Similar documents
Chicago Public Schools 6 Month Asbestos Surveillance Fall

Appendix 2-A: Asbestos Assessment Summary Table

6% Chrysotile NA White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor

SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

Safeway 691 Berkeley Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.

Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.

Asbestos Management Program

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT AIP 84

Chicago Public Schools 6 Month Asbestos Surveillance Spring

Don Hau, Project Development, 100 Shops Building, th Avenue SE, Minneapolis, MN 55414

Request for Proposals ASBESTOS ABATEMENT SERVICES. Coffeyville Community College 400 W. 11 th Street Coffeyville, KS 67337

Asbestos Procedures. Asbestos Products

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

Asbestos Survey Form (See Instructions)

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

Crawford Inspection Services C.C.B. #

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Saint Cloud Business Center

Environmental Education Associates. Asbestos in Construction

Restoration Specific Asbestos and Lead Based Paint Survey Report Logan Ave Colorado Springs, CO 80909

CONDITION OF QUALITY ITEMS

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES

New Jersey Army National Guard. Environmental Compliance Database

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

CATALOGUE OF ASBESTOS MATERIALS. City of White Rock White Rock Library Buena Vista Avenue White Rock, BC

Management Consultancy Training. Asbestos Materials. Residential Guide

Saxe Middle School Auditorium Renovation February 4, 2015

DF Technical & Consulting Services Ltd Avenue, Edmonton, AB T6B 2N2 Ph: Fax: Toll Free:

How To Perform A Limited Asbestos Survey

1200 N. COLORADO WINSLOW, ARIZONA

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

MURCH ELEMENTARY SCHOOL

ASBESTOS BUILDING INSPECTION

Asbestos Management POLICY

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

BUNKER HILL ELEMENTARY SCHOOL

Bid Tabulation for IFB #9708 (Asbestos and Mold Abatement Services)

ASBESTOS INSPECTION REPORT

UBC Plant Operations Asbestos Work Procedures April 2004

Building Condition Assessment Report

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES HOMEOWNER PROGRAM

Asbestos 2 hr. Awareness

Building Condition Assessment Report

IMPROVEMENT COST ESTIMATE powered by HomeFixers

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

DENTAL CLINIC REMODEL for PORT GAMBLE S'KLALLAM TRIBE ADDENDUM #3

IDENTIFICATION OF ASBESTOS You can t identify asbestos-containing materials with the naked eye. Experienced employees can identify suspected

PRE-DEMOLITION ASBESTOS SURVEY

Asbestos Containing Material MANAGEMENT PLAN

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WorkSafe BC Guidelines Regarding Demolition and Asbestos Waste Materials

DRAPER ELEMENTARY SCHOOL

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

MEMORANDUM. General: Foundation:

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

H2 Opening Statement Asbestos

Survey Report: Asbestos and other Designated Substances. MTO - Regional Office (N00724) 1355 John Counter Blvd., Kingston, Ontario

YOUR COMPANY NAME HERE

Proof of Claim Form for Asbestos Personal Injury

Orlando Home Inspection Services

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Water Leak 1: Intrusion Policy

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

Transcription:

Room ID------- Material ID ASBESTOS Components Positive? Yes, No, Trace, Assumed PISTM-1 White pipe insulation on hot water supply and return throughout building Yes 5-10% CH, 5-15%AM NA NA LF 1400 FLVCT-7 12x12" black floor tiles w/ black mastic in bathroom off exam room in basement Yes 10-20% CH NA NA SF 24 PILAG-15 White woven cotton paper and sheet pipe insulation throughout 2nd & 3rd floors Yes 10-20% CH NA NA LF 250 FLGRIP-17 Black stepgrip on north center stairwell Yes 10-20% CH 10-20% CH 5-15% CH SF 250 RFTAR-21 Roofing tar, felt paper and associated materials Yes 5-10% CH NA NA SF 3400 RFROLL-100 2 Black roofing tar w/ glass & gravel over black tar and paper Yes 3-10% CH NA NA SF 2500 RFROLL-101 3 Black roofing tar w/ glass & gravel under grey slate surface Yes 5-10% CH NA NA SF 9300 CAULK-102 4 Black/brown tar over black tar and jute on annex parapet wall Yes 5-15% CH NA NA SF 160 RFCAULK-103 Green caulk over RFROLL-100 Yes 15-20% CH NA NA LF 15 PAINT-113 Green paint on exterior Yes 2-5% CH NA NA SF 20700 WLSH-5 1 Wallboard w/ joint compound throughout basement Trace <1% CH <1% CH <1% CH SF 13800 WLSH-107 Sheetrock w. joint compound and tape in annex building Trace <1% CH <1% CH <1% CH SF 2500 WLSH-110 Unfinished sheetrock in basement Trace <1% CH <1% CH <1% CH SF 2500 NON-ASBESTOS PAINT-2 Beige peeling paint throughout the sub-basement No ND ND ND SF PNQ WLPL-3 Plaster wall panel attached to concrete at stairwell in sub-basement No ND ND ND SF 18 WLPL-4 Plaster wall w/ paint throughout sub-basement No ND ND ND SF PNQ MASTIC-6 Brown mastic behind fake green ceramic wallboard in treatment, exam and file room in basement No ND ND ND SF 580 FLVCS-8 Black floor sheeting with mastic in treatment room in basement No ND ND ND SF PNQ FLVCS-9 Tan & Red pattern floor sheeting w/ mastic and black felt in treatment room in basement No ND ND ND SF PNQ FLVCS-10 Red floor sheeting w/ mastic (battleship linoleum) throughout building No ND ND ND SF PNQ BBMAS-11 Black baseboard w/ brown mastic in exam room in basement No ND ND ND LF PNQ CLPL-12 Ceiling plaster w/ paint throughout original construction No ND ND ND SF PNQ WLPL-13 Wall plaster w/ textured white paint throughout original construction No ND ND ND SF PNQ CAULK-14 White interior window putty on 1st floor No ND ND ND LF PNQ CAULK-16 White caulk/plaster between battleship linoleum in SE corner of 1st floor No ND ND ND LF 5 FLVCT-18 9x9" yellow vinyl floor tile w/ black mastic in 1st floor lobby No ND ND ND SF 315 FLGRIP-19 Black stepgrip on center stairwell No ND ND ND SF PNQ FLVCT-20 9x9" yellow & red vinyl floor tile w/ mastic in 2nd floor lobby No ND ND ND SF 358 CAULK-22 Exterior window caulking No ND ND ND LF 1100 PAINT-111 Red paint on corrugated metal in annex building No ND ND ND SF PNQ PAINT-112 Green exterior paint on windows and doors No ND ND ND SF PNQ FLVCS-104 Brown linoleum with jute backing over wood on 3rd floor No ND ND ND SF PNQ PUTTY-105 Exterior window glazing/putty No ND ND ND LF PNQ CARMAS-106 Carpet mastic under green carpet No ND ND ND SF PNQ FIREDOORS-AAA Fire doors not present EA FIREHOSES-AAA Fire Hoses not present EA FLOORS-NNN non-suspect floors Not suspect WALLS-NNN non-suspect walls Not suspect CEILING-NNN non-suspect ceilings Not suspect OTHER HAZMATS TUBES Mercury-containing fluorescent tubes PPNQ EA BALLASTS Possible PCB-containing lighting ballasts PPNQ EA THERMOSTATS Mercury-containing thermostat switches PPNQ EA SMOKE DETECTORS Radioisotope smoke detectors PPNQ EA LEAD PAINT Sub-basement paints Yes 0.01 - >5.0 mg/cm 2 PNQ Basement paints Yes 0.06 - >5.0 mg/cm 2 PNQ 1st floor paints Yes 0.06 - >5.0 mg/cm 2 PNQ 2nd floor paints Yes 0.28 - >5.0 mg/cm 2 PNQ Exterior paints Yes 0.04 - >5.0 mg/cm 2 PNQ ARSENIC-CONTAINING PAINT Green paint on exterior windows of original building Yes 1.4-2.1 mg/kg PNQ Green paint on exterior windows of annex building Yes 48-55 mg/kg PNQ CADMIUM-CONTAINING PAINT Green paint on exterior windows of original building Yes 3.3-4.2 mg/kg PNQ Green paint on exterior windows of annex building Yes 49-120 mg/kg PNQ CHROMIUM- CONTAINING PAINT Green paint on exterior windows of original building Yes 950-1100 mg/kg PNQ Green paint on exterior windows of annex building Yes 2500-5800 mg/kg PNQ MERCURY-CONTAINING PAINT Green paint on exterior windows of annex building Yes 0.26 mg/kg PNQ 1 1-3% CH found in joint compound 2 3-10% CH in layer 1 (roofing tar w/ glass and gravel), ND in Layer 2 (black tar and paper) 3 ND in layer 1 (grey slate surface), 5-10% CH in Layer 2 (roofing tar w/ glass and gravel) 4 5-10% CH in layer 1 (black/brown tar), ND in Layer 2 (black tar and jute) NOTE 1: Data extrapolated from limited March 1998 survey report and October 1999 survey report, both prepared by SCA Environmental, Inc. NOTE 2: Information provided in this table was summarized from documentation provided to SCA by the Port of San Francisco. SCA has not verified the accuracy or completeness of the information listed above. SCA makes no warranties or representations that the information contained in this matrix is accurate. The building should be reinspected/surveyed prior to renovation activities to identify all information contained in this matrix is accurate. The building should be reinspected/surveyed prior to renovation activities to identify all hazardous materials and verify the accuracy of the presented data. Notes: ND=none detected NA=not analyzed CH=chrysotile asbestos AM=amosite PNQ=present, but not quantified Sample 1 Sample 2 Sample 3 Units Interior Exterior Annex roof Main building Roof MATERIAL MATRIX REPORT Pier 70-Bldg. 104 Page 9 of 12 Prepared by SCA Environmental, Inc. SCA Project No.: F8983 May 19, 2008