MAY 2011. HardiePipe Concrete Pipes. Installation Guide



Similar documents
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Wastewater Capital Projects Management Standard Construction Specification

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Section SEWER PIPE INSTALLATION AND TESTING

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Pipes and Fittings for Gravity Sewer Mains. SewerMAX

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Section 2100-Trenching and Tunneling

Guide to working on Public Sewers

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

DIVISION 4300 STORM DRAINAGE

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

Proven Strong Smart Fast

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SECTION STORM DRAINAGE SYSTEM

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

Watershed Works Manual

C. Section TESTING LABORATORY SERVICE.

SECTION GRAVITY SANITARY SEWERS

SECTION 1 GENERAL REQUIREMENTS

SECTION POLYVINYL CHLORIDE (PVC) PIPE

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

How to build raised beds page

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

THE METALITH PERIMETER SECURITY SYSTEM INSTALLATION INSTRUCTIONS. Attention

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

PRE INSTALLATION MANUAL

Native InDesign 2890 SaniTite Brochure 1/8" CMYK April 17, 07

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

APPENDIX B. I. Background Information

Lenntech psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503

SECTION EARTH MOVING

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

SECTION NONREINFORCED CONCRETE SEWER PIPE

Division 2 Section Section 02795

SPM FIS B-Net Assembly Instructions. Installation Recommendations. 2009, World Cup Supply, Inc SPM B-Net Assembly/Installation

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

LS 2540 SEWER LATERALS AND INSPECTION TEES

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

WATERPROOFING FOR CONCRETE STRUCTURES

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

Specification Guidelines: Allan Block Modular Retaining Wall Systems

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Contractor s Safe Working Agreement

SECTION STORM DRAIN SYSTEM

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Ultra-Rib PVC Storm Sewer Pipe 8" - 30"

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

Trenching and Excavation Safety

Pipeline Replacement using Relining

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Guidelines for storage and handling BlueScope Steel's products

How To Retaining Wall Guide

TECHNICAL SPECIFICATION

High Strain Dynamic Load Testing of Drilled Shafts

Moving Small Mountains Vesuvius Dam Rehab

Excavation & Trenching Procedure

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Hydraulic Excavators

Chapter. Restoration of Damaged Structures

Owner s Manual Gantry Cranes

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

Photographs: Acceptable, Unacceptable, and Unacceptably Repaired Precast Concrete Products

Minor Cracks in Horizontal Surfaces

ITS specification Jointing chambers and pull pits (ITS-02-02)

The WANZ Guide to Window Installation

SECTION STORM DRAINAGE TABLE OF CONTENTS

Stormwater/Wetland Pond Construction Inspection Checklist

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

METHOD OF STATEMENT FOR STATIC LOADING TEST

IMPACT DAMAGE RESISTANT WALL SYSTEMS

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Transcription:

MAY 0 HardiePipe Concrete Pipes Installation Guide

Contents Introduction. Overview. Scope. More Information Why HardiePipe?. Longer Lengths. Smart. Safe. Durable.5 Lightweight Composition.6 Strong Product Information. Standards. Composition. HardiePipe Rubber Ring Joint. Sizes.5 HardiePipe Fittings safe Working Practices 5. Health & Safety Information 5. Cutting HardiePipe Concrete Pipes 5 5 Storage and Handling 6 5. Avoiding Product Damage 6 5. Pipe Stack Configuration & Mass 6 5. Unloading Requirements 8 5. Storing On-site 9 5.5 General Handling 9 5.6 Lifting 6 Loads on Buried Pipes 6. Types of Loads 6. Force from Backfill Weight 6. Construction Loads 6. Traffic Loads 7 Supporting the Pipe 5 7. Overview 5 7. Type U 6 7. Type H 6 7. Type HS 7 7.5 Compaction 8 7.6 Bedding Factor 8 8 Trench 9 8. Trench Size 9 8. Preparing of the Trench 9 8. Width of the Trench 9 8. Trench Stability 0 8.5 Trench Depth 0 8.6 Groundwater 0 9 Suitable Pipe Support Material 9. Overview 9. Bedding and Haunch 9. Side Zone 9. Overlay 9.5 Backfill 0 Installation 0. Overview 0. Preparation 0. Grade 0. Pipe Laying Sequence 0.5 Joints 0.6 Installing Rubber V Ring 0.7 Applying Lube 0.8 HardieJoin Lubricant 0.9 Joining Lubricated Pipes 0.0 Joint Gap Tolerances 5 0. Splayed Joint Deflection 5 0. Haunch, Side and Overlay Installation 6 0. Compaction Using Flooding Methods 7 0. Optimum Moisture Content for Compaction 7 0.5 Backfill 7 Cutting and Fittings 8. Cutting 8. HardiePipe Fittings 8. Joining a Cut Pipe 8. Making Holes 9.5 Saddles 9.6 Equal Slope Junctions 9.7 Bends 0.8 Connecting to Pits 0 Damage and Repairs. Pipe Cracking. Repairing Pipe Sections. Repairing Punctures. Damaged Ends WARRANTY Note: We value your feedback. For ideas and suggestions please contact us on 800 650 859 or pipes@jameshardie.com.au. MAY 0 HardiePipe INSTALLATION GUIDE

