Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions)



Similar documents
TIGER Drylac U.S.A., Inc Swenson Avenue St Charles, IL T F office.us@tiger-coatings.us

PRODUCT DATA SHEET Sika Cable System

10P20-44 High Solids Epoxy Primer

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

3.8 HSP (High Solids Polyurethane)

Scotch-Weld TM. DP410 Off-White. Product Data Sheet. Product Description. Key Features Rapid cure at room temperature; cure rate may be accelerated

Technical Data Sheet L Top coats. Mat Clear

Additional Information. Paint Application

SIGMAFAST 210. PRODUCT DATA SHEET December 12, 2014 (Revision of April 1, 2013) DESCRIPTION

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

Process Control For Phosphate Coating A new military specification for phosphate coatings...

Eclipse. Technical Data Sheet. Polyurethane topcoat. Product Group

Pictorial Surface Preparation Standards For Painting Steel Surfaces

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

BLACK JACK ALL WEATHER ROOF COATING

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1 30 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Hexavalent Chrome Removal in Aircraft Painting Schemes

SURFACE PREPARATION STANDARDS

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002

Evaluating Protective Coatings for Ballast Tanks

expectation as hot dip galvanizing?

N.V.S.C. INDUSTRIAL PRODUCTS NVSC INDUSTRIAL COATINGS THIS DOCUMENT SHOWS ALL THE N.V.S.C. PRODUCTS SUITABLE FOR INDSUTRIAL PURPOSE

3 Scotch-Weld TM. Structural Adhesive Films AF 6 AF 10 AF 13. Technical Data July, 2001

Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment

SURFACE PREPARATION. High pressure fresh water cleaning.

TECHNICAL DATA RS European Clear EZ N. Webster Street Dayton, OH Phone Toll Free Fax

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

3M Scotchkote Urethane Coating 165HB

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

Intershield 300 The industry benchmark in corrosion protection

Scotch-Weld TM. Acrylic Adhesives. DP8405NS Green. Product Data Sheet. Date: March 2014 Supersedes: August 2013

Drylac Product data sheet

PRODUCT DATA SHEET DESCRIPTION:

WATERPROOFING FOR CONCRETE STRUCTURES

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data January, 2010

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

Houston Plating & Coatings

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

NORSOK STANDARD COMMON REQUIREMENTS SURFACE PREPARATION AND PROTECTIVE COATING

A comprehensive range

The Application Guide offers product details and recommended practices for the use of the product.

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

Wecryl Waterproofing System under surfacing supplied by others

Paint Test Equipment. Holitech DC Holiday Tester Data Sheet

How To Test A Base Axe

Technical Data Sheet February 2014

Araldite AV 170. Advanced Materials. One component epoxy adhesive. Structural Adhesives. Key properties. Description. Product data.

PAINTING OVER HOT DIP GALVANIZED STEEL

Two separate and different methods are used to manufacture the above items:

PROBLEM SOLVING FORUM

Colorado State University. Durrell Center Roof Repair

Technical Data SeaQueen

GRIP-GARD BC BASECOAT CHROME

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

RAPTOR TRUCK BED LINER - BLACK

White rust on galvanized and galvanized pre-painted steel. Technical Information

Process Engineering Service

AkzoNobel Aerospace Coatings. Aerowave. Series Next generation structural waterborne coatings

NDT Procedure for Liquid Penetrant Inspection

ZINCROLYTE VS DUPLEX 700

Black epoxy paste adhesive system

Chromadek for Roofing Applications Pre-painted hot-dip galvanised steel sheet

Pre-treatment of Aluminium Surfaces Architect Information Surface Finishes. Status

Tractor Painting Tips

Guidelines. Applica. Interzinc 22. Protective. Coatings. Rev. Date ID 22_UK. Paint Ltd. International. tional-pc.com.

TECHNICAL DATASHEET. Ronascreen TM SPSR 5900 SP / HL-3

High Solids Epoxy System G Intermediate Coating.

Cautionary Information

DENSO WATERPROOFING SYSTEMS

Temperature C Cure time to reach hours LSS > 1MPa minutes

Infrastructure Services Department. Design & Construction Buildings & Parks SPECIFICATIONS. Walter Baker Sports Centre. Pool Column Repairs

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

CONTENTS. 1 cooling technology white paper

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

Tecnoepo Flooring System 185

Metal Rescue Rust Remover Technical Data

RECOATING AND RENEWING SPF ROOFING SYSTEMS

TAIYO PSR-4000 AUS703

Comparison of steel bridge coatings

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Offshore Substation. Protective Coating of Steel. ETS-25 Rev. 2. technical standards. Document no , case 10/4054 ETS-25 v.

