PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES



Similar documents
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Mold Basics. Why is mold growing in my home?

Vari Inspection Services

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

159 Morningside Avenue, Toronto

Mold In Your Home and at Work

Self-Home Inspection Checklist

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

HOME INSPECTION CHECKLIST

COMPREHENSIVE PROPERTY INSPECTIONS

Old Dominion University Mold Management Plan

DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE

MOLD FAQs. 1. What is mold and where does it live? 2. How can mold affect my health?

SWF Home Inspections

INVOICE. DATE: May 11, DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl.

How To Prevent Water Damage To A Home

Georgia Home Inspection Services

October 5, 2015 Dear Client,

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Home Inspection Report

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Total Home Inspection Checklist

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue

PROPERTY INSPECTION REPORT

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

Exterior Condition Report

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

Estimating Database Checklist

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

Crawford Inspection Services C.C.B. #

Home Inspection Report

Inspecton Report. Property Address:

Water Leak 1: Intrusion Policy

Real Estate Inspection Report

Mold and Mildew Mold and mildew can be detected by sight, smell and touch.

10 Secrets of Home Inspections Every Home Buyer Should Know

All CDBG-DR Program Subrecipients. Texas General Land Office. Date: August 20, Damage Assessment Guidelines

Home inspectors are not mold inspectors, however they do inspect for defects that

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program

Accurate Home Inspection of Illinois. Property Inspection Report For Steve & Jenny Hynek 210 W.Chicago Ave., Westmont, Illinois

healthy homes assessment

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Basic Mold Prevention

Help Yourself to a Healthy Home Mold and Moisture

Rehab Inspection Report Page 1

Now that Your Building Experienced Water Damage What Must You and Your Water Damage Restoration Contractor Agree On?

A.C.E. Home Inspection Service St. Peters, MO (636)

Structure Survey Findings:

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Orlando Home Inspection Services

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

How To Prevent And Manage A Flood And Mold

KNOW YOUR RIGHTS AND

Simplify. Homeownership

CHRIS CURLES and ASSOCIATES INSPECTION SERVICES

CONDITION OF QUALITY ITEMS

INSPECTION REPORT. LOCATION OF PROPERTY 1234 Sample Street Tucson, AZ CLIENT Mr. & Mrs. John Q. Sample c/o Agent DATE OF INSPECTION 1/30/2008

Nick s Inspection Services

Building Condition Assessment Report

Stanley Neighborhood Series

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:

Inspection Item COMMENTS

Quality Home Inspections, LLC 4433 Tennyson Street Denver, Colorado

Building and Grounds Maintenance Checklist

Building Condition Assessment Report

PROPERTY INSPECTION REPORT Property Address:

What Causes Foundation Leaking?

Inspection Report. Property Address: St. Marks Ave. Brooklyn NY Five Borough Home Inspection, LLC. Derek Lomer

bout your HOUSE before you start Renovating Your Basement Moisture Problems

OC Home Inspect. 333 S Crest Rd Orange, CA (714) guybrianadams@gmail.com Inspected By: Brian Adams

Home Inspection Report

SAMPLE INSPECTION REPORT PREPARED FOR: John Q Public

Home Management Checklist: Spring

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

bout your house before you start Renovating Your Basement Moisture Problems

Cuyahoga County Urban Mold & Moisture Project

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

Open House and Home Tour Checklist

The Uniform Building Inspection Report Condensed

I NI NP R Inspected Items

Building Permits: When are they required?

University of Vermont

Inspection Tech. (330) Inspected By: Aaron Westerburg

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Mould Mould A Basic Guide

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

GENERAL WIRING RULES FOR HOUSES

Code Enforcement Inspection Manual. City of Virginia Beach Department of Housing and Neighborhood Preservation Code Enforcement Division

What I will cover: Cuyahoga County Urban Mold & Moisture Project. Mold & moisture problems. Mold and moisture problems. Mold & moisture problems

Minimum Housing and Health Standards

A comfortable house is a great source of happiness. - Sydney Smith. Home Maintenance Guide

Transcription:

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA 8028867-B2 INTERNATIONAL CODE COUNCIL 2640 Hollywood Blvd Suite 200, Hollywood FL - 33020 Page 1 of 108