INTRODUCTION Why HardiePipe?. OVERVIEW Thank you for choosing HardiePipe concrete pipes. Today the Smart thinking is towards modern concrete pipe design and construction. At the forefront of this new technology is the groundbreaking range of HardiePipe concrete pipes and fittings. As a result of our ongoing research and development the HardiePipe product range has revolutionised modern construction practices. Light, long, adaptable and strong features enable speed of construction efficiencies that deliver real cost benefits. We hope you enjoy the experience of using HardiePipe concrete pipes, the SMART option.. Scope The purpose of this document is to give you, the skilled pipe layer, a guide to installing HardiePipe into the ground. Our aim is to present this information to you in the clearest and easiest way possible, while presenting all the facts you need to know to get the job done. This manual does not cover material performance, durability, design and other technical aspects. Refer to Section. from more information on these topics. This document is intended for an audience who are already familiar or experienced in pipe laying and hence topics on general safety, setting out, levelling, earthworks, working with trenches, lifting and handling of construction materials - are not covered in this manual although they are relevant to pipe-laying. This knowledge is assumed, or would be acquired through other training and development courses, programs, or literature. Pipe installers should also familiarise themselves with any applicable local government specifications that may affect the particular project. This installation guide refers primarily to the Australian Standard AS/NZS75:007. More information Refer to our HardiePipe Material Properties manual for information about James Hardie, our pipes history, the manufacturing process, physical properties, standards, design life, quality and durability. For detailed product information on all James Hardie concrete pipe products refer to our Product Information Book. The above publications are available at www.jameshardiepipes.com.au For further information you can also Ask James Hardie on 800 659 850 (toll free) or email pipes@jameshardie.com.au. Longer Lengths HardiePipe concrete pipes are manufactured in nominal m lengths, as opposed to the standard.m lengths of steel reinforced concrete pipes. The longer length of HardiePipe concrete pipes reduces the number of laying operations during pipeline installation, which allows faster laying and significant savings. This is demonstrated in a straight 00m run which would require only 5 lengths of HardiePipe concrete pipe instead of 0 lengths of steel reinforced concrete pipe.. Smart Versatile The Smart range of HardiePipe bends, junctions and reducers avoids unnecessary pits saving you time and money. Use our saddle connectors to join smaller pvc pipes directly into HardiePipe wherever you want.. Safe HardiePipe concrete pipes are delivered, stacked and packed in safety crates Store large quantities of pipe in a limited space Easy and quick movement and handling. Durable As HardiePipe concrete pipes do not contain steel, the risk of steel corrosion is not present. The autoclaved chemical structure ensures good resistance to saltwater and acidic soil attack, making it ideal for saltwater or marine applications..5 Lightweight Composition At about half the weight per metre of steel reinforced concrete pipe, the inherent Strong, light and long features of HardiePipe concrete pipes translate to: Easier handling; Cost effective, easy transportation; and Efficient installation.6 Strong HardiePipe concrete pipes meet and exceed the strength capacity required by AS75:007 Design for installation of buried concrete pipes. The impressive long-term capabilities of HardiePipe concrete pipes are attributed in part to their unique deflection capability and its ability to gain extra load capacity by engaging support from the surrounding soil in which it is buried. HardiePipe INSTALLATION GUIDE MAY 0

Product Information. Standards The following standards are applicable to HardiePipe concrete pipes: Design & Installation: AS/NZS75:007 Manufacture: AS9:00 Quality: ISO900:008 Table HardiePipe Dimensions and Mass Nominal Pipe Size DN (mm) 5 Strength Class (AS75) Pipe I.D. (mm) Pipe O.D. (mm) 0 70 7 Pipe Wall Thickness (mm) 0 Pipe Length DN (m) Approx Dry Mass (kg) 96 0 Approx Dry mass (kg/m) 6 For more information relating to fibre reinforced concrete pipe standards refer to HardiePipe Material Properties manual. 00 0 6 8 5 6 0 8 68 5 7. Composition Sand (silica), cement, cellulose reinforcement & proprietary additives. Refer to the HardiePipe Material Properties manual for more details relating to our manufacturing process. 75 50 77 7 9 57 5 59 59 5 7 8 5 96 8 7 08 60 9 5 6 68 77 90. HardiePipe Rubber Ring Joint HardiePipe concrete pipes are manufactured with a unique rubber V ring joint to seal against moisture ingres or egress, See Figure. The standard rubber ring joint enables: 55 600 5 59 606 68 60 678 69 705 0 6 8 6 88 5 68 86 0 57 Easy pipe assembly - low insertion forces mean less effort for equipment and less strain to join pipelines. Flush pipe exterior - the flush exterior through each joint ultimately increases the ease of laying. 675 750 675 75 770 787 70 80 8 89 9 8 56 5 60 556 69 8 68 780 90 9 7 06 57 95 0 HardiePipe Spigot Figure Rubber Ring Joint V ring HardiePipe Socket.5 HardiePipe Fittings There are a variety of fittings and accessories available for use with the HardiePipe concrete pipes, making it one of the most versatile concrete pipes on the market. More information about our products can be found in our Product Information Book and on our website at www.jameshardiepipes.com.au. Sizes HardiePipe concrete pipes are available in the following range of size and class: 5mm in Class & 00-750mm in Class, & Length = m nominal Nominal diameters relate to the sizes listed in AS9. A nominal diameter is a convenient round number reference related to the internal diameter, in millimetres where DN = Nominal Size (mm). MAY 0 HardiePipe INSTALLATION GUIDE

Safe Working Practices. Health & Safety Information WARNING - DO NOT BREATHE DUST AND CUT ONLY IN WELL VENTILATED AREA. James Hardie products contain sand, a source of respirable crystalline silica which is considered by some international authorities to be a cause of cancer from some occupational sources. Breathing excessive amounts of respirable silica dust can also cause a disabling and potentially fatal lung disease called silicosis, and has been linked with other diseases. Some studies suggest smoking may increase these risks. During installation or handling:. Work in outdoor areas with ample ventilation;. Minimise dust when cutting by only using suitable cutting equipment capable of adequately suppressing dust;. Warn others in the immediate area to avoid breathing dust;. Wear a properly fitted, approved dust mask or respirator (e.g. P or P) in accordance with applicable government regulations and manufacturer instructions to further limit respirable silica exposures. During clean-up, use HEPA vacuums or wet clean-up methods - never dry sweep. For further information such as Material Safety Data Sheets, please Ask James Hardie on 800 659 850. FAILURE TO ADHERE TO OUR WARNINGS, MATERIAL SAFETY DATA SHEETS, AND INSTALLATION INSTRUCTIONS MAY LEAD TO SERIOUS PERSONAL INJURY OR DEATH.. Cutting HardiePipe Concrete Pipes From time to time it will be necessary to cut pipes and install fittings. Only use suitable cutting equipment capable of adequately suppressing dust. All power cutting operations should be carried out in an open-air situation or in well ventilated spaces. As there is no steel reinforcement to corrode, no corrosion protection is required to be applied to the cut end. Use appropriate safety precautions when operating saw/blade in accordance with manufacturers recommended practices. Cutting guide:. Mark a cut line on the outside of the pipe.. Make sure pipe is stable before cutting.. Cut length of pipe to the cut line marked.. When cutting a length of pipe, it will be necessary to roll the pipe to get access to the entire circumference. After rolling make sure pipe is stable before resuming cutting. It is recommended pipe be chocked to prevent the pipe rolling during cutting. 5. Proper safety gear must be worn to protect operator in accordance with applicable safety standards and manufacturers recommendations. Note: Refer to section for further cutting recommendations. HardiePipe INSTALLATION GUIDE MAY 0 5

5 Handling and Storage 5. Avoiding Product Damage HardiePipe concrete pipes are supplied in timber crates to facilitate safe and economical transport and to reduce the likelihood of damage during transit. Before attempting to unload HardiePipe concrete pipes, personnel should be aware of the weight to be lifted. The mass of pipes is given in Table. Careless handling can damage pipes and couplings. They should not be dropped or thrown to the ground and severe impact with other pipes or objects should be avoided. Pipes should be unloaded using a crane and a suitable spreader and lifting bars or a forklift with slippers supporting the full width of the crate. Wire slings must be kept clear of pipes. The timber crating is solely for packing purposes and should never be used for lifting. 5. Pipe Stack Configuration & Mass HardiePipe concrete pipes are delivered in safety crates for secure transportation and site storage. Pipes are packed in rows onto timber gluts. Crates are made up of either one or two rows tied together with metal strapping. A stack is made up of a certain number of crates depending on the pipe size. The diagram in Figure helps understand the packaging configuration. Pipe row Pipe stack Pipe crate Figure - Pipe Stack Configuration Example - 00 diameter Class 6 MAY 0 HardiePipe INSTALLATION GUIDE