IMO Approved Tank Cleaning Chemicals

SSPC-SP 6/NACE NO. 3

WATERPROOFING OF WET ROOMS

Acrylic Enamel Topcoat

SECTION GUARDA SECURITY WINDOW SCREENS

Diamond Grade Conspicuity Markings For School Bus Safety Markings

TECHNICAL DATA SHEET DURO HARD CHROME PLATING PROCESS

PRODUCT DATASHEET. Confidex Ironside Micro CONTENTS

3 Scotch-Weld TM. Epoxy Adhesive DP110 Translucent and Gray. Technical Data December, 2009

KALPANA INDUSTRIES LTD. TECHNICAL DATA SHEET

Teflon Nonstick & Industrial Coatings

TECHNICAL DATA SHEET HAMMERITE METAL PAINT. Smooth Hammered Satin Aerosol

Transcription:

Product Datasheet Product Description Powder Properties Test Conditions BU Powder Coatings Interpon PZ 77 Interpon PZ 77 is a powder coating primer containing zinc which is designed to give enhanced corrosion protection of mild steel. Interpon PZ 77 has been designed to be overcoated with powder topcoats such as Interpon TC, Interpon D194, Interpon D136, Interpon D55 or Interpon D. In this datasheet, the Interpon PZ 77 primer overcoated with a finish is termed the Interpon PZ 77 system. Chemical type Thermosetting epoxy, rich in zinc Appearance Grey metallic, slightly granular film Particle Size Suitable for electrostatic spray Specific gravity 1,8. g/cm³ Storage Dry, cool conditions below 3 C Stoving schedule 15 4 minutes at 11 C (green cure) (object temperature) 1 3 minutes at 13 C (green cure) 1 3 minutes at 16 C (minimum) 8 17 minutes at 17 C 8 minutes at C 1 min. 3 sec. 5 min 3 sec. at C (maximum) The results shown below are based on mechanical and chemical tests which (unless otherwise indicated) have been carried out under laboratory conditions using a complete coating system and are given for guidance only. Actual product performance will depend upon the circumstances under which the product is used. Substrate Steel,.5 mm thick Pretreatment Cold trichloroethylene degreasing Film Thickness 7± 1 µm Curing 1 minutes at 17 C (PZ 77 alone) 5 minutes 3 sec. at C (maximum curing conditions) Powder Topcoat Interpon D36 (RAL91) Curing 8 minutes at C Corrosion Tests Substrate Steel, mm thick Pretreatment As detailed in results tables in Appendix Film Thickness As detailed in results tables in Appendix Curing As detailed in results tables in Appendix Mechanical Tests ISO49 Class (PZ77 alone) (mm crosshatch) Class (system Erichsen Cupping ISO15 Pass 8mm (PZ77 alone) Pass 6mm (system) Impact ISO67 Pass.5 kg.m (PZ77 alone) Pass.5 kg.m (system) Flexibility ISO1519 Pass 4mm (PZ77 alone) (Cylindrical Mandrel) Pass 5mm (system) ISO686 No cracking (PZ77 alone) (Conical Mandrel) No cracking system Corrosion Tests The Interpon PZ 77 system provides excellent protection against corrosion on the surface to which it is applied. However the efficiency of this protection depends on the surface, its preparation before coating and the topcoat applied. If there is penetrating damage to the coating system, there may be localised signs of corrosion where damage has occurred but this will not affect the adhesion of the film to the adjacent surface. Interpon PZ 77 considerably limits the extent of spread of corrosion in the event of coating damage. Spray ISO97 Results are detailed in Table 1 of Appendix Cycle 3 C Renault D17 1686 Results are detailed in Table 1 of Appendix SCAB Corrosion Volvo STD 17, 137 Results are detailed in Table of Appendix Natural Exposure Results are detailed in Table 3 of Appendix 1 PZ77 Issue 1 Issued 7/1/11

