INTERNATIONAL HOUSING AND HOME WARRANTY CONFERENCE IHHWC 2011



Similar documents
S.A. Claim Experiences and the Development of A Building Quality Inspection Index for Houses

NHBRC WARRANTY SCHEME ENROLMENTS AND REQUIREMENTS

NEW HOUSING AND HOME IMPROVEMENT WARRANTIES Minn. Stat , et. seq. Winter 2004

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!

PERFORMANCE GUIDELINES

Smart Settlement Investment Case: Key Findings

HUMAN SETTLEMENTS Programmes and Subsidies

Energy Company Obligation (ECO): Technical Monitoring Questions

What you need to know about concrete block basement construction.

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

Advice Series. the maintenance and repair of historic buildings

A Guide to the Home Building Manual. (Final 1 October 2014)

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT.

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

bout your house before you start Renovating Your Bathroom

Water Damage & Repair

WATER. Water Management Protect your building from water damage. Intent. Information & Tips

bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

TechPractices: Home Front Homes:

Solar Homes Catch the Sun. Are you planning a new house? Discover how you can apply solar architecture principles to:

Energy Efficiency in Buildings

Contents. Who is Premier Guarantee? Your Structural Warranty. What to look out for in your New Home. Running in your New Home. DIY and Maintenance

Introduction. 1. Heat Transfer. In Townsville s climate it is essential to choose building materials that perform well in our local conditions.

Does Wall Township require an inspection by the building department on resale of a home?

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

The Types of Standard 2 Guidance on the Standards 2 Changes to Legislation 2

G. Common Defects in Buildings - Leakage

HEDDERMAN ENGINEERING, INC. Office , Fax

Archant London Environmental Awards

CONDENSATION IN REFRIDGERATED BUILDINGS

Apartments. Setting a new standard in medium density public housing. Change View

Guide to buying a house

Waterproofing and interior insulation for basements takes new twist in technology.

Module 3.7. Thermal bridging

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Cold Weather Concrete Practices

PRE-PURCHASE INSPECTION REPORT

LEED PRESENTATION OUTLINE

Building Energy Codes 101 October 23, Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

An issues paper on a Review of the Residential Building Cover Package. Residential Building Cover Review Panel

Waltham Forest Private Sector Housing. Renewal Assistance. Policy. Author:

Before You Start an Energy Efficiency Retrofit The Building Envelope

Renovating Your Basement

A Homeowner s Guide to Building Permits

School Construction Authority Architecture & Engineering

2009 IECC Update. Scope. Content. International Energy Conservation Code

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

KIRKLEES. Visions and Strategies related to Energy and Climate Issues

PRIVATE SECTOR HOUSING RENEWAL POLICY

BUILDING SAFETY UNIT

FireSmart IRS Insulating Roof Screed

FLORIDA SOLAR ENERGY CENTER

Pre-Drywall Inspection Report

Chapter. Restoration of Damaged Structures

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Building Permit Application

Green and Sustainable Buildings

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

ISO Types 1-6: Construction Code Descriptions

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

Preventing Ice Dams on Roofs

Harval Homes Custom Built Home Series TABLE OF CONTENTS

Rainwater Harvesting

HomeSpec REPORT SUMMARY

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Best Practices in Building Healthy Communities

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT

Integrated Solar Radiant Systems

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

London Borough of Redbridge

Building Owners Guide to a Duro-Last System!

Homeowner s Handbook

Mold Preventing I nterior System

The Gold Shield Ten Year. Warranty Scheme

NUNAVUT HOUSING CORPORATION. Home Repair Program (HRP)

L&Q new home warranty L&Q new. home warranty

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

WHEN IS A PERMIT REQUIRED?

Regulatory Services. Asbestos in the Home. What is asbestos?

Structure Survey Findings:

Table 1: Prescriptive Envelope Requirements: Residential WOOD FRAME WALL R-VALUE MASS WALL R-VALUE CEILING R-VALUE

eading Performance Solutions

Cowley Resident Management Organisation Ltd Cowley House, 147 Brixton Road London SW9 6LZ

Patio Covers / Carports

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Maintenance Matters. Window and Door Replacement

Your guide to the Energy Company Obligation (ECO) How we can make it work for you. A5_ECOguide_AW.indd 2 24/10/ :04

What is QuickBase? Traditional foundations (left) compared with QuickBase (right)

Residential Weatherization Plus Program

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

Transcription:

INTERNATIONAL HOUSING AND HOME WARRANTY CONFERENCE IHHWC 2011 Dr. Jeffrey Mahachi, Acting CEO National Home Builders Registration Council Email: jeffreym@nhbrc.org.za Bryanston, South Africa Quality is our priority Website address: www.nhbrc.org.za Toll free number: 0800 200 842

