ELECTRICITY DISTRIBUTION INFRASTRUCTURE MASTER DATA GOVERNANCE USING THE MASTERKEY TOOL



Similar documents
Data Governance Best Practice

Incident Reporting & Management

Risk & Hazard Management

IDMS PMSA Infrastructure Project Management Congress, Durban, 16/17 September Greg Evans: Strategic Executive Engineering Unit

Service Definition: MooD Cloud Application Configuration & Evolution

CRM Initial Implementation PROJECT DOCUMENTATION PROJECT INITIATION DOCUMENT PID. Document Description. Version Number 0.1 Release Date Author

Simplifying the audit through innovation

Information Management Advice 39 Developing an Information Asset Register

Cities are the Future. But, modern cities also pose some of the most challenging problems mankind has had to face.

In this Lecture you will Learn: Development Process. Unified Software Development Process. Best Practice

Audit & Inspection Management. Enterprise Cloud Audit & Inspection Management Solution

CAPABILITY MATURITY MODEL & ASSESSMENT

Asset Register Asset Care Plan Developer On Key Analytics Maintenance Manager Planning and Scheduling On Key Interface Tool

SECTION C SCHEDULE A: PROJECT BRIEF PART 1: SCOPE OF SERVICES

Business process, document archiving and workflow, all words when joined together can add significant cost to your business

An Introduction to Customer Relationship Management Software

Integration scenarios, functionalities and processes surrounding the Microsoft Project Server

<workers> Online Claims and Injury Management

ewise TM Project Knowledge Management Solution

Business Enhancement Ltd

Objectives of this presentation

Data ownership within governance: getting it right

Request for Information Integrated Portfolio, Project & Management Information System Technical Assistance Unit RFI: TAU/01

Reduce risk. Reduce cost. Raise performance.

PLANNING AND DEVELOPMENT DEPARTMENT OUTLINE FUNCTIONAL SPECIFICATION FOR A BUSINESS OBJECTS DASHBOARD TOOL MAY 2011

TfNSW Standard Requirements TSR T Technical Management

Best Practices for Data Loading into SAP ERP Systems

4 Adoption of Asset Management Policy and Strategy

BMC Remedyforce Asset Management. Frequently Asked Questions

Phase Attribute Identification using GPS Technology

Asset and Plant Lifecycle Management

!"#$%&&'(#)*+,+#*-#./(0/1#2'3*4,%(5#%(#678'1# /(&#9:/,#;*0#)/(#<*#/=*0,#>:'?# !"#$%&'()%*&

OPERATIONAL DIRECTIVE. Data Stewardship and Custodianship Policy. Superseded By:

What is depotnet? Key features:

Integrating the Marine Enterprise

ONE INTEGRATED PLATFORM FOR ALL YOUR PRINT, SCAN AND DEVICE MANAGEMENT. uniflow canon.com.au/business

Final Audit Report. Audit of the Human Resources Management Information System. December Canada

MANAGING DIGITAL CONTINUITY

Equipment Master Standardization

Windchill PDMLink Curriculum Guide

AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT

Master Data Management Architecture

SAP MRS Multiresource Scheduling Info session Atul Wakankar May 2013

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management

Information Management: A common approach

Frédéric Tardieu, IBITEK Group, details the company s business intelligence tool and how it can be used to help decision-making from the plant up.

Clarity Infrastructure Management helps network operators to plan and document the change to their networks

Lonmin Plc The SAP PM Journey Process Division. Power without control is meaningless. SAP PM without structure and execution suffers a similar fate.

Utilizing KolibriMFG Software System to Schedule and Control Shop Floor

Key Benefits of Microsoft Visual Studio Team System

Fortune 500 Medical Devices Company Addresses Unique Device Identification

Five Steps to Integrate SalesForce.com with 3 rd -Party Systems and Avoid Most Common Mistakes

System Center Configuration Manager

Action/Task Management

DATA QUALITY FRAMEWORK (DQF) GRIFFITH UNIVERSITY. Prepared by Catherine Delahunty and Wendy Marchment, QPS

Office SharePoint Server 2007

Managing explicit knowledge using SharePoint in a collaborative environment: ICIMOD s experience

The overall aim for this project is To improve the way that the University currently manages its research publications data

NSW Data & Information Custodianship Policy. June 2013 v1.0

«COSWIN 7i helps you increase your return on assets while boosting their productivity.»

