FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST

Similar documents
FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

Original Document 10/16/07 Revised 01/30/09 2 nd Revision rd Revision- 12/18/14

HERNANDO COUNTY FIRE ALARM GUIDELINES

Fire Alarm Submittal Requirements and Acceptance Testing

Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

FIRE ALARM APPLICATION

Bold items are particular to the City of Euless

Fire Alarm Systems Certification

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January 2014

BELMONT FIRE DEPARTMENT FIRE ALARM SYSTEM REQUIREMENTS BFD-OFM

C. Conform to requirements of Americans with Disabilities Act (ADA).

FIRE ALARM SYSTEM RECORD OF COMPLETION

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14

FIRE ALARM SYSTEM RECORD OF COMPLETION

PLAN REVIEW GUIDE FOR FIRE ALARM

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

SECTION FIRE ALARM AND DETECTION SYSTEMS

Finance and Administration Department 907 Billy Mitchell Blvd. P: (210) Fire Alarm Permit Application

City of Columbus Department of Building and Zoning Services

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

OBOA 2009 Huntsville, ON Overview of ULC Standards Affecting Building Occupancy Alan Cavers Area Manager Fire & Security Systems Group

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

ENGINEERING SPECIFICATIONS

Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007

How To Get A Fire Alarm Permit In Vail

Fire Alarm Systems Permit Packet. City of Greer Fire Department

NATIONAL FIRE ALARM AND SIGNALING CODE

SECTION FIRE ALARM AND DETECTION SYSTEM

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

Fire Alarm System Plans Review Checklist Property location Date of Review

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

HOW TO ESTIMATE THE COST OF A COMMERCIAL FIRE ALARM SYSTEM

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

EXHIBIT A SCOPE OF WORK

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

1.0 General. Inspection, Testing, and Maintenance 1 of 8

FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM RECORD OF COMPLETION

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Fire Alarm System Submissions

Fire Alarm Trainee Log Book

CHANGES IN NFPA 72 NATIONAL FIRE ALARM CODE

University of Houston Master Construction Specifications Insert Project Name

Reference numbers following checklist statements represent an NFPA code section unless otherwise specified.

FIRE ALARM SYSTEM CHECKLIST For Addressable Systems PRIOR TO INSPECTION

Scope: Communications and Electronic Systems addressed in this section include:

The Mission Critical Fire Protection Experts

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

Module 4, Lesson 12 Fire Alarm Systems

Understanding Fire Alarm Requirements & Inspections. Presented By Bill Conroy Technical Sales For Briscoe Protective Systems Inc

COMMISSIONING OF FIRE ALARM SYSTEMS

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

INSPECTION AND TESTING OF FIRE ALARM SYSTEMS

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

NFPA 72. Exception No. 1: Where ambient conditions prohibit installation of automatic smoke detection, automatic heat detection shall be permitted.

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

FIRE DETECTION AND ALARM

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM INSPECTION AND TESTING FORM

1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri.

FIRE ALARM SYSTEMS INFORMATION PACKET

IR F-1 EMERGENCY VOICE/ALARM COMMUNICATION SYSTEMS

Commissioning of Fire Protection and Life Safety Systems. Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA

SECTION FIRE ALARM AND DETECTION SYSTEM

DTW Works Master Specification Version 2006

Fire Alarm System Monitoring - CAN/ULC-S561-03

INSPECTION AND TESTING FORM

Building Permit Application

Program No Section Heading

Automatic Fire Sprinkler Submittal Requirements

AETNA FIRE ALARM SERVICE CO., INC.

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

ESTABLISHMENT OF A NEW BUSINESS

The Evolution of Requirements for Supervising Station Alarm Systems

City of Bettendorf Fire Alarm System Requirements

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

Design Standards Fire Alarm Systems Division (1995 CMS); (2004 CMS) Amended Feb 2015

Transcription:

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST All fire alarm system plan submittals must include this Fire Alarm System Plan Submittal Checklist. PLAN APPROVAL - No work shall be performed until plans are reviewed and approved. By providing all the information requested in this checklist and any other requested information pertinent to your project, you are assuring the quickest possible turnaround time for plan review. It is the responsibility of the designer/installer of record to assure all applicable code requirements are satisfied. The current adopted edition (2007) of the International Fire Code and the International Building Code, with local and state amendments, together with the 2007 edition of NFPA 72 The National Fire Alarm Code shall be the primary, but not all inclusive, resource documents for code requirements, design and installation standards. Additional requirements applicable to a specific jurisdiction may also apply. SUBMITTAL REQUIREMENTS Permits are required to install or modify a fire alarm or detection systems and / or related equipment. Applications for such permits shall include the following: Fees and Permit Application Form The appropriate fee and a completed application form provided by the jurisdiction is required. Vicinity Map A vicinity map showing the site address and location, nearest cross street and nearby buildings for multibuilding properties or suites in a building. Contractors License Proof of current 01 or 06 license issued by the Washington State Department of Labor and Industry. Original Design and Installation Documents (Unless otherwise noted, provide three sets of each) Installation drawings: o Minimum size of 24 x 36 o Drawn to an indicated scale (1/8 = 1-0 minimum) o o Containing the job title, site address and designer s name, address, phone and fax numbers. Floor plans, clearly indicating the use and / or function of all rooms and areas; the location of all alarminitiating, control, notification, annunciation or trouble signaling devices or equipment, device addresses; ceiling height, type of construction (Example: beams, joists, ceiling slope, drop ceiling, refer to NFPA 72 section 3.3.22 and 3.3.24) and elevations as needed to clearly indicate construction features; power connections high and low voltage if applicable, and a wiring diagram including point-to-point connections for all equipment (No reflected ceiling, HVAC, or lighting on fire alarm plans.) o A legend clearly identifying all device symbols (NFPA 170 symbols are preferred.) o Conductor types and sizes. o Circuit class and style Cut sheets or other necessary information for all devices and equipment: o Device manufacturer, model number, operational requirements and limitations, listing information (per UL 864) shall be clearly identifiable or hi-lighted. o Listed compatibility with existing equipment (if applicable) shall be indicated.

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST System Calculations o Battery calculations including a minimum 1.2 derating factor. Employee work areas with audible alarm coverage shall have a 20% extra capacity for ADA. o Voltage drop calculations. A single-line riser diagram of all devices, circuits, power connections and interfaces. A project narrative to include design assumptions for detection and notification, current and projected occupancy type, scope of work, type of panel, and number of devices. The interface of all fire safety control functions. A Sequence of Operation / Alarm Matrix. Faxes are not accepted for original submittals. Additional Submittal Requirements Name and contact information for the listed supervising or remote station. If system layout is a performance-based design, include design parameters and values per NFPA 72, 2007, Appendix B. Plan or drawing revisions shall be submitted with changes clouded. Other changes or corrections shall be clearly identified. Zone maps may be required at the discretion of the AHJ SITE REQUIREMENTS The approved set of plans, including comments and conditions of approval issued by the AHJ shall be available on-site while work is being accomplished. The permit shall be posted and other permitting information shall be retained on site. By checking the above boxes you are indicating that all required information is present and that the submittal is counter complete and ready for review and subsequent approval. Submittals requiring additional information shall be placed on hold until required information is submitted. If upon review corrections to the design are necessary part or all of the submittal package may be returned to the applicant for correction and re-submittal prior to approval or permit issuance. WORK REQUIRING A PERMIT IS NOT AUTHORIZED UNTIL PLANS ARE REVIEWED AND APPROVED AND NECESSARY PERMITS ARE ISSUED. Signature: Print Name: Staff Name: Date: Title: Date:

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST AS BUILTS AND INSTALLATION MODIFICATIONS Modification to approved plans or calculations shall be reflected in an As Built drawing. Modifications that result in a variance of 10% to any approved calculation shall be submitted to the AHJ as a revision requiring approval prior to any system acceptance testing or permit approval. As built point map drawings and calculations shall be provided to the AHJ inspector prior to acceptance testing. INSPECTION AND APPROVAL REQUIREMENTS ACCEPTANCE TESTING A functionality and acceptance test shall be witnessed by the AHJ. The installer shall provide all necessary test equipment including volt / ohm and decibel meters. No partial inspections or acceptance testing will be conducted prior to the completion of the installation without additional inspection fees being paid. Detection devices shall either be protected or shall not be installed until all trade work has been completed. (Example: painting, clean-up, carpet cleaning, etc.). No testing will occur until system monitoring is operational and all devices and communicators have been field tested, proven to be operational and are functioning correctly. The required Labor and Industry electrical inspection shall be completed with the inspection sticker or permit card signed prior to acceptance testing. A Record of Completion shall be delivered to the AHJ prior to inspection. All initiating or input devices shall have legible addressing labels affixed to device Contact the appropriate AHJ to request an inspection at least two work days prior to the desired inspection date. Kitsap County 360-337-4699 Bainbridge Island 206-842-7686 City of Bremerton 360-473-5394 City of Port Orchard 360-871-2411 City of Poulsbo 360-779-3997 Final system and permit approval is subject to Field Inspection. Re-inspection fees may be assessed where work for which an inspection has been requested is not complete or where such work fails to meet operational expectations. Assessment of reinspection fees shall be at the discretion of the individual AHJ per code or policy and such fees shall be paid prior to subsequent inspections being performed or approvals granted.