Table shows the standard packing configuration and masses for all sizes and classes of HardiePipe concrete pipes. Table PIPE STACK CONFIGURATION Product Type Packing Configuration Dimensions Masses Size Class Pipes per Row 5 00 75 50 55 600 675 750 8 8 6 6 6 5 5 5 Rows per Crate Pipes per Crate 6 6 5 5 5 Crates per Stack 5 5 5 Pipes per Semi 9 9 08 08 08 75 75 75 8 8 8 8 8 8 7 7 7 7 7 7 7 7 7 AVG. crate height (m) 0.68 0.7 0.8 0.85 0.88 0.5 0.5 0.55 0.6 0.6 0.6 0.69 0.7 0.7 0.77 0.79 0.8 0.85 0.86 0.90 0.90 0.9 0.95 AVG. stack height (m).7.88.5.55.6.60.68.75..5.56.76.8.8..7.6.55.58.70.70.75.85 AVG. pipe mass (kg) 98 06 8 67 95 6 7 09 60 5 87 5 68 557 69 8 68 780 99 AVG. crate mass* (kg) 586 7 70 79 0 990 075 5 5 55 9 675 96 7 6 899 686 09 8 899 55 77 AVG. stack mass* (kg) 6 6856 50 58 6066 950 575 65 500 580 556 6700 785 0 8 5697 5058 67 7 5697 7065 86 * Mass includes timber packaging Straps or chains over whole stack Additional Straps or chains over bottom crate in each stack Figure - A semi-trailer can hold three full stacks HardiePipe INSTALLATION GUIDE MAY 0 7

5. Unloading Requirements Coordinate delivery and unloading with the construction schedule to avoid re-handling and unnecessary equipment movement. It is the responsibility of the contractor to ensure that HardiePipe concrete pipe delivery trucks have full access to the unloading area. For ease in shipping and offloading, HardiePipe concrete pipes are bundled and banded together in standard quantities and loaded on flatbed trucks. HardiePipe concrete pipes are longer than traditional steel reinforced concrete pipe. It is therefore important to centre the load on your equipment before the pipe is lifted off the truck. Follow the manufacturer s guidelines and safety procedures for the specific piece of equipment used to unload the pipe. Unloading can be undertaken using a suitably load rated Franna crane or similar, which has a load capacity able to carry a stack off the truck. The stack should be kept strapped together if opting to unload by stack. The crane operator should determine the correct sling method to secure the load, however we recommend that the method of lifting chosen should not place excessive forces onto the pipes to avoid damage to the pipe. Do not use timber gluts as lifting points Keep metal straps intact Figure 5 Supporting pipes while unloading If the crane does not have sufficient load carrying capacity to lift a stack, then the stack should be untied by cutting off the metal straps that hold together the individual crates together in the stack. Slings can be used and looped around each end of the crate as shown in Figure 5 and unloaded crate by crate or row by row. Ensure that the straps holding the pipes in the crate together remain intact. Forklifts can also be used as long as the load is spread evenly onto the underside of all pipes. Depending upon equipment, fork extensions may be used if designed to properly support the load of the pipe bundle. Align forks on pipe as recommended and place HardiePipe concrete pipes on level ground as appropriate..m Do not load on timber Figure Unloading of pipes Forklift tynes must be able to support full width of crate on the underside of the pipe. Figure 6 - Unloading by forklift 8 MAY 0 HardiePipe INSTALLATION GUIDE

Notes. HardiePipe concrete pipes are heavy and need to be handled with extreme caution to prevent injury or property damage.. When the contractor is unloading it is their responsibility to do so in a safe manner. All necessary risk assessments, hazard identifications, and safe work methods must be implemented.. It is not recommended to cut the steel bands bundling the pipe together until safely stored on site. However, if it is necessary to cut the bands while on the truck, please take safety precautions to stabilise the pipe on the pallet and the remaining pipe on the truck.. Do not use the timber gluts or beams as lifting points at any time. 5. Contact your local sales representative or Ask James Hardie on 800 659 850 if you are not sure about offloading procedures. 5. Storing On-site HardiePipe concrete pipes should be stored properly on site to prevent unnecessary damage to the pipe and gaskets. Be sure to keep stored gaskets out of direct contact with sunlight to prevent the rubber from experiencing UV damage. Storage area must be a level area with a stable base. HardiePipe concrete pipes should not be stored on sloping ground as shown in Figure 6. Pallets of pipe can usually be stacked up to. metres high provided: Pipe must be aligned in the same direction Pallets must be aligned in the same direction Pallets must be centered on the lower bundle No cantilever pipe or pallets are allowed m PLAN VIEW m All stacks in same direction Up to.m high stack Figure 8 Storage on level ground Timber gluts are in line Timber gluts are not in line Note The above recommendations must be considered in addition to any on-site OH&S requirements applicable to the safe handling and storage of HardiePipe concrete pipes. 5.5 General Handling HardiePipe concrete pipes should be picked up and handled using properly rated rigging equipment capable of lifting appropriate load (refer to Table for pipe masses). Care should be taken to ensure that the pipe ends are not damaged and worker safety is maintained while maneuvering HardiePipe concrete pipes around the jobsite and setting pipes into the trench. Pipe should be carried level to avoid damaging joints. Figure 7 Storage on level ground Figure 9 - Incorrect handling Do not lift through centre of pipe HardiePipe INSTALLATION GUIDE MAY 0 9

Figure 0 - Incorrect handling Do not sling through pipe Good handling practice is based on sound judgment and common sense, keeping in mind regard for safety, health, and the environment. We believe that a skilled pipelayer is the best person to manage the handling of our products around the worksite, but we offer some tips here to encourage best practices: Figure - Unsafe handling Lifting operations should be undertaken by skilled operators using suitable equipment Do not impact the pipe, this may cause damage eg dropping the pipe, bumping into the pipe Protect the pipe from damage in storage, handling or installation Do not create hazards from handling operations for example, having a suspended pipe directly above workers in a trench Find the centre of the pipe by eye until you come to the balance point. Ensure sling is tight around pipe to prevent slipping. Figure - Proper Lifting 0 MAY 0 HardiePipe INSTALLATION GUIDE

5.6 Lifting Locate the true centre of the pipe for lifting and to handle loads safely. Align rigging along centre to ensure stability of pipe during lift. Use appropriate job safety precautions such as a dogman and keep people clear. Use nylon straps for lifting. Figure Rigging of nylon straps Figure - Pipe lifting HardiePipe INSTALLATION GUIDE MAY 0