R a p i d I m p l e m e n tat i o n ARIES ARIES METHODOLOGY OVERVIEW

Data Management Implementation Plan

Windchill PDMLink Curriculum Guide

Delivery Management Guidelines Delivery Process 2 - Project Management

A WAY TO SUCCESSFUL AND STRATEGIC CONTRACT MANAGEMENT

Business Intelligence Maturity In Australia

E LEARNING STRATEGY 1. INTRODUCTION

GRIPS. Global Editing and Information Planning System. STAR Group Your single-source partner for information services & tools

A GUIDE TO IMPLEMENTING SAP BUSINESS ONE

ENTERPRISE CONTENT MANAGEMENT. Trusted by Government Easy to Use Vast Scalability Flexible Deployment Automate Business Processes

Enterprise Information Management

1 Executive Summary Document Structure Business Context... 5

Data Quality Policy. Appendix A. 1. Why do we need a Data Quality Policy? Scope of this Policy Principles of data quality...

Mobile Technology For Tourism

business IT BSG Track Record Business Analysis Version 1.1

SECTION C - GUIDELINE FOR ASSET DATA COLLECTION

LOG AND EVENT MANAGEMENT FOR SECURITY AND COMPLIANCE

Benefits to you. Account & Contact Management. Sales & Quotations Marketing & Campaigns Customer Service & Support Project & Event Management

Holistic Development of Knowledge Management with KMMM

Lead Management User Guide

Attached is the business plan for Transport Services for consideration by OPCC. (Please see attached)

The Sage Evolution Branch Accounting Solution. Uninterrupted Secure Accurate. Branch Accounting 1

Handbook for municipal finance officers Performance management Section J

ERP vs. PLM: What s the Difference?

Accounts Payable Automation 7 Ways Automation Can Reduce Pain Points in Accounts Payable. Ebook

Legalesign Service Definition Electronic signature and contract management service

1. INTRODUCTION PURPOSE OF THE ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT... 3

MASTER DATA THE BACKBONE OF A SUCCESSFUL COMPUTERISED MAINTENANCE MANAGEMENT SYSTEM. KEYWORDS: Master Data, Maintenance, ERP, CMMS, SAP.

Project Document Collaboration

Transcription:

ELECTRICITY DISTRIBUTION INFRASTRUCTURE MASTER DATA GOVERNANCE USING THE MASTERKEY TOOL Author & Presenter: C Plüddemann BSc Mech Eng Master Data Design & Administration City of Cape Town Electricity Distribution 1. Introduction Prudent technical management decision making needs to be based on accurate facts. In a complex, distributed technical asset environment it is impossible to make sound management decisions without knowing exactly what equipment you have, where it is installed, what condition it is in and what its maintenance history is. From a financial perspective, the GRAP17 accounting standard for Property, Plant & Equipment similarly requires the componentisation of assets for financial reporting. This paper aims to explain what master data is, why it is important and how it is being established and maintained with the help of the Masterkey software tool in the City of Cape Town. 2. Background The City of Cape Town is busy with an Enterprise Asset Management improvement initiative, which includes better use of the functionality available in its existing SAP ERP (Enterprise Resources Planning) system. This is being piloted in Electricity Distribution for the City and the initial project phases, focused on the Plant Maintenance part of the asset life cycle, cover master data design, nameplate data collection and corrective maintenance process design. Roll-out to the Maintenance users has commenced. Future phases include preventive maintenance and refurbishment. 3. Critical Success Factors The most critical elements for a successful enterprise asset management improvement project include: A strong business drive to make it work A true, passionate business champion, not just someone appointed to fill the champion role Management support Accurate, trustworthy master data Effective business processes An organisation structure that is aligned with the needs of the business processes and master data management requirements, including dedicated people to manage and support master data User education, buy-in and support Effective software Understanding that data collection, maintenance and refinement is a long term commitment 4. Master Data and Data Governance Master data, which may include reference data, is information that is key to the operation of an organisation and is the primary focus of the IT discipline of Master Data Management (MDM). Data governance is an emerging discipline with an evolving definition. It embodies a convergence of data quality, data management, data policies, business process management, and risk management surrounding the handling of data in an organisation. Through data governance, organisations aim to Page 1 of 10

