Permeable Pavement Construction Guide



Similar documents
Permeable Pavement Operation & Maintanence Guide

Tree Pits Operation & Maintenance Guide

Building Your Interlocking Concrete Pavement to Last a Lifetime

Guidelines for. Permeable Pavement

AUSTRALIAN PAVING CENTRE

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Outlet stabilization structure

Permeable Pavement Treatment Capacity

Unit Price Averages Reports

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Storm Drain Inlet Protection

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

Storm Drain Inlet Protection for Construction Sites (1060)

Division 2 Section Section 02795

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

Pervious Pavers: Where is the Perviousness?

SUDAS Revision Submittal Form

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Table 4.9 Storm Drain Inlet Protetion Applicable for

Low Impact Development Permeable Paving

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION PERVIOUS INTERLOCKING CERAMIC PAVERS

Beseck Switching Station Inspection

Local Road Assessment and Improvement Drainage Manual

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

Porous Pavement Alternatives Cost Analysis

Stormwater/Wetland Pond Construction Inspection Checklist

CASFM Stormwater Quality Field Trip June 23rd, 2011

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Storm Drain Inlet Protection - IP

LID-01 Permeable Paving Systems

Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

SUSTAINABLE URBAN DRAINAGE SYSTEMS

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012

Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng.

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Firth Ecopave system installation guide

PICP Construction. Why PICPs The Big Picture. Key things to know about PICPs

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Emergency Spillways (Sediment basins)

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Permeable Interlocking Concrete Pavements

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

BMP #: Dry Wells / French Drains

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Underground Injection Control Storm Water Information

BMP 6.4.6: Dry Well / Seepage Pit

Permeable Interlocking Concrete Pavements. The Stormwater Problem

Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

NEUPAVE. Permeable Pavers. A Permeable Eco-Friendly Beauty

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides

Permeable Interlocking Concrete Pavements

Property Care White Papers. Site Drainage: Monitor and Maintain

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SC-07 STORM DRAIN INLET PROTECTION

How To Retaining Wall Guide

City of Shelbyville Site Inspection Checklist

DEVELOPMENT OF AN ASCE STANDARD FOR PERMEABLE INTERLOCKING CONCRETE PAVEMENT

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

LANDSCAPING AQUA SPORT. Rainwater treatment using filter substrate channel. DIBt approval applied for

Permeable Interlocking Concrete Pavement

Permeable Interlocking Concrete Pavements

>S`[SOPZS 7\bS`Z]QYW\U 1]\Q`SbS >OdS[S\b

4.1. Permeable Pavement Systems

Concrete Waste Management

Sustainable Site Pavement Systems

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM

Vehicle Tracking Pad

USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE

Block and Gravel Inlet Protection (BIP)

Soils, Foundations & Moisture Control

PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Transcription:

Permeable Pavement Construction Guide

Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce stormwater runoff flows and improve runoff water quality. The porous surface of permeable pavement allows stormwater to soak through to an underlying coarse gravel layer, before slowly draining away. They are used in low traffic areas such as carparks, driveways and footpaths. 1

Nine key components of permeable pavements 8. Edge beams 300 x 300mm concrete to fix pavers in place. 7. Pavers Three main types: open cell grid of concrete or plastic with sand or grass cover; solid interlocking blocks with drainage gaps; porous interlocking blocks. Porous Block Pavers Modular Block Pavers (impermeable) 6. Bedding material Porous material. May be coarse sand or fine gravel (2-5mm), depending on paver type. Filters pollutants from runoff. 4. Geotextile (if required) Placed between layers to provide additional tensile strength. 9. Overflow To take excess flows. Includes catchpits. Bedding sand Geotextile Connection to stormwater system Impermeable liner 2. Impermeable liner (if required) Prevents water draining through to subgrade material. May be specified on sites with poor draining soils, in high groundwater areas or in structurally sensitive soils. On some sites, clay soils create a natural impermeable layer. water flow Perforated under drain Pavers Base course Sub-grade (impermeable or permeable) water flow 1. Sub-grade material Strong and durable material to withstand wetting and drying over time. Perforated under drain Bedding sand Geotextile Connection to stormwater system Impermeable liner 3. Underdrain (if present) Directs flow draining through pavers. Perforated pipes connecting to local stormwater system. 5. Basecourse Strong, durable high volume draining material (up to 30% voids). Provides temporary storage for runoff. 2

Other types of permeable / porous surfaces Porous Paving Porous Concrete Open Grade Porous Asphalt (Photo: Leighton Contractors)

Construction Sequence The following is a general guide for permeable pavement construction. Refer to detailed plans and specifications for each site in consent plans. 1. Prepare site ground Mark or peg out paving area. Put erosion and sediment control measures in place (catchpit protection, filter socks, silt fencing). Remove topsoil and, if specified, compact subgrade. Grade to specified level. Place edge beams around perimeter. 3. Fit geotextile, if included. Place geotextile over subgrade material, or over impermeable layer and underdrain to prevent clogging by fine sediment in runoff. 4. Place basecourse Place gravel basecourse material to level and depth specified. Basecourse gravel to be washed crushed rock (not scoria) with 30% minimum voids. Place layer of geotextile over basecourse. Fig.1 Excavation to design level. Finished soil level marked as white T 2. Lay impermeable liner and underdrain, if included. If specified, lay impermeable liner over entire area, checking seams are sealed and there are no stress points or tears. Fig.2 If included, lay underdrain (with filter sock, if specified), on 300mm minimum depth gravel with 0.5% slope (50mm drop over 1m length). Connect to stormwater outlet with watertight fit. Backfill carefully over underdrain with 50mm basecourse. 3

Construction Sequence Cont... 5. Lay bedding material Lay clean, bedding material over basecourse. Level with rake or straight edge. Do not compact. Lay to 25mm minimum depth, or deeper if specified by paver manufacturer. 7.Restore site Remove construction materials and reinstate surrounding area, regrassing disturbed areas. Remove sediment and erosion controls. Check underdrain connections to stormwater systems are clear of blockages. 6. Lay pavers Follow manufacturer s specifications for paver type, making paving even and flat with joint material filling edges. If area is on a slope, start laying pavers from lowest point. Fill paver joints and gaps with bedding material to top. For open cell grid pavers, sow grass seed and place pea gravel, as specified by manufacturer. Water to establish grass. Fig.3 Permeable paving Fig.4 Jointing material between pavers 4

Quick checks Allow pavers to settle before vehicles have access to site. Keep sediment and soil clear of permeable paving area during construction. Inspect area after one year to check functioning as designed. Block new and existing inlets and outlets from area during construction. Avoid Do not expose soils in surrounding area before erosion and sediment controls are in place. Do not puncture, tear or not install impermeable layer if specified, and ensure geotextile layer is placed between impermeable layer and basecourse. Do not use fertilizers or herbicides around permeable pavements, to prevent draining to waterways. Do not use scoria material for bedding or joint material or basecourse. Do not compact paving materials this reduces drainage capacity. Disclaimer This publication is provided strictly subject to Auckland Council s (AC) copyright and other intellectual property rights (if any) in the publication. Users of the publication may only access, reproduce and use the publication, in a secure digital medium or hard copy, for responsible genuine noncommercial purposes relating to personal, public service or educational purposes, provided that the publication is only ever accurately reproduced and proper attribution of its source, publication date and authorship is attached to any use or reproduction. This publication must not be used in any way for any commercial purpose without the prior written consent of AC. AC does not give any warranty whatsoever, including without limitation, as to the availability, accuracy, completeness, currency or reliability of the information or data (including third party data) made available via the publication and expressly disclaim (to the maximum extent permitted in law) all liability for any damage or loss resulting from your use of, or reliance on the publication or the information and data provided via the publication. The publication and information and data contained within it are provided on an as is basis. 7