Interpon PZ 77 Pretreatment Application For maximum protection it is essential that Interpon PZ 77 is applied to clean, dry oxidefree ferrous metal surface, followed by Interpon topcoat. Surface preparation depends upon the type of surface, its condition and the required performance. For good protection against corrosion the following is recommended: Grit blasting to at least SA.5 in accordance with ISO 851.1, 1998 (F), roughness equivalent to B9a, B1b, or B1a (Rz 3565 µm; Ra 6 1 µm) using Rutogest n 3 LCACEA, in accordance with NFE 551 (1981) and/or Degreasing Phosphating followed by passivation, rinsing with demineralised water and drying. Follow the procedural advice of the pretreatment supplier. Interpon PZ 77 can be applied by manual or automatic, triboelectric or standard electrostatic spray equipment. Tribo application should be tested before commencing production. The application conditions given below are for information only: Fluidising air pressure: 1.5kg/cm initially then 1kg/cm Transport air pressure:.5 to.8kg/cm Recommended voltage: 65 to 7kV Recommended thickness: 7 microns (+5/1) Reclaiming Powder: Trials, with suitable recycling equipment, must be carried out before commencing production. Attention should be paid to the ratio of new powder, a minimum of 8% must be used. Gun nozzles must be cleaned every 3 minutes. Interpon PZ 77 should be cured, or at least gelled, using the recommended stoving schedules, before application of the topcoat. The object temperature must not be below 13 o C or above o C. The primer should be cured in a convection oven, optionally with infrared heaters, with air temperature not exceeding o C. Note: Failure to comply with the recommended curing conditions may affect the adhesion of the topcoat and cause degradation of the coating properties of the system. Parts coated with Interpon PZ 77 should not be handled if possible. If handling is unavoidable, clean lintfree gloves must be worn. Topcoat Application Interpon PZ 77 should be overcoated on the same site within 1 hours of applying the primer. If the delay exceeds 1 hours the parts should be heated for 1 minutes at 115 o C (object temperature). The delay must not exceed 4 hours. Refer to the Product Data Sheet for the powder topcoat for application parameters. To ensure the integrity of the Interpon PZ 77 system, as well as optimum performance, the whole system must be cured in accordance with the recommended curing conditions for the topcoat. Curing should be carried out in a convection oven, optionally with infrared heaters. There must be a uniform heat distribution inside the oven. Note: Failure to comply with the recommended final curing conditions may cause variations in colour and gloss and cause degradation of the coating properties of the system. A detailed protocol for applying Interpon PZ 77 system is available on request. Damage Repair Any damage to the Interpon PZ 77 system must be repaired as soon as possible. Surface preparation Application Damaged areas must be clean and free of grease or rust. Drysand the area with 6grade paper down to the substrate. The area must be completely free of dust and cleaned with a nonaggressive solvent before proceeding. For repairs the following twocoat liquid paint system from International Protective Coatings is recommended: 1 st Coat : twopack zincrich epoxy primer, Interzinc 7 nd Coat : twopack polyurethane topcoat, Interthane 99 Product Data Sheets for these products can be obtained from International Protective Coatings at Felling (Tel: +44 () 191 469 6111) or the local office. PZ77 Issue 1 Issued 7/1/1

Interpon PZ 77 Safety Precautions Please consult the Material Safety Datasheet (MSDS) FOR PROFESSIONAL USE ONLY IMPORTANT NOTE The information in this data sheet is not intended to be exhaustive and is based on the present state of our knowledge and on current laws: any person using the product for any purpose other than that specifically recommended in the technical data sheet without first obtaining written confirmation from us as to the suitability of the product for the intended purpose does so at his own risk. It is always the responsibility of the user to take all necessary steps to fulfill the demands set out in the local rules and legislation. Always read the Material Data Sheet and the Technical Data Sheet for this product if available. All advice we give or any statement made about the product by us (whether in this data sheet or otherwise) is correct to the best of our knowledge but we have no control over the quality or the condition of the substrate or the many factors affecting the use and application of the product. Therefore, unless we specifically agree in writing otherwise, we do not accept any liability whatsoever for the performance of the product or for any loss or damage arising out of the use of the product. All products supplied and technical advice given are subject to our standard terms and conditions of sale. You should request a copy of this document and review it carefully. The information contained in this data sheet is subject to modification from time to time in the light of experience and our policy of continuous development. It is the user's responsibility to verify that this data sheet is current prior to using the product. Brand names mentioned in this data sheet are trademarks of or are licensed to AkzoNobel PZ77 Issue 1 Issued 7/1/1

