Tender Evaluation Summary and conclusions



Similar documents
Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV)

Gas pricing and network access

NSW OFFSHORE AND SPECIAL CABLES. Cables for the future, delivered today.

Fault location on power cables. Fault location on power cables

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

Cyber Security for the energy industry

Running a Load Flow Analysis

EEL303: Power Engineering I - Tutorial 4

Cybersecurity in the maritime and offshore industry

Energy efficient operation what matters

Fundamentals of CIM for big data integration and interoperability

Transformers Energy efficient transformer solutions European Minimum Energy Performance Standard (MEPS)

DNVGL-CP-0393 Edition December 2015

RHODE ISLAND SMALL BUSINESS ENERGY EFFICIENCY PROGRAM PRESCRIPTIVE LIGHTING STUDY

Analysing Big Data in ArcGIS

TENNET, NL OFFSHORE WIND FARM TRANSMISSION SYSTEMS

JIP Offshore Leak Detection

Utilising SCADA data to enhance performance monitoring of operating assets: The move to real-time performance management

Cyber Security Health Test

CABLES FOR PHOTOVOLTAIC SOLAR ENERGY INSTALLATIONS FOR CLEAN ENERGY

SmartGrids SRA Summary of Priorities for SmartGrids Research Topics

European Distribution System Operators for Smart Grids

Phase Attribute Identification using GPS Technology

NSW Submarine Power. Cables for the future, delivered today

Energy Storage for Renewable Integration

Creating a Participants Mailing and/or Contact List:

EAMS for Future Grids

We appreciate your feedback

HVDC Light Cables. Submarine and land power cables

12/08/2015. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems. August 2015


ISO 9001:2015 Draft International Standard Overview

A Network Reference Model for Distribution Regulation and Planning: the Spanish Case

Integrated Development and Assessment of New Thermoplastic High Voltage Power Cable Systems

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Closing the Month for Cash Accounting

TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS. What Is Tan δ, Or Tan Delta?

PV GRID. Efficient Grid Integration of European PV: Project Results. Jörg Mayer, Managing Director German Solar Industry Association (BSW-Solar)

Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation

Reporting. Understanding Advanced Reporting Features for Managers

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK

DNVGL-RU-0050 Edition October 2014

STANDARD. Maritime training providers DNVGL-ST-0029: DNV GL AS

D 6.4 and D7.4 Draft topics of EEGI Implementation Plan Revision: Definitive

New Solutions for Cost Challenges in the Oil & Gas Industry

Takfan Machinery and Mould Co Ltd. Plug in Bushing. LV Monoblock. RMU Bushing. 4 Way CT Terminal.

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

A social marketing approach to behaviour change

ScottishPower Distribution Cables & Equipment. Metal Theft

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

Introduction to TTC s Enterprise Risk Management (ERM) Program. TTC Audit and Risk Management Committee

RAM Analyses do we expect too little?

SSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement

NSW Submarine Power. Cables for the future, delivered today.

KNOW YOUR OPTIONS: 230 KV POWER CABLES

Regional Analysis: Latin American Cable Markets

Modular Systems wind portfolio overview Power Collection and Grid Connection products

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL...

Semi-rigid Coaxial Cables

Fuse Selection Method Module 2. Date of the presentation

3 Guidance for Successful Evaluations

Optimising a LNG supply chain and its assets through performance prediction studies

DSL Calculator. 2. Starting the DSL Calculator

Prepared By: Sheilani Binti Shaari Department of Electrical Engineering/PKB

APPLICATION ORIENTED DESIGN OF CABLES

DNVGL-CP-0209 Edition March 2016

Operating the power system while enabling more renewables : which solutions?

What Matters for Successful Integration of Distributed Generation

Section kv Power Cables

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS

3-PHASE LOW VOLTAGE NETWORK LOAD BALANCER : A COST EFFECTIVE SOLUTION TO LINE VOLTAGE VARIATIONS

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

Cost Reduction Potential in the Offshore Grid

LMS User Manual LMS Grade Book NUST LMS

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

LINEA 120 FIXED Colour White = MW Matte White RAL 9016 Colour Black = BL Matte Black RAL 9005 Beam Angle 60 EN60598 / EN62031 / EN62471.

Smart vessel reporting for decreased administrative burden on crew and easier fleet performance monitoring ashore

Using NVivo to Manage Qualitative Data. R e i d Roemmi c h R HS A s s e s s me n t Office A p r i l 6,

The Answer to the 14 Most Frequently Asked Modbus Questions

Beware of Simplistic Voltage Drop Calculations. By Aaron Hesse, PE, Coffman Engineers, Spokane, Washington INTRODUCTION

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS

Magnus Callavik, ABB Power Systems, HVDC, Västerås, Sweden Phone: +46(0)

TECHNICAL DESCRIPTION OF THE DISTRIBUTION SUBSTATION REMOTE MONITORING SYSTEM

DRY TYPE TRANSFORMER

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

Managing risks for lay-up of OSVs and Rigs

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

Guidelines for Creating Reports

Data entry and analysis Evaluation resources from Wilder Research

Sharing Lessons Learned and Good Practice in Offshore Transmission

KNOW YOUR OPTIONS: 69 KV XLPE POWER CABLE

Presentation of the France Transfo factories

Transcription:

ENERGY Tender Evaluation Summary and conclusions Maroeska Boots and Bieuwe Pruiksma August 2015 Commissioned by 1 DNV GL 2014 August 2015 SAFER, SMARTER, GREENER

