Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description



Similar documents
Data Centre Services. JT First Tower Lane Data Centre Facility Product Description

singapore//singapore data center specifications tel: fax: internet + intellectual property + intelligence

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

melbourne//australia data center specifications internet + intellectual property + intelligence tel: fax:

BELLE VUE MANCHESTER DATA CENTRE

South Datacentre Studley

hong kong//china data center specifications tel: fax: internet + intellectual property + intelligence

HealthcareBookings.com Security Set Up

LDeX Group. Colocation Solutions for High Expectations

Powerful Dedicated Servers

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management

moscow//russia data center specifications tel: fax: internet + intellectual property + intelligence

112 Linton House Union Street London SE1 0LH T: F:

out of this world guide to: POWERFUL DEDICATED SERVERS

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Datacentre South Gyle 1 Data sheet

ASX Australian Liquidity Centre. ASXCoLo

Datacentre South London Data sheet

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

Data Center Presentation

Web Hosting Features

Colocation Service Definition. SD008 v1.3 Issue Date 19 Feb 09

Colocation. Introduction. Structure of the service. Service Description

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12

Data Center Infrastructure & Managed Services Outline

LEVEL 3 DATA CENTER ASSESSMENT

Datacentre Maidenhead P1 Data sheet

DATA CENTRE DATA CENTRE MAY 2015

Datacentre Reading East 2 Data sheet

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive

Server Monitoring & Management Services

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering % uptime

Data Center Overview Document

TELEDATA DATA CENTRE AND COLOCATION SERVICES IN MANCHESTER

DATA CENTRE DATA CENTRE

DATACENTER COLOCATION. Flexible, Secure and Connected

Frankfurt Data Centre Overview

Portable Energy Efficient Data Centre Solution

POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access

NeuStar Ultra Services Physical Security Overview

Pacnet Hong Kong CloudSpace2 Technical Specifications. Upholding the Principles of Efficiency and Sustainability in Data Center Design

The evolution of data connectivity

Sovereign. The made to measure data centre

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

Technical specifications. Containerized data centre NTR CDC 40f+

On Telecom Hosting and Colocation Data Centre Solutions

MARULENG LOCAL MUNICIPALITY

Global Data Center & Colocation Facilities

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

National Aluminium Co. Ltd.

611 Tradewind Dr. Suite 100, Ancaster ON, L9G 4V5 (905) ext 244

Netmagic Vikhroli Datacenter Infrastructure & Capabilities

Server Room, Data Centre Management and Monitoring Solutions

CONTENTS. Security Policy

DESIGNING DATA CENTERS & SERVER ROOMS

san francisco//usa data center specifications tel: fax: internet + intellectual property + intelligence

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Data Centre Testing and Commissioning

Strategic Data Centre Site Profiles. Data Centre Co-Location London East

Introducing UNSW s R1 Data Centre

Data Centre Best Practices Summary

Datacenter Hosting and Cloud Computing Services

Access Control and Operating Conditions Monitoring System for Telecommunication and Server Racks

Building a data center. C R Srinivasan Tata Communications

Colt Colocation Services Colt Technology Services Group Limited. All rights reserved.

Colocation. Scalable Solutions for a Shared IT Infrastructure. Enterprise. Colocation

DATA CENTRES UNDERSTANDING THE ISSUES TECHNICAL ARTICLE

STACK ACCESS YOTTABYTES DATA SOLUTIONS abbreviated as SAY Data Solutions is a secure and innovative techno-space and was established to cater

Data Centre Infrastructure

Why Choose Go4Hosting Data Center?

Colocation. Scalable Solutions for Shared IT Infrastructure. Enterprise. Colocation

Liebert GXT MT+ CX UPS, 1000VA VA Intelligent, Reliable UPS Protection. AC Power for Business-Critical Continuity

White paper. SAS Solutions OnDemand Hosting Overview

Enable Networks UFB Services Agreement Service Description for Central Office and POI Co-location Service

Every business owns precious data and every business should recognise the risk of losing their data. Natural Disaster

PowerGem Pro Uninterruptible Power Supply

IBM Twin Data Center Complex Ehningen Peter John IBM BS 2011 IBM Corporation

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

Network Router Monitoring & Management Services

LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.