exercise positive control over the processes and methods used by their data custodians and data stewards to handle data. Data Custodians are responsible for the safe custody, transport and storage of the data as well as implementation of the business rules. In the City, this role is being covered by the IS&T Department s Enterprise Support Centre. Data Stewards are responsible for the actual content and timely capture of master data changes. These can be different people depending on the type of master data. In the City of Cape Town, complex master data governance is being centralised. Examples of such centrally managed master data are reference functional locations, work centres, task lists, measuring points, maintenance plans and materials/bills of material (BOMs). Data Custodian/Steward overlap is inevitable and encouraged during early stages of development in data governance. In the City this straddling role has been formalised as the Master Data Administrator (MDA), and made possible because of the close working relationship between IS&T and Electricity Distribution. In a Plant Maintenance environment, the core master data is the technical object structure (called the functional location structure in SAP). This functional location structure systematically defines and uniquely identifies each maintenance significant item of equipment (i.e. technical object) installed in the field. All equipment specific data (reference master data as well as transactional data) is assigned to this structure and retrieved from it for reporting and analysis. Master data is the foundational backbone for sound, fact based management decision making. If the physical item of equipment in the field is not accurately and uniquely represented in the system by a master data element (called a functional location in SAP), maintenance transactions in the system can t be accumulated against that technical object and hence no maintenance history can be built up for it. The result is that management decision making with regard to that technical object must be based on anecdotal information. The presence of accurate master data in the system also facilitates faster, more consistent processing of transactions such as a) the notification of problems requiring maintenance intervention, b) the planning and execution of work using work orders and c) the confirmation of actual work done, resulting in a complete record of the maintenance intervention in the system. With master data in place in the background, many data fields in the SAP Notification, Work Order and Confirmation transaction screens are automatically populated by virtue of the selection of the correct technical object in the system. Some examples of such automatically populated data fields are the main work centre responsible, the cost centre, the planner group, the plant, the address and the partners. Consistently accurate data upholds system integrity and facilitates data retrieval for analysis and reporting. It is important not to tackle all possible master data elements at once. One should start with the most critical ones first and then add others as required, once the core is established and stable. Don t waste time and resources on unimportant data that will never be used. Examples of Master Data elements are: Functional locations unique alphanumeric strings that uniquely represent the actual physical technical objects installed in the field. Classes groupings of similar types of technical objects to facilitate horizontal reporting irrespective of where in the structure they are located. Characteristics specific attributes or name plate data elements of the technical objects in a class, e.g. transformer might be a class and rated voltage: secondary a characteristic that is relevant to that transformer class. For each individual transformer in that class there would be a specific secondary rated voltage value. See figure 1 in the appendix for further examples of master data. Page 2 of 10