Occasion of the assignment Current situation Current tendering procedures for power cable projects may be suboptimal, ignoring certain criteria and lacking a long-term perspective, due to rather formal tendering processes. Accounting for these points might lead to different outcomes. Room for improvement Therefore, ECI is looking for a simple evaluation tool to score tendering criteria in power cable projects, with the aim to assess what type of conductor is optimal. The assignment DNV GL prepared a spreadsheet tool distinguishing relevant power cable segments and tender criteria. The tool can be used to score the segments, and the aim is to test the tool with a number of real projects. The overall scoring should result in recommended conductor types per segment. 2

Approach Step 1: What is known First, the available information from relevant previous projects is summarized. Step 2: Tender info Then, general procurement policy and tender procedures with respect to power cables are discussed. This is based on available knowledge and information within DNV GL, and on the feedback of interviews conducted with DNV GL cable experts and with the procurement department of TSO and DNOs. Step 3: Segments & criteria Subsequently, the different power cable segments, criteria and the assigned scores per segment for each criterion are described. An internal workshop with DNV GL power cable experts formed the basis for this. Step 4: Spreadsheet tool Finally, the spreadsheet tool is presented and the results are discussed. 3

Spreadsheet tool - Screenshot The screenshot shows a brief explanation, an input field and the output. For the segment indicated in the input field, the output field gives both the result per criterion and the overall result. In addition, the relative score is given, which is the score divided by the maximum score. The score reflects the performance of copper compared to aluminium. Step Step 1 Step 2 Step 3 Choice Result per criteria Evaluation tool to score criteria in power cable projects Introduction: This tool can be used to see the score on tendering criteria for a certain high-level power cable segment. Both the score per criterion and the total score is presented, where the score is based on a qualitative assessment in terms of positive, neutral or negative for the use of a copper conductor compared to an aluminium conductor. The score is also expressed in relative terms (%), as per criterion a total score could be obtained in the range of -10 to +10 (because of a qualitative score in the range of -2 to +2 times a weight in the range of 1 to 5). Accordingly, the total score for copper compared to aluminium is divided by 60. How to use this tool: To use this tool, input is required with respect to which power cable segment is considered. Accordingly, 3 steps need to be taken (i.e. input) in order to obtain the right result (i.e. output): - In step 1, a choice of the voltage level needs to be made: LV is 1kV, MV is between >1-36kV, and HV is >36-150kV - In step 2, one has to enter whether an onshore or an offshore power cable is considered - In step 3, one can choose whether the main purpose of the power cable is transmission or distribution Important note: For proper functioning of the tool, please be sure to first change the input by clicking the drop-down list of step 1, then of step 2 and finally of step 3. Input Output Score Relative score Transport capacity 5 50% Total cost of ownership -5-50% References 3 30% Workability 0 0% Reliability 0 0% Environmental impact 1 10% Total score 4 7% 4

Results Scores per criterion and power cable segment Power cable segments Voltage level HV, >36kV-150kV MV, >1-36kV LV, 1kV Transmission/distribution Transmission Transmission Distribution Distribution Onshore/offshore Onshore Offshore Onshore Offshore Onshore Onshore Criteria Transport capacity Score 1 1 1 1 1 0 Weight 4 5 3 4 3 1 Result 4 5 3 4 3 0 Total cost of ownership Score -1-1 -1-2 -1-1 Weight 5 5 5 5 5 4 Result -5-5 -5-10 -5-4 References Score 0 1 0 1 0 0 Weight 2 3 1 1 1 2 Result 0 3 0 1 0 0 Workability Score 0 0 1 1 1 0 Weight 3 2 4 4 4 5 Result 0 0 4 4 4 0 Reliability Score 0 0 0 0 0 1 Weight 4 5 5 5 4 2 Result 0 0 0 0 0 2 Environmental impact Score 1 1 1 1 1 1 Weight 1 1 1 1 1 1 Result 1 1 1 1 1 1 Overall result 0 4 3 0 3-1 5

Main results The significance or value of the results is not very high, since overall results per power cable segment only varies between -1.7% to +6.7% (positive sign indicating a preference of copper over aluminium). This implies that the difference in performance between using a copper or an aluminium conductor in tendering processes is not that large. Main results In tendering for power cable, we expect that: At the LV level, the use of an aluminium conductor is beneficial compared to copper, which is mainly due to the higher total cost of ownership for copper. This might be one of the factors explaining the increased use of aluminium conductors at the LV segment for the larger cables (e.g. 4*150mm 2 ). At the MV level, the use of a copper conductor is beneficial for onshore cables compared to the use of an aluminium conductor. This is somewhat surprising, as more and more aluminium conductors are used in this segment. At the HV level, the use of a copper conductor is preferred for offshore cables, while for the onshore cable there is no difference. Copper performs equal or better compared to aluminium for each segment for all criteria, except for total cost of ownership. However, the weight factor contributes to the fact that the overall result (sum over criteria) per power cable segment does not differ that much (from -1 to +4, while the theoretical range is -60 to +60). The order of most important criteria in terms of the weight factor is total cost of ownership, reliability, workability, transport capacity, references and environmental impact. 6

Conclusions Conclusions Given the scoring results on theoretical cases in power cable tendering The use of a copper conductor is slightly preferred for the power cable segments HV offshore and for MV onshore, with about 7% and 5% respective advantage of copper above aluminium. For the MV segment this might be surprising, as more and more aluminium conductors are used in the MV onshore segment, and may require further investigation. For the MV offshore and HV onshore cable segment there is no difference. The use of an aluminium conductor is slightly preferred for the LV power cable segment, although the difference in performance is marginal (2%). This might be one of the factors explaining the increased use of aluminium conductors at the LV segment for the larger cables (e.g. 4*150mm 2 ). However, the use of copper conductors will probably remain preferred for the smaller LV cables and for public lighting. However, such specific cases has not been evaluated in this study. Documentation on finalized real life projects could not be retrieved from the TSOs and DSOs. This would have been useful to compare and test the results of the tool for a certain power cable case. 7