6 Loads on buried pipes 6. Types of Loads A buried pipeline must be tough enough to withstand all forces that are imposed on it. HardiePipe concrete pipes are strong and made to last. It is however important to appreciate the kind of punishment that buried pipe must withstand. Typically buried pipes are subjected to loads from the selfweight of backfill and pavements, construction loads and long-term traffic loads. See Figures 5-7. Weight of Material Figure 7 - Wheel loads from traffic 6. Force from Backfill Weight This is the force caused by the weight of the material on top of the pipe. The width of the trench is related to the size of the force, with a wider trench causing greater force. It is important not to exceed the width of the pipe trench, otherwise the forces will be more severe than what has been allowed for. Correct Width Wider Trench = MORE SEVERE LOAD Figure 5 - Self-weight of backfill and pavement Figure 8 - Correct trench width Construction loads maybe too heavy. There maybe insufficient cover. These factors are usually most critical. Figure 6 - Construction loads MAY 0 HardiePipe INSTALLATION GUIDE

6. Construction Loads In many cases loads imposed on pipes during construction can exceed those the pipe will experience once in service. This will depend on the type of compaction/construction equipment used on-site, the ground/trench condition, the given depth and cover, etc. When a designer specifies the pipe strength class he/she may not be aware of the type of construction equipment and temporary cover being used by the contractor. It is not uncommon that the actual cover over the pipe during construction will be less than what the final cover once the finished surface levels have been established, see Figure 9. This combined with heavy construction equipment can cause pipe cracking if the construction cover and loads have not been allowed for. The effect of heavy machine wheel loads and shallow cover may induce an extremely severe load onto the pipe and lead to failure. The contractor must take care that they do not run heavy machines over buried pipelines unless they have provided adequate cover over the pipe. The pipeline should be protected by either mounding up soil temporarily over haul roads, or to redirect heavy construction plant to alternative locations, see Figure 0. TIP In some cases it may be necessary to use a stronger pipe (eg Class instead of Class ) to meet construction load requirements. Final cover Construction cover Figure 9 - Design vs construction cover HardiePipe INSTALLATION GUIDE MAY 0

Provide cover over pipe during construction if neccessary, by putting a mound over the pipe Loads are spread out if there is enough cover Heavy concentration of load cover Temporary mound over the pipe Not enough cover Figure 0 - Temporary construction cover James Hardie has a design program available called PipeLoad which can simulate many different loading conditions including various construction equipment. For more information about this software visit www.jameshardiepipes.com.au or Ask James Hardie on 800 659 850. Figure - Traffic loads 6. Traffic Loads Wheel loads from traffic are transferred to the pipe and could pose a potential danger of failure unless the correct amount of cover is provided. The cover provides cushioning for the pipe, and spreads out the force from wheels over a larger area, rather than having it concentrated in one spot, where the effect will be more severe. Shallow cover is considered cover less than 00mm over the crown of the pipe, however adequate cover is dependent on the magnitude of wheel force. Typically heavier wheel loads would require a thicker cover over the pipe. Wheel loads act as concentrated forces onto the pipe when pipe has shallow cover. Cover more than 00mm is required before allowing any traffic load, but the cover thickness may need to be thicker to carry heavier wheel loads. The engineer must be consulted to determine the correct amount of cover. MAY 0 HardiePipe INSTALLATION GUIDE

7 Supporting the Pipe 7. Overview We ve discussed the forces and loads that provide a challenging working environment for a buried pipe. It is therefore imperative that quality support material and installation is provided to withstand these loads. A critical part of ensuring long-term performance comes down to pipe support. In many cases where failure occurs, the reason for the failure is traced back to the pipe support quality. There are main types of pipe support as defined by AS/ NZS75 which are: U Unsupported H Haunch HS Haunch and side Pipe support conditions are a combination of trench foundation, bedding, haunch, side support, overlay and backfill. Figure illustrates the various components of the pipe supports. Figure - Pipe support HardiePipe INSTALLATION GUIDE MAY 0 5

7. Type U Type U support (U - unsupported ) is essentially pipe that is directly placed on top of an excavated foundation floor without any bedding. This could be either soil or rock foundation. Type U supports do not feature any bedding, haunch or side supports, but are filled with ordinary fill all around the pipe. Type U support provides the least amount of support to the pipeline, and generally would only be used in temporary installations or other non-essential uses. Compaction requirements are typically specified by the design engineer. It is typically the cheapest support condition to install and the quickest. Refer to Table for type U support requirements. Table TYPE U SUPPORT Size (mm) Class Width of Trench W (mm) Depth of Embedment D (mm) 5 570 57 50 5 00 66 68 65 596 598 60 75 77 7 79 677 68 689 50 8 89 89 76 769 779 55 89 906 98 8 856 868 600 978 99 005 98 9 955 675 05 070 087 00 00 07 750 0 9 05 07 089 7. Type H Type H support (H - haunch ) provides support to the pipeline by placing a bedding layer on top of the excavated foundation, and also providing support to the pipe s haunch. Type H support is further broken into H and H, where H has a slightly deeper haunch support zone and a slightly higher compaction requirement. Type H supports are the most common forms of pipe support specified by the engineer. Refer to Table for type H support requirements and Clause 7.5 for compaction requirements. Table TYPE H SUPPORT Size (mm) Class Width of Trench W (mm) Depth of Embedment D (mm) Haunch thickness H (mm) H H 5 570 57 50 5 7 7 8 8 00 66 68 65 596 598 60 5 5 5 0 0 06 75 77 7 79 677 68 689 8 9 50 8 89 89 76 769 779 5 5 5 5 56 59 55 89 906 98 8 856 868 59 6 6 78 8 85 600 978 99 005 98 9 955 68 69 7 0 07 675 05 070 087 00 00 07 75 77 79 6 6 750 0 9 05 07 089 80 8 8 7 5

7. Type HS Type HS support (HS - haunch and side ) is a higher level of support given to the pipe, by adding a side support zone in addition to the support in Type H. Type HS support is further broken into HS, HS and HS with specific compaction requirements for each type. Type HS supports is generally used where cover over pipe is quite high in a deep trench, or a high fill embankment. Type HS installations require a high level of quality control on site, and hence, is generally used where there is tight supervision available to ensure that the exacting requirements of the Engineer are met in the quality of workmanship. Refer to Table 5 for type HS support requirements and Clause 7.5 for compaction requirements. Table 5 TYPE HS SUPPORT Size (mm) 5 00 75 50 55 600 675 750 Class Width of Trench W (mm) 570 57 66 68 65 77 7 79 8 89 89 89 906 98 978 99 005 05 070 087 0 9 Depth of Embedment D (mm) 50 5 596 598 60 677 68 689 76 769 779 8 856 868 98 9 955 00 00 07 05 07 089 Haunch thickness H (mm) HS HS & HS 7 7 5 5 5 5 5 5 59 6 6 68 69 7 75 77 79 80 8 8 8 8 0 0 06 8 9 5 56 59 78 8 85 0 07 6 6 7 5 Side Zone Layer S (mm) HS HS & HS 08 09 8 9 7 7 76 05 08 8 7 7 76 8 0 08 5 9 6 5 55 69 70 7 85 86 88 0 0 06 9 6 8 50 5 57 6 6 68 HardiePipe INSTALLATION GUIDE MAY 0 7