Client's Name: GAIA GC Property Address: Somewhere, FL ID No: 2015000 Date: 12/31/2015 DISCLAIMER THIS REPORT IS VALID FOR THIRTY (30) DAYS FROM INSPECTION DATE. This report depicts our findings during the process of a limited, non-invasive examination of the condition of a property. recognizes that the individual(s) performing this inspection, have the training and experience to perform such examination. We do not guarantee future condition, efficiency or life expectancy of systems or components. All information contained on this report is to be taken as an informative condition and our opinion of the systems readily accessible during the inspection process. is a Licensed General Contractor in the State of Florida and conducts this process as such. Usually included in our reports are the current conditions of roof, crawl space, structure, HVAC, plumbing, electrical systems and interior and exterior finishes; unless otherwise noted or specifically requested by our client. This inspection is not technically exhaustive and does not imply that every defect will be discovered. POOL INSPECTION: If applicable, a limited visual examination of the pool components will be performed. MAY YOU REQUIRE A POOL INSPECTION CERTIFICATE, WE RECOMMEND TO HIRE A CERTIFIED POOL OPERATOR (CPO). WOOD DESTROYING ORGANISM INSPECTION: Wood destroying organism related damage; if visible will be included with photographs in our report and a WDO certificate must be obatined from a Certified Pest Control Operator (CPCO) MOLD INSPECTION: MOLD SAMPLINGS ARE NOT PART OF THIS REPORT. THERE IS NO STATE OR FEDERAL STANDARD THAT DEFINES WHAT CONSTITUTES A HIGH OR LOW LEVEL OF MOLD. VISIT http://www.epa.gov/mold/ FOR FEDERAL GOVERNMENT RELEASED INFORMATION ABOUT MOLD. Ten Things You Should Know About Mold: 1. Potential health effects and symptoms associated with mold exposures include allergic reactions, asthma, and other respiratory complaints. 2. There is no practical way to eliminate all mold and mold spores in the indoor environment; the way to control indoor mold growth is to control moisture. 3. If mold is a problem in your home or school, you must clean up the mold and eliminate sources of moisture. 4. Fix the source of the water problem or leak to prevent mold growth. 5. Reduce indoor humidity (to 30-60%) to decrease mold growth by: venting bathrooms, dryers, and other moisture-generating sources to the outside; using air conditioners and de-humidifiers; increasing ventilation; and using exhaust fans whenever cooking, dishwashing, and cleaning. 6. Clean and dry any damp or wet building materials and furnishings within 24-48 hours to prevent mold growth. 7. Clean mold off hard surfaces with water and detergent, and dry completely. Absorbent materials such as ceiling tiles, that are moldy, may need to be replaced. 8. Prevent condensation: Reduce the potential for condensation on cold surfaces (i.e., windows, piping, exterior walls, roof, or floors) by adding insulation. 9. In areas where there is a perpetual moisture problem, do not install carpeting (i.e., by drinking fountains, by classroom sinks, or on concrete floors with leaks or frequent condensation). 10. Molds can be found almost anywhere; they can grow on virtually any substance, providing moisture is present. There are molds that can grow on wood, paper, carpet, and foods. Source: http://www.epa.gov/mold/moldresources.html#ten_things 2640 Hollywood Blvd Suite 200, Hollywood FL - 33020 Page 2 of 108

Client's Name: Property Address: GAIA GC Somewhere, FL ID No: 2015000 Date: 12/31/2015 DISCLAIMER THIS REPORT IS VALID FOR THIRTY (30) DAYS FROM INSPECTION DATE. DEFECTIVE CHINESE DRYWALL INSPECTION: Inspections involving Defective Chinese Drywall are performed following publicized data by Florida Department of Health -Case Definition (12-18-09) for Drywall Associated Corrosion in Residences- More information and guidance can be found at: http://www.doh.state.fl.us/environment/community/indoor-air/casedefinition.html#2 makes no assumptions on this subject but follows the Florida Department of Health criterias for inspection on suspected homes with defective chinese drywall Criteria 1. Citerias 2 and 3 are not part of the procedures to conduct this inspection and can only be done by writing request by the home owner or property owner, understanding the need for sampling and invasive/destructive analysis of samples involving third party laboratory analysis. Defective Chinese Drywall Inspection will be performed upon request and not as part of the scope of work of the inspection. ASBESTOS AND LEAD BASE PAINT INSPECTIONS OR ASSESSMENTS: ASBESTOS AND LEAD BASED PAINT Inspection will be performed upon request and not as part of the scope of work of the inspection. 2640 Hollywood Blvd Suite 200, Hollywood FL - 33020 Page 3 of 108

