For the purposes of this article the Shannon can conveniently be divided into five sections:



Similar documents
Burnt River Black River and Gull River Flood Contingency Plan

Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam

Reservoir Simulations for the Delaware River Basin Flood of June, 2006

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA

HEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES

Manage water resources for on site hydro-electricity generation

Section 2. Mono Basin Operations

Water Security in Iraq

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

The Flow Regulator. Flow regulation

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

WaReg The Flow Regulator

BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA)

Phosphorus inputs to Lough Neagh. The increasing impact of agriculture

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Management of flooding downstream of dams

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

How To Build A River Restoration Project In North Korea

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

TO ADDRESS VOLUME 1 - REPORT JUNE 2010 CONSULTING ENGINEERS

Methodology for Merit Order Dispatch. Version 1.0

Water Year 2001 in Northern California: Have the Good Years Ended?

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Chapter 12 - HYDROLOGICAL MEASUREMENTS

XAYABURI HYDRO POWER PLANT, LAO PDR

Exercise (4): Open Channel Flow - Gradually Varied Flow

THE WATER AGENCY, INC. Water Supply Update

Floods are too much water on normally dry land. Rivers can flood after heavy rain has fallen over a long period of time. River flooding can last

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system

Adoption of an Interim 602(a) Storage Guideline. Final Environmental Assessment

Hydrologic Modeling using HEC-HMS

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

International Data Centre for Hydrology of Lakes and Reservoirs (HYDROLARE)

...Eq(11.6) The energy loss in the jump is dependent on the two depths y 1 and y 2 3 = E =...Eq(11.7)

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

Standard Operating Procedures for Flood Preparation and Response

Experiment (13): Flow channel

How To Write A Bill Of Rights

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

21. Channel flow III ( )

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT?

Sample Micro Hydro Initial Report

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Effect of barrages on water level in estuaries

CEE 370 Fall Laboratory #3 Open Channel Flow

THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER

KID'S SCIENCE Structure of a hydroelectric power plant : Assembly Instructions. Structure of a hydroelectric power plant.

THE PLAN Water Supply Project - Dublin Region

Swannanoa River Flood Risk Management Study

. Water Resources in Korea.. IWRM Application Cases.. Future Works

Essex County Council Flood Investigation Report

Sanitary Sewer Overflow (SSO) Incident Report Form

CHARACTERISTIC EQUATIONS FOR HYDROPOWER STATIONS OF MAIN BARRAGES IN EGYPT

THE LAKE CHAMPLAIN HAUT-RICHELIEU WATER SYSTEM; ADAPTATION TO CLIMATE AND ANTHROPOGENIC CHANGES.

Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

Overview and highlights

Background Information: The Mamquam River Floodplain Restoration Project

United States Army Corps of Engineers, Civil Works

WELCOMES ALL THE ATTENDEES WATER UTILISATION, MEASUREMENT AND METHODOLOGIES

Manuscript: Restoration Analysis: Lake Michigan-Huron Water Levels. Author(s): IUGLS Study Team. Name of Reviewer: _R. A. Halliday, P. Eng.

Physical Stock Accounts for Water 1

Lecture 4: Streamflow and Stream Gauging

How To Assess The Vulnerability Of The Neman River To Climate Change

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

Sihwa Tidal Power Plant: a success of environment and energy policy in Korea

Station #1 Interpreting Infographs

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

Technical Approach and Methodology

SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER SYSTEMS. Stephen H. Scott 1 and Yafei Jia 2

What are the Benefits?

Symposium on Climate Risk Management

Estimating Potential Reduction Flood Benefits of Restored Wetlands

LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM. Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan

MICRO HYDRO FOR THE FARM AND HOME

Frequently Asked Questions (FAQs) on Hydropower

7.10 INCORPORATING HYDROCLIMATIC VARIABILITY IN RESERVOIR MANAGEMENT AT FOLSOM LAKE, CALIFORNIA

Búrfell. hydropower station

Water Management in the Netherlands

FACT SHEET 6: HYDRO ELECTRICITY

Appendix 4-C. Open Channel Theory

Flood After Fire Fact Sheet

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet


TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station)

Howsham fish passage Consultation document

Simulating Potential Structural and Operational Changes for Detroit Dam on the North Santiam River, Oregon, for Downstream Temperature Management

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

River Management 2013 Colorado Flood

Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM

CONTENTS. 1. Introduction: Rationale of the Project within the context of this Forum. 2. Integrated Planning of Waterborne Transport in Cambodia

EPA s Climate Resilience Evaluation and Awareness Tool (CREAT): A Case Study

Broad Crested Weirs. I. Introduction

Expert Panel Assessment. Snowy Precipitation Enhancement Trial (SPET) Executive Summary