7.5 Compaction Adequate compaction of support material is crucial to the life of the pipeline. Compaction is measured by the Density Index (for non-cohesive materials), or the Standard maximum dry density (for cohesive materials). Table 6 specifies the compaction requirements for support conditions H and HS. There are also no overlay compaction requirements under the Standard, but check the engineer s design for possible compaction requirements that are unique to the project. Table 6 COMPACTION REQUIREMENTS Support Type Bed and Haunch Std Compaction Max Dry Density Density Index Side Support Std Compaction Max Dry Density Density Index H 50% No Side Support in H Do Not 60% H Type HS Use 50% 85% 50% HS Cohesive Soils 60% 90% 60% HS 70% 95% 70% 7.6 Bedding Factor The bedding factor is a measure of the level of support given by the pipe support condition. Each Type of pipe support has a bedding factor assigned, to describe its ability to provide support for the pipe and to share the load imposed on the pipeline. Generally, support conditions with higher bedding factors can withstand more load. The bedding factor, along with effort and supervision, increases in this order U, H, HS, See Table 7. Table 7 BEDDING FACTOR Install Type Bedding Factor (larger figure - more support) U H.5 H HS HS.5 HS The bedding factor affects the overall strength of the pipeline it is important to follow the engineering drawings accurately as the engineer would have designed the pipeline with the bedding support level in mind. 8 MAY 0 HardiePipe INSTALLATION GUIDE

8 Trench 8. Trench Size Care should be taken to ensure that excavation of the trench conforms to any specifications, AS/NZS75, local regulations or other statutory requirements, particularly in regard to benching or shoring. The width and depth of trenches to be excavated will depend on many factors including: Pipe size Type of soil and substrate Application and load (local road, highway, inter-allotment, etc) Pipe invert depth Pipeline direction (whether straight or deflecting around a curve) holes or pockets should be backfilled to ensure that the pipe is supported over the whole length of the barrel. See Figure. As a guide, the bedding material should be spread across the full trench width to a depth of 00mm - 50mm above the highest projection in the trench bottom and compacted to prevent settlement of the pipeline. The trench walls should be firm, to provide effective side support. The trench wall firmness is an important consideration for HS type installations. Refer to Section 7 for trench size requirements for various pipe diameters and support conditions. Trenches should be excavated in accordance with drainage plans and specifications. The pipe designer has specified the pipe strength class based on a maximum trench width at the level of the top of the pipe and the trench depth and/or pipe invert level. The width and depth of the trench nominated must not be exceeded without consulting the designer. Remove and replace soft spots Trench walls firm Trench foundation firm Remove rocks Figure - Trench walls and foundations 8. Width of the Trench The width of the trench has a bearing on the amount of load a pipeline will receive from the weight of materials above it. The design engineer specifies a particular trench width for the pipeline. The installer is to take heed of the design trench width and excavate as close as possible to the design. Typically the available bucket widths will dictate the trench widths, the pipelayer should ensure the bucket used is as close as possible to the required trench width. Figure - Trench excavation 8. Preparing the Trench The trench bottom provides the foundation for the pipeline and therefore should be stable and uniform along the pipeline. Prior to placement of bedding material, in good working conditions, the trench bottom should be made sufficiently even with stones and rocks removed to provide even distribution of the bedding material layer and provide continuous support for the pipes. Depressions left in the trench bottom below the pipe can result in damage to the pipe. When the trench bottom is flat, localised HardiePipe INSTALLATION GUIDE MAY 0 9

TOO WIDE BATTERING MUST START FROM THE TOP OF THE EMBEDMENT ZONE 8.5 Trench Depth The trench depth and/or invert level should be specified by the pipeline designer. As a guide, typical figures for the minimum clear cover above pipes would be: Highways 750mm Other roads 600mm Areas not subjected to wheel loads 50mm Typically trenches deeper than.5m require shoring or battering of trench walls. Battering of walls can only be applied from the top of the overlay layer of the pipeline the trench walls must be vertical and firm to provide pipe support. Trench width in the pipe embedment zone must not be exceeded Figure 5 - Trench width 8. Trench Stability Stable conditions are those where, after excavation, the trench walls remain solid and do not show any signs of collapse or cave-in. Unstable conditions are those where, during or after excavation, the trench walls tend to collapse and cave-in. Under these conditions, in open or unrestricted areas, the top of the trench can be widened until stability is achieved. A smaller trench should then be dug in the bottom of the excavation to contain the pipe as shown. If for any reason trench widths exceed the maximum allowed, provision should be made for additional loading on the pipes. Trench shoring or bracing may be required, but this is to be determined by a suitably qualified engineer or supervisor. 8.6 Groundwater The presence of ground water may affect the trench foundation and side walls by making the material soft. The trench foundation and walls ability to provide a stable base for the pipeline may be adversely affected. The engineer must determine the best way to stabilise the trench in light of groundwater, and ensure that the trench provides adequate support for the bedding and side support layers that the pipeline depends on for its structural integrity. GROUND WATER W W Start D Trench could be too soft. See engineers advice BATTERING Figure 7 - Groundwater D Pipe embedment Start W Batter / Bench to start above the pipe embedment height D BENCHING Figure 6 - Battering and benching 0 MAY 0 HardiePipe INSTALLATION GUIDE