Attachment to Inspection: ESTIMATED COST OF REPAIRS 2476 SF Property Address: Somewhere, FL 4.00 Bed Contact: GAIA GC 3.00 Bath Item Description Qty. Code Unit Price Total ROOF 1 REPAIRS / REPLACE TYPE: 2476 1.00 8.00 $19,808 ROOF 2 REPAIRS / REPLACE TYPE: 0 1.00 6.00 $0 WINDOWS FBC EQUIVALENT 2010 REPLACE 13 1.00 600.00 $7,800 SLIDING GLASS DOORS FBC EQUIVALENT 2010 REPLACE 2 1.00 1800.00 $3,600 DRIVEWAY REPAIRS / REPLACE TYPE: PRESSURE WASH FRONT AND BACK 1 1.00 1000.00 $1,000 CUSTOM EXT. DOOR FBC EQUIVALENT 2010 REPLACE 2 1.00 700.00 $1,400 REGULAR EXT. DOOR FBC EQUIVALENT 2010 REPLACE 1 1.00 750.00 $750 GARAGE DOOR FBC EQUIVALENT 2010 REPLACE 1 120.00 25.00 $3,000 HVAC EQUIPMENT REPAIRS / REPLACE TONS: 3 1/2 1 1.00 7500.00 $7,500 HVAC DUCTWORK REPAIRS / REPLACE: 1 1.00 800.00 $800 STRUCTURAL 1 N/A 0 1.00 0.00 $0 STRUCTURAL 2 N/A 0 1.00 0.00 $0 ILLEGAL WORK ALLOWANCE FOR LEGALIZATION 0 1.00 0.00 $0 EXTERIOR PAINT PRESSURE CLEAN AND PAINT 2476 0.75 1.60 $2,971 EXTERIOR WALL REPAIRS TO SURFACE: STUCCO REPAIRS 1 1.00 1800.00 $1,800 DRYWALL CEILING REPAIRS / REPLACE 200 1.00 15.00 $3,000 DRYWALL WALLS REPAIRS / REPLACE 100 1.00 15.00 $1,500 DRYWALL OTHER 0 1.00 15.00 $0 INTERIOR PAINT PRIME AND PAINT 2476 1.00 1.90 $4,704 KITCHEN REPLACE CABINETRY / EXISTING LAYOUT 0 1.00 155.00 $0 KITCHEN REPLACE COUNTERTOPS / EXISTING LAYOUT 0 1.00 65.00 $0 APPLIANCES ALLOWANCE FOR REPLACEMENT 1 1.00 3000.00 $3,000 INTERIOR DOORS BEDROOMS AND BATHROOMS DOORS 8 1.00 250.00 $2,000 INTERIOR DOORS CLOSET DOORS 12 1.00 200.00 $2,400 BATHROOMS MINIMUM ALLOWANCE / FULL UPDATE 3 1.00 7000.00 $21,000 ELECTRICAL FULL UPGRADE OF ELECTRICAL SYSTEM 1 1.00 7500.00 $7,500 ELECTRICAL NEW GFCIS 5 1.00 300.00 $1,500 ELECTRICAL OTHER 0 1.00 0.00 $0 ELECTRICAL OTHER 0 1.00 0.00 $0 FLOORING REPLACE FLOORING APPROX SF: 2228 1.00 5.00 $11,142 BASEBOARDS REPLACE AFTER NEW FLOORING APP LF: 867 1.00 3.50 $3,033 FASCIA AND SOFFIT REPLACE DAMAGED APPROX: 0 1.00 50.00 $0 STORM SHUTTERS INSTALLATION 0 1.00 0.00 $0 POOL POOL EQUIPMENT 1 1.00 2500.00 $2,500 POOL DIAMOND BRITE REFINISH 1 1.00 4500.00 $4,500 POOL DECK REPAIR OR REPLACE DAMAGED SURFACE 150 1.00 15.00 $2,250 GUTTERS REPAIR OR REPLACE 0 1.00 0.00 $0 PLUMBING NEW WATER HEATER 1 1.00 850.00 $850 PLUMBING HOOK UP KITCHEN SINK 1 1.00 500.00 $500 WOOD DESTROYING ORGANISM WDO TREATMENT 1 1.00 2300.00 $2,300 MISCELANEOUS REPLACE ALL ROTTED WOOD 1 1.00 700.00 $700 MISCELANEOUS REMOVE IRON BARS ON ALL WINDOWS AND DOORS 1 1.00 1000.00 $1,000 INSULATION ATTIC SPACE 0 1.00 0.00 $0 MOLD TREATMENT BIOCIDE TREATMENT 1 1.00 1800.00 $1,800 DEFECTIVE CHINESE DRYWALL N/A 0 1.00 0.00 $0 FENCE REPLACE / REPAIR LINEAR FEET 0 1.00 0.00 $0 LANDSCAPING REMOVE OVERGROWN VEGETATION 1 1.00 1800.00 $1,800 CLEAN UP DUMPSTERS AND DUMPING FEES 5 1.00 650.00 $3,250 Sub Total Construction / repairs $132,658.70 Plans and Permits for a legal remodeling $7,959.52 2640 Hollywood Blvd Suite 200, Hollywood FL - 33020 Page 4 of 108