Transcription:

Volume 29 Number 3 Autumn Inland Waterways News Table of Contents Shannon Water Level Management Robert Cullen The water levels along the Shannon River and its lakes are the subject of much discussion, particularly during periods of drought or heavy rain. What I hope to do in this article is explain the controls that are on the levels and how they are managed. Initially, let me state that for the last eleven years I was ESB s manager at Ardnacrusha Hydroelectric Power Station and, while no longer in that position, am still an ESB employee. The article uses some technical terms and measurements: m 3 /s = cubic meters per second = tonnes per second (1m 3 /s = 220 gals per second) m O.D. = meters Ordnance Datum (Poolbeg), ie the level above a fixed point at Poolbeg in Dublin. The River Shannon is some 256km from its source in the Cuilcagh Mountains on the Cavan Fermanagh border to its mouth between Loop Head and Kerry Head. ESB and Waterways Ireland manage the controls of the River Shannon water levels, where such controls exist. ESB controls water levels for the purpose of electricity generation at Ardnacrusha and Waterways Ireland controls levels (or depths) for navigation purposes. ESB and Waterways Ireland each morning collect information from their respective gauges and share the relevant information with each other. This gives both organisations a broad picture of what is happening throughout the river. For the purposes of this article the Shannon can conveniently be divided into five sections: source to Lough Allen outlet Lough Allen to Lough Ree outlet Lough Ree to Meelick Weir Meelick Weir to Parteen Weir and Ardnacrusha Parteen Weir and Ardnacrusha to the mouth of the Shannon. Source to Lough Allen outlet The only control on water levels in this section is ESB s sluices at Bellantra at the outlet of Lough Allen. These sluices were constructed in the period 1935 1937, replacing an existing sluice barrage that had been erected in the 1870s to regulate the levels for navigation. The channel between the lake and the sluices was dredged as the sill of the new sluices was 2.44m below that of the old sluices. The old navigation channel was dammed. This was done to increase the utilisable storage of Lough Allen for generation purposes. The optimisation of the storage has ceased to be a factor and ESB has endeavoured to manage the level in the lake to meet the conflicting demands of the various interests. In 1996 navigation was re-opened into Lough Allen. The minimum navigation level in Lough Allen is 48.16m OD and ESB has undertaken to try and maintain the level of the lake above this during the period mid-march to mid-september. Easier said than done. waterlevel.doc Page 1

There is a requirement to discharge a minimum 5.0m 3 /s through the sluices to maintain the channel downstream in good order and have a fair flow in the river. This unfortunately exceeds the average summer inflow to the lake. This means that in most years the level in Lough Allen will continue to fall during the summer months. The drier the summer, the more it falls. Ideally, the level in mid September would be exactly at the minimum navigation level and the level could then be lowered further to increase the storage capacity of the lake for winter floods. If only it rained when we wanted! Generally, with our weather pattern there is seldom difficulty in maintaining navigation levels mid-march to May. However, it is desirable in May and early June that the level in Lough Allen should be around 48.66m O.D. Should there be no prolonged periods of drought then the minimum navigation level will not be reached. If, however, March and April are dry and they are followed by a good summer then navigation in to Lough Allen will not be possible at some stage during the summer/autumn period. We have not had those set of conditions yet since the reopening of navigation. But they will occur. During flood conditions, when Lough Allen reaches its upper level the sluices are set to discharge any excess water above this level. No further control is exercised and the level reached in the lake is a matter of the magnitude of the inflows to the lake and of course the outflow. 52 51 Lough Allen Levels 50 49 48 47 Minimum Navigation Level - 48.16 mod 46 The Lough Allen Water Levels chart shows the variation in water level for and to date. You will remember that was a reasonably dry year (without much sunshine) and has sort of ensured that there will be no lack of water in the nation s reservoirs! Lough Allen to Lough Ree outlet Waterways Ireland control the River Shannon water level/depth for navigation by weirs with sluices at Jamestown, Roosky and Tarmonbarry. At each location sluices are opened or closed to maintain an identified level. During flood conditions all sluices are open. A navigational weir controls the water level in and discharges from Lough Ree with sluices at Athlone. The weir was installed for navigation purposes in the mid-nineteenth century and the sluices were added in the 1880s to control river flows during low flow conditions. Waterways Ireland staff, on instructions from ESB at Ardnacrusha, operate the sluices. waterlevel.doc Page 2