Master data and its governance is important to: Facilitate standardisation of data Facilitate accuracy and completeness of data and system transactions Avoid duplication and have one version of the truth that everyone utilises Control data changes. Limit authorisation to change master data to a small central group of people Execute physical asset management functions such as condition assessment, Failure Mode and Effect Analysis (FMEA), reliability analysis, asset replacement programs, equipment value analysis and application of manufacturers bulletins Answer financial audit queries (GRAP17 statutory requirements) Have a complete, high quality structure to interrogate 5. Masterkey Software For it to be trustworthy, only accurate, uncontaminated data must be uploaded to the ERP system. In addition, this data must be continuously updated and maintained as changes are made to technical objects installed in the field. The master data in the system must accurately reflect the true state of the technical objects in the field in as close to real time as possible. The Masterkey software tool, developed by Martin Aldrich, is being continually enhanced in the City of Cape Town on the journey towards full master data management. Its core function is to stage and validate data to make sure it is pure before being transmitted to the SAP ERP system. Doing this manually would be a near impossible task. Masterkey is a web application running on a MySQL database installed on a central Windows 2008 server and can be accessed from anywhere in the City s network. The data schemas are guided by SAP master data definitions and there is tight integration with SAP via the workflow API (Application Programming Interface). Business rules and definitions as well as rules for data formats are built into the tool and used for validation. In addition to the central web application, there is also a Masterkey local application which is installed on portable devices for the collection of nameplate data off line in the field and subsequent synchronisation to the central database. Masterkey Local is used to maintain the as built configuration in the system by allowing users to build, delete and edit the technical object structure and capture the master data relevant to each technical object in the field. Figures 2 and 3 in the appendix show the master data capturing screens. The field devices currently being used are laptops for the data stewards and ruggedized YUMA hand held tablet PCs for the high volume nameplate data collection contractors. Figure 4 in the appendix shows how the field application, central database and SAP system interface with one another. A prerequisite for utilizing a tool such as Masterkey is that there is suitably skilled capacity embedded in the organisation. Two key roles required are that of data steward and data custodian, as described in section 4. Without these, as well as a close and symbiotic working relationship between the business process owners and the IS&T department, the exercise would be futile. There are two important aspects to having accurate master data. Firstly the initial mass data gathering exercise and secondly the on-going updating of data as changes are made to technical objects in the field. The latter is of fundamental importance and is often overlooked. A data collection exercise cannot just be a once off collection effort to determine what assets an organisation owns. Doing that alone results in accurate data on day one only. Thereafter its accuracy, and hence value to the organisation, decays until is it more of a hindrance than a help. Masterkey facilitates and manages both of these stages in the life of master data. A Take-over / Hand-over process with acknowledgement and approval steps has been developed using workflows in SAP to embed and ensure the accurate updating of master data via Masterkey every time a change is made to a technical object in the field. Page 3 of 10

6. The City of Cape Town s Master Data Journey with Masterkey 6.1 Technical Object Structure The first step was to design the technical object structure. The upper 6 levels of the structure are organisational/geographical and from level 7 down they are technical. This design facilitates both vertical reporting and master data maintenance. At each level there are defined, allowable alphanumeric codes. Figures 5 and 6 in the appendix show part of the structure and some of the allowable codes respectively. The design was developed based on principles in the international KKS (Kraftwerk Kennzeichen System) structuring standard for power generation plants, and is specific to Electricity Distribution. It also caters for extension to multiple Municipalities. Reaching a final structure design involved weekly workshops with the business data stewards, representative managers, master data administrator, EAM consultant and project champion over a period of about six months. The structure definitions have been codified in Masterkey and are used to validate what the data stewards build in the system. Once the design was completed, the data stewards began compiling the actual technical objects on Excel spreadsheet templates, which were validated before being mass uploaded into Masterkey. This was an iterative process with post-validation error reports being made available via web interface for correction by data stewards. Only validated data was uploaded to Masterkey. To date there are over 110 000 functional locations in the system, uniquely representing the Electricity Distribution infrastructure. These functional locations represent mostly medium voltage (MV) technical objects as the more numerous LV technical objects still need to be collected. 6.2 Classes and Characteristics The class structure was designed after the functional location structure and is intended to be expanded to cover all City infrastructure. Initially only the classes relevant to Electricity Distribution technical objects have been identified. Each class has a defined type of functional location that it may be assigned to and this relationship is captured in Masterkey definition tables. Figure 7 in the appendix shows a snapshot of part of the class structure. After the classes were established, design workshops were held to identify the characteristics needed for each class, i.e. what the various name plate data elements were for each type of technical object. Many of the characteristics have a set of possible values which were identified and codified. Masterkey users see these in drop down lists from which they can select values during the data collection process for each technical object in the field. This simplifies data collection and reduces the scope for errors during field collection. Initially the design of the classes and characteristics with possible values was developed in Excel. Thereafter it was captured in an extensive set of tables in Masterkey. To date there are 86 classes specific to Electricity technical objects and 420 characteristics with a total of 195 drop down list selection tables. The development of the classes and characteristics design took approximately 6 months. 6.3 Nameplate Data Capturing A three year nameplate data capturing exercise is currently under way with nine data collectors in the field. Most of the MV technical object nameplate data has been captured, encompassing 950 000 line items of data as at the end of July 2011. The data capturing exercise includes taking photographs of the technical object and its nameplate as well as a visual condition assessment based on the rating scale in PAS 55 (BSI s Specification for the optimised management of physical infrastructure assets). It is anticipated that once LV nameplate data has been collected, a total of 2.5 3.0 million line items of data will have been captured. It was important to design the technical object structure as well as Page 4 of 10