Contractor overhead and Profit = 10% $13,265.87 TOTAL $153,884.09 NOTES AND ADDITIONAL DETAILS: GENERAL DETAILS ARE PROVIDED BASED ON VISUAL OBSERVATION. CLIENT TO FINALIZE AND APPROVE SCOPE AND MATERIALS. WE RECOMMEND TO HIRE ONLY LICENSED AND INSURED CONTRACTORS WHEN PERFORMING YOUR REPAIRS. CONSULT WITH YOUR LOCAL BUILDING DEPARTMENT AND HOME OWNERS ASSOCIATION (IF APPLICABLE) BEFORE PERFORMING ANY WORK ON YOUR PROPERTY. ALL DESCRIBED WORK IS REQUIRED, CLIENT TO DETERMINE PRIORITIES. 2640 Hollywood Blvd Suite 200, Hollywood FL - 33020 Page 5 of 108

Exterior rehabilitation must include and not limited to: Pressure wash and paint, replace obsolete and failing window system, replace exterior doors, fascia and soffit rotted wood replacement, overgrown vegetation removal, structural repairs required. Refer to attached photographs for details. Page 6 of 108

Driveway requires pressure wash. Page 7 of 108

Driveway requires pressure wash. Page 8 of 108

Exterior rehabilitation must include and not limited to: Pressure wash and paint, replace obsolete and failing window system, replace exterior doors, fascia and soffit rotted wood replacement, overgrown vegetation removal, structural repairs required. Refer to attached photographs for details. Page 9 of 108

Stucco repairs required. Page 10 of 108

Removal of iron bars required to allow for emergency egress. It is recommended a full replacement of windows with impact glass as per current code and avoid the installation of hurricane shutters. Page 11 of 108

Exterior rehabilitation must include and not limited to: Pressure wash and paint, replace obsolete and failing window system, replace exterior doors, fascia and soffit rotted wood replacement, overgrown Page 12 of 108

Exterior door(s) require replacement. Currently beyond possibilities of repair. Page 13 of 108

Removal of iron bars required to allow for emergency egress. Garage doors require replacement, currently corroded and damaged beyond possibilities of repairs. Page 14 of 108

Removal of iron bars required to allow for emergency egress. It is recommended a full replacement of windows with impact glass as per current code and avoid the installation of hurricane shutters. Page 15 of 108

We did perform a limited visual examination of the pool condition. Allowances must be made for re-surfacing. Diamond-brite or similar coating required. Page 16 of 108

We did perform a limited visual examination of the pool condition. Allowances must be made for re-surfacing. Diamond-brite or similar coating required. Page 17 of 108

Pool deck requires structural repairs and resurfacing (concrete). Page 18 of 108

Removal of iron bars required to allow for emergency egress. It is recommended a full replacement of windows with impact glass as per current code and avoid the installation of hurricane shutters. Page 19 of 108

It is recommended a full replacement of windows with impact glass as per current code and avoid the installation of hurricane shutters. Page 20 of 108

Pool deck requires structural repairs and resurfacing (concrete). Page 21 of 108

Allowances must be made for the removal of overgrown vegetation. Page 22 of 108

Allowances must be made for the removal of overgrown vegetation. Page 23 of 108

Both HVAC did not operate during the inspection, allowances must be made for repair or replacement Page 24 of 108

Both HVAC did not operate during the inspection, allowances must be made for repair or replacement Page 25 of 108

Active Beehive requires removal by a trained professional. Page 26 of 108

Allowances must be made for the removal of overgrown vegetation. Page 27 of 108

Pool deck requires structural repairs and resurfacing (concrete). Page 28 of 108

Pool deck requires structural repairs and resurfacing (concrete). Page 29 of 108

Exterior walls require proper waterproofing application in order to avoid water damage caused by fracture of the stucco work. Page 30 of 108

Driveway requires pressure wash. Page 31 of 108

Equipment not tested / not running at the time of inspection. Electrical service unavailable at the time of inspection. Page 32 of 108

Allowances must be made for the removal of overgrown vegetation. Page 33 of 108

Removal of iron bars required to allow for emergency egress. It is recommended a full replacement of windows with impact glass as per current code and avoid the installation of hurricane shutters. Page 34 of 108

Signs of water infiltration due to roof failure noticed. Allowances must be made for roofing and stucco repairs. Page 35 of 108