9 Suitable Pipe Support Material 9. Overview There are many types of materials available on the market place that could be used for pipe support. The most common materials are sand, crusher dust and gravel amongst others. Australian Standard AS/NZS75 provides guidance on assessing whether the material you intend to use is suitable for supporting the pipe. Check with the relevant local government authority for applicable specifications in a specific area. Pipe support components consist of: Bedding Haunch Side support Overlay Backfill 9. Overlay The overlay layer is to be at least 50mm thick. It can be made up of ordinary fill, which can be material obtained from excavation of the pipe trench. It is often the case that the size zone material is used for overlay. The overlay is the last layer of the pipe support layers. Note Whilst the Standard allows for 0% of material to be 75-50mm particle size, we recommend that all large rocks be removed from the overlay to prevent damage to the pipe during compaction. 9. Bedding and Haunch Bedding and haunch layers of the pipe support have identical requirements on material properties. The material must be a non-cohesive soil. The particles of the material must not be made of a material that would break down, such as shale. The grading of the material is such that it is a free draining material. The material must pass the particle size distribution shown in Table 8 (from AS/NZS75). Pipe Embedment Backfill Overlay - No rocks larger than 50mm. - Only 0% of material between 75mm-50mm Table 8 BEDDING MATERIAL Sieve Size mm % Weight Passing through Sieve 9.0 00.6 00-50 0.6 90-0 0. 60-0 0.5 5-0 0.075 0-0 9. Side Zone Side zone material must be a non-cohesive soil. The particles of the material must not be made of a material that would break down, such as shale. The material must pass the particle size distribution shown in Table 9 (from AS/NZS75). Figure 8 Overlay material 9.5 Backfill The backfill layer is material that fills up the rest of the trench. There are no specific requirements for backfill for the pipe support itself, but note there may be other requirements such as pavement layers that may apply. The pipelayer is recommended to check with their materials supplier to ensure that material requirements are met. Table 9 BEDDING MATERIAL Sieve Size mm % Weight Passing through Sieve 75.0 00 9.5 00-50.6 00-0 0.6 50-5 0.075 5-0 HardiePipe INSTALLATION GUIDE MAY 0

0 Installation 0. Overview Although laying conditions vary from site to site, the following information is intended as a guide and covers some issues encountered during normal installation of HardiePipe concrete pipes. All construction must comply with the project specific engineering specifications and any relevant regulations and standards. 0. Preparation Pipes are laid after the preparation of the trench and the bedding. The pipelayer should make sure that the pipe is going to be sitting on firm support, meaning there are no soft areas in the trench foundation, and no sharp protruding material anywhere in the bedding, see Section 7 for more information relating to the trench. Bedding must be flat, with appropriate level and grade to achieve fall for the pipeline. Bedding is compacted around the outer thirds of the bedding width, leaving the middle third lightly compacted or not compacted at all. The pipe sits on top of the middle third, and will induce compaction through its own self weight and the weight of other loads. If pipe grade needs to be lowered, remove pipe from the trench and correct the grade. Do not make adjustment in grade by lifting and dropping the pipe, by pushing down on pipe with excavating equipment or by lifting the pipe and packing bedding material beneath the pipe. Any pipe not installed at correct grade should be completely removed, the grade corrected and the pipe re-laid. 0. Pipe Laying Sequence The pipe laying sequence is normally conducted facing upstream, with the spigot (male) end facing down-stream. The spigot (male) ends are pushed into the socket (female) end. Progress FALL Push home 0. Grade Check for proper line and grade. Ensure minimum specified bedding thickness is maintained. If pipe grade needs to be raised, remove the pipe from the trench and regrade full length of bedding. Lifting up pipe and shovelling dirt/bedding material under the pipe will leave voids and is NOT acceptable. Do not use excavation equipment to bring pipe into line with grade, see Figure 9. Male end faces direction of fall Figure 0 - Pipe laying sequence 0.5 Joints HardiePipe joints have an in-wall rebated spigot and socket which is designed to resist water ingress/egress using rubber v rings, see Figure. The joint allows a smooth flush surface on the outside of the joint, which enables you to lay the pipe on a continuous bed, without having to dig recesses in your bedding. The joint also allows for some degree of movement to allow the pipeline some flexibility to withstand some ground movement. Figure 9 - Improper grade alignment MAY 0 HardiePipe INSTALLATION GUIDE

Rubber V-Ring OR Spigot (Male) Socket (Female) V-Ring faces the socket Gasket Goove Figure - HardiePipe V ring joint 0.6 Installing Rubber V Ring Carefully clean all dirt and foreign substances from the jointing surfaces of the spigot end of HardiePipe concrete pipes, including the rubber ring groove. Rubber ring should not be placed on HardiePipe joints until the pipe is ready to be installed. Confirm that rubber ring diameter matches the pipe diameter. Install the rubber ring on spigot end of pipe in the machined groove and orientate in the proper direction as illustrated in Figure. Warning: Be sure that gasket is seated properly in machined gasket groove and free of any soil, twists, or abrasions to ensure proper joint seal is made. 0.7 Applying Lube After the rubber ring is in place, generously apply lube to the HardiePipe socket and spigot as shown in Figure. Be sure to apply a generous amount of lube along the entire surface of the joint surfaces to allow for easy installation. Figure - Applying lube 0.8 HardieJoin Lubricant HardieJoin lubricant is a special compound that consists of a soft soap solution, which facilitates jointing of the HardiePipe rubber ring joint. It is essential that HardieJoin lubricant be used and not oil or grease as these will cause deterioration of the rubber rings. In an emergency, a solution of soap or soap powder and water can be used as a jointing compound. Table 0 identifies the number of pipes which can be jointed per litre of HardieJoin lubricant. TABLE 0 HARDIEJOIN LUBRICANT USAGE CHART Pipes Joined Per Litre Of HardieJoin Lubricant Pipe Size mm Joints per Litre Metres per Litre 5 9 80 00 60 75 8 50 9 0 55 8 6 600 7 675 5 750 0 Application of the jointing lubricant can be done manually or using a brush. NOTE Do not use petroleum based lubricants ie grease is not allowed. HardiePipe INSTALLATION GUIDE MAY 0

0.9 Joining Lubricated Pipes Join pipe by inserting the spigot into the socket end at as small of an angle as possible. By doing this you prevent rolling of gasket. Push pipe home using standard wooden block and lever techniques as shown in Figure. For larger diameter pipes it may be necessary to use machine assistance. In all cases take care not to damage the pipe end, see Figure. Leaverage Push home Figure 5 - Do not use excavator to push pipe home Piece of timber to protect the pipe edge while levering Figure - Pushing home using block and lever Assistance from machine 5º Be careful not to damage the pipe Figure - Pushing home using machine assistance Do not use excavation equipment to push pipe sections together. This can damage the pipe, see Figure 5. MAY 0 HardiePipe INSTALLATION GUIDE

0.0 Joint Gap Tolerances It is recommended that when joining HardiePipe concrete pipes the pipes are pushed fully home so that no gaps are visible on the outside of the pipe. The design of the HardiePipe joint leaves a nominal mm finished gap on the inside of the pipe even when the pipe is pushed fully home, see Figure 6. max. joint gap Positive seal max. deflection at pipe end Spigot Socket max. radius of curvature Figure 7 Rubber V-Ring Figure 6 - Gaps in joints mm nom. gap In some circumstances however gaps may be unavoidable eg pipes installed on a slight curve. Table specifies the maximum allowable joint gap required to ensure an effective joint seal. 0. SPLAYED Joint DEFLECTION In some circumstances, a slight deflection may be desirable when pipes are installed on a curved alignment. Table specifies the maximum allowable deflection and subsequent curve radius allowable to maintain an effective joint seal. TABLE JOINT DEFLECTION - M PIPE LENGTH Pipe Diameter Max. Deflection Angle (degrees) Max. Joint Gap (mm) Max. Deflection at Pipe End (mm) Max. Radius of Curvature (m) 5.0 5 06 76 00.0 8 75.5 0 5 50.5 0 5 55.0 0 70 8 600.0 70 8 675.0 70 8 750.0 70 8 HardiePipe INSTALLATION GUIDE MAY 0 5