The minimum navigation level in Lough Ree is 36.88m OD. However, ESB has agreed that it would endeavour to restrict the drawdown of Lough Ree to 37.49m OD until mid August and to 37.19m OD until mid October. Should circumstances permit, ESB would endeavour to lower Lough Ree below that level after mid-october to provide flood storage capacity in the lake. This very seldom occurs and has no significant impact on flooding in the Shannon. The sluices in the weir at Athlone are only opened when the lake level drops near the crest level of the weir, ie 37.4m OD. Prior to that stage the level of Lough Ree depends on the inflow to the lake as no control is exercised: water flows naturally over the weir. The standing instructions are that, when the lake level reaches 37.49m OD, two sluices should be kept open 0.91m each in order to maintain a flow to keep the river fresh. There is a proviso that, if the level downstream of the weir reaches 36.12m OD during the period April to mid-october, then all sluices are closed. 39.00 38.80 Lough Ree Lake Levels measured at Athlone Weir 38.60 38.40 38.20 38.00 37.80 37.60 37.40 37.20 37.00 It is interesting to note that the sluices at Athlone have not been opened since 1998 but it looks as though they may be opened this month (September ) if rainfall amounts continue to be low. Readers will remember that was a dry year and a wet year! However, it has been relatively dry for the last number of weeks and it looks as though the water levels downstream of Athlone Weir will permit opening of the sluices. This will enable ESB to lower the level in Lough Ree to increase its storage capacity before the onset of Autumn/Winter rains. The nature of the operations at Athlone mean that during flood conditions no control is exercised or is possible by any agency on the water levels. Lough Ree to Meelick Weir Waterways Ireland have two sets of sluices at Meelick, one on the main river channel at Keelogue Weir consisting of 12 sluices and the other at Marlborough, otherwise the New Cut, consisting of 18 sluices. The opening regime for the sluices is as the other sluices on the navigation system. Weir boards are placed in position to maintain navigation depth upstream of the weir. As flows increase the weir boards are gradually removed. If the water level exceeds 35.42m OD all the sluices are opened. Again, as in other areas on the Shannon this far, no control is exercised, or indeed is possible, on the levels reached during flood conditions. waterlevel.doc Page 3

Meelick Weir to Parteen Weir and Ardnacrusha The level in Lough Derg and the River Shannon from Lough Derg to Parteen Weir is managed by ESB by the use of the water to generate electricity at Ardnacrusha and, if required, opening of sluices at Parteen Weir. A minimum flow of 10m 3 /s must at all times be discharged down the Shannon River below Parteen Weir. Ardnacrusha Station can discharge up to 400m 3 /sec through the turbines when on full output. ESB agreed to endeavour to maintain a minimum level to facilitate navigation of 32.80m OD, although the statutory low water level is 0.8m lower. The upper limit is 33.56m OD. Except in very dry years, no difficulties are experienced in maintaining the level above the lower limit. 34.00 33.90 Lough Derg Levels 33.80 33.70 33.60 33.50 33.40 33.30 33.20 33.10 33.00 The level is managed outside flood conditions by daily calculating the inflows to, and the outflows from, the lake and translating the difference into the megawatt-hours of generation of electricity required to maintain, raise or lower the lake level. ESB s National Control Centre is then given that megawatt-hour target for the day. That target can frequently be zero as, during periods of low flow, the inflows might not be sufficient to maintain the lake level or the lake level may be being raised in anticipation of a period of forecast very good weather. Unlike all other locations, significant control exists at Parteen Weir on the level reached by Lough Derg during flood conditions. On the approach of a flood, when the water level in the lake reaches 33.40m OD, the four turbine generators at Ardnacrusha are put on full output. When Lough Derg reaches its upper limit and the inflows to Lough Derg are greater than the throughput of Ardnacrusha, ESB opens sluice gates at Parteen Weir to release excess water. This water is spilled down the Shannon River downstream of Parteen Weir. Due to the restriction in the channel at Killaloe it is not possible to exactly match inflows and outflows at Lough Derg. Parteen Weir can discharge greater quantities of water than exit Lough Derg. Parteen Weir and Ardnacrusha to the mouth of the Shannon No control is exercised on water levels in this stretch of the River Shannon from Parteen Weir, and the canal from Ardnacrusha, to the mouth of the Shannon. I hope that in the above I have satisfactorily explained where and how the Shannon water levels controlled are managed. waterlevel.doc Page 4

Over the past few years, I've pestered Bob Cullen every so often for information about Ardnacrusha, so that I could keep readers updated. He has always given it, and more than that he has always been direct and straightforward about it, something I appreciate in an era of spinners and PR flacks. On behalf of our readers I'd like to thank him for all his help and to wish him the best in the future. Brian J Goggin, Editor. waterlevel.doc Page 5