Signs of water infiltration due to roof failure noticed. Allowances must be made for roofing and stucco repairs. Page 36 of 108

Cracks on vertical planes due to foundation settlement indicating downward and lateral movement. These types of cracks do compromise the ability of the building to function as designed and avoid water intrusion. Structural repair and proper waterproofing treatment are required to avoid further damage to the interior of the building and water infiltration. Signs of water infiltration due to roof failure noticed. Allowances must be made for roofing and stucco repairs. Page 37 of 108

Roof covering has reached the end of its useful life; new roofing is required to be installed on the entire property. Page 38 of 108

Roof covering has reached the end of its useful life; new roofing is required to be installed on the entire property. Page 39 of 108

Roof covering has reached the end of its useful life; new roofing is required to be installed on the entire property. Page 40 of 108

Roof covering has reached the end of its useful life; new roofing is required to be installed on the entire property. Page 41 of 108

Roof covering has reached the end of its useful life; new roofing is required to be installed on the entire property. Page 42 of 108

Rotted wood requires replacement. Page 43 of 108

Rotted wood requires replacement. Page 44 of 108

Rotted wood requires replacement. Page 45 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 46 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 47 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 48 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 49 of 108

Duct work repairs required. Page 50 of 108

A complete upgrade of the electrical system is recommended including and not limited to GFCI s, smoke detectors, replace outlets and switches and make allowances for replacement of interior and exterior light fixtures. Beware that additional grounding will be required inside the property. Page 51 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 52 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 53 of 108

Signs of wood destroying organism related damage were noted during inspection. We recommend to have the property treated against WDO using a certified pest control company. Page 54 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 55 of 108

Kitchen in general good condition. Requires new appliances and proper hookup of kitchen sink. Page 56 of 108

Kitchen in general good condition. Requires new appliances and proper Page 57 of 108

hookup of kitchen sink. Kitchen in general good condition. Requires new appliances and proper hookup of kitchen sink. Page 58 of 108

. GFCI receptacles installation is required at wet areas such as bathrooms and kitchens. Page 59 of 108

GFCI receptacles installation is required at wet areas such as bathrooms and kitchens. Page 60 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 61 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Page 62 of 108

HVAC did not operate during the inspection, allowances must be made for repair or replacement Page 63 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair. Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 64 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair. Drywall repairs required. Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 65 of 108

Signs of wood destroying organism related damage were noted during inspection. We recommend to have the property treated against WDO using a certified pest control company. Page 66 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Drywall repairs required. Page 67 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Drywall repairs required. Page 68 of 108

A complete upgrade of the electrical system is recommended including and not limited to GFCI s, smoke detectors, replace outlets and switches and make allowances for replacement of interior and exterior light fixtures. Beware that additional grounding will be required inside the property. Page 69 of 108

A complete upgrade of the electrical system is recommended including and not limited to GFCI s, smoke detectors, replace outlets and switches and make allowances for replacement of interior and exterior light fixtures. Beware that additional grounding will be required inside the property. Page 70 of 108

Soiled carpet throughout requires replacement. Page 71 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 72 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 73 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Page 74 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 75 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 76 of 108

Soiled carpet throughout requires replacement. Page 77 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 78 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 79 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 80 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 81 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 82 of 108

GFCI receptacles installation is required at wet areas such as bathrooms and kitchens. Page 83 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 84 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 85 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 86 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 87 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Page 88 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 89 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 90 of 108

Soiled carpet throughout requires replacement. Page 91 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 92 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 93 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 94 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 95 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Page 96 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 97 of 108

Allowances must be made for the complete upgrade of finishes in bathroom(s). Page 98 of 108

Mold growth caused by water damage is visible. Do not attempt to remove damaged surfaces related to Mold growth or with signs of mold growth on your own. Hire only licensed and Insured Mold remediation services. Page 99 of 108

HVAC did not operate during the inspection, allowances must be made for repair or replacement Page 100 of 108

A complete upgrade of the electrical system is recommended including and not limited to GFCI s, smoke detectors, replace outlets and switches and make allowances for replacement of interior and exterior light fixtures. Beware that additional grounding will be required inside the property. Page 101 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Drywall repairs required. Page 102 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Drywall repairs required. Page 103 of 108

Signs of water infiltration due to roof failure noticed at the habitable space ceiling; allowances must be made for roofing and ceiling repair Drywall repairs required. Page 104 of 108

Soiled carpet throughout requires replacement. Page 105 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 106 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 107 of 108

A complete rehabilitation of the interior must be done in order to provide move in conditions. Plumbing, electrical and Ac systems require replacement or repairs. Wood destroying organism active in the property. Page 108 of 108