the classes and characteristics before commencement of data collection in order to know exactly what data needed to be collected at each specific technical object in the field and avoid wasted effort. Transfer routines have been developed, which automatically transfer functional locations (representing the technical objects) and certain associated data to the live SAP system once they have been validated in Masterkey. This is already live in SAP and being used. Detailed nameplate data will only be transferred to SAP after completion of the data collection exercise and data purification workshops. All nameplate data collected thus far, as well as condition assessments and technical object photographs, are currently available in real time in Masterkey and can be interrogated and comprehensively reported on. See figures 8 11 in the appendix for examples of some of the reporting available in Masterkey. 7. Conclusions Trustworthy, high quality master data is essential for making good management decisions. Become obsessive about data quality. It takes a significant investment of time and effort to design, establish and continually maintain an organisation s master data, but this must be done. Complete the design for functional locations, classes and characteristics before beginning the nameplate data collection exercise so that it is clear exactly what data must be collected. Dedicated and suitably skilled people must be embedded in the organisation to govern master data. A governance software tool such as Masterkey is required to house the design standards and business rules to simplify staging, validation and reporting of master data. The large volumes of data make it impossible to do this manually. 8. Acknowledgements A hearty acknowledgement is due to the following people for their vision and dedication in making the execution of this project possible: Dr. Les Rencontre Electricity Business Drive and Vision Hugo Mostert Electricity Distribution Champion Peter Lupton-Smith IS&T Enterprise Support Centre Champion Martin Aldrich EAM Consultant and Project Leader Ilan Kotzin Process Design, Master Data Design, Training and User Support Hannes van Zyl Process Design, Master Data Design and Training Page 5 of 10

APPENDIX DIAGRAMS & SCREEN SHOTS Technical Objects Classes & Characteristics Classification Maintenance Items Task Lists Catalogs Partners Maintenance Plans Work Centres Masterkey / SAP Workflow interface Direct update SAP EAM Master Data Fig.1 Examples of master data elements and how they are updated in SAP Fig.2 Masterkey Local technical object data capturing screen Fig.3 Masterkey Local characteristic data capturing screen showing a field with drop down values Page 6 of 10

Fig.4 Relationships between, and functions of Masterkey Local, Masterkey Central and SAP Fig.5 Part of the functional location structure in the Masterkey Central database Page 7 of 10

Fig.6 Sample of allowable codes at various levels of the functional location structure Fig.7 Part of the class structure in Masterkey Central database Page 8 of 10

Fig.8 Masterkey Central report showing characteristics for the class: mini sub with RMU Fig.9 Masterkey Central report showing characteristic (nameplate) data for mini subs with RMU Page 9 of 10

Fig.10 Masterkey Central condition assessment report for PAS 55 rating 6: very poor Fig.11 Masterkey Central condition assessment report photo Page 10 of 10