Payment will be made for all activities associated with completing the work detailed in this Specification in accordance with the following Pay Items. If any item for which a quantity of work is listed in the Schedule of Rates has not been priced by you, it will be deemed that due allowance has been made in the prices of other items for the cost of the activity which has not been priced. Measurement and Payment for items defined in other specifications exclude works carried out only to comply with RMS. Pay Item P1 This is a Lump Sum item. The Lump Sum includes preparation of Plans and associated documents; the design, construction, maintenance and removal of temporary roadways and detours; provision of access to properties; all activities associated with opening to traffic; provision of Traffic Controllers; lighting including floodlights; traffic control devices including barriers, temporary linemarkings and signs, Variable Message Signs, radar activated speed signs and temporary traffic signals; and any other work required for the safe movement of traffic and the protection of persons and property in accordance with this Specification and the TCWS, except where specific pay items are provided below. Progress payments will be made on a pro-rata basis of work done under this item, having due regard to the duration of the Works under the Contract. Pay Item P2 Maintenance of Traffic Control Measures The Pay Item is for maintenance of the traffic control measures constructed or installed, including temporary roadways and detours, signposting, pavement markings, lights including floodlighting, safety barriers, and any other items required for the safe movement of traffic and the protection of persons and property in accordance with this Specification and the Traffic Control at Work Sites Manual. The unit of measurement is per week. The rate must be an average cost for maintenance (including hire charges) of traffic control measures at all stages during the contract. This work is deemed to commence at the time of the installation of the first traffic control measures on site and be completed when the last traffic control measure is removed from the site, or until the Contractual Completion Date, whichever occurs first. Pay Item P3 Routine Maintenance of Existing Roadways (when nominated in Annexure /A1) The unit of measurement is per week. The rate covers all activities associated with routine maintenance of the pavement and drainage on existing roads under construction (including shoulders and kerb and gutter) within the limits of the Works, in accordance with Clause 7.1. Ed 5 / Rev 3 23
36 Payment will be made from the date of commencement of work on site other than site establishment until Contractual Completion Date or Actual Completion Date, whichever occurs first. Pay Item P4 Routine Maintenance of New Roadways Opened to Traffic (when nominated in Annexure /A1) The unit of measurement is per kilometre per week from the time of opening newly constructed sections of road to traffic until the Contractual Completion Date or Completion whichever occurs first, or as otherwise directed by the Principal. The unit rate includes all activities associated with routine maintenance, in accordance with Clause 7.3. NOTES TO TENDER DOCUMENTER: (Delete this boxed text after customising ) The DOCUMENTER may insert additional Pay Items (as Provisional Sum or Provisional Quantity) to be ordered at the discretion of the Principal. Inclusion of these additional Pay Items must only be made after consultation with Manager Contract Administration, Infrastructure Contracts Branch. Examples of such work include: additional signage not part of traffic control, Variable Message Signs, replacement or renewal of raised pavement markers, lines and pavement markings. 24 Ed 5 / Rev 3