0. Haunch, Side and Overlay Installation Compaction requirements and suitable materials for haunch, side and overlay is covered in Sections 7 & 9 respectively. Material is placed on both sides making sure that the height of the material is kept equal on both sides of the pipe to avoid the pipe moving about during installation. These materials must be placed in thin layers (typically 50mm each layer as per the engineering specifications) and compacted using suitable compaction equipment. Typical compaction equipment include tampers, vibrating plates, wacker packers and trench rollers as shown in Figures 7-0. Figure 8 - Vibrating plate Figure 7 - Tamping bar Figure 9 - Wacker packer 6 MAY 0 HardiePipe INSTALLATION GUIDE

0. Compaction Using Flooding Method Flooding with water is a method that is sometimes used to compact materials such as sand. However this only achieves approximately 0% density index, and does not achieve bedding, haunch and side zone compaction levels that are required. Flooding with water could be used for the overlay and backfill layers, provided that the trench and supporting material can drain away the water quickly. 0. Optimum Moisture Content for Compaction The best compaction occurs at the optimum moisture content for the particular material. A suitable qualified engineer can advise on this. A balance must be found between either being too dry or over saturated to find this optimum moisture content. Figure 0 - Trench roller compactor Ensure there are no gaps or voids in the support. Gaps typically appear near the pipe and pit connection, in the haunch, or sometimes occur where the bedding has not been graded properly, see Figure. 0.5 Backfill The remaining backfill material should be placed and compacted over the pipe in accordance with project plans and specifications. To insure that the pipe does not move when installing the next section of pipe, uniformly place and compact backfill on each side of the pipe to the specified density to prevent lateral displacement of pipe. NO VOIDS KEEP LAYERS EVEN COMPACT IN 50MM LAYERS Bedding, haunch and side supports placed and compacted. Place backfill material Compact backfull according to engineer s instructions Figure - Proper pipe support You should also ensure that you achieve the required compaction levels in the supports, and use suitable material for each component. Compaction is discussed in Section 7. Also, refer to Section 9 for pipe support material requirements. Note Whilst the Standard allows for 0% of material to be 75-50mm particle size, we recommend that all large rocks be removed from the overlay to prevent damage to the pipe during compaction. Figure Backfilling Avoid running heavy construction equipment over the pipes until a sufficient cushion of material has been placed. Since HardiePipe concrete pipes are manufactured to achieve high initial ultimate crush strength compared with the long term design load, HardiePipe concrete pipes perform well under construction loads of this type. HardiePipe INSTALLATION GUIDE MAY 0 7

Cutting and Fittings. Cutting From time to time it will be necessary to cut pipes and install fittings. Refer to Section for safe working methods. Use appropriate safety precautions when operating saw/blade in accordance with manufacturers recommended practices. Cutting guide:. Mark a cut line on the outside of the pipe.. Make sure pipe is stable before cutting.. Cut length of pipe to the cut line marked.. When cutting a length of pipe, it will be necessary to roll the pipe to get access to the entire circumference. After rolling make sure pipe is stable before resuming cutting. It is recommended pipe be chocked to prevent the pipe rolling during cutting. 5. Proper safety gear must be worn to protect operator in accordance with applicable safety standards and manufacturers recommendations. As there is no steel reinforcement to corrode, no corrosion protection is required to be applied to the cut end. When joining using unturned coupling follow these steps:. cut mating ends square.. roll on O ring onto the outside of the pipe, roll up and down a couple of times to get all kinks out of the ring.. align the ring close to the end of the pipe.. Push the coupling on to the pipe, ensuring the ring rolls on. Note DO NOT APPLY LUBRICANT when joining with the Unturned coupling.. Cut end square. Roll on O-Ring. HardiePipe Fittings HardiePipe concrete pipes have the unique benefit of being able to connect branches to the pipeline. This allows installers to custom align PVC connections, or align other drainage branches by making a hole in HardiePipe and using the assortment of saddles, tees and junctions available from James Hardie. Bends and reducers are also available. For detailed product information about HardiePipe fittings refer to the Product Information Book available at www.jameshardiepipes.com.au.. Push on U.C. Figure - Joining with unturned couplings Do not use HardieJoin for U.C.. Joining a Cut Pipe Unturned Couplings are used with HardiePipe concrete pipes in underground applications to enable two cut pipe ends to be joined. Unturned HardiePipe Unturned HardiePipe O ring Unturned Coupling O ring Figure - Unturned Couplings 8 MAY 0 HardiePipe INSTALLATION GUIDE

. Making Holes Holes can be made within the Overlay zone of the pipe. Holes are to be formed using clean cuts by using a circular drill, or a suitable wet saw with straight cuts as shown in Figure 5. Overlay Penetrating holes should be located in the overlay zone Pipe Support Figure 7 - Saddle connection cross section Figure 5 - Hole forming.6 Equal Slope Junctions Equal saddles slope junctions enable branch connection as shown in Figure 8..5 Saddles HardiePipe saddles are used to provide connections without the need to install a pit structure. Saddles are epoxy glued over an already formed hole as shown in Figures 6 and 7. Once installed a branch drainage line can then be connected to the saddle connection. Expoxy adhesive applied to underside of saddle Saddle Figure 8 - Slope junction Figure 6 - Saddle installation HardiePipe INSTALLATION GUIDE MAY 0 9

.7 Bends HardiePipe bends enable change of direction with the need to install a pit structure. Bends are available in 5 0 & 88 0 angles, See Figure 9. Pit Grout or flexible mastic Closed cell foam eg. ABLEFLEX UC Coupling Short length of pipe a.k.a stub or rocker pipe Normal lengths Figure 50 Flexible pit junction Figure 9 Bends.8 Connecting to Pits Pipes connected to pits should be designed to accommodate differential movement between pipes and pits. It is recommended that a short pipe or rocker pipe is used in this situation. The end of the pipe joining to the pit should be cut square and aligned with the inside wall of the pit. Figure 50 shows the typical configuration. The outside diameters of HardiePipe concrete pipes are generally smaller than the same size and class steel reinforced concrete pipe. Refer to Table of this manual for pipe OD dimensions. Ensure that you take this into account when ordering pits. Suitable grout composition to fill gaps, can be a sand:cement mortar, or a flexible adhesive mastic. A closed cell foam of 0mm thick is placed on the outside of the pipe and then the gap filled with mortar or mastic. Generally the short pipe length nominated is the maximum length, there is a degree of customisation allowable to ensure that your pipeline fits between the pit distances. It is common to find cracks in pipe near the pit and pipe joint due to differential settlement and voids in bedding between the pit and pipe. The installer can custom cut short lengths of HardiePipe and connect to adjacent pipe lengths using the unturned coupling. See Clause. for information about joining a cut pipe. 0 MAY 0 HardiePipe INSTALLATION GUIDE