CHICAGO S PREMIERE DATA CENTER

Powering the Cloud Desktop: OS33 Data Centers

Strategic Data Centre Site Profiles Data Centre Co-Location London North

REVIEWED ICT DATA CENTRE PHYSICAL ACCESS AND ENVIROMENTAL CONTROL POLICY

Level I - Public. Technical Portfolio. Revised: July 2015

Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS

South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering % guaranteed uptime

Transcription:

JT Rue Des Pres Data Centre Facility Product Description JT s Data Centre Hosting Service provides a secure computer room environment with protected and backup power, security and bandwidth. Data Centre specification JT s Data Centre provides a secure, environmentally controlled and protected facility, with reliable connectivity providing: 2 KW AC electrical power to each rack Dual fed UPS (10 minutes battery autonomy at full load) Generator backup (24 hour diesel supply) Fully redundant air conditioning system VESDA early warning fire detection Temperature and humidity sensors Water detection sensors FM 200 Gas Suppression Rack specification All racks are lockable and designed to accommodate multi-vendor servers and are compliant with IBM, Compaq, Dell, Hewlett Packard and Sun: Earth continuity Dual power distribution units (2x32 amp circuits) Dual power strips per unit Dual redundant UPS (10 minutes battery autonomy at full load) Cable management strip per unit 600 x 1000mm rack space All racks in the Data Centre are connected to a centralised switching environment with 10/100 Mbps. Ethernet or fast Ethernet presentation provided. VLANs can also be provided. 01 Contact our Business Solutions team T: 882 345 E: business.solutions@jtglobal.com W: www.jtglobal.com

Data Centre - Air conditioning Climate control for the Data Centre is provided by 12x Denco 70(KW) DX units. Each one of these units circulates 5.6 cubic metres of air per second. The total cooling for the data centre is 840 (KW). The air conditioning in the Data Centre is retained at an N+2 situation ensuring that if one air conditioning unit fails there is sufficient cooling capacity provided by the other air conditioning units. Power room - Air conditioning The power room has its own air conditioning units, which are independent of the cooling system for the Data Centre. To ensure that the UPS is kept in the optimum climate, 2x Daikin DX units have been installed. Electricity JT has its own electricity substation, which is dedicated to providing the power supply to the whole site. The local electricity company has provided this Data Centre with dual 2000 amp / 1500 KVA HV electrical supplies which are diversely fed from HV network. Data Centre The power to the facility is fed by dual 1.5 MVA transformers. Each cabinet is supplied with 2x 32 amp single phase supply via separate CPDU s. Provision has been made to accommodate all individual power requests. Generator The Data Centre is supported by four on-site generators which are contained within their individual acoustic housings separate to the Data Centre. Each unit is rated at 550KVA. In the unlikely event of a generator failure these units are configured to N+1 to provide total power resilience. Alarmed components Action taken Monitoring Engine run Immediate attention 24/7/365 Engine fail Immediate attention 24/7/365 Low fuel Immediate attention 24/7/365 Low water Immediate attention 24/7/365 Battery charger fail Immediate attention 24/7/365 Test Off load Full load Frequency 4 weekly Yearly 02