37 ANNEXURE /C SCHEDULES OF HOLD POINTS AND IDENTIFIED RECORDS Refer to clause C1 SCHEDULE OF HOLD POINTS Clause Description Submission of traffic control personnel details 2.5 Submission of Plan (TMP) and associated documents Submission of Traffic Control Plan (TCP), where submitted separately from TMP 3.3 Opening temporary roadway or detour to traffic C2 SCHEDULE OF IDENTIFIED RECORDS The records listed below are Identified Records for the purposes of RMS Q Annexure Q/E. Clause Description of the Identified Record Traffic Controllers qualification details 2.3 Road Occupancy Licences obtained 2.5 Plan (TMP) 2.6 Traffic Staging Plans, including road design drawings (if not part of TMP) 2.8 Traffic Control Plans (TCP) and Vehicle Movement Plans (VMP) (if not part of TMP) 2.9 Risk issues identified in Risk Assessment Workshop 2.10 Road Safety Audit of TCPs report and associated documentation 3.3 Inspection reports on traffic control measures, prior to opening of traffic switches or temporary roadways 3.4 Road Safety Audit report of TCP implementation 5 Daily inspection records of traffic control measures in place Ed 5 / Rev 3 25
38 ANNEXURES /D TO /L (NOT USED) ANNEXURE /M REFERENCED DOCUMENTS AND ACRONYMS M1 REFERENCE DOCUMENTS Refer to clause RMS Q RMS R132 RMS R141 RMS R142 RMS R143 SI/TCS/8 RMS Specifications Quality Management System Safety Barrier Systems Pavement Marking Retroreflective Raised Pavement Markers Signposting RMS Traffic Signals Equipment Specifications Installation of Traffic Light Signals RMS Publications Road Design Guide Road Occupancy Manual Traffic Control at Work Sites Manual Supplement to the Austroads Guide to the Structural Design of Pavements AS/NZS 4602 AS AGPT02/08 AGRS06/09 Australian Standards High visibility safety garments Variable Message Signs Part 2: Portable Signs Austroads Publications Guide to Pavement Technology - Part 2: Pavement Structural Design Guide to Road Safety Part 6: Road Safety Audit NSW Government Roads Regulation Ed 5 / Rev 3
39 M2 ACRONYMS IPWEA Institute of Public Works Engineering Australia RASS ROL TCP TCSM TCWS TMC TMP VMP VMS Radar Activated Speed Signs Road Occupancy Licence Traffic Control Plan Traffic Control Site Manager RMS Traffic Control at Work Sites Manual Transport Management Centre Plan Vehicle Movement Plan Variable Message Signs Ed 5 / Rev 3 27
Delineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
Traffic controllers and speed zones
Section 8 Traffic controllers and speed zones 8.1 Traffic Controllers 8.1.1 General (AS 4.10.2) (a) Equipment Traffic controllers shall wear approved high visibility clothing and shall control traffic
ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT
I. GENERAL ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT ANNEX III B i. The setting up and implementing of appropriate management procedures is an essential tool for improving the
GENERAL SPECIFICATION
R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G3 TRAFFIC MANAGEMENT Date JUNE 2013 Edition 1 / Revision 0 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources REVISION REGISTER
Victoria Government Gazette
Victoria Government Gazette No. S 351 Tuesday 31 August 2010 By Authority of Victorian Government Printer ROAD MANAGEMENT ACT 2004 CODE OF PRACTICE WORKSITE SAFETY TRAFFIC MANAGEMENT SPECIAL 2 S 351 31
Guide to the Preparation of a Traffic Management Plan
Guide to the Preparation of a Traffic Management 1. INTRODUCTION... 4 2. PREPARATION OF TRAFFIC MANAGEMENT PLANS... 5 2.1. LEASEHOLDER SITE... 5 2.1.1. Site Operations... 6 2.1.2. Statutory Requirements...
STANDARD OPERATING INSTRUCTION. Worksite Safety Traffic Management Procedure
STANDARD OPERATING INSTRUCTION Worksite Safety Traffic Management Procedure November 2012 Title System Reference Number Approved By Worksite Safety Traffic Management People and Wellbeing SOI-GVW-329 Manager
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
CONTRACT TRAFFIC MANAGEMENT PLAN
CONTRACT TRAFFIC MANAGEMENT PLAN Project: Client: Gisborne District Council Contractor: PF Olsen Ltd TMP No.: Contract Plan Issue Date Document Control Document Authorisation 27.08.4 B McArthur Page Edition
3.1 Introduction. 3.1.1 General (AS 1.5 & 2.1)
Section 3 General procedures 3.1 Introduction 3.1.1 General (AS 1.5 & 2.1) Work shall be arranged so that workers are able to work safely and are separated from road users wherever possible. All personnel
TRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
Principles of Traffic Management on sites / road network
IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This
Guidelines for Traffic Controllers
Guidelines for Traffic Controllers keeping victorians connected 2 IMPORTANT Before undertaking the tasks of a Traffic Controller on a public road, a person must successfully complete an accredited Traffic
TEMPORARY TRAFFIC CONTROL SAFETY
TEMPORARY TRAFFIC CONTROL SAFETY BASIC PRINCIPLES OF WORK ZONE TRAFFIC MANAGEMENT Temporary traffic control zone safety has become an area of national concern as awareness of risk to workers, pedestrians,
Temporary Traffic Management
Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary
Traffic Management Plan
Traffic Management Plan Contract: [insert the contract title, section, chainage, length, contract ID No] Contractor: [Full name of the contractor, Address, City, Country] Supervision Consultant: [Full
Traffic Management Plan - Depot Procedure
Traffic Management Plan - Depot Procedure Date: 1/8/13 Version: TMPDPGWT001 Status: Approved 1. Purpose This procedure outlines the traffic management plan which must be followed for the Depots. 2. Scope
Construction Traffic Management Plan
. Construction Traffic Management Plan PROJECT: FOXGROUND AND BERRY BYPASS CONTRACT No.: 12.2574.3019 CONTROLLED COPY NO: e-copy DISTRIBUTION LIST OF CONTROLLED COPIES Copy No. Issued to 1 Fulton Hogan
TEMPORARY TRAFFIC MANAGEMENT Operate as a Traffic Controller (TC) for low volume and Level 1 roads
1 of 8 level: 3 credit: 4 planned review date: October 2008 sub-field: purpose: Highway Construction and Maintenance This unit standard is for people who may be appointed, subject to guidance and monitoring
Release: 1. RIIOHS302A Implement traffic management plan
Release: 1 RIIOHS302A Implement traffic management plan RIIOHS302A Implement traffic management plan Modification History Not applicable. Unit Descriptor This unit covers the competency required to implement
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS
Issue Date: 27 June 2014 GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS This document is owned and authorised by the Executive Director Road Network Services. Please submit all comments and requests
TRAFFIC MANAGEMENT PLAN
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India SIX LANING OF CHANDIKHOLE JAGATPUR BHUBANESWAR SECTION OF NH-5 FROM KM 414.000 TO 419.000 AND FROM KM 0.000
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction
City of Kelowna Traffic Management Guide. December 2010
City of Kelowna Traffic Management Guide December 2010 City of Kelowna Traffic Management Guide December 2010 Prepared by: Urban Systems Ltd. 304-1353 Ellis Street Kelowna, BC V1Y 1Z9 T: (250) 762-2517
Traffic Management Guidelines
Ministry of Transportation Traffic Management Guidelines For Work On Roadways September 2001 TABLE OF CONTENTS COVER PAGE 1 TABLE OF CONTENTS 2 LIST OF FIGURES AND TABLES 5 PREFACE 6 PART 1 - INTRODUCTION
APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.
Document No: 16-02-12A Issue Date: 09 December 2014 APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS (An approved Traffic Management
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
GUIDELINES FOR WORKING ON ROADS
GUIDELINES FOR WORKING ON ROADS Guide to the Safety, Health and Welfare at Work (Construction)(Amendment)(No. 2) Regulations 2008 (S.I. No. 423 of 2008) 7 CONTENTS Page Introduction.....................................................
Economic and Social Council
UNITED NATIONS E Economic and Social Council Distr. GENERAL TRANS/WP.1/2003/1/Rev.4 23 April 2004 ENGLISH Original: ENGLISH, FRENCH and RUSSIAN ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE
GUIDELINES. for oversize and overmass vehicles and loads MAY 2006. Government of South Australia. Department for Transport, Energy and Infrastructure
ESCORTING GUIDELINES ESCORTING GUIDELINES SCORTING GUIDELINES ESCORTING GUIDELINES ESCORTING ESCORTING GUIDELINES for oversize and overmass vehicles and loads Government of South Australia Department for
Construction Management Plan (CMP) Application
About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction
ARTWORK COMMISSION AGREEMENT
ARTWORK COMMISSION AGREEMENT THIS AGREEMENT is made the day of in the year BETWEEN the Minister for Works of Level 6, 16 Parkland Road, Osborne Park, WA 6017 being the body corporate created under Section
G2 Contract Management Plan Date: July 2014 Edition 1 / Revision 0
G2 Contract Management Plan Date: Edition 1 / Revision 0 REVISION REGISTER Ed/Rev Number Ed 1 / Rev 0 Clause Number All G2.1 G2.2 G2.3 G2.4 G2.5 G2.5 G2.6.1 G2.6.2 G2.6.3 G2.6.4 G2.6.5 G2.6.6 G2.6.7 G2.7
CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
Table of Contents. Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7
1 Table of Contents Introduction 2 Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7 Five Parts of a Traffic Control Zone 8 Buffer Space Guidance 9 Taper Length
Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC
TRANSPORT SCOTLAND TRUNK ROAD & BUS OPERATIONS TS INTERIM AMENDMENT 40/11 Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC Summary This Interim Amendment provides guidance to ensure
Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details
Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details
1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1
DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1 Guideline: DRAFT Planning the opening of a road project guideline Version: 1.1 Issue: September 2009 Approved By: Phil Margison General Manager,
Transportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014
LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington
Project Traffic Management Plan for Design & Construction of the Port Botany Expansion Project of Sydney Ports Corporation Document No: PLAN-TM-001
Project Traffic Management Plan for Design & Construction of the Port Botany Expansion Project of Sydney Ports Corporation Document No: PLAN-TM-001 PLAN-TM-001 [5W] Traffic Management Plan.doc Page 1 of29
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES
WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
Demolition Works Measures for Public Safety
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note
ANGUS COUNCIL SUPPLEMENTARY CONDITIONS OF CONTRACT. SC 01 - Contract Performance Guarantee Insurance
SC 01 - Contract Performance Guarantee Insurance For contracts equal to or exceeding 750,000 in value the Contractor shall, within 28 days of the date of the award of the Contract, obtain and provide to
Traffic Management Scheme
Traffic Management Scheme Plan Number: #0296 Date Produced: 10/12/2013 Date Delivered: 08/01/2014 Works Description: Building deliveries & concrete pours to 540 Burke Rd, Camberwell Submitted To: Company
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
NORTH CAROLINA NUG UPDATES FOR SUCCESSFUL TIM TEAMS. Traffic Incident Management Workshop June 19th, 2012
NORTH CAROLINA NUG UPDATES FOR SUCCESSFUL TIM TEAMS Traffic Incident Management Workshop June 19th, 2012 OUTLINE FEMA PARKING GUIDELINES DVD / CARD RESPONDER VISIBILITY ACCIDENT INVESTIGATION SITES SAFE,
Special Event Resources
Special Event Resources Special Event Transport Management Plan Template Refer to Chapter 7 of the Guide for a complete description of the Transport Management Plan 1 EVENT DETAILS 1.1 Event summary Event
CHAPTER 10 SCHOOL AREA PEDESTRIAN SAFETY
STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING DEPARTMENT OF TRANSPORTATION TRAFFIC MANUAL CHAPTER 10 AREA PEDESTRIAN SAFETY 10-00 - Introduction, General Provisions, Table of Contents and List
Engineering Standard
Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description
Traffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
CATERING CONTRACTORS General Code of Safety Practice
Residential & Business Services Director s Office CATERING CONTRACTORS General Code of Safety Practice CONTENTS 1 Introduction 2 2 Commencement of Work 3 3 Vehicles 3 4 Temperature control 3 5 Food hygiene
SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014
SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 Traffic Management Plan TABLE OF CONTENTS 1 INTRODUCTION... 1 2 OBJECTIVES... 1 3 APPLICABLE
Traffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
CHAPTER. Traffic Signs Manual. Part 1: Design. Traffic Safety Measures and Signs for Road Works and Temporary Situations
Traffic Signs Manual CHAPTER 8 Traffic Safety Measures and Signs for Road Works and Temporary Situations Part 1: Design 2009 Traffic Signs Manual Chapter 8 Traffic Safety Measures and Signs for Road Works
ROADWORKS TRAFFIC MANAGEMENT PLAN
ROADWORKS TRAFFIC MANAGEMENT PLAN Project: Bulk Earth Operations Location: 253 Yangedi Rd Hopeland Contractor: SAGH Pty Ltd Date: 01-03-2015 to 30-06-2018 Declaration I Richard Gibson (KTS-AWTM-13-42961-02)
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Document Comparison. AIA Documents A134 2009 and A131CMc 2003
Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections
3. QUALITY ASSURANCE REQUIREMENTS
3. QUALITY ASSURANCE REQUIREMENTS 3.1 General This section covers the Kaipara District Council requirements for monitoring and testing of physical asset construction to ensure that the final asset delivered
Chaffey Dam Augmentation and Safety Upgrade
Chaffey Dam Augmentation and Safety Upgrade Site Access and Traffic Management Plan Rev Date Prepared by Reviewed by Approved by Remarks Name & Signature Name & Signature Name & Signature A 02/07/2014
Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
STANDARDS AUSTRALIA/STANDARDS NEW ZEALAND. Committee CE-001 Parking Facilities DRAFT. Australian/New Zealand Standard
Draft For Committee Purposes Only DRAFT FOR SUBMISSION TO ABCB CE/001/09-481A (Supersedes CE/001/05-406) Issued: February 2009 Project No: 5431 STANDARDS AUSTRALIA/STANDARDS NEW ZEALAND Committee CE-001
Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.
Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of
INTERIM ADVICE NOTE 179/14
INTERIM ADVICE NOTE 179/14 Guidance on the Use of Vehicle Mounted High Level to provide advance warning of lane closures for Relaxation Works on Dual Carriageways with a Hard Shoulder Summary Guidance
WORKZONE TRAFFIC MANAGEMENT PROCEDURE
1. OVERVIEW The Flinders Ranges Council as part of its commitment under its Hazardous Work Policy, recognises its obligation to eliminate so far as is reasonably practicable or, where that is not reasonably
Guide to Assessment and Rating for Regulatory Authorities
Guide to Assessment and Rating for Regulatory Authorities January 2013 Copyright The details of the relevant licence conditions are available on the Creative Commons website (accessible using the links
For ease of reference the clauses are arranged in 12 sections as follows:-
NASC TERMS The general NASC terms under which members carry out their work are normally set out in their Standard Terms of Trading, often found on the reverse of their quotation form and referred to as
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues
Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015
Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)
Ontario Emergency Medical Services Section 21 Sub Committee. Emergency Medical Services Guidance Note #5
Emergency Medical Services Guidance Note #5 Issue: TRAFFIC SAFETY AND WORKER VISIBILITY PREAMBLE Emergency Medical Services (EMS) workers (paramedics) performing their duties while responding to emergencies/unplanned
California Crossing Guard Training: Online Course Part 2
California Crossing Guard Training: Online Course Part 2 Prepared by the Safe Routes to School Technical Assistance Resource Center The Safe Routes to School Technical Assistance Resource Center is a program
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
Operations ODO 27.0 Traffic Management
SES OPERATIONS DOCTRINE OPERATIONAL DIRECTIVES Operations ODO 27.0 Traffic Management Valid from 28/01/2014 Version 3.0 1. PURPOSE To outline requirements relating to the conduct of traffic management
How To Design A Crash Investigation Site
CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where
DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST
State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage
WHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
Traffic Management Plan SPAPLAN015
Page: 1 of 39 Traffic Management Plan SPAPLAN015 Approval and Implementation Prepared by: Thomas Mitchell Version Number: 1 Date of Approval: 10/04/2015 Approved by: Position: Date of Implementation: OHS
Prequalification of Roading Contractors
Prequalification of Roading Contractors Manual for Roading Contractor Prequalification for Authorised CCC Roading Work Please send prequalification applications to Chris Nordstrom Project Manager Capital
For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems
BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY. The City of Bunbury acknowledges that it has a Duty of Care obligation under the Occupational Safety and Health Act 1984 (Section
AUSTRALIAN CAPITAL TERRITORY Road Transport (Dimension and Mass) ACT 1990 OVERSIZE VEHICLES EXEMPTION NOTICE INSTRUMENT NO.
AUSTRALIAN CAPITAL TERRITORY Road Transport (Dimension and Mass) ACT 1990 OVERSIZE VEHICLES EXEMPTION NOTICE INSTRUMENT NO. 331 OF 2000 1. Under paragraph 31 A( 1 )(b) of the Road Transport (Dimensions
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