Interpon PZ 77 PZ77 Issue 1 Issued 7/1/1

Interpon PZ 77 Table 1: Spray (in accordance with ISO97) and Cycle 3C (Renault D17 1686 Test) one cycle consists of the following stages: 1.4 hours salt spray (5% NaCl) at 35 o C,.4 x 4 hours in climatic chamber as follows 8 hours damp heat (4±1 o C, 98±% RH); 16 hours ambient air (±1 o C, 73±% RH) 3.48 hours drying in climatic chamber at ±1 o C, 63±% RH. 1 hours 6 cycles 15 hours 9 cycles hours 1 cycles 5 hours 15 cycles 3 hours Cycle 3C: Not applicable Pretreatment: Film Thickness: Curing Times (@ o C): Size Spread loss, R i Size Spread loss, R i Size Spread loss, R i Size Spread loss, R i Size Spread loss, R Solvent degreasing, grit blast (SA.5; R a 61μm) PZ 77 = 67μm abcd D36 = 81μm PZ 77 = 8 minutes abcd D36 1 minutes Alkaline degreasing, iron phosphate, demineralised water rinse dry PZ 77 = 79μm abcd D36 = 11μm PZ 77 = 8 minutes abcd D36 = 1 minutes Alkaline degreasing, iron phosphate, Cr passivation, demineralised water rinse dry PZ 77 = 795μm abcd D36 = 951μm PZ 77 = 8 minutes abcd D36 = 1 minutes Results Spray Cycle 3C Spray Cycle 3C Spray Cycle 3C / (15mm) (<1mm) 3 4 3 blisters 1 1mm 1mm 1mm 3 3 blisters 3 3 blisters 4mm 4 several blisters 4 several blisters 4mm 4 5mm 5 6mm 34mm (4mm) Several blisters mm (4mm) 5 Several blisters 8mm 5 5mm 9mm Peeling 1mm 1mm (1mm).5mm (1mm) Several small blisters 3 1.5mm 1.5mm / 34 1 mm 5 PZ77 Issue 1 Issued 7/1/11

Interpon PZ 77 Key to Corrosion Test Results ( Spray Cycle 3C): At Scribe On General Surface None Rating in accordance with ISO468 R i 5 (Best Worst) Slight Moderate Severe Size in accordance with ISO468: none (invisible at 1x magnification) 1 just visible (1x magnification) just visible (normal vision) 3 clearly visible (.5mm) 4.5 to 5mm 5. >5mm Spread of blistering measured in mm from either side of scribe or as number of blisters Loss of adhesion from edge of scribe, in mm (by peeling using a scalpel) In accordance with ISO49 Class 5 (Best Worst) AkzoNobel Powder Coatings Ltd. Worldwide Powder Group. Stoneygate Lane, Felling, Tyne Wear. NE1 JY. UK. Tel: +44 () 191 469 6111 Fax: +44 () 191 438 5431 www.interpon.com Copyright 11 AkzoNobel Powder Coatings Ltd. Interpon is a registered trademark of AkzoNobel Interpon PZ77 Issue 1 Issued 7/1/11 6

Interpon PZ 77 Table : SCAB Corrosion Test (Volvo) Natural exposure at Segé, near Malmö, Sweden, 4km from Baltic coast, in Table 3:Natural Exposure At the test site of the Swedish Corrosion Institute a few metres from the sea on.accordance with STD 17, 137. Twice weekly spraying with a 5% salt solution. BohusMalmön Island, southwest Sweden 5.5 months 1 months 4 months Pretreatment: Film Thickness: Curing Times: Solvent degreasing, grit blast (SA.5; R a 67μm) PZ 77 = 7+5/1μm, abcd D36 = 9±1μm PZ 77 = 1 minutes @ 17 o C abcd D36 = 1 minutes @ o C Pretreatment: Film Thickness: Curing Times: Propagation of corrosion from either side of scribe + mm 1 months Propagation of corrosion from either side of scribe Solvent degreasing, grit blast (SA.5; R a 67μm) PZ 77 = 7±1μm abcd D36 = 9±1μm PZ 77 = 1 minutes @ 17 o C abcd D36 = 1 minutes @ o C +.5 mm General surface corrosion None General surface corrosion None Propagation of corrosion from either side of scribe 1 + 1 mm 3 months Propagation of corrosion from either side of scribe +.5 mm General surface corrosion None General surface corrosion None Propagation of corrosion from either side of scribe 1 + 1 mm 36 months Propagation of corrosion from either +.5 mm side of scribe General surface corrosion None General surface corrosion None AkzoNobel Powder Coatings Ltd. Worldwide Powder Group. Stoneygate Lane, Felling, Tyne Wear. NE1 JY. UK. Tel: +44 () 191 469 6111 Fax: +44 () 191 438 5431 www.interpon.com Copyright 11 AkzoNobel Powder Coatings Ltd. Interpon is a registered trademark of AkzoNobel Interpon PZ77 Issue 1 Issued 7/1/11 7