Fuel storage Each generator has its own integral 24 hour fuel tank. UPS 2x Chloride 800KVA Trienergy units, 3 phase in, 3 phase out, full on-line, double conversion UPS units, each supplies 10 minutes battery autonomy with 400 sealed for life batteries. The UPS equipment has been configured with 12 pulse rectifiers and 5% harmonic input distortion filters. The UPS units have been configured as a N+N UPS having both static and manual by-pass capabilities. In addition there is a further external, total wrap around 800 amp rated by-pass system, complete with its own independent mains supply. The power output of the system is configured as 800 KVA maximum to provide 100% redundancy; the run time is 10 minutes per UPS at 100% load, which is variable to the level of applied load. Every 3 months the level of applied load and characteristics are examined on the UPS. Security systems The facility is protected by a Europlex 3GS combined intruder and door access control system, utilising door contacts and dual technology movement detectors, which all report back to a centralised 3GS system with its onward connected signalling. Access is controlled by HID proximity fob readers with entry into the Data Centre by combined individual fob and PIN code. In addition, a digitally recorded CCTV system is installed with cameras viewing all entrances into the Data Centre. All information recorded by the system is downloaded and stored on to a hard disc digital recording system. The systems are maintained by Computer Protec and are checked bi-annually at six-month intervals. Computer Protec provide JT with reports of maintenance visits detailing the status of the system and highlighting any errors found. As well as CCTV, security guards patrol the data centre on a 24/7/365 basis. Fire detection The facility is protected by a sophisticated particle detection system, the Very Early Smoke Detection Apparatus (VESDA) LaserPLUS system has been installed. This system detects fire at the earliest possible stage by drawing in air through a network of air sampling pipes. The detection chamber uses a Class 1 laser to achieve the optimum response to a vast range of smoke types. Using unique detection principles, the LaserPLUS has a sensitivity range of 0.005 20% obscuration/m. These systems are constantly monitored by our Network Operations Centre (NOC). 03

Gas suppression In addition to protection provided by the VESDA laser system, the Data Centre is equipped with an FM-200 Fire Suppression agent. FM-200 has zero ozone depleting potential, and is typically deployed where an electrically non-conductive medium is needed and people compatibility is an overriding factor. FM-200 is a colourless, liquefied compressed gas. It is stored as a liquid and dispensed into the hazard as a colourless, electrically non-conductive vapour that is clear and does not obscure vision. It leaves no residue and has acceptable toxicity for use in occupied spaces at design concentration. FM-200 does not displace oxygen and therefore is safer for use in occupied spaces without fear of oxygen deprivation. FM-200 is chosen to protect occupied areas such as computer rooms and the telecommunications market as it out-performs the majority of other gaseous systems in terms of speed of reaction to fire. FM-200 is effective within 10 seconds of initial discharge. Telecommunication connectivity The facility has been designed to provide complete network diversity to avoid any single point of failure. To this end, services are fed into the building from two separate routes. Fibre and connectivity services are fed into the building from two separate routes and Points of Presence (POP s). The facility is connected to the JT network and as such the complete JT portfolio of connectivity services (both fibre & copper) is available and includes all types of Private Circuits, ADSL services, telephony lines and high-speed, low latency Internet Backbone services. Benefits and features Fast and effective No significant reduction in oxygen levels Clean gaseous agent leaving no residue Zero ozone depleting potential Short atmospheric life span Electronically non-conductive Safe for use in fully occupied areas Extensively tested, recognised and approved worldwide 04

Network security JT does not take responsibility for screening data that transits its network. Security checking, virus checking, data encryption, censorship or policing of content is therefore not undertaken by JT. Customers are advised to ensure that adequate measures are deployed at the point of connection to their network or equipment in order to satisfy their own security requirements. It is strongly recommended that a firewall is used. JT reserves the right to disconnect a customer if abuse of that customer s connection to JTIBS is detected. Typical abuse would be deemed as any attempts to hack the systems of JT or one of its customers. This includes port scanning and repeated attempts to gain Telnet or FTP access to unauthorised equipment. Lightning protection Soil resistivity testing was conducted as part of the design to establish the most suitable earthing system for the particular ground conditions. The Lightning Protection system complies with BS 6651-1999 Protection of Structures Against Lightning and BS 7430 Earthing. Service Level Agreement A standard Service Level Agreement is included with this service (see JT Colocation Service Level Agreement). Terms & Conditions The JT Colocation and JT Data available at this facility are provided under and subject to, the JT Colocation and JT Data Terms & Conditions of Service. Customers are strongly advised to read these Terms & Conditions on our website, before applying for the Service. Contact our Business Solutions team T: 882 345 E: business.solutions@jtglobal.com W: www.jtglobal.com 05 Je_RDPDC_BusLit_Jan12_V2