Damage and Repairs. Pipe Cracking Cracking of concrete pipe is an industry issue which everyone wants to avoid. There are many factors which affect the performance of a pipe when installed including, but not limited to; quality of pipe material, ground conditions, pipe support material, compaction, proper installation, construction loading, etc. Common causes of pipe cracking are overloading (during construction or in service) and lack of adequate pipe supporting. The most common types of cracks observed are as follows: Circumferential cracking typically due to inadequate bedding and haunch support, which leads to bending of the pipe. This type of damage can also be caused by unstable trench foundation and walls.. Repairing Pipe Sections Repairing damaged HardiePipe concrete pipes is relatively straight forward as the material does not contain steel reinforcing and is easy to cut when using the right tools. Damaged sections can be cut-out and repaired using rubber repair collars as outlined below: Cut away pipe to sound material using suitable wet saw Insert a length of pipe equivalent to that cut away with the rubber repair collar positioned on the pipe Slide and position the rubber repair collar across the joints and secure with the stainless steel straps, see Figure 5 Circumferential Cracking - Uneven bedding -Voids - Unstable trench floor Figure 5 - Repair section Figure 5 - Circumferential cracking Longitudinal cracking typically due to over-loading of the pipe. Overload occurs when an extremely heavy wheel load is imposed or where there is not enough cover over the pipe. Longitudinal Cracking Figure 5 - Longitudinal cracking - Overload - Not enough cover. Repairing PUNCTURES The Saddle repair method can be used to fix pipe damage at isolated spots. Before attempting to use this repair method, it is important to consider the size and location of the hold in the pipe. The puncture should sit in the overlay zone, i.e. above the haunch or side zone material, and as a guide should be no larger than 0% of the pipe circumference. For example, a 00mm size hole could be repaired in a 50mm diameter pipe but not in a 75mm diameter pipe. The saddle repair is conducted as outlined below:. Cut away material back to firm substrate as shown in Figure 5.. Measure the size of the cut hole.. Using a section from the next pipe size up, cut a saddle piece large enough to cover the hole by at least 00mm all around.. Ensure all surfaces to be bonded are free from dust, grime and are dry. 5. Mix and apply a liberal amount of two part construction epoxy around the edge of the hole in the pipe. 6. Position the saddle over the hole and ensure there is a seal formed by the epoxy between the pipe and the saddle piece, see figure 55. HardiePipe INSTALLATION GUIDE MAY 0

cut Cut off damaged end Figure 5 - SADDLE repair step 00mm min. Saddle piece Epoxy adhesive Plug Figure 56 - Damaged end Completed repair Figure 55 - SADDLE repair step. Damaged Ends Damaged joints and ends should be cut off to leave a square end, see Figure 56. Cut pipe sections can be joined using unturned coupling as shown in Section.. Cut ends can also be used as a piece connecting into or out-of pit structures. MAY 0 HardiePipe INSTALLATION GUIDE

Warranty James Hardie Australia Pty Limited ( James Hardie ) warrants to the first purchaser of the product and the last purchaser prior to installation of the product for a period of 0 years from the date of purchase that the HardiePipe concrete pipe (the Product ), will be free from defects due to defective factory workmanship or materials and, subject to compliance with the conditions below, will be resistant to cracking, rotting, fire and damage from termite attacks to the extent set out in James Hardie s relevant published literature current at the time of installation. James Hardie warrants for a period of months from the date of purchase that the accessories supplied by James Hardie will be free from defects due to defective factory workmanship or materials. Nothing in this document shall exclude or modify any legal rights a customer may have under the Trade Practices Act or otherwise which cannot be excluded or modified at law. CONDITIONS OF WARRANTY The warranty is strictly subject to the following conditions: a) James Hardie will not be liable for breach of warranty unless the claimant provides proof of purchase and makes a written claim either within 0 days after the defect would have become reasonably apparent or, if the defect was reasonably apparent prior to installation, then the claim must be made prior to installation; efflorescence or performance of paint/coatings applied to the Product, normal wear and tear, growth of mould, mildew, fungi, bacteria, or any organism on any Product surface or Product (whether on the exposed or unexposed surfaces); g) all warranties, conditions, liabilities and obligations other than those specified in this warranty are excluded to the fullest extent allowed by law; DISCLAIMER The recommendations in James Hardie s literature are based on good building practice, but are not an exhaustive statement of all relevant information and are subject to conditions (c), (d), (f) and (g) above. Further, as the successful performance of the relevant system depends on numerous factors outside the control of James Hardie (eg quality of workmanship and design) James Hardie shall not be liable for the recommendations in that literature and the performance of the relevant system, including its suitability for any purpose or ability to satisfy the relevant provisions of AS/NZS75 or other relevant regulations and standards. b) this warranty is not transferable; c) the Product must be installed and maintained strictly in accordance with the relevant James Hardie literature current at the time of installation and must be installed in conjunction with the components or products specified in the literature. To obtain copies of such literature contact Ask James Hardie on 800 659 850. Further, all other products, are to be used in conjunction with the Product must be applied or installed and maintained strictly in accordance with the relevant manufacturer s instructions and good trade practice; d) the project must be designed and constructed in strict compliance with all relevant provisions of the current AS/ NZS75 and all other relevant regulations and standards; e) the claimant s sole remedy for breach of warranty is (at James Hardie s option) that James Hardie will either supply replacement product, rectify the affected product or pay for the cost of the replacement or rectification of the affected product; f) James Hardie will not be liable for any losses or damages (whether direct or indirect) including property damage or personal injury, consequential loss, economic loss or loss of profits, arising in contract or negligence or howsoever arising. Without limiting the foregoing James Hardie will not be liable for any claims, damages or defects arising from or in any way attributable to poor workmanship, poor design or detailing, settlement or structural movement and/or movement of materials to which the Product is attached, incorrect design of the structure, acts of God including but not limited to earthquakes, cyclones, floods or other severe weather conditions or unusual climatic conditions, HardiePipe INSTALLATION GUIDE MAY 0

James Hardie Australia Pty Ltd ABN 08 65 558 Copyright MAY 0 James Hardie Australia Pty Ltd ABN 08 65 558 and Denotes a Trademark or registered mark owned by james hardie TECHNOLOGY LIMITED.