Presentation Outline Background to NHBRC & its mandate Housing Delivery Challenges Towards Building Sustainable Human Settlements Background to the Legacy Project Short video of the Legacy Project

Background to the Establishment of NHBRC Problems inherited prior to 1994 Democratic South Africa Poverty alleviation Job creation Urban renewal Rural development and Housing delivery

Housing Delivery Problems with housing delivery Shortfall of accommodation (Housing backlog in 1994 was in excess of 4 million) Proximity of development to potential workplace Banks not providing mortgage to the low-income housing market Exclusion or marginalisation of emerging home builders in the mainstream of home building EVERYBODY CAN BE A BUILDER!!! Formulation and implementation of National Housing Policy in 1994.

Challenges with Quality Houses Good quality affordable housing products Materials and products that meet the National Standards requirements Quality of imported materials & products Unsafe products being used in the market Low prices for housing consumers and a demand for high quality High price for contractors (maximisation of profit)

Ethos behind establishment of NHBRC Late Former Minister of Housing, Hon Joe Slovo Housing consumers do not have any form of protection against fly-by-night contractors who deliver poor quality structures, nor do they have access to a database of reputable builders who are legally bound to their contracts and produce quality work. This is critical within the low-income housing market as it has the potential to disrupt housing delivery

NHBRC Background - Year 1995 cont. Establishment of the National Home Builders Registration Council (NHBRC) as Section 21 not-for-profit company. Objective To promote the interest of the people and the profession of home builders Little or no emphasis on protection of housing consumer!

NHBRC Background - Year 1999 cont. Legislation of the Housing Consumers Protection Measures Act, 1998 (Act No. 95 of 1998) 26 March 1999 NHBRC became a statutory body with a mandate to protect mortgaged homes

NHBRC Mandate NHBRC s primary mandate is: To protect housing consumers by establishing, implementing, regulating quality standards in the home building industry To establish a warranty fund and to provide assistance to housing consumers under circumstances where home builders fail to meet their obligations. To build capacity of home builders and housing consumers with specific emphasis to the historically disadvantaged

Objects of NHBRC To represent the interests of housing consumers by providing warranty protection against defects in new homes. To regulate the home building industry. To provide protection to housing consumers in respect of the failure of home builders to comply with their obligations in terms of the Act. To establish and promote ethical and technical standards in the home building industry.

Objectives of NHBRC Cont. To improve structural quality in the interest of housing consumers and the home building industry. To promote housing consumer rights and to provide housing consumer information. To communicate with and to assist home builders to register in terms of the Act. To assist home builders through training and inspections

Extension of Warranty to Subsidy Houses Government Subsidy: Government of SA provides a full subsidy for the acquisition of land, services and housing top structures to those households earning up to R3,500 (US$500)/mth. Year 2002: Government extends warranty scheme to cover the subsidised houses. A cross subsidisation model for the enrolment fee between subsidy and non-subsidy houses was implemented by NHBRC.

Regulation of the Home Building Industry Registration & Grading Renewal or Voluntary withdrawals NHBRC Regulatory Framework Training of Home Builders Disciplinary (Suspensions & Deregistrations HOME BUILDER HOUSING CONSUMER Technical & Ethical Standards Defaults by Home Builders

Housing Consumers Protection Process Enrolment Recoveries NHBRC Inspection Remedial Work PROTECTION Occupation Certificate Conciliations HOME BUILDER HOUSING CONSUMER Warranty Cover Complaints

No. of Active Registered Builders

Enrolment of Homes

Enrolment Fees Category Selling price Enrolment fee as a percentage of the selling price of the house Maximum Enrolment Fee R-Value US$-Value A 0 to R500 000 (0 to $71,430) 1,3% R6,500 $930 B R500,001 to R1,0 m ($71,430 to $142,860) A+1,0% difference R11,500 $1,642 C R1 million to R2 million ($142,860 to $285,715) B+0,75 of difference R19,000 $2,715 D R2 million to R5 million ($285,715 to $714,285) C+0,5% of difference R34,000 $4,860 E R5 million plus ($714,285 plus) Maximum of R34 000 R34,000 $4,860 <0.68% 1US$ = R7

Warranty Phase The Home Builder shall: a. Rectify non-compliances with, or deviation from, the contract with a home owner or any deficiency. (3 months) b. Repair roof leaks attributable to workmanship, design or materials (12 months roof leak). c. Rectify any Major Structural Defect in the Home caused by the non-compliance with NHBRC s technical requirements. (5 - year structural warranty)

Maximum Amounts Payable Cover is for 5 year structural failures Maximum amount payable is the lesser of Enrolment Value or R500k ($71,430) Payable amount includes professional fees + accommodation + transport

Affordable house Rectified for R87k ($12,5k) BEFORE AFTER

Medium to High Income Houses House Rectified for R600k ($86k) House rectified for R690k ($98.6k)

High Income House During Demolition Stage AFTER at R4,5m ($643k)

Claims Paid (millions)

Potential risk from the subsidy houses A 2,000 housing development For subsidy houses, no claims to the fund has been made so far. However, potential risk to the fund is multi-fold Simple Risk Analysis: Current number of houses enrolled and under warranty = 500,000 A 1% failure rate = 5,000 houses!!!

Present Quality Housing Delivery Challenges Late enrolment of projects and homes (consequential effects wrong foundation solutions and no inspections) Escalating building materials (subsidy amount inadequate for top structure) Current subsidy amount of R55k ($8k) to build a top structure of 40m² (i.e. R1,375 per m² or $200/m²) Lack of skilled labour in the construction industry (contractors and inspectors) Projects implemented as Peoples Houses Process are meant to be owner builder in order to give ownership to the people Abuse of emerging home builders by established builders.

NHBRC s mandate is on top structures In order to mitigate its risk NHBRC has to check proper implementation of stormwater controls

The effects of poor infrastructural Non-existent stormwater control design Poorly designed infrastructure (stormwater) Performance of Top Structure affected by infrastructural design

The need for training in basic concrete technology Partly cast foundation. Incomplete slab.

The need for proper engineering solution and site inspection Proper design for dolomites Safety during construction

The effects of late enrolment! Structural cracking before completion of house Trying to fix floor level on hardened concrete

TOWARDS BUILDING SUSTAINABLE HUMAN SETTLEMENTS

NHBRC Contribution to Sustainable Human Settlements NHBRC has been involved in: Contributing to Govt national policy on Sustainable Human Settlements; Designing and production of project documentation of housing typologies for the subsidy sector; and Ensuring projects are enrolled timeously.

Government s vision for human settlements The strategy incorporated in the Government s vision for Sustainable Human Settlements is to: accelerate delivery, use housing provision as a job creation strategy, ensure access to property and home loans by all, leverage economic growth, combat crime, reduce duality within the housing market, and develop integrated and sustainable human settlements

HOUSING TYPOLOGIES: WHERE ARE WE COMING FROM?

House Built Pre- 1994 o o o o Matchbox houses were built Size of houses were 12 to 17m 2 No standards existed Poor quality houses

Post 1994 to 2004 Subsidy Houses o o o o o Govt s approach was mainly to provide land Little emphasis was placed on top structure Size of houses increased to 30m² Regulations for the subsidy houses introduced in 2002 Quality slightly improved

Post 2004 2009 40m 2 Breaking New Ground o NHBRC engaged by government to assist in delivery of better quality products o Minimum of 40m 2 houses introduced o Govt introduces a variety of housing typologies

2009 to the future Sustainable Human Settlements (SHS) Housing is not about Houses o Govt moves from provision of houses to SHS o Promote through innovation: Energy efficiency Affordability Constructability (easy to construct) sustainable construction principles Quick to construct, Low maintenance, and Easy to have additions or alterations to the houses

Alternative Building Methods

Compliance to National Building Regulations (NBR) By application of deemed-to-satisfy design and construction rules (SANS 10400 or NHBRC Home Building Manual) By application of well established engineering principles and design rules (Rational Design), or By performance assessment and expert opinion/judgment - Agrément Certification

Why promote Alternative Building Methods Sustainable, durable materials Good thermal properties Reduction in carbon footprint Social acceptability Cost effectiveness Fast track construction processes (time saving = cost saving) Bankability and resale value Assist Govt in delivering good quality homes and reducing the current backlog

NHBRC and Agrément approval of rational design / assessment Structural safety Structural serviceability Structural Durability Fire Safety Energy Efficiency Condensation (Depends on the area) Constructability (Quality Assurance, health & safety etc)

THE LEGACY PROJECT IHHWC 2011

The Legacy Project The hosting of the IHHWC, for the first time on African soil, is a momentous occasion for South Africa and the continent This calls for a need to leave behind a tangible legacy that improves the circumstances of the less privileged It also calls for tangible demonstration of innovative or alternative building technologies that lead to improvement in construction practices, habits and standards for better quality speed, economy and safety durability and hygienic housing, extending economical, environmental and societal benefits for the people of the country

The Legacy Project Cont. The Legacy Project is an opportunity to model housing projects incorporating sustainable and affordable technologies in partnership with the private sector This is an example of such an engagement: to invite private sector to support the Govt in housing delivery (currently approx 2.4 million housing backlog) The project is a baby of National Dept of Human Settlements and NHBRC, with support from Western Cape Dept of Human Settlements and City of Cape Town

The Site: The site was chosen in order to reduce costs of living through: Living close to amenities Easy access to transport Nearby work opportunities Growing own vegetables Paying less for electricity and water Conifers, Blue Downs, Cape Town

The Legacy Project 8 units unified in design to form a group of houses further strengthened by reducing internal boundaries Units are modernistic & are joined by a central core that reflects South Africa s appreciation for nature by its abstract application of natural materials, warm colours and textures The design of the core joining the two units signifies South Africa s unity in diversity

Concept Description cont. 3. Green Economy Considerations The built environment is directly and indirectly responsible for: Consumption of the earth s resources (especially energy) Generation of polluting toxins (e.g. coal burning) and waste Creation of conditions leading to loss of soils and biodiversity Interference with life support systems (e.g. water cycle, soil systems and air quality) It is estimated that 60% of all energy consumed on earth goes towards manufacturing of building materials, physical building of structures, their operation throughout their life span and eventual demolition and recycling

Features considered in the energy efficient design of the houses The Legacy Project Planned and designed in terms of energy efficient principles Just large enough to satisfy demand (Total plan area is 60m2) In order to address the challenges of land, the houses were constructed as double storey with a footprint of 30m2 2 Bedroom, a lounge, kitchen & bathroom

Features considered in the energy efficient design of the houses The Legacy Project Designed:- To maximise the advantages of correct orientation first, prevailing wind directions second and lastly aesthetic natural views Using low embodied and alternative building materials To have large windows on the northern side, placed to maximise natural light and restrict the use of artificial light during the day To have high and sloping ceilings to allow ventilation during the evening

Features considered in the energy efficient design of the houses Designed to have floors constructed of high thermal mass materials in order to collect heat from the winter sun and releasing it slowly thus heating the houses at night Houses are painted in light colours internally and externally, internally to maximise light and externally to reflect heat Rain water harvested through the provision of water tanks is used for vegetable garden Houses have solar water heaters to supply the kitchen and bathroom

The Launch. The project was launched on the 18 th July, 2011 by Hon Minister of Human Settlements This day marked the beginning of the construction of the houses This is the beginning of a legacy that will be replicated throughout SA

Identification of Beneficiaries Beneficiaries of the houses were identified by the Western Cape Dept of Human Settlements in collaboration with the City of Cape Town Beneficiaries identified from the waiting list and consist of: elderly women and orphan headed households disabled families living below the poverty line

THE SYSTEMS & TECHNOLOGIES USED IN THE DESIGN

Innovation in Foundation Design

Innovation in Foundation (GEOPLAST MODULO SYSTEM) The most important part of a building is the foundation which has to support the structure above. Strength and stability are crucial consideration in foundation design

The Modulo System Designed for Strength It consists in a permanent formwork in recycled polypropylene that creates a system of pillars and arches that will permanently support the ground floor slab once concrete is poured on

Dolomite Holes Expansive Clay Behaviour of Multimodulo in Expansive Clay

Less steel, less concrete, less time =SAVINGS HOUSE FOUNDATION IN 7 WORKING HOURS

Construction Process Improvement through the use of thin-bed mortar Thin Bed Mortar Construction using concrete blocks of close dimensional tolerance with 2-3mm mortar joints Thin bed mortar is a pre-mixed cement-based product that only requires the addition of water to make an easily-applied mortar It sets more rapidly, thus giving early stability to the construction Allows the depth of the mortar to be reduced from at least 10mm to 3mm or less Self-aligning blocks allow for easy, accurate and efficient application

Recycled concrete blocks Concrete masonry units produced using recycled concrete have a lower embodied energy The blocks are manufactured using 70% recycled material Has same properties as quarried materials and comparable compressive strengths Construction Process Improvement through the use of recycled concrete

Walls consist of a 150mm thick expanded polystyrene (EPS) beaded concrete core encapsulated both sides with a 4.5mm calcium silicate board Walls fixed together using an interlocking tongue and groove method between panels and use of mortar sizing liquid to bind and seal Internal walls made of a similar panel but 120mm thick The roof consists of light gauge, structural steel trusses Ceilings always fitted as part of system and insulated Interlocking EPS walling system

Lightweight structure made of galvanized metal profiles Exterior walls are cladded with cement boards 15mm thick whilst the interior walls are cladded with a double layer of gypsum boards 15mm thick The cavity is filled with insulation material and electrical and water lines are laid in this cavity. Gypsum Boards with infill of insulation material

Let s take you through Our Legacy Journey