Appendix G. Security management plan



Similar documents
Crime Prevention through Environmental Design (CPTED) - Checklist

UBC Technical Guidelines Section Edition Secure Access: General Standards Page 1 of 7

Physical Security Assessment Form

Home Security Assessment Checklist DATE

1. Perimeter fencing or walls should enclose the vicinity around cargo handling and loading areas, as well as storage facilities.

Security Tools. Forms. Physical Security Assessment Security Plan Template Traffic Control Plan Template

Restaurant and Café Risk Management Guide. Don t Risk It!

Designing Out Crime Assessment

Restaurant & café guide

Integrated Security System

A guide to access control for manufacturing sites

This directive establishes Department of Homeland Security (DHS) policy regarding the physical protection of facilities and real property.

Current as of 11/10/08 1 of 1

Commercial or Business Security Survey

Site Security Standards and Strategy

Physical Security for Drinking Water Facilities

Secured By Design (SBD) New Schools 2014 Application & Checklist

Home Security Inspection

Middleborough Police Electronic Security Narrative

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS

PHLOSOPHY OF SCHOOL SAFETY AND SECURITY SYSTEMS INTERDICIPLINARY DECISION MATRIX

IOWA LABORATORIES FACILITIES PHYSICAL SECURITY PLAN

FIRE SAFETY INSPECTION REPORT

A Self-Audit of Your Current Campus Security Systems

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

How To Ensure Security At A Site Security Site

Walking and Working Surface Checklist:

Physical Security Checklist and Inventory

Physical Security. Paul Troncone CS 996

Physical Security Design Guidelines

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

Data Center Due Diligence List

Fire Evacuation Procedures Network Building, 97 Tottenham Court Road, London, W1

New York City Department of Buildings

SCHOOL SECURITY SURVEY

THE UNIVERSITY OF EDINBURGH. ECA Evolution House.

ISO IEC ( ) INFORMATION SECURITY AUDIT TOOL

Guidance Notes FSR 2014

Overview of Hotel Fire Safety Requirements

Certification: Building Plans Examiner. Exam ID: B3

ACCESS AUDIT OF WESTPORT HOUSE

Reliable Security Solutions

Fire Alarm System Plans Review Checklist Property location Date of Review

integrated fire and security solutions Maximum protection for buildings

Security 101 For School Safety. Intertech Associates, Inc. Lunch & Learn

Alarm Systems. The purpose of an intruder alarm system is: Commonly utilised detection devices include:

The Occupant Handbook

50 St Mary Axe London EC3

This guide sets out what forms of shop front security will and will not be acceptable to the Council.

Design and Construction Design Phase Deliverables

TO LET. Modern Office Suites in comprehensively refurbished building. 62 Brandon Parade Holly Walk, Leamington Spa, CV32 4JE

WESTERVILLE DIVISION OF POLICE Security Survey Checklist: Business

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

BUILDING SECURITY & ACCESS CONTROL

Fire Safety Requirements for Child Care Centre

Number of Sides Required to Have a Handrail

FIRE SAFETY REQUIREMENTS

Frankfurt Data Centre Overview

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

Feel Secure Your Guide to Home Safety

HOUSTON FIRE DEPARTMENT HIGH-RISE SURVEY CHECKLIST

BELLE VUE MANCHESTER DATA CENTRE

How To Protect A Water System

Harris County Fire Code Electronic Lock Procedures

SECURITY OF BUILDINGS, GROUNDS AND OTHER ASSETS

Engineering Standard

City of Riverside Building & Safety Division Phone: (951)

Minimum Housing and Health Standards

visit us on the web at:

HARDWARE REQUIREMENTS FOR ACCESS AND EGRESS

ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Global Data Center & Colocation Facilities

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

FLORIDA STATE UNIVERSITY PURCHASING DEPARTMENT A1400 UNIVERSITY CENTER TALLAHASSEE FL ADDENDUM ACKNOWLEDGMENT FORM. DATE: December 8, 2011

CMPD Home Security Newsletter

OCDC. OMNIconnect Data Centre.

FACILITY SECURITY CERTIFICATION FORM DOJ SECURITY LEVEL II

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

HealthcareBookings.com Security Set Up

BRANCH SECURITY REVIEW CHECKLIST

Understanding Access Control

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

Fire Alarm Systems Requirements by Occupancy Type

Car Park Management Plan SouthGate, Bath SouthGate Limited Partnership

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA)

Construction Traffic Management Plan

Compliance Schedules and Building Warrant of Fitness

Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013

Integrated Physical Security and Incident Management

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

HyperAccess Access Control System

Transcription:

Appendix G Security management plan

Security Management Plan Prepared by: Kann Finch Group Project Energy Australia Belmore Park Zone 1- Sub-station component General Design Requirements The perimeter of the substation is to be secured against intruders and possible casual entry by members of the public at any time of the day or night. This barrier will be achieved via solid building walls and a number of secure doors and gates Personnel and Vehicular entry gates within the security building shall be fitted with access control points (via electronic swipe cards) and locks. All doors, windows, ventilation grilles and other building openings exposed to a public street will be adequately secured and alarmed against forced entry. All entry/exit doors into the building are to swing outwards, unless opening onto a public footpath where it results in an unacceptable hazard to passing pedestrians. If a wall of a building faces a public space, there should be no external recesses in the facade capable of offering a concealed place for vagrants. Doors shall meet the National Guidelines for prevention of unauthorized access to electricity infrastructure. Energy Australia will arrange for the design and installation of security systems in its substations. Certain doors are to be connected either by reed switches or electric strikes to a monitored security system, which can be disabled by an access card system. Movement detectors are to be installed in certain areas. The security system will be scheduled by the appointed Energy Australia Security Contractor. Access to Pump & Valve Room for non-substation Trained Personnel A fire pump & valve room is required, it shall have a separate and secure access. Access to this room is designed to allow Fire Brigade to enter this room without having to access the other areas of the substation. Monitoring and Alarms VESDA (very early smoke detection alarms) will be installed throughout the building and connected to the Energy Australia SCADA system and to the local fire authority fire detection system. Intruder alarms and motion detectors will be specified by Energy Australia where required. External Lighting External lighting will conform to Energy Australia NEG-SM04.21 Light and Power and provisions of AS 4282 / AS 1158. For types and layout of fittings, refer to landscape architect s drawings. Security Cameras An appropriate number of security cameras will be installed on the building to cover the laneway and street frontages to provide monitoring day and night as per Council's security plan for the CBD. Development Consent Conditions 1of 2 K:\Arch\Belmore Park Zone Substation\5749\Admin\09Consult\9.01Misc Consult\Security Management Plan

Comply with Development Consent for any special conditions. 2- Commercial component Entry Points CCTV system is to provide camera coverage of all building entry points including car park, loading dock and fire stairs. Lighting must meet the minimum level required for effective CCTV operation. Perimeter entry and egress points are designed to eliminate the possibility of manipulating the request to exit devices, locking mechanism and internal door furniture. All doors must be electronically locked and alarmed. Access to the lifts servicing the client floors is to be provided through electronically controlled channels or optical turnstiles. Located adjacent to the channels is to be located a concierge desk that will have space for at least two persons and associated computing / security equipment. Loading Dock and Car Park An access control point is to control access to the car park. This must be in the form of an access control reader for entry and another for exit together with a boom-gate. The access control entry to the car park is to be operable whilst the occupant remains in the vehicle. Security Control Room A security control room shall be provided by the building owner and located in a location agreed by the tenant. As a minimum, a 24-hour guard presence is to be maintained, consisting of one control room operator and one roving guard. Access Control System An access control system shall provide principle control over the building perimeter, common spaces, car park and lifts. The access control system shall be connected to as a minimum a generator backed source of power a security specific UPS capable of supporting the entire base building system for a minimum period of 1 hour, and also supported by diesel generator power. The system must be monitored at all times. All points must be able to be monitored and must include all major plant and other services to ensure security of services. Access Card Base building management shall provide a dedicated security terminal for the tenant to facilitate card programming for access through the building perimeter, common areas, car park, fire stairs and authorized lift levels and all tenant points. Security Code Compliance Comply with all relevant codes, standards and regulations. 2of 2 K:\Arch\Belmore Park Zone Substation\5749\Admin\09Consult\9.01Misc Consult\Security Management Plan

Office Building Design Brief (Part) BELMORE PARK ZONE SUBSTATION 08 July 2008 Revision 0C SECURITY Security S01 Building Entry Point CCTV Security S02 Building Lighting For Entry Point CCTV Security S03 Building Exterior - Crime Prevention Through Environmental Design Security S04 Building Perimeter - Entry and egress points Security S05 Building Interior - Entry Control Security S06 Building Interior - Fire Doors Security S07 Building Interior - Loading Dock & Carpark Security S08 Security Services - Security Control Room Security S09 Security Services - Security Personnel Security S10 Access Control System - System Requirements Security S11 Access Control System - Perimeter Security CCTV system is to provide colour camera coverage of all building entry and egress points including carpark, loading dock and fire stairs. Lighting must meet the minimum level required for effective CCTV operation. Points monitored by CCTV must be illuminated by "white" light such as that emitted by a metal halide or equivalent lamp. Additionally to that required by other services, transition lighting must be provided at the entry and egress points to both the carpark and loading dock. Line of sight between entry and egress point and public space, such as footpaths and roads, not impeded by fixtures or gardens that provide concealment for a human sized object or prevent vehicle traffic from viewing oncoming pedestrian and vehicular traffic Perimeter entry and egress points must be designed to eliminate the possibility of manipulating the request to exit devices, locking mechanisms and internal door furniture. All doors must be electronically locked and alarmed. Access to the lifts servicing the clients floors is to be provided through electronically controlled channels or optical turnstiles. Located adjacent to the channels is to be located a Concierge Desk that will have space for at least two persons and associated computing/security equipment. The desk is to be located in such a way as to facilitate a response to a channel alarm by providing unimpeded thoroughfare to the rear of the turnstiles. Fire doors to allow egress to fire stairs via push bar. Fire doors to be monitored by building security system. Intercoms to be provide on every 4th floor for emergency use. If access to both the loading dock and carpark are provided through a single point then an additional access control point is to control access to the carpark. This must be in the form of an access control reader for entry and another for exit together with a boomgate. The access control entry to the carpark is to be operable whilst the occupant remains in the vehicle. The Security Control Room shall be provided by the building owner and located in a location agreed by the tenant. As a minimum a 24 hour guard presence is to be maintained, consisting of one control room operator and one roving guard. An access control system must be provided for the base building & the tenant at the following points: main entrance, after hours entrances, carpark entrance and exit, all lifts, major plant rooms and BD rooms, all tenancy entry & exit points including fire stairs, and a minimum of 5 additional tenancy points per 800m2. The system must support proximity card technology. The Access Control System shall archive all events and alarms for a period no less than 8 weeks. The Access Control System shall provide principle control over the building perimeter, common spaces, carpark and lifts.

Security S12 Access Control System - UPS Security S13 Access Control System - Monitoring Security S14 Access Control System - Multiple site capability Security S15 Access Control System - Antipassback Security S16 Access control system - Partitioning Security S17 Access Control System - ID Card Function Security S18 Access Control System - Access Card Issue Security S19 CCTV System - Internal Security S20 CCTV System - System Requirements Security S21 CCTV System - Remote Monitoring Security S22 CCTV System - Expandability Security S23 Cabling - Riser Monitoring Security S24 Cabling - Public Space The Access Control System must be connected to as a minimum a generator backed source of power and a security specific UPS capable of supporting the entire base building system for a minimum period of 1 hour, and also supported by diesel generator power. The Access Control System must be monitored at all times. All points must be able to be monitored and must include all major plant and other services to ensure security of services. Access Control System must be able to support multiple site codes. Access control system must support anti-passback function. Access control system must be able to support the client's requirements within the building and support hardware and software partitioning. The partitioning must ensure that only designated alarms / events can be passed between the tenant and BMCS system. Access Control System must provide integrated ID card software that enables the client to produce ID cards within their tenancy area. Base Building Management shall provide a dedicated security terminal for the tenant to facilitate card programming for access through the building perimeter, common areas, carpark, fire stairs and authorised lift levels and all tenant points. Internal CCTV cameras must provide coverage of lift lobbies, concierge desk, channels, loading dock and all areas of the carpark. CCTV system is to use digital recording and conform to the specifications of the Dalmeier or similar system. The system is to be monitored in the Security Control Room. CCTV system must support remote monitoring over a LAN and WAN. CCTV system must be able to support at least 100 cameras in addition to those required by the base building requirements. All communications and electrical risers and rooms on each level shall be monitored with encapsulated magnetic reed switches to specifically identify the level and door status. Network cabling must not pass unprotected through public space. Security Code Compliance S25 Code Compliance Comply with all relevant codes